HomeMy WebLinkAboutNCG160114_Inspection Report_20190819ROY COOPER
Governor
MICHAEL S. REGAN
Secretary
S. DANIEL SMITH
Director
Maymead Materials Inc
Attention: Sean Mackey
Post Office Box 911
Mountain City, Tennessee 37683
NORTH CAROLINA
Environmental QuaUty
August 19, 2019
Subject: Compliance Evaluation Inspection
Permit: NCG160000
Certificate of Coverage: NCG160114
Avery County, North Carolina
Dear Mr. Mackey:
Enclosed please find a copy of the Compliance Evaluation Inspection Report for the
inspection I conducted at the subject facility on August 15, 2019.
The report should be self-explanatory; however, should you have any questions
concerning this report, please do not hesitate to contact me at (828) 296-4500 or by email
at Isaiah.reed@ncdenr.gov.
Sincer
Isaiah 116ed, CPSWqCPSC1,,MS4CECI
Environmental Specialist
Land Quality Section
Enclosure: Inspection Report
rol'fti, North Carolina Department of Environmental Quality I Division of Energy, Mineral and Land Resources
Asheville Regional Office 1 2090 U.S. Highway 70 1 Swannanoa, North Carolina 28778
828.296.4500
Compliance Inspection Report
Permit: NCG160114 Effective: 08/01/19 Expiration: 05/31/24 Owner: Maymead Materials Inc
SOC: Effective: Expiration: Facility: Maymead Materials Inc- Plneola
County: Avery US 221 And NC 181
Region: Asheville
Pineola NC 28662
Contact Person: Sean Mackey Title: Phone:
Directions to Facility:
System Classifications:
Primary ORC:
Secondary ORC(s):
On -Site Representative(s):
Related Permits:
Inspection Date: 08/15/2019
Primary Inspector: Isaiah L Reed
Secondary Inspector(s):
Certification:
Phone:
Entry Time: 01:30PM Exit Time: 02:30PM
Phone: 828-296-4614
Reason for Inspection: Routine Inspection Type: Compliance Evaluation
Permit Inspection Type: Asphalt Paving Mixture Stormwater Discharge COC
Facility Status: ❑ Compliant E Not Compliant
Question Areas:
Storm water
(See attachment summary)
Page 1 of 3
Permit: NCG160114 Owner -Facility: Maymead Materials Inc
Inspection Date: 08/15/2019 Inspection Type : Compliance Evaluation Reason for Visit: Routine
Inspection Summary
On August 15, 2019 this facility was inspected for compliance. I met with Sean Mackey on site. During the inspection, the
following items were noted:
1) The site plan did not have all information required by the NCG160000 General Permit. The permittee is directed to modify
the Site Plan to meet all requirements of the permit.
2) The Stormwater Pollution Prevention Plan did not document and record semi-annual inspections at the facility. the
permittee is directed to immediately revise the facility inspections description in the Stormwater Pollution Prevention Plan to
meet all requirements of the NCG160000 General Permit.
3) The secondary containment at the facility was leaking at the time of the inspection, and the liquid leaking from the
containment had a visible oil sheen. The permittee is directed to immediately invenstigate all secondary containment on site
for leaks and repair them as necessary. All repairs should be documented in the Secondary Containment records in the
Stormwater Pollution Prevention Plan.
4) Secondary containment was not provided for all bulk storage of liquid materials on site. The permittee is directed to
immediately begin installing or designing secondary containment structures for all bulk storage of liquid materials on site.
5) Asphalt waste material was observed at the "asphalt testing area" on site. The permittee is directed to revise the good
housekeeping section of the stormwater pollution prevention plan to address this issue.
This facility will be re -inspected on or after September 24, 2019. If the above items have not been addressed at the time of
the inspection, further action will be taken.
If you have any questions, please contact this office at (828) 296-4614
Page 2 of 3
Permit: NCG160114 Owner -Facility: Maymead Materials Inc
Inspection Date: 08/15/2019 Inspection Type : Compliance Evaluation Reason for Visit: Routine
Stormwater Pollution Prevention Plan
Yes No NA NE
Does the site have a Stormwater Pollution Prevention Plan?
0
❑ ❑
# Does the Plan include a General Location (USGS) map?
0
❑ ❑ ❑
# Does the Plan include a "Narrative Description of Practices'?
0
❑ ❑ ❑
# Does the Plan include a detailed site map including outfall locations and drainage areas?
❑
0 Q ❑
# Does the Plan include a list of significant spills occurring during the past 3 years?
0
❑ ❑ ❑
# Has the facility evaluated feasible alternatives to current practices?
0
❑ ❑ ❑
# Does the facility provide all necessary secondary containment?
❑
0 El El
# Does the Plan include a BMP summary?
❑ ❑
# Does the Plan include a Spill Prevention and Response Plan (SPRP)?
0
❑ ❑ ❑
# Does the Plan include a Preventative Maintenance and Good Housekeeping Plan?
0
❑ ❑ ❑
# Does the facility provide and document Employee Training?
# Does the Plan include a list of Responsible Party(s)?
# Is the Plan reviewed and updated annually?
❑ ❑
# Does the Plan include a Stormwater Facility Inspection Program?
N
❑ ❑ ❑
Has the Stormwater Pollution Prevention Plan been implemented?
11
0 Q
Comment: The Site Plan did not have all required information based on the NCG160000 General Permit
The plan had been reviewed, but was not completely updated.
Secondarvt containment was not provided for all bulk storage of liquid materials on site
Qualitative Monitoring Yes No NA NE
Has the facility conducted its Qualitative Monitoring semi-annually? 0 D ❑ El
Comment:
Analytical Monitoring Yes No NA NE
Has the facility conducted its Analytical monitoring? 0 ❑ ❑ ❑
# Has the facility conducted its Analytical monitoring from Vehicle Maintenance areas? ❑ ❑ On
Comment:
Permit and Outfalls
Yes No NA NE
# Is a copy of the Permit and the Certificate of Coverage available at the site? 0 ❑ ❑ ❑
# Were all outfalls observed during the inspection? 0 ❑ ❑ ❑
# If the facility has representative outfall status, is it properly documented by the Division? ❑ ❑ on
# Has the facility evaluated all illicit (non stormwater) discharges? 0 ❑ ❑ ❑
Comment:
Page 3 of 3