HomeMy WebLinkAbout20220439 Ver 1_Field Site Review_20190814Site Information
Site Information
Date: *
Prepared By:
Meeting Type:*
USACE AID:
8/14/2019
Mac Haupt
Field Site Review
NCDWR ID: 20191028
NCDWR Version 1
Weather:
Coordinates:
Attendees
Project Name:* Juniper Tract
Type of Site:* Bank Stream and Wetland Site
Sponsor/Provider: *Bank Stream and Wetland Site
County:* Brunswick
HUC and Basin:* Cape Fear - 03030005
Degrees North Degrees West
C Priesiozi- LMG, Cory, Rob Moul!!!
COE- Jordan J, Bradley G, Todd T, Kim B
DWR- Erin
WRC- Travis
Project Review Checklist
(provide additional detail in notes section on next page)
...............................................
General Site Issues/Concerns
Tract Drains to 4 different tribs
Have installed some gauges for pre
construction (20 gauges)
Will do updated JD
Some discussion of appropriate wetland
enhancement ratios
Entire tract not in easement, most approx-
500 acres
UT Hickman Branch -started at upper end
Need to watch for proper valley, it may not
just follow ditch line, walked to top of
proposed single thread channel
Visited AWC area- gauge present, wt>3 ft
Then another example wetland R, E, on
south side of large road bend
Lastly looked at top of zero order channel
that will be bisected by power line. Difficult
to say how much headwater above power
line. Probably headwater stream below
power line.
A positive that they gauges out.
Relatively short site visit, Todd had to get
back.
Site was a mix of natural stands and
managed pine.
F Vegetation Composition or
Density
Ir Planted Stem Vigor (due to soil,
browsing)
17 Invasive/Exotic Species
Ir Beaver/Feral Hogs
(management plan)
17 Soil (manipulation, compaction,
fertility)
Ir Livestock Present/Evidence of
Livestock Access
17 Crossings or Utility Lines
Ir BMPs or Alternate Approaches
17 Fencing Issues or Fencing
Needed
Ir Ponds Within Project Area
17 Inappropriate Credit Ratio
Proposed
Ir JD Needed to Confirm
Approach
17 Continuity/Fragmentation
Ir Easement Issues (existing farm,
CE, NRCS funding)
17 Easement Encroachments
(livestock, clearing)
Ir Easement Marking/Signage
17 Insufficient Project Size
Ir Adjacent Property Owner
17 T&E Species
Ir Section 106 (historic
listing/tribal issues)
Stream Issues/Concerns
Wetland Issues/Concerns
17 Incised/Entrenched
'7 Headcuts Present/Forming
17 Stream Structures
Failing/Piping
F- Excess Sediment/Aggradation
17 CrosslSections
Missing/Indicate Problems
Ir Bank Instability/Failure
17 Bench Rills/Erosion
(constructed bench or P2 valley)
Ir Excess Sinuosity (lack of flow)
r Braided/Anabranch Channel
IF- Evidence of Excessive
Hydrology
F- Evidence of Insufficient
Hydrology
r Hydric Soil Indicators/Soil
Series
IF- Surface Roughness or Bedding
Ir Channel Relocation/Riparian
Connectivity
17 Hydroperiod Length or
Start/Stop Date
17 Insufficient Stream Drainage
Area
Ir Insufficient Hydrology (if raising
channel bed)
17 Vegetation in Channel (stream
vs wetland)
17 Flow Obstructions (undersized
pipes, fords)
17 Substrate Concerns
(embeddedness, particle size)
Ir Live Stakes Absent/Failing
17 Evidence of Water Quality
Issues
Ir Inlstream Habitat Weak/Missing
17 Stream Buffer Width Inadequate
Ir Missing Gauge Data
(preconstruction or monitoring)
17 Gauge Location/Placement
Ir Gauge Maintenance
17 Drainage Ditches/Swales
Present
Ir Field Tiles/Subsurface
Drainage
17 Continued Ag Use Adjacent to
Wetland
Page 2 --
Notes and Sketches, etc
Credit Release/Site Closeout Information
(For rnnitoring or closeout review only)
.....................................................................................
Stream Credits
Warm Cool Cold
Requested
Approved*
Wetland Credits
Riparian Riverine Riparian Non-Riverine Non -Riparian Coastal
Requested
Approved*
*the updated credit ledger for the project, which includes this release, rust be approved by the Project IVhnager.
Result of Monitoring Report or Closeout
Credit Release Not Approved
Signature *
Date 8/15/2019