Loading...
HomeMy WebLinkAbout20150334 Ver 1_Certification of Completion_20190715CERTIFICATE OF COMPLETION NCDWR Project No.: DWR# 15-0334 county: /NECKL N 80Z6, Applicant, IVIS, T L/ L F- M C LIE L- 4610 - OiARIO'ITL 1444Tf 2 Project Name: I -A G G A RT C Rff K 0 LF FA u. Date of Issuance of 401 Water Quality Certification: MA%( 131 2014 Certificate of Completion Upon completion of all work approved within the 401 Water Quality Certification or applicable Buffer Rules, and any subsequent modifications, the applicant is required to return this certificate to the 401 Transportation Permitting Unit, North Carolina Division of Water Resources, 1650 Mail Service Center, Raleigh, NC, 27699-1650. This form may be returned to NCDWR by the applicant, the applicant's authorized agent, or the project engineer. It is not necessary to send certificates from all of these. Applicant's Certification I, luliettp I Mrl allanrt , hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials. Signature: Q4a32�z /— Date: 6/11 /2019 enior Project Manager Charlotte Water Agent's Certification 1, hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials. Signature: Engineer's Certffleation Partial �i , Final Date: 1, $RAMO&V 4410r2E f-9 , as a duly registered Professional Engineer in the State of North Carolina, having been authorized to observe (periodically, weekly, full time) the construction of the project for the Permittee hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials. Signature ~ Z A*K4..0 _ 1�i Registration No. 0397&& Date &—/1— ZO 1.9