HomeMy WebLinkAbout201690573 Ver 1_Certification of Completion_20190604C�- 61 / ('t� d 5- /�3
Action ID Number: 2016-00500 County: Wake
Permittee: Town of Cary / Jarrod Buchanan
1v C
Date Verification Issued: August 8, 2016 4CA
b�
Project Manager: Tasha Alexander
Upon completion of the activity authorized by this permit and any mitigation required by the permit, sign this
certification and return it to the following address:
US ARMY CORPS OF ENGINEERS
WILMINGTON DISTRICT
Attn.: CESAW-RG-R
3331 Heritage Trade Drive, Suite 105
Wake Forest, NC 27587
Please note that your permitted activity is subject to a compliance inspection by a U. S. Army Corps of
Engineers representative. Failure to comply with any terms or conditions of this authorization may result in the
Corps suspending, modifying or revoking the authorization and/or issuing a Class I administrative penalty, or
initiating other appropriate legal action.
I hereby certify that the work authorized by the above referenced permit has been completed in accordance with
the terms and condition of the said permit, and required mitigation was completed in accordance with the permit
conditions.
5-1)/ake - PE, Q
Signature of Permittee of '4.7 D to
�jsJfL� /'l%ns/�! '�