Loading...
HomeMy WebLinkAbout201690573 Ver 1_Certification of Completion_20190604C�- 61 / ('t� d 5- /�3 Action ID Number: 2016-00500 County: Wake Permittee: Town of Cary / Jarrod Buchanan 1v C Date Verification Issued: August 8, 2016 4CA b� Project Manager: Tasha Alexander Upon completion of the activity authorized by this permit and any mitigation required by the permit, sign this certification and return it to the following address: US ARMY CORPS OF ENGINEERS WILMINGTON DISTRICT Attn.: CESAW-RG-R 3331 Heritage Trade Drive, Suite 105 Wake Forest, NC 27587 Please note that your permitted activity is subject to a compliance inspection by a U. S. Army Corps of Engineers representative. Failure to comply with any terms or conditions of this authorization may result in the Corps suspending, modifying or revoking the authorization and/or issuing a Class I administrative penalty, or initiating other appropriate legal action. I hereby certify that the work authorized by the above referenced permit has been completed in accordance with the terms and condition of the said permit, and required mitigation was completed in accordance with the permit conditions. 5-1)/ake - PE, Q Signature of Permittee of '4.7 D to �jsJfL� /'l%ns/�! '�