Loading...
HomeMy WebLinkAbout20181027 Ver 1_Certification of Completion_20190604ROY COOPER covomor h9Cl- ML S. BEGAN $Mwwy LINDA CULPEPPER 8zWft D&fttw DWR Project No.: 18-1027 NORTH CARt)UNA amhMmentdQuaft County: Montgomery Applicant: Duke Energy Progress, Inc. Project Name: Swift Island Access Area Shoreline Stabilization Date of Issuance of 401 Water Quality Certification: August 17, 2018 Certificate of Completion Upon completion of all work approved within the 401 Water Quality Certification or applicable Buffer Rules, and any subsequent modifications, the applicant is required to return this certificate to the DWR Central Office — Wetlands and Buffers Permitting Unit at 1650 Mail Service Center, Raleigh, NC 27699-1650. This form may be returned to DWR by the applicant, the applicant's authorized agent, or the project engineer. It is not necessary to send certificates from all of these. Applicant's Certification I, , hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials. Signature: Date: Agent's Certification I, , hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials. Signature: Date: If this project was designed by a Certified Professional 1 Todd Gingerich as a duly registered Professional Engineer(i.e., Engineer, Landscape Architect, Surveyor, etc.) in the State of North Carolina, having been authorized to observe (periodically, weekly, full time) the construction of the project, for the Permitee hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certificati �Qt1> fI��III�i Buffer Rules, the appr tans and s cifications, and other supporting materials. \��� fit{ CA,9 Signature: Registration No. 032049 ���10 SSSiO Date 5/24/201 ; aQ' �'••9 SEAL �• 032429 _ NSI N E�� •G��\� fto M i GI NG��\\�� NbR`!H GRRav�N�t} North Carolina Department of Environmental Quality I Division of Water Resources / ,��yf� N�� `_.30� Fayetteville Regional Office 225 Green Street, Suite 714 1 Fayetteville, North Carolina 28301 V J 910.433.3300