Loading...
HomeMy WebLinkAboutNC0025453_CEI Response_20190809TOWN OF CLAYTON "SERVICE" OPERATIONS CENTER "ENVIRONMENT' ELECTRIC SERVICE • PUBLIC WORKS (919)553-1530 (919)553-1530 VEHICLE MAINTENANCE WATER RECLAMATION (919)553-1530 (919)553-1535 entrl i August 9, 2019 pt of EnvironmeQuality Rick Bolich, L. G. Assistant Supervisor, DWR Raleigh Regional Office 3800 Barrett Dr. Raleigh, NC 27609 AUG 12 2019 Raleigh Regional off.ce Re: Pretreatment Compliance Inspection Letter NPDES NC0025453, Dated July 10, 2019, Reply Mr. Bolich; The Town of Clayton offers the following replies to items 2 & 4 from the compliance letter dated July 10, 2019. Item 2 addresses late reports from Grifols Permit # 0001-02. Further investigation into this matter revealed that the permit contained conflicting information for reporting deadlines in Part I Specific Conditions G. 6 and Part II General Conditions 2. Part 1 has the last day of the following month and Part II has the twentieth of the following month. The Town will correct this typo by amending the permit to reflect the requirement in Part I G. that establishes the reporting date as the last day of the following month. The amended permit page will be submitted within 10 working days to the PERCs unit. The Town does not deem it appropriate at this time to take enforcement action on Grifols for the reports received after the twentieth of the month since IDMRs were received prior to the last day of the month. If the division does not concur with the Town's determination please let us know.(Pages attached) Item 4 addresses detection limits for silver, chromium, molybdenum and arsenic. Town staff contacted the contract lab to have the correct detection limits reported and we have received the corrected reports. The Town will have all the pertinent reports amended to reflect the values provided by August 30, 2019. The Town appreciates the consideration of NC DWR in this matter, please contact me at 919-553-1536 if you have questions or concerns. Sincerely ' v mes Warren Town of Clayton, NC Wastewater Operations Superintendent 653 Hi6hwuy 42 West - P.O. Box 879 - Clayton, North Carolina 27520 - (919) 553-1530 - Fax (919) 553-1541 Industrial User Pretreatment Permit (IUP) PART I Specific Conditions G.) Definitions and Limit Page(s) notes: (continued) 6. Monitoring and Reporting All Monitoring shall be performed by a state certified laboratory by standard methods. Ali data shall be reported to the Division as specified in Part I1. 2) of this permit, note that violations shall be reported within 24 hours, and that all sampling (even if done more frequently than required) shall be summarized on turns approved by the Division and sent to the following address by the last day of the following month: James Warren, Water Reclamation Superintendent Town of Clayton Post Office Box 879 Clayton, North Carolina 27520 7. Notice to Permittees Permittee is subject to the thirty (30) general conditions attached, found in Part It of this pen -nit. 10 Industrial User Pretreatment Permit (IUP PART II General Conditions Outline of PART II, 1. Representative Sampling 16. Federal and/or State Laws 2. Reporting 17. Penalties 3. Test Procedures 18. Need to Halt or Reduce 4. Additional Monitoring by 19. TransferabiIity Permittee 5. Duty to comply 20. Property Rights 6. Duty to Mitigate 21. Severability 7. Facilities Operation, Bypass 22. Modification, Revocation, Termination 8. Removed substances 23. Reapplication 9. Upset Conditions 24. Dilution Prohibition 10. Right of Entry 25. Reports of Changed Conditions 11. Availability of Records 26. Construction of pretreatment facilities 12. Duty to provide information 27. Reopener 13. Signatory Requirements 28. Categorical Reopener 14. Toxic Pollutants 29. General Prohibitive Standards 15. Civil and Criminal Liability 30. Reports of Potential Problems Representative Sampling Samples and measurements taken as required herein shall be representative of the volumc and nature of the monitored discharge. All samples shall be taken at the monitoring points specified in this permit and, unless otherwise specified, before the effluent joins or is diluted by any other wastesircam, body of water, or substance. Monitoring points shall not be changed without notification to, and approval by, the permit issuing authority. 2. Reporting a.) Monitoring results obtained by the permittee shall be reported on forms specified by the Control Authority and/or Municipality, postmarked no later than the twentieth day of the month follou7ng the month in which the tramples were taken. if nn'dtse arge occurs during a reporting perio (herein defined as each calendar month) in which a sampling event was to have occurred, a f'omi with the phrase "no diuiiarge" shall be submitted. Copies of these and all other reports required hercin shall be submaled to the Control Authority and/or Municipality and shall be sent to the following address: James Warren Water Reclamation Superintendent Town of Clayton PO Box 879 Clayton, NC 27520 b.) If the sampling performed by the permittee indicates a violation, the pennittee shall notify the Control Authority and/or Municipality within 24 hours of becoming aware of the violation. The permittee shall also repeat the sampling and analysis and submit the results or the repeat analysis to the Control Authority and/or Municipality within 30 days after becoming aware of the violation. 11