Loading...
HomeMy WebLinkAbout19860295 Ver 1_COMPLETE FILE_19861205Permit Class Mi nor l i fi cati on STATE OF NORTH CAROLINA AW, Department of Natural-0 0 Community Development [A I El ?e 1 in? L 12,%771, to NCGS 113-229 Permit Number 190-86 issuedto Windchase Subdivision, (Rising 3), 4852 Randall Drive, Wilmington, NC 28403 authorizing development in New Hanover County at AIWW and Whiskey Creek near the end of Cabbage Inlet Lane as requested in the permittee's application dated 12/2/85 including attached plats, 6, bulkhead, Section "A" and "B", and pier alignment dated received 5/6/86 and site plan dated revised 2/86, and bulkhead extension dated received 11/14/86. This permit, issued on IY./ a , is subject to compliance with the application (where consistent with the permit), all applicable regulations, special conditions and notes set forth below. Any violation of these terms may subject permittee to a fine, imprisonment or civil action; or may cause the permit to be null and void. (1) In order to protect juvenile shrimp and finfish populations, no excavation or filling will be permitted between April 1 and September 30 of any year without the prior approval of the Division of Coastal Management. (2) All backfill material will be obtained from a highground source and confined behind the permitted bulkhead. (3) No marsh grass will be excavated and/or filled. (4) Stormwater retention basins shall be periodically cleaned of silt and debris, and shall be maintained to prevent erosion of the basin walls. (5) A 30 foot buffer shall exist between all impervious surfaces and the mean high water contour... (6) The marina shall prominently post and enforce a "no sewage discharge" policy. This permit action may be appealed by the permittee or other qualified persons within twenty (20) days of the issuing date. An appeal requires resolution prior to work initiation or continuance, as the case may be. This permit must be accessible on-site to Department personnel when the project is inspected for compliance. Any maintenance work or project modification not covered hereunder requires further Departmental approval. All work must cease when the permit expires on December 31, 1989 In issuing this permit, the State of North Carolina agrees that your project is consistent with the North Carolina Coastal Management Program. Signed by the. authority of the Secretary of DNRCD and the Chairman of the Coastal Resources Commission. e-, &4ell Z vid W. Owens, Director Division of Coastal Management This permit and its conditions are hereby accepted. Signature of Permittee *qw Wi- se Subdivision (Rising 3) . ADDITIONAL CONDITIONS Permit #190-86 Page 2 of 2 (7) All floating structures, other than boats, used for habitation or commerce (as defined.in 15 NCAC 7M.0602) shall be in conformance with local regulations for onshore sewage treatment. (8) A sign listing local pumpout facilities for boats with holding tanks will be posted at the docking facility. (9) No attempt will be made by the permittee to prevent the full and free use by the public of all navigable waters at or adjacent to the authorized work. (10).. It is possible that the authorized structure may be damaged by wavewash from passing vessels. The issuance of- this-permit does not relieve the permittee from taking all proper steps to ensure the integrity of the permitted structure and the safety of moored boats from damage by wavewash. (11) The permittee will maintain the authorized work in good condition and in conformance with the terms and conditions of this permit. The permittee is not relieved of this requirement if he abandons the permitted activity without transferring it to a third party. (12) The permittee's scheme of development, of which the authorized work is a part, contemplates the presence of structures and their attendant utilities on lands subject to an easement in favor of the United States for the operation, maintenance, improvement, and enlargement of the Atlantic Intracoastal Waterway (AIWW). Accordingly the permittee will be required to remove such structures and improvements at his own expense in the event that, in the judgment of the U. S. Army Corps -of.Engineers acting on behalf of the United States, the lands are needed at any time for any purpose_ within the''scope of the easement. Permanent buildings will not be constructed in areas subject to easement. NOTE: The proposed project is certified under General Water Quality Certification No. 1272issued on.November 10, 1978, for bulkhead construction. NOTE: An approved erosion and sedimentation control plan, is on file with the Land Quality Section. NOTE: If this project will be -served `by a community public water system (one serving at.least 15 connections or 25 year round residents), the plans and specifications for the water system must be approved by the Division of Health Services, Engineering Planning Branch, (919) 733-2460 prior to construction. NOTE: The pier and -dock should be marked with durable, reflective material to reduce hazards to navigation. DEPARTMENT OF THE ARMY WILMINGTON DISTRICT, CORPS OF ENGINEERS P.O. BOX 1890 WILMINGTON, NORTH CAROLINA 28402.1890 October 3, 1986 IN REPLY REFER TO Regulatory Branch SUBJECT: File No. SAWC086-N-065-0293 Mr. Joseph Johnson Rising 3, Incorporated Windchase Subdivision 4852 Randall Drive Wilmington, North Carolina 28403 Dear Mr. Johnson: it Reference your application for a Department of the Army permit to construct a pier and dock system on the Atlantic Intracoastal Waterway (AIWW), Whiskey Creek, near Wilmington, New Hanover County, North Carolina. Your proposal has been reviewed and found to be consistent with the provisions and objectives of general permit No. SAWC080- N-000-0291. Therefore, you may commence construction activity in strict accordance with applicable State authorization and the enclosed plan. Failure to comply with the State authorization or conditions of the general permit could result in a violation of Federal law. If any change in your work is required because of unforeseen or altered conditions or for any other reason, plans revised to show the change must be sent promptly to this office and the North Carolina Division of Coastal Management prior to performing any such change or alteration. Such action is necessary, as revised plans must be reviewed and the authorization modified. Questions or comments may be addressed to Ms. Alison Arnold, telephone (919) 343-4634. Sincerely, Charles W. Hollis Chief, Regulatory Branch Enclosure 4kM -2- Copies Furnished (with enclosure): Director, Atlantic Marine Center National Ocean Service ATTN: MOA 232X1 439 West York Street Norfolk, Virginia 23510-1114 Mr. William Mills Water Quality Section Division of Environmental Management North Carolina Department Natural Resources and Community Development Post Office Box 27687 Raleigh, North Carolina Mr. John Parker Division of Coastal Management North Carolina Department of Natural Resources and Community Development Post Office Box 27687 Raleigh, North Carolina 27611-7687 Ms. L. K. (Mike) Gantt U.S. Fish and Wildlife of Post Office Box 25039 Raleigh, North Carolina 27611-7687 Mr. William L. Kruczynski, Chief Wetlands Section Region IV Marine and Estuarine Branch U.S. Environmental Protection Agency 345 Courtland Street Atlanta, Georgia 30365 Mr. James Mercer Morehead City Regional Office North Carolina Division of Coastal Management Post Office Box 769 Morehead City, North Carolina 28557 Service 27611-5039 Mr. Randy Cheek National Marine Fisheries Service, NOAA Pivers Island Beaufort, North Carolina 28516 Mr. C. Robert Stroud Wilmington Regional Office North Carolina Division of Coastal Management 7225 Wrightsville Avenue Wilmington, North Carolina 28403 s s jl LOT n . OVSFER BAY WP wo. ;,I PACE 66 :Or 2 \n s E K'OIWU,I BOOK ws PAGE 46E rRACr .J I , t„r+nw ,Ar ?t D v,s v of K•,KIZ11 I AhO t MAP Boom ! A•6E I , %P ••• : C: AMOW" C r, +.r,tA? ? C(iYSEAMfiKAV t ° ? "? 'p, J cw.s. a•?E_?? y ALSpUIt[\ / _ SLr..cK 3 ? - -? 'OL -J L- e rw.. NWLCHA•SE LAME °Onir•:r 1O:nAr`?r.r ?j Nlnn •.r n,v ,,r nP n,n • lr e ``, .• r i,ii s,ra'ovE •'w.eo' '? w?1 ?fNJIF/ECO REPAIR AREA • L14AM'IECO e `??r'r .•? r? Iwo I' ? L • ` ' NiSt YIM' ? •,z z S• W,,ISKEr OR PURV,A/VCE CREI Y ? } SITE S : I •'?r ?u' ? 1' ?z LQCdII? L Ivr' 1-r AK WIAVCH ASE LAME F WWAL GRNAM ASNEWAY SECTKri . rs Y l? ILK roor IW rYK 1-L rwc r CAB" a SEF o? 7 f /I. 0111 ( M•C /MOAr•KAy,• .••1[ Or r.'s I/ a 1. /qI •A(A • 1 aa• ACArI wM o11VLMT w MAw wl "ra•.YL? ?.a? I „ Iwwwl awww ra.l r A/L wlwlw ''•? ,5I I I laR. Awl H? /arl Y. M.w. Ir•.ll/r ? r r ' I U S Cowes of EA1f,1KLIRS •' r r' Srm wwww r am 480 Ar •.4a .r^ J COI _-Zif ® w.I{-ww) a a r w? •a.ar 1 r .n a ?.. r ! ~ r d. •• r sw.arYi'?iwa? r :h??, X I 1 •' / r.T r s u -Ow3 Pr E_R6a1LfR5 I r r 1, 1 r w? - $w..wt* aw. Awffrror swrAlr /aawl 1. wlwa Iw wlwlw 1, ?., HU IwMLL w. wiw Mdoem wUrc.r / . wwAL wr.r ' . /. n Ac. j wwfw Itrw~ o8v" A"" Air rA•-w RK 1wAl A[a0 w\.. 0/11. Is- I$*. -m. naml RMI war mLfMrfw • •.r• AC. rw.r< AOfw awo.,? w .wwtcvl . r"w . lw cL&4%wYr . wwwwlw . 1. a/ r Ila WNIN1. row acres rw.w AO?. awct m w wew.wl. mlws. - -?- /Oriwlw rYl./aw Ir aawla? .a.a? M s rw/lwe . Q wrw oww Iwoew . 1 ..r Ac (n Ywsl. ). ALL AI.<Aw wW w s rVlww. Yawl ww saw ..« A.?.awt•Mw A wltlwl.w w rw A/w --ftmW LUIM AM a 141W raw A\ MW Aw... 30' IIIIIVy/7IwJG • Ia /wIC11/? a aaO..lal fA.l/ /wi .Mwaa.l. r a war a' -- nwl Aw?rwa< w..o n Arawrw,R. w MIrYi.l? >r_a . T-- .aaw.l 00wl" w AIM M r/. AMA .OIAr1Ald IOl M wwawliw M RRaw1R AaalA. . .. aawT A.L la awwallr . /..a At Inw. a wwwl• SITE and UTXITIES PL M o . ?I Ro AAww rww .a.wi/".. a.Aw Aw Iwwr v owrw/. „ .. /OT •. wrwwabw AAR aw mm MA wTrw A .L t.w.i.R. . r HA rovr lrJlLaA.AnaRa AarR.M1- wwlalaw me M Islwrr. aIaWN S HLL, •At dPb ,M: r H/1/ c T ` sww?w/n wu .c rr. CprAa'pC (116+AJ ww h.AMI[b ':µ, ? • ' t? 1w' r. rrw ano w w rwlnM w rwra .ww 1 YraL/Taaw. NIL. IrsrM WtOMMI. w lr C. asalw.a watwwa w w 4twr wwK TAM . L.r.w ]a Amw"rr T wR. /•iA.[ "[a'r( co~ sMlwla/ mm"m Aw ARpm MH w M IaaIM *` /, COAtrr 6000" MWVArMw IM ATTAGw Wl• ?a s• .. s ," rLL w rw vam M mLL .t rwtrtwww?. : {'•t? t T LAAE EXTENSION r w ww.a.w. Mwart?..w. Mlt •. ',?+? - h `?wait? gaw c:l r d' r nr..• .« pop/ Yr r I? 1 J. _ n, I I ; y L4 i J M L '; y? . y k O • m i h N J ry ` u ilk IL ? ? ? 'v?.. ? t'•.. ? ?' b } } "s- ct r •r r k4 O. Z ?: rk)l ?ti { 3 G ^ (n za? \ p .. ?? !vm ? ? ? ? l .tit •r:? y+ ,?7 !, --? i H \ CO O Co r; O` ryb I 2 Ohhh ? or , I W W r -J .. . WC ., t Ql) LLJ u?J .i R E T W ?.= v N Z 4 1 N Y N ?, O c 47 t z .. ? J Y ? -:Tr 0. 07 ,< Q ? I ? gb a Ip ? \,r<.r? U n ~ 'O, ?zoy O V ?n O= t = W s CL_ a Jr M1 p j w Q Q CM r ` r ? i?+ T \ Q r{ i? ry W 0400 000 2+00 3400 4+00 5+00 &00 3025 NA ' t V I ROOF PEAK 20' /60 /0' 5? t 0? ? rr t :^ ? ? n*'-? s±- t ??!i '? .?''i?s''? • > . r? " > ('i?M? •s'?,F ? ' {? - . ..k h ,_ _ i , , . y , , . _ ? c ., Hi sc A4 10 8400 9+00 10+00 /1400 12400 13+00 144-OQ 0 a M O ? aD q n ,n y h V .6V = 38.0 , BUILDING *9 .EV = 31.0' VeH/cle Scale ® " , / = /0 q ELEV. = 23.00 fT ELEV. = 14. iARY TO /OVE /00 TOP Of BULKHEAD ELEV. = 70':t t MEM HIGH WATER VD CHASE ROUND PROFILE CT/ON "A 1" = 5' VERT. I c I00' HORT. ? Ite•IF_ nit . ssryw?wspw :5#t` r.: of 7 I 0400 /400 30 0 o n u 25 a a ROOF PEAK ELEV. _ P""r1 1. ?`• - ?.:J/r?g;^j nJ?F f.. MAY s r''i vi.liir,C ;`r rMAVAGRAE kcG;ONAL of rrt cf 2400 20 BUILDING * 9 ROOF EDGE ELEV. _ 310 Verticle Scale ® l" = l0' 15 SECOND FLOOR ELEV = ZH O' _ _ _ 1B FINISH ' /0 FLOOR ELEV. = 14.0 3 TOP OF BULKHEAD ELEV. = T.Ot r r rBr e _MHW - Et e' ANYII. AM. 0 SErriNTJOM SEPARAMN W/NDCHQSE HIGHGROUND' PROFILE SECTION °B" SCALE - I" = VERT. /" =100' HORT. .r O 0 N A R Q? J W z W ar itz W vZi uZi 3 3 3 v to m O I- 3 J W o Q J O J N Q k 3 2 k h ?! U it h y. W -?F „o ;£ „O Z c 0 W 0 tp s(? co 1j4 1`1p.1t11J3;.1c\tr' IG vJiN,Al3 3J1 ,,,,; It;l.???J J iNal,?3'.J'1 -lik 41FN "M r Q N J 2 Q Q W o _a ° o O 1. = 3 2 co O y J O Q i F' OD ? W 3 N O 0 3 J J ? J J k Q Q to N N 2 • ~ ? W W Q "J C.) 2 O Q W 41 ? Z O Ki j m , Aft 7 0? 7 Permit Class Permit Number New STATE OF NORTH CAROLINA 190-86 Department of Natural Y grtd,Community Development C ` eSb rcR " ion C? r- 1 nt;in onmental 0 Ma14 ' Con x eft rb /h? Sf- ° 2 9 1986 Excavatiofaf)4, 6cf gr p¢Ht to NCGS 113-229 ?r???? r•', ;111;3.1(' i,T1i}i i OPERA i*10!N"! Issuedto Windchase Subdivision, (Rising 3), 4852 Randall Drive, Wilmington, NC 28403 authorizing development in New Hanover County at AIWW and Whiskey Creek near the end of Cabbage Inlet Lane as requested in the permittee's application dated 12/2/85 including attached plats, 5, bulkhead, Section "A" and "B", and pier alignment dated received 5/6/86 and site plan dated revised 2/86. This permit, issued on 912/4'6 , is subject to compliance with the application (where consistent with the permit), all applicable regulations, special conditions and notes set forth below. Any violation of these terms may subject permittee to a fine, imprisonment or civil action; or may cause the permit to be null and void. (1) In order to protect juvenile shrimp and fin fish populations, no excavation or filling will be permitted between April 1 and September 30 of any year without the prior approval of the Division of Coastal Management. (2) All backfill material will be obtained from a highground source and confined behind the permitted bulkhead. (3) No marsh grass will be excavated and/or filled. (4) Stormwater retention basins shall be periodically cleaned of silt and debris, and shall be maintained to prevent erosion of the basin walls. (5) A 30 foot buffer shall exist between all impervious surfaces and the mean high water contour. (6) The marina shall prominently post and enforce a "no sewage discharge" policy. (See attached sheet for Additional Conditions) This permit action may be appealed by the permittee or other qualified persons within twenty (20) days of the issuing date. An appeal requires resolution prior to work initiation or continuance, as the case may be. This permit must be accessible on-site to Department personnel when the project is inspected for compliance. Any maintenance work or project modification not covered hereunder requires further Departmental approval. All work must cease when the permit expires on _December 31, 1989 In issuing this permit, the State of North Carolina agrees that your project is consistent with the North Carolina Coastal Management Program. Signed by the authority of the Secretary of DNRCD and the Chairman of the Coastal Resources Commission. N a, s, ,? 6i David W. Owens, Director Division of Coastal Management This permit and its conditions are hereby accepted. Signature of Permittee WIndchase Subdivision (Rising 3) rt ADDITIONAL CONDITIONS Permit #190-86 Page 2 of 2 (7) All floating structures, other than boats, used for habitation or commerce (as defined in 15 NCAC 7M.0602) shall be in conformance with local regulations for onshore sewage treatment. (8) A sign listing local pumpout facilities for boats with holding tanks will be posted at the docking facility. (9) No attempt will be made by the permittee to prevent the full and free use by the public of all navigable waters at or adjacent to the authorized work. (10) It is possible that the authorized structure may be damaged by wavewash from passing vessels. The issuance of this permit does not relieve the permittee from taking all proper steps to ensure the integrity of the permitted structure and the safety of moored boats from damage by wavewash. (11) The permittee will maintain the authorized work in good condition and in conformance with the terms and conditions of this permit. The permittee is not relieved of this requirement if he abandons the permitted activity without transferring it to a third party. (12) The permittee's scheme of development, of which the authorized work is a part, contemplates the presence of structures and their attendant utilities on lands subject to an easement in favor of the United States for the operation, maintenance, improvement, and enlargement of the Atlantic Intracoastal Waterway (AIWW). Accordingly, the permittee will be required to remove such structures and improvements at his own expense in the event that, in the judgment of the U. S. Army Corps of Engineers acting on behalf of the United States, the lands are needed at any time for any purpose within the scope of the easement. Permanent buildings will not be constructed in areas subject to easement. NOTE: The proposed project is certified under General Water Quality Certification No. 1272 issued on November 10, 1978, for bulkhead construction. NOTE: An approved erosion and sedimentation control plan is on file with the Land Quality Section. NOTE: If this project will be served by a community public water system (one serving at least 15 connections or 25 year round residents), the plans and specifications for the water system must be approved by the Division of Health Services, Engineering Planning Branch, (919) 733-2460 prior to construction. NOTE: The pier. and-.:dock should.:-,be mArkeO- 'with durable, reflective . materi.al -to reduce hazards to navigation. OF APPLICATION FOR PERMIT TO EXCAVATE AND/OR FILL WATER QUALITY CERTIFICATION EASEMENT IN LANDS COVERED BY WATER CAMA PERMIT FOR MAJOR DEVELOPMENT Department of Administration State of North Carolina Department of the Army (GS 14612) Department of Natural Resources and Community Development Corps of Engineers, Wilmington District (GS 113-229, 143-215.3(a)(1),143-215.3(c), 113A-118 (33 CFR 209.320.329) Please type or print and fill in all blanks. If information is not applicable, so indicate by placing N/A in blank. 1. Applicant Information A. Name Rising 3 (Windchase Subdivision) Last First ' Midd4e B. Address 4852 Randall Drive Street, P. O. Box or Route Wilmington N.C. 28403 (919) 395-5333 City or Town State Zip Code Phone . 11. Location of Proposed Project: A. County New Hanover B. 1. City, town, community or landmark. 2. Is proposed work within city limits? Yes No A C. Creek, river, sound or bay upon which project is located or nearest named body of water to project Whiskey Creek II1. Description of Project 1 X A. 1. Maintenance of existing project 2. New work B. Purpose of excavation or fill 1. Acress channel length width depth 2. Boat basin length width dept.' „ 3. Fill area length width depth 4. Other length width depth C. 1. Bulkhead length 1270 ' Average distance waterward of MHW (shoreline) Approx. 2-5' inland from MHW 2. Type of bulkhead construction (material) Treated l Umber (2"x8" tongue and groove sheeting) D. Excavated material (total for project) 1. Cubic yards 0 2. Type of material E. Fill material to be placed below jNHW (see also VI. A) 1. Cubic yards 0 2. Type of material IV. Land Type, Disposal Area, and Construction Equipment: A. Does the area to be excavated include any marshland, swamps or other wetland? Yes No X B. Does the disposal area include any marshland, swamps or other wetland? Yes No X C. Disposal Area 1. Location Backfill along inland fare of Bulkhead 2. Do you claim title to disposal area? Yes D. Fill material source if fill is to be trucked in `E `How"wilt excavated material be entrapped and erosion controlled? Material will be retained by Bulkhead F. Type of equipment to be used Rarkhoe-. 111il ldozpr, otc G. Will marshland be crossed in transporting equipment to project site? If yes, explain No - D& F-B 1 Rev. 10/78 r, i V. Intended Use of Project Area (Describe) *A. 1. "rivate 2. Commercial 3. Housing Development or Industrial Single Family Residences A Other B. 1. Lot size(s) 6.78 Acres total project area above MHW 2. Elevation of lot(s) above mean high water 3. Soil type and texture Generally Sandy - Type I Soils 4. Type of building facilities of structures Single Family Residences. 10 s l i p boat dock 5. Sewage disposal and/or waste Wdter treatment A. Existing Planned X B. Describe Septic Tank with L P P Disposal System 6. Land Classification (circle one) DEVELOPED TRANSITIONAL COMMUNITY' RURAL CONSERVATION OTHER (See CAMA Loca and. Use Plan Synopsis) VI. Pertaining to Fill and Water Quality: A. Does the proposed project involve the placement of fill materials below mean high water? Yes No X B. 1. Will any runoff or discharge enter adjacent waters as a result of project activity or planned use of the area following project completion? Yes-No X 2. Type of discharge 3. Location of discharge VII. Present rate of shoreline erosion (if known): Less than 2 feet gerr year VIII. List permit numbers and issue dates of previous Department of Army Corps of Engineers or State permits for work in project area, if applicable: IX. Length of time required to complete project: r X. In add::ion to the completed application form, the following items must be provided: A. Attach a copy of the deed (with State application only) or other instrument under which applicant claims title to the affected property. OR if applicant is not claiming to be the owner of said property, then forward a copy of the deed or other instrument under which the owner claims title plus written permission from the owner to carry out the project on his land. B. Attach an accurate work plat drawn to scale on 8%: X 11" white paper (see instruction booklet for details). Note: Original drawings preferred - only high quality copies accepted. C. A copy of the application and plat must be served upon adjacent riparian landowners by registered or certified mail or by publication (G.S. 113-229 (d))Enter date served D. List names and complete addresses of the riparian landowners with property adjoining applicant's. XI. Certification requirement: I certify that to the best of my knowledge, the proposed activity complies with the State of North Carolina's approved coastal management program and will be conducted in a manner consistent with such program. r i XI1. Any permit issued pursuant to this application will allow only the development describP'd?in cation and plat. Applicants should therefore describe in the application and plat all anticipated devel- opment activities, including construction, excavation, filling, and land clearing. y DATE 1--=.T?? Applicant's Signature D&F•02 SEE REVERSE SIDE FOR MAILING INSTRUCTIONS Rev. 10/78 Such owners have 30 days in which to submit comments to agencies listed below. Elwood Kirkum, 335 Cahhaap Tnlpt Lam, Wilmington N ii 0 1 O N ' yw11M 'o fat ,„?^• a",•,: , '?A. to CL N 2 Q Z W ? Q OD U O ? W W ? p in in 3 3 v 3 = o Q z m o c `3 m k tz Q x W y O W co oc aD W to LL 3 N O o0r ? C 3 ~ Q O Q 3 W o 3 cm C?j o Q o ? ? ?? o ? ? ,? Q Q V O x 3 i N " W ti \\ / ? ?t U W W ? ? ? ?ri i 4 W . okc? ZF„o -,E :F „o -, i/ Rq), G? V 7 0#00 1+00 2400 3#00 4+00 5+00 6+00 7+00 8400 9+00 10+00 a 400 12+00 13+00 14+09 30 • v a y H 25' "A" ROOF .PEAK ELEV. = 38.0' -20 ' - • Er 17= ? BUILDING *3 ' ROOF EDGE ELEV. = 31.0 PL O- ® vortlelo seam 15, 110 SECOND STORY FLOOR ELEV = 23.0' 10 . _ , .._.... r .». rd :.r 'PWISHE D FLOOR ELEV A • TOP OF BULKHEAD ELEV.: 7.0' # • PILINGS AS NECESSARY TO ELEVATE FLOOR ABOVE 100 F'NISN YEAR ROOD (I3.0?1 GRADf 5' MIEAM HIGH WAFER 'WIND HIGHGROUND PROFILE SECTION "A" SCALE- 1" = 5' VERT. to ' 1 -100 HORT. AY 6 1989 r lrr z s`Err `L?.f?r pq i/ p pi F., lrt?:41t31 Ul"1-l?fr ?T 0#00 /#00 2#00 30 A O y, u u 25 h q ROOF , PEAK ELEV.' a 20 WILDING 9 ROOF EDGE ELEV. = Verticle Scale L-Li /" = /0' 15 SECOND FLOOR ELEV = 230' --- 1B FINISH l0 FLOOR ELEV. = 140' TOP OF BypKHEAD ELEV. = 70t MHW _ MHW • - je-r a+- AMR. MHV. 0 SEAYMT10V SEPARATION W/NDCHASE HIGHGROUND PROFILE SECTION "B" SCALE - I's = 5' VERT. I" =1OOr HORT. .a+ n1 , a 1 N ? ?' N ? 1 ? a d t U1 .? nn oo W O - n I r r. t ? O O .• 'rr2. ?'?ouc 5 m ( aro -O \ K V ? j T { t ?_ Y r: r ai t r Z k .16 i ate:- of . _ ? Of {.. O C rr1 y <. r 03 t ? ro C U 'cS? J A Y ' DEPARTMENT OF THE ARMY i, WILMINGTON DISTRICT, CORPS OF ENGINEERS P.O. BOX 1890 WILMINGTON, NORTH CAROLINA 28402.1890 IN REPLY REFER TO Regulatory Branch May 29, 1986 SUBJECT: File No. SAWC086-N-065-0293 Mr. John Parker Division of Coastal Management North Carolina Department of Natural Resources and Community Development Post Office Box 27687 Raleigh, North Carolina 27611-7687 Dear Mr. Parker: Reference the application of Rising 3, Incorporated (Windchase subdivision), represented by Mr. Joseph Johnson, for a Department of the Army permit to construct a pier and dock system on the Atlantic Intracoastal Waterway (AIWW), Whiskey Creek, near Wilmington, New Hanover County, North Carolina. The Federal agencies have completed review of the proposal as presented by the application and your field investigation report. We recommend that the following conditions be included in the State authorization: a. The permittee's scheme of development, of which the authorized work is a part, contemplates the presence of structures and their attendant utilities on lands subject to an easement in favor of the United States for the operation, maintenance, improvement, and enlargement of the Atlantic Intracoastal Waterway (AIWW). Accordingly, the permittee will be required to remove such structures and improvements at his own expense in the event that, in the judgment of the U.S. Army Corps of Engineers acting on behalf of the United States, the lands are needed at any time for any purpose within the scope of the easement. Permanent buildings will not be constructed in areas subject to easement. b. This permit does not authorize the interference with any existing or proposed Federal project, and the permittee will not A 0 tie entitled to compensation structure or work which may operations undertaken by the -2- for damage or injury to the authorized be caused from existing or future United States in the public interest. c. No attempt will be made by the permittee to prevent the full and free use by the public of all navigable waters at or adjacent to the authorized work. Use of the permitted activity must not interfere with the public's right to free navigation on all navigable waters of the United States. d. If the display of lights and signals on the authorized structure is not otherwise provided for by law, such lights and signals as may be prescribed by the U.S. Coast Guard will be installed and maintained by and at the expense of the permittee. e. It is possible that the authorized structure may be damaged by wavewash from passing vessels. The issuance of this permit does not relieve the permittee from taking all proper steps to ensure the integrity of the permitted structure and the safety of moored boats from damage by wavewash. The permittee will not hold the United States liable for any such damage. f. The permittee will maintain the authorized work in good condition and in conformance with the terms and conditions of this permit. The permittee is not relieved of this requirement if he abandons the permitted activity without transferring it to a third party. Questions or comments may be addressed to Ms. Alison Arnold, telephone (919) 343-4634. Sincerely, Charles W. Hollis Chief, Regulatory Branch Copies Furnished: Mr. William Mills Water Quality Section Division of Environmental Management North Carolina Department of Natural Resources and Community Development Post Office Box 27687 Raleigh, North Carolina 27611-7687 Mr. Charles Jones Morehead City Regional Office North Carolina Division of Coastal Management Post Office Box 769 Morehead City, North Carolina 28557 Ms. L. K. (Mike) Gantt U.S. Fish and Wildlife Service Post Office Box 25039 Raleigh, North Carolina 27611-5039 Mr. Randy Cheek National Marine Fisheries Service, NOAA Pivers Island Beaufort, North Carolina 28516 Mr. William L. Kruczynski, Chief Wetlands Section Marine and Estuarine Branch U.S. Environmental Protection Agency 345 Courtland Street Atlanta, Georgia 30365 Mr. C. Robert Stroud Wilmington Regional Office North Carolina Division of Coastal Management 7225 Wrightsville Avenue Wilmington, North Carolina 28403 . AWAL IN REPLY REFER TO Regulatory Branch DEPARTMENT OF THE ARMY WILMINGTON DISTRICT, CORPS OF ENGINEERS P.O. BOX 1890 WILMINGTON, NORTH CAROLINA 28402-1890 May 16, 1986 SUBJECT:. File No. SAWC086-N-065-0293 Mr. Joseph Johnson Rising 3, Incorporated Windchase Subdivision 4852 Randall Drive Wilmington, North Carolina 28403 Dear Mr. Johnson: RECEIVEr) MAY 19 1-98b WATER QUALITY SECTION OPERATIONS BRANCH On February 6, 1986, we renewed general permit No. SAWC080-N- 000-0291 (enclosed), which provides Federal authorization for construction activities that receive authorization from the State of North Carolina. A review of your application received May 13, 1986, for a Department of the Army permit to construct a pier and dock system on the Atlantic Intracoastal Waterway (AIWW), Whiskey Creek, near Wilmington, New Hanover County, North Carolina, indicates it to be a candidate for Federal authorization under this general permit. Accordingly, the administrative processing of your application will be accomplished by the North Carolina Division of Coastal Management. Comments from Federal review agencies will be furnished to the State. If your application must be withdrawn from this general permit process for any reason, you will be written and informed of its further management. If there are no unresolved differences of State-Federal positions or policy, the final action taken on your application by the State will result.in your receiving written notice from us that your application has been successfully processed under our general permit. Only after receiving such confirmation should you begin work. Your application, pursuant to Section 10 of the River and Harbor Act, has been assigned No. SAWCO86-N-065-0293 and will be coordinated by Ms. Alison Arnold. She is available to address questions or comments you may have at telephone (919) 343-4634. Sincerely, Charles W. Hollis Chief, Regulatory Branch Enclosure -2- Copies Furnished (without enclosure): Mr. John Parker Division of Coastal Management North Carolina Department of Natural Resources and Community Development Post Office Box 27687 Raleigh, North Carolina 27611-7687 Mr. William Mills Water Quality Section Division of Environmental Management North Carolina Department of Natural Resources and Community Development Post Office Box 27687 Raleigh, North Carolina 27611-7687 Mr. Charles Jones Morehead City Regional Office North Carolina Division of Coastal Management Post Office Box 769 Morehead City, North Carolina 28557 Ms. L. K. (Mike) Gantt U.S. Fish and Wildlife Service Post Office Box 25039 Raleigh, North Carolina 27611-5039 Mr. Randy Cheek National Marine Fisheries Service, NOAA Pivers Island Beaufort, North Carolina 28516 Mr. William L. Kruczynski, Chief Wetlands Section Marine and Estuarine Branch U.S. Environmental Protection Agency 345 Courtland Street Atlanta, Georgia 30365 Mr. C. Robert Stroud Wilmington Regional Office North Carolina Division of Coastal Management 7225 Wrightsville Avenue Wilmington, North Carolina 28403 Mr. Michael S. Marsh Joseph S. Hill, Jr. and Associates Post Office Box 5592-Station Wilmington, North Carolina 28403-41 Ab" DIVISION OF ENVIRONMENTAL MANAGEMENT Water Quality Section June 5, 1986 M E M O R A N D U M TO: John Parker , FROM: Bill Mills44?0 U" SUBJECT: Application for CAMA Permit Windchase Subdivision New Hanover County The Subject application has been reviewed for water quality impacts and the following comments are offered: 1. The stormwater management plan for the project provides for retention of the 10-year, 24-hour storm event. Therefore, the water quality as a result of stormwater runoff is not expected to be significantly different than natural conditions. 2. Conditions recommended for inclusion in the CAMA permit are: a. Stormwater retention basins shall be periodically cleaned of silt and debris, and shall be maintained to prevent erosion of the basin walls. b. A 30 foot buffer shall exist between all impervious surfaces and the mean high water contour. C. A locked head policy shall be maintained by the homeowners for the boat docking facilities, and signs shall be posted along the docks prohibiting any overboard discharge of sewage. 3. The project does require a 401 certification but does meet our requirements for the general certification for fill behind bulkheads. BM/dkb cc: Preston Howard Mike Marsh Wow MEMORANDUM DATE: TO: FROM: THROUGH: DIVISION OF ENVIRONMENTAL MANAGEMENT May 30, 1986 Bill Mills Operations Branch Pkichael F. Williams AW Wilmington Regional Office A. Preston Howard, Jr. /l Wilmington Regional Office RECEIVED JUN 0 1 1??G WATER QUALITY S; GTM,' OPERATIONS SRANC11 SUBJECT: Regional Office Review & Recommendations Application for Permit for Excavation and/or Fill Windchase Subdivision - Whiskey Creek New Hanover County The applicants propose to develop a tract of land of approxiately 6.78 acres in size, by constructing 13, 2 story single family residential units. The proposed project is located along the AIWW near Whiskey Creek, classifed SA, and currently closed to shellfishing. The project has been reviewed to determine impacts to water quality. The following comments are provided: 1. The project will require 401 certification, but should meet the conditions of a general 401 certification for bulkhead construction. 2. The impervious surface percentage of the property as proposed, will amount to approximately 24%. An engineered plan has been developed to collect and retain storm water runoff from a 10 year 24-hour storm event. Eight retention basins or swales have been designed based on soils evaluations performed by a consulting hydrogeologist. Calculations indicate that the storm water retention systems designed should effectively contain the runoff resulting from a 10 year 24-hour storm event, and have the capability of exfiltrating the volume of storm water within 71 hours. 3. The following conditions are recommended to be forwarded to DCM: a. Storm water retention basins shall be periodically cleaned of silt and debris, and shall be maintained to prevent erosion of the basin walls. X40 Page Two Memo to Bill Mills May 30, 1986 b. A 30' buffer shall exist between all impervious surface areas and the mean high water contour. C. A locked head policy shall be maintained by the homeowners for the boat docking facilities, and signs shall be posted along the docks prohibiting the overboard discharge of sewage. This office has no objections to the project as proposed, providing that the above conditions are met. MFW:kc cc: DCM - Bob Stroud WiRO CF OFFICE OF COASTAL MANAGEMENT FIELD INVESTIGATION REPORT 1. Applicant's name Windchase Subdivision (Rising 3, Inc. Joseph Johnson, AIA Partner) 2. Location of project site Confluence of AIWW - Whiskey Creek in Myrtle Grove Sound - New Hanover County, North aro na. ew o o 17- or 17-218; r , , , ,R- , on 218 3. Investigation type: Dredge & Fill, No CAMA X 4. Investigative procedure: (A) Dates of site visit Nov. 1985 4/30/86 (B) Was applicant present Yes No 5. Processing procedure: Application receivedcomplete 5/6/86 Office DCM-Wilmington 6. Site description: (A) Local Land Use Plan Wilmington, New Hanover County Land classification from LUP Rural - Conservation Development constraints identified in LUP at areas of the project within 100-year storm flood plain must be declared exceptionally esigned development by Planning Ottice in order to be consistent w1th an se an. (B) AEC(s) involved: Ocean Hazard Estuarine shoreline X Coastal wetlands Public trust waters Estuarine waters X Other (C) Water dependent: Yes No Other Both (D) Intended use: Public Private X Commercial X (E) Type of waste water treatment: Existing central septic tank with low pressure pipe disposal system. Planned (F) Type of structures: Existing. N/A Planned 10 single family residences - boat dock with ten slips (G) Estimated annual rate of erosion N/A Source N/A 7. Habi'Lat description: AREA (A) Vegetated wetlands: Dredged Filled Other N/A (B) Non-vegetated wetlands: N/A (C) Other: Dock Coverage appx. 9,408 sf Highground a?px. 6.78 ac (D) Total area disturbed: (see above) 8. Project summary The applicants propose to develop the highground portion of the property by constructing roads, waste treatment areas and 13 single family dwelling units. A 10 slip boat dock will also be provided. WINDCHASE SUBDIVISION PAGE 2 9. PROJECT DESCRIPTION: The project is located on the north side of the mouth of Whiskey Creek and wast of the AIWW. It is also just north of the establishment known as Uncle Henry Kirkum's Oyster Roast. It is reached via Masonboro Loop Road (S.R. 1515). The site consists of a parcel of approximately 8.99 acres which has a fairly low mean elevation. Of the total acreage approximately 6.78 acres is above the mean high water contour. Elevation range from approximately +3.3' near the water to approximately 21.5' above the 100-year flood contour. The property forms a finger of highground which extends toward the waters of the AIWW and is also touched by Whiskey Creek. Wetlands surround a large portion of the tract. Species included smooth cordgrass (Spartina alterniflora); saltwort (Salicornia sp.); spike grass (Distichlis spicata); and sea ox-eye (Borrichia sue.). The widest portion of the tract appears to be an old spoil area and common reed is the predominate species here. Soundings in the offshore area indicate that water depth of -4' MLW are located approximately 140' - 150' waterward of the MHW contour on the east shoreline. The wetland boundaries including MHW and "404" limits were identified by Corps and DCM personnel in late 1985. The shoreline of the property along the HHW contour is approximately 1,280 linear feet. The area is classified as S.A. closed water and as a primary nursery area. The applicants are proposing to subdivide the highground into 13 residential lots initially. The disposal area will be divided into an additional four lots upon the availability of a county-wide sewer system. These lots will be served by a central road. This road in order to satisfy current stormwater requirements will be unpaved at all points less than 30.' from the MHW contour. A full stormwater plan has been submitted to and tenatively approved by the Division of Environmental Management for this project (see application package) Retention ponds and percu- lation basins will be utilized. A central septic tank with a low pressure pipe drainfield will provide wastewater treatment for the 13 units. A 1,270' bulkhead consisting of treated lumber will be constructed as indicated on the plans. The top elevation of this structure will be approximately 7.0'±. The alignment will be from 2'-5' landward of the MHW contour along the north side and around the east point of the property. Some highground fill material will be placed landward of the structure. In order to provide for boat access a pier and dock system will be constructed. The pier is approximately 200' in length. The terminus has a 16' x 16' platform. A ramp extends from the platform to a platform (34' x 12') which attaches to a floating dock approximately 45' x 200'. This dock displaces approximately 9,408 s.f. of public trust area. The project will not require dredging. 10. ANTICIPATED IMPACTS: The project has been designed to meet current stormwater requirements. The boat dock system is within the proposed CAMA guidelines for the ratio of square footage of dock to linear feet of shoreline. The applicants have approximately 34,560 s.f. of area available under the proposed marina regulation which will become effective in the near future. They are limited by the fact that the area is a designated nursery area. Wetland areas will be avoided and protected from impacts by either the bulkhead or buffer areas or both. The project will clear the AIWW right-of-way. WINDCHASE SUBDIVISION PAGE 3 In order for the project to be considered consistent with the land use plan it must be declared exceptionally designed by the New Hanover County Planning staff due to the position of the 100-year storm flood line. SUBMITTED BY: C. Robert Stroud, Jr. OFFICE: DCM-Wilmington DATE: May 7, 1986 APPLICATION FOR PERMIT TO EXCAVATE AND/OR FILL ' WATER QUALITY CERTIFICATION EASEMENT IN LANDS COVERED BY WATER CAMA PERMIT FOR MAJOR DEVELOPMENT Department of Administration State of North Carolina Department of the Army (GS 146-12) Department of Natural Resources and Community Development Corps of Engineers, Wilmington District (GS 113-229,143-215.3(a)(1), 143-215.3(c), 113A-118 (33 CFR 209.320.329) Please type or print and fill in all blanks. If information is not applicable, so indicate by placing N/A in blank. 1. Applicant Information A. Name Rising 3 (Windchase Subdivision) Last First ' Middle B. Address 4852 Randall Drive Street, P. O. Box or Route Wilmington R.C. 28403 (919) 395-5333 City or Town State Zip Code Phone 11. Location of Proposed Project. A. County New Hanover B. 1. City, town, community or landmark -Near end of Cabbage Inlet Lane - Wilmington 2. Is proposed work within city limits? Yes No X C. Creek, river, sound or bay upon which project is located or nearest named body of water to project Whiskey Creek 111. Description of Project A. 1. Maintenance of existing project 2. New work B. Purpose of excavation or fill DEC 11 1985.E 1. Access channel length width depth 2. Boat basin --length- width deptbFHE - E :,? f. F=:1. fr_nfraT BF 3. Fill area length widthdepth wn . -.. Of ICE MINf:T?tJ RF MIl Al _ 4. Other length width depth C. 1. Bulkhead length 2? 70' Average distance waterward of MHW (shoreline) Ap prox. 2-5' inland from MHW 2. Type of bulkhead construction (material) Treat ed lumber (211x8" tongu e and groove sheeting) D. Excavated material (total for project) 1. Cubic yards 0 1). E. Fill material to be placed below MHW (see also VI 1. Cubic yards 0 2. Type of material . A) Type of material IV. Land Type, Disposal Area, and Construction Equipment: A. Does the area to be excavated include any marshland, swamps or other wetland? Yes No -_ B. Does the disposal area include any marshland, swamps or other wetland? Yes No X C. Disposal Area 1. Location Backfill along inland face of Bulkh ad 2. Do you claim title to disposal area?- Yes D. Fill material source if fill is to be trucked in E. How will excavated material be entrapped and erosion controlled? Material will be retained by Bulkhead F. Type of equipment to be used BackhnP, Bul 1 dozer, Ptr _ G. Will marshland be crossed in transporting equipment to project site? If yes, explain No D & F-81 Rev. 10/78 V. Intended Use of Project Area (Describe) A. "rivate 2. Commercial 3. Housing Development or Industrial Single Family Residences 4. Other B. 1. Lotsize(s)-6.78 Acres total project area above MHW 2. Elevation of lot(s) above mean high water 3. Soil type and texture _ Generally San& - Type I Soils 4. Type of building facilitiesoi structures Single Family Residences. 10 slip hoat mark, S. Sewage disposal and/or waste eater treatment A. Existing Planned X B. Describe Septic Tank with L.P.P. Dis oral System 6. Land Classification (circle one) DEVELOPED TRANSITIONAL COMMUNITY' AtF?WdpUse CONSERVATION OTHER (See CAMA Plan Synopsis) Vi. Pertaining to Fill and Water Quality: A. Does the proposed project involve the placement of fill materials below mean high water? Yes ' No X B. 1. Will any runoff or discharge enter adjacent waters as a result of project activity or planned use of the area following project completion? Yes_ No X 2. Type of discharge 3. Location of discharge VII. Present rate of shoreline erosion (if known): Less than 2 feet per year VIII. List permit numbers and issue dates of previous Department of Army Corps of Engineers or State permits for work in project area, if applicable: IX. Length of time required to complete project: - 1 year X. In addition to the completed application form, the following items must be provided: A. Attach a-copy of the deed (with State application only) or other instrument under which applicant claims title to the affected property. OR if applicant is not claiming to be the owner of said property, then forward a copy of the deed or other instrument under which the owner claims title plus written permission from the owner to carry out the project on his land. B. Attach an accurate work plat drawn to scale on 8% X 11" white paper (see instruction booklet for details). Note: Original drawings preferred - only high quality copies accepted. C. A copy of the application and plat must be served upon adjacent riparian landowners-by registered or certified mail or by-publication (G.S. 113-229 (d))Enter date served D. List names and complete addresses of the riparian landowners with property adjoining applicant's. Such owners have 30 days in which to submit comments-to agencies listed below. Elwood Kirkim- 335 Cahhane TnlPt lane. Wilminaton- N_C_ Edna M. Kirkum- 334 r;ihhano Tnla+ I nnO Wilm4nn+nn ICI r X1. Certification requirement: I certify that to the best of my knowledge, the proposed ac cnmR ! Igs? with the State of North Carolinas approved coastal management program and will be condud?% manner consistent with such program. r_['I f NT Ile, X11. Any permit issued pursuant to this application will allow only the development desc b'g.I (}pFfltG1 L cation and plat. Applicants should therefore describe in the application and plat all anticipated devel- opment activities, including construction, excavation, filling, and land clearing. DATE 2 Z,,,? Applicant's Signa ure D&F-82 SEE REVERSE SIDE FOR MAILING INSTRUCTIONS Rev. 10/78 JOSEPH S. ILL, JR. and ASSOCIATES CONSULTING ENGINEERS and PLANNERS 1602 HARBODR Owe: WUAU GTON. NORTH CAROLINA TELEPHONE gw"96I5M April 7, 1986 Mr. Mike Williams NC Division of Environmental Management 7225 Wrightsville Avenue Wilmington, North Carolina 28403 Subject: Windchase Stormwater Plan Amendment to Area #4 Revisions 'New Hanover County Dear Mr. Williams: MAILM ADDRESS POV OFIWZ BOX 3!f• 4TA. WRIMMOTON. N.C. =0341. As we discussed in our conversation on April 7, 1986, the following changes are proposed for the revised Windchase stormwater plan - Area #4: 1. The bottom elevation of the basin will be 5.4'. This will allow a two (2) foot separation between the seasonal high water table and the bottom of the basin. 2. The rim elevation remains at elevation 7.21, providing 1.8' of storage-depth. 3.• The calculations are: 2,350 Sq. Ft.(pond area) x 1.5'/Hr/Sq. Ft.(perc. rate) a 3;525 CF/Hr'(basin perc. rate 9,840 CF (total runoff into basin for 1.0 year storm) j 3,525 CF/Hr 2.8 Hrs (time to percolate 10 year storm runoff) Since this basin will percolate the total calculated runoff in 2.8 hours, it is adequate for use as a stormwater pond, with no discharge .occurring to S.A. waters from a 10 year, 24 tiour storm. Please do not hesitate to contact me if you have any-questions or need additional information. Sincerely,I JOSEPH S. HILL, JR. and ASSOCIATES Michael S. Marsh {?, 1046 FAi?? "Ew,9E?IT 1;: FFI'a MSM/p va JOSEPH S. HILL JR and ASSOCUTES CONSULTING ENGINEERS =0 PLANNERS HU HARBOUR DME "AUNGT+ON. NORTH CAROLINA ' TELEPHONE rig. WU" January 8, 1985 Mr. Mike Williams N.C. Division of Environmental Management 7225 Wrightsville Avenue Wilmington, N.C. 28403 Subject: Stormwater Management Plan Windchase Subdivision New Hanover County Dear Mr. Williams: Please find attached two (2) copies of the Sto.rmwater Management Plan and. Calculations for subject project. Please take a look at these items at your earliest convenience. If you have any questions, please contact Mike Marsh or nWself. - Sincerely,. JOSEPH{ S. HILL, • JR. and ASSOCIATES -`; osepb. S: Hill, Jr.; p.E J JSH/pva ' ... ' ,? y ?C YT? K .?. 13 enc. ?; z< ; WINDCHASE Stormwater Retention Plan 100 Year Storm RUNOFF CALCULATIONS For calculation purposes, the entire site was divided into 8 subareas. The amount of area covered by impervious surfaces in each subarea will be determined and runoff volume calculated for the 100 year storm event (10.5" precipitation in 24 hours, 4.5" precipitation max. intensity in 1 hour).: After this volume has been determined, a retention system will be designed to insure that no discharge to surface waters will occur from impervious surfaces during the 100 year storm and that the retained runoff will percolate into the soil. See attached color-coded site plan for the various subareas. The soils are Wakulla sand throughout the site having a permeability of 6.3 to 20.0 inches per hour. A permeability of 18 inches per hour was used for the calculations. AREA 1 Runoff from the impervious surfaces in Area 1 will be collected and diverted into a percolati-on basin. Impervious Surfaces - Rooftops = 2 x 2,400 = 4,800 FT2 Driveways = 146 LF x 10' W = 1,460 FT2 Streets = 390 LF x 16' W = M40 FT2 Total Impervious Surface Area = 12,500 FT2 10.5" Precip. in 24 hours = x .875 FT.'Precip./24 hrs 109937.5 CF/24 hrs 12,500 FT2 4.5" Precip. (max. intensity) in 1 hr.= x .375 FT. Precip./1 hr 4,687.5 CF/l hr. Percolation Basin Area 2,000 FT2 Percolation Basin Depth = 1.'6' Watertable Elevation = 2.0' Arpa 1 rnnt_ Rim Elevation = 6.2' Percolation Rate = 1.5'/hr. Basin will percolate 1.5'/hr x 2,000 Ft2 = 3,000 CF/hr 4,687.5 CF (l hr Runoff) - 3,000 CF (1 hr Perc.) = 1,687.5 CF Storage Volume Required 1,687.5 CF 2,400 Ft = 0.70' Basin Depth + 0.375' Precip. onto Basin 1.08' Basin Depth Required for 1 hr Intensity + 0.50' Freeboard. 1.58' Total Basin Depth Total Runoff fry 100 year storm = 10,937.5 CF = 24 = 455 CF/hr. Basin will percolate 3,000 CF/hr therefore no accumulation from 100 year storm of 24 hours duration. AREA 2 Runoff from the impervious surfaces in Area 2 will be collected and diverted into a retention/percolation swaie. Impervious Surfaces - Rooftop = 1 x 2,400 = 2,400 Ft2 Driveway = 125 LF x 10'W = 1,250 Ft2 3,650 Ft2 x .875 Ft Precip/24 hours 3,193.75 CF RO/24 hours 3,650 Ft2 x .375 Ft Precip/l hour 1,368.75 CF RO/i hour Swale Area = 640 Ft2 Swale Depth = 1.5' W.T. Elev. = 2.0' Rim Elev. 6.0' Percolation Rate = 1.5'/hr 2 Area 2 Cont. Swale will percolate 1.5'/hr x 640 Ft2 = 960 CF/hr. 1,368.75 CF (1 Hr RO) - 900 CF (1 Hr Perc.) = 408.75 CF Storage Volume Required 408.75 CF = 640 Ft2 = 0.64' Depth Required + 0.375' Precip. onto Swale 1.02' Swale depth required for 1 hour intensity + 0.50' Freeboard 1.52' Total Swale Depth Total runoff from 100 year storm = 3,193.75 CF 24 = 133 CF/Hr Swale will percolate 960 CF/Hr therefore, no accumulation. AREA 3 Runoff from impervious surfaces in Area 3 will be collected and diverted into a percolation swale. Impervious Surfaces - Rooftop = 1 x 2,400 Ft2 Driveway = 25 LF x 10' W Total Impervious Area Swale Area = 600 Ft2 Swale Depth = 1.0' W.T. Elev. = 2.0' Rim Elev. = 5.8' Perco. Rate .= 1.5"/Hr = 2,400 Ft2 250 Ft2 = 2,650 Ft2 x.0.875 Ft Precip./24 hrs 2,318.75 CF/24 hrs 2,650 Ft2 x 0.375 ft' Precip./l hr 993.75 CF/i hr Swale will percolate 1.5'/Hr x 600 Ft2 = 900 CF/Hr 994 CF (1 Hr RO) - 900 CF (1 Hr Perc.) = 94 CF Required Storage Volume 3 Area 3 Cont. 94 CF j 900 Ft2 = 0.10' Depth Required + 0.375' Precip. onto Swale 0.475' Depth Required for 1 hour intensity + 0.50' Freeboard 0.975' Total Swale Depth Total Runoff from 100 year storm = 2318.75 CF j 24 = 96.CF/Hr Swale will percolate 900 CF/Hr; therefore, no accumulation. AREA 4 Runoff from impervious suirfaces in Area 4 will be collected and diverted into a percolation basin. Impervious Surfaces - Rooftops = 3 x 2,400 = 7,200 Ft2 Driveways = 140 LF x 10' W' = 1,400 Ft2 Street = 150 LF x 16' W = 2,400 Ft2 Circle = 155 LF x 10' W = 1,550 Ft2 12,550 Ft2 x .875 Ft Precip./24 hours 1-0,981 CF/24 hours Percolation Basin Area = 2,350 Ft2 Percolation Basin Depth = 1.41 , W.T. Elevation = 2.0' Rim Elevation = 5.5' Percolation Rate = 1-.5'/Hr 12;550 Ft2 x .375 Ft Precip./l hour 4,706 CF RO/1 hour Basin will percolate 1.5'/Hr x 2,350 Ft2 = 3,525 CF/Hr 4,706 CF (1 Hr RO) - 3,525 CF (1 Hr Perc.) = 1,181 CF Storage Volume Required 4 Area 4 Cont. 1,181 CF t 2,350 Ft2 = 0.50' Basin Depth + 0.375' Precip. onto Basin 0.875' Basin Depth Required for 1 Hr Intensity + 0.50' Freeboard 1.375' Total Basin Depth Total Runoff from 100 year storm = 10,981 CF j 24 = 458 CF/Hr Swale will percolate 3,525'CF/Hr, therefore, no accumulation from 100 year storm of 24 hour duration. AREA 5 Runoff from impervious surfaces in Area 5 will be collected and diverted into a percolation. basin. Impervious Surfaces - Rooftops = 3 x 2,400 Ft2 = 7,200 Ft2 Driveways = 125 LF x 10' W = 1,250 Ft2 Total Impervious Surface Area = 8,450 Ft2 x 0.875 Ft Precip./24 Hr 7,393 CF RO/2-4 Hrs Percolation Basin Area = 2,500 Ft2 Percolation Basin Depth = 0.5' W_ T. Elevation = 2.0' Rim Elevation = 5.5' Perc. Rate = 1.5'/Hr 8,450 Ft2 x 0.375 Ft Precip./1 Hr 3,168 CF RO/1 Hr Basin will percolate 2,500 Ft2 x 1.5'/Hr = 3,750 CF/Hr 3,168 CF (1 Hr RO) - 3,750 CF (1 Hr Perc.) = -582 CF (Excess Capacity) Excavate Basin 0.50' to provide Freeboard. 5 Area 5 Cont. Total runoff from 100 year storm = 7,393 CF j 24 = 308 CF/Hr Basin will percolate 3,750 CF/Hr, therefore, no accumulation. AREA 6 Runoff from impervious surfaces in Area 6 will be collected and diverted into a percolation basin. Impervious Surfaces - Rooftops = 2 x 2,400 Ft2 = 4,800 Ft2 Driveways = 55 LF x 10' W = 550 Ft2 Street = 155 LF x 16' W = 2,480 Ft2 Total Impervious Surface Area = 7,830 Ft2 , x 0.875 Ft 6,851 CF/24 Hrs 7,830 Ft2 x 0.375 Ft 2,936 CF/1 Hr Percolation Basin Area = 2050 Ft2 Percolation Basin Depth = 0,5' W.T. Elevation = 2.0' Rim Elevation = 5.8' Percolation Rate = 1.5'/Hr Basin will percolate 2,050 Ft2 x 1.5'/Hr. = 3,07-5 CF/Hr 2,936 CF (1 H-r.RO) - 3,075 CF (1 Hr Perc.) _ -139 CF (Excess Capacity) Excavate Basin 0.50' to provide Freeboard. Total runoff from 100 year storm = 6,851 CF j 24 Hrs = 285 CF/Hr. Basin will percolate 3,075 CF/Hr, therefore, no accumulation. 6 AREA 7 Runoff from impervious surfaces in Area 7 will be collected and diverted into a percolation swale. Impervious Surfaces - Street = 290 LF x 16' W = 4,640 Ft2 x 0.875 Ft 4,060 CF RO/24 Hrs 4,640 Ft2 x 0.375 Ft 1,522..5 CF RO/1 Hr Swale Area = 1,100 Ft2 Swale Depth = 0.5' W.T. Elevation = 2.0' Rim Elevation = 5.3' Percolation Rate = 1.5'/Hr., Swale will percolate 1,100 Ft2 x 1.5'/Hr = 1,650 CF/Hr 1,522 (1 Hr RO) - 1,650 CF (1 Hr Perc.) = -128 CF (Excess Capacity) Excavate swale 0.50' to provide Freeboard. Total runoff from 100 year storm = 4,060 CF = 24 Hours = 170 CF/Hr. Swale will percolate 1,650 CF/Hr., therefore, no accumulation from 100 year storm of 24 hour duration. AREA 8 Runoff from impervious surfaces in Area 8 will be collected and diverted into a percolation basin. Impervious Surfaces - Rooftop = 1,500 Ft2 Parking Lot = 800 Ft2 Driveway = 450 Ft2 Street Circle = 220 LF x 10' W T 2,200 Ft2 4,950 Ft2 x 0.875 Ft 4,331 CF RO in 24 Hrs 7 Area 8 Cont. 4,950 Ft2 x 0.375 Ft 1,856.25 CF RO/1 Hr Percolation Basin Area = 1,300 Ft2 Percolation Basin Depth = 0.5' W.T. Elevation = 2.0' Rim Elevation = 5.8' Percolation Rate = 1.5'/Hr, Basin will percolate 1,300 Ft2 x 1.5'/Hr = 1,950 CF/Hr. 1,856 CF (1 Hr RO) - 1,950 CF (1 Hr Perc.) _ -94 CF (Excess Capacity) Excavate Basin 0.5' to provide Freeboard. Total runoff from 100 year storm = 4,331 CF j 24 Hrs = 180 CF/Hr. Basin will percolate 1,950 CF/Hr, therefore, no accumulation. 8 a'-o"t 3-o of n y v J/ A i? r o ? O ? ? ? r y Z IF it ril N _? O? 3 o ? co a o • •' r ? ? n a ? a 41 r a ? ? m o r y o O O ti o o to n r n 2 ? o n r O a \? of ? ac r N ? o ? n r y 2 ? m o i ti ? O I n i c ti 2 2 m r k n i 0 N 0 0 zz/ u .. i ,? a ion OS o n e ?` « ?.. ? o C? M Z 91 ? 1 ? / .oh , •` .+ ^Y` `? 1 it 'l `• •?r' ?, ? :y?, n 44Z i o a aro ° \ I QJD 26 CQ w f • ^t \+ oo? A 'Plo Ar -Z 40 .0 1Oy? a y ., .+ o ?a _ r S y Aftft- 30 + r- N u O f ' n r a r `!P l Z 7 M L w f r• -. ?' ,._. ..• ,? AREA 7` a, am-Now .. N rem / / ' , Y iL / / A .e © c-• • ' 16 • +'Mi rte:. . i.. 1 .•• ti, z?!.•. ?I U?I• •.• Mme/ 'p ?- ?,Q1 \t , :h , _. • ?64 AR fj .. M ! ?, _ • ,rrrr ? r1. wry `? rler?? .wwr rr+', Y aw.. Y wr r. YrwOf tw w.. r rw . ur .., wrr - s rr wr rr? I .fir •. (• it ? .,.. r. ? Dare i .rc Y • L . , 'rr? r.r ?w?.r, ww. .wr r?r ?_ t ? ? .?? ! .. ? r cwt=w?w•. ??r. ? ` © wrr. ? ? ;? .... rur rnr. ?~• wwr? i r ?....~ IM'NOCNdSf ' '?J ? /? . ?. ... r • ?.rw ..rrl w.rr _. _ r ,r.r.r..?rrr.r. r+?r.?? Wr ar UrurifT AtAW '•'• srrw?•wr rlrrorwr. ;.- w wr rr?r.r.wrr?w?rr.r. 1 _ i . _ 'nrn` - •? ? - ... w•r+.vr_ .?..?w.r = o ?75C _... 1!i "'?F: 'fl.," .... .(r*,_.'?r.. .. !r• ? nr wY , .w A• ?A . \\\ 1 . w •?+. ? y _., ? ? ? r+«ra .x.w¢ a..n..' acme _ ,, r ... r+ ? ? ? ? ! ?,,. ,."•?.r? o ..?..??. ? ,----- :.. r?r r. , ..e wry ?`? ? {OGIlOr , Gwwf f(Ir W[ fxrcwst*v i ?AtlIG9NrJ?i ' 11MP Air R-LVM HD*# M>3W f ,02 = A373 rya av-wof7A9 d0 dcu 00+01 OO+EI y 00+ZI YIdOH,001: rl 183A ,9 =.I -37M „Vf, N01103S 371dOYd olvnDa9H9lH .:.:.. ::/`? ! '?'•? ?t.. 3SVHDQNIM +r..l:.. L..7? :'??Y??r i:hM"if TT^^ i,f :? - 1 IJ,•. p+ f4 : 10 10, 19 30dAf;! NSIN/d (.0 -RI) 0007.4 !ld3A 001 3AO9V 8007.4 3.LVA379 O1 AWSS903N S'd 59N171d .01 ,0*1 : A373 BOOV 03HSINI?G, -- - - - ,0'EZ = A373 !!007.4 AflOJS ON003.9 FI ,01:,1 alvaS olar??v? 107E = A373 3903 -4008 6+At 9N/0711'18 ,0'8E : A973 XV3d -400H r?r 19Z y y a a ' w w ' 10E 00+11 00+01 00+6 00+8 00+1 00+9 00+9 00+* OOfE 00+Z 00+1 00f0 lk w Y w7d s31117un PLo 3 x iV II1W/fIIN www uw wlw Q wMtw ??--- Y!w mm AIN17f7 M A1111tm AAr Nw *WW rllr7fiw/wdN1N WMON (.. _._.?i 4p '7A(fw wAfA/w t? mum ?- 1114 II7A/11t -+_ - A013wo Awr &ANM411 .- •t?1w1/4 rttt•I 4 r ?tfirwr w Tw r 7171w1 wmN TN 414 •/ •IAIw1Mw 4l Amww1w 4?w1 AwAN wwltw tw1 w twwlw w 101W OMA14 Yeti N1L Mr 1177w 4 Y 1 ft ilr4 •1 -IMYwtrwl) 711'=W1ux ImNI tlr4 r wt11W w Y WWAW w14 Yw ¦ TN 64l 4A0w t. ANYA 'IfNlwur tlt/lwl?siel 'WWWO 7 Y 4N141 1M N W4d ttN1NrN7 'I •I Y4 YIt/1 Al I 44wW1 w NN'1 .1111Y . 4T1N4 W _ = / 1'wlr w1r 'I t w Nr AMY ' I 'rwl mt 4 ~Aw4 4 tY wM1114 tew 4 w w1w w TN Y4 w11Y fY N"" w •74714 w Ail" 771r 1M •tM4/ 4IM fINfIM t ? ww1111NU It 'r •IAiw tM Or wuw~ wr 741 AwOfIN 4 • f714N 4 N .Svm4 t A tY ww '4rf w Y Aw wiM rw ' I 'lY4 All w AI.1 • t4T4 in me ti Two ti Nww1 •Y4w '41Y4N1 w 41i1NA N 7 - •144 *I I w /1'I . wONN 'iltwlr '1wwwflwr 1 wur 1 a4r 1NAt 'w 11'1 l4AV 'Y NI I tl -am ww ew 1NY AbllaW aftV 7YJ1d.U NOISN31X3 3W7 13711 3a1'9B?J j"'m am Nac wA113? LI7w1M , A A.l INj ,W r MI t .M , f ronr r.Y,r :JOB AGO/ M a ur AA AOJOW AVA2AW 3lYN6d 7V-OI Al 3NV7 36YH,7W141 i wr,J f-7 ,Nr IIORrJD1 ' ?: goo 71K mr A>wr0111 T? 1 r gul w i I I I l i I I II I I I I I z I W w?77Yw Jw - -JOSEPH'S. 11114 JR. and ASSOCIATES CONSULTING ENGINEERS and PLANNERS MAiLnvc'AnnRFSS: 1602 HARBOUR DRIVE FO6T OFFICE BOX 092-STA. 1 VALhUNGTON, NORTH CAROLINA W11AUNGTON, N.C. 2810341S5 TELEPHONE 919-M-1561 April 7, 1986 Mr. Mike.Williams NC Division of Environmental Management 7225 Wrightsville Avenue Wilmington, North Carolina 28403 Subject: Windchase Stormwater Plan Amendment to Area #4 Revisions New Hanover County Dear Mr. Williams: As we discussed in our conversation on April 7, 1986, the following changes are proposed for the revised Windchase stormwater plan - Area #4: 1. The bottom elevation of the basin will be 5.4'. This will allow a two (2) foot separation between the seasonal high water table and the bottom of the basin. 2. The rim elevation remains at elevation 7.2', providing 1.8' of storage depth. 3. The calculations are: 2,350 Sq. Ft.(pond area) x 1.5'/Hr/Sq. Ft.(perc. rate) 3,525 CF/Hr (basin perc. rate 9,840 CF (total runoff into basin for 10 year storm) = 3,525 CF/Hr = 2.8 Hrs (time to percolate 10 year storm runoff) Since this basin will percolate the total,cal_culated runoff in 2.8 hours, it is adequate for use as a stormwater pond, with no'discharge occurring to S.A. waters.from a 1-0 year. 24 hour storm. Please do not hesitate to contact.me if you have any questions or need additional information. Sincerely, JOSEPH S. HILL, JR. and ASSOCIATES Michael S. Marsh MSM/pva JOSEPH S. HILL, JR. and ASS0CUTES CONSULTING ENGINEERS and PLANNERS MAILING ADDRESS: 1602 HARBOUR DRIVE POST OFFICE BOX 35924TA. 1 WILMINOTON, NORTH CAROLINA WUMINOTON, N.C. 28103.4155 TELEPHONE 919.799.1514 March 11, 1986 Mr. Mike Williams N.C. Division of Environmental Management 7225 Wrightsville Avenue Wilmington, N.C. 28403 Subject: Windchase Stormwater Plan Soils Evaluation New Hanover County MM 14 M6 WILMINGTON REGIONAL OFFICE DFM Dear Mr. Williams: Attached is a copy of the soils evaluation conducted by Mr. Ed Andrews, P.G. for the Windchase stormwater plan. The report shows that the retention areas will rapidly percolate the collected stormwater runoff as designed. Please do not hesitate to contact me if you have any questions or need additional information. Sincerely, JOSEPH S. HILL, JR. and ASSOCIATES Michael S. Marsh MSM/pva 1r?D 0 0 SCO? A RECEIVED MAR 11 1986 RKA RUSSNOW, KANE & ANDREWS Hydrweology Post Office Box 33634 Offices: Gw1ogy Raleigh, North Carolina 27606 Raleigh, North Carolina Env/ronawntal Sdonen (919) 781-7326 Newport News, Virginia Solis March 8, 1986 Joseph S. Hill, Jr. and Associates P.O. Box 5592-Station I Wilmington, North Carolina 28403 RE: Stormwater Evaluation Windchase Development Dear Mr. Hill: A preliminary geologic and hydrologic evaluation of the stormwater retention basins for the Windchase Development reveals that significant infiltration will occur. Eight specific sites were inspected to determine lithology; depth to the water table; seasonal high water table; and infiltration rates. Two distinct types of sites were identified: Site #I, which is located at an approximate elevation of 8 feet above mean sea • level, consists primarily of regressive beach ridge sands. Sites #2 through #8 consist primarily of oyster shell fill at lower elevations. In order to determine the infiltration rates at Site #I, double- ring infiltrometers were used to characterize the maximum infiltration rate for the finest textured layer which was approximately at 1.5 feet below land surface. The infiltration rate was calculated to be greater than 28.5 inches per hour. The slightly coarser well sorted sands to six feet should exhibit a higher infiltration rates. An attempt to measure the infiltration rates at the other sites was unsuccessful because the double ring infi.ltrometer could not be seated in the shell fragments. Estimated water table elevations indicate that the permeabil- ity is greatest at sites 2, 3, 5, 7. and 8. Site #4 consists of intersticial sand and silt with the oyster shells which has resulted in a slightly elevated water table surface. The sites revealed the following characteristics: Mr. Joseph S. Hill, Jr., P.E. March 8, 1986 Joseph S. Hill, Jr, and Associates Windchase Development Page 2 J u ace elevation is 2.1 feet above MSL. A double ring infiltrometer was performed at a depth of 1.5 feet below land surface with an infiltration rate of 28.5 in/hr. Site #2 - This site revealed oyster shell fill to a depth- 4 feet below land surface. The estimated land surface is 5.8 feet land surface, with the water level at a depth of 3.65 eet below land surface or 2.15 feet above sea level.. Due to oyster shells, it was not possible to measure either infiltration rates or permeabilities. Site #3 - This site revealed oyster shell fill to a depth of 4 feet below land surface. The estimated land / surface is 4.8 feet above mean sea level, with an estimated f water table surface elevation eet above mean sea level (depth to water table 2.8 feet Due to oyster shells, it was not possible to ure either infiltration rates or permeabilities. Site #4 - T-he estimated land surface elevation was 4.5 feet above mean vel and the water table surface was encountered a 1.1 fee below land surface; therefore, the water table min ion was 3.4 feet above mean sea level. Due to oyster shells to a depth of 6 feet, it was not possible to measure either infiltration rates or permeabil-. ities. Site #5 - The estimated land surface elevation was 5.0 feet above me=-I ?vei and the depth to the water table surface wa ee below land surface; therefore, the water table a on was 2.9 feet above mean sea level. Due to oyster shells to a depth of 6 feet, it was not possible to measure either infiltration rates or permeabil- it ies . Site #6 - The estimated land surface elevation was 4.5 feet ve me evel and the depth to the water table surface wa 2.2 feet below land surface; therefore, the water table e ev ion was 2.3 feet above mean sea Site #1 - The estimated elevation was 8 feet above mea - lev el and the water table surface was encountered at 5.90 feet below land surf ace; therefore the estimated wa table s rf Joseph S. Hill, Jr. and Associates Windchase Development Page 3 level. Due to oyster not possible to measure ities. March 8, 1986 shells to a depth of 6 feet, it was either infiltration rates or permeabil- Site #7 - The estimated land surface elevation, was 5 feet above mea level and the depth to the water table surface wa 2.44 eet below land surface; therefore, the water table a evation was 2.56 feet above mean sea level. Due to oyster shells to a depth of 6 feet, it was not possible to measure infiltration rates or permeabilties. Site #8 - *The estimated land surface elevation was 5.5 ee above me evel and the depth to the water J table surface wa 3.9 fee below land surface; therefore, the water table eleva n was 1.6 feet abov-e mean sea level. Due to oyster shells to a depth of 6 feet, it was not possible to measure infiltration rates or permeabilities. The measured water table surface appears at the depths where the soil seems to exhibit the chroma 2 or less color (Munsell Color Chart). Therefore, the water table elevation for February 1986 is very close or identical to the seasonal high water tab-le. The relative water table surface elevation provides an insight into the relative permeabilities. Apparently, Site #4 has a slightly higher water table elevation, because of lower overall permeabilities. For the purpose of your design effort, you should use a conservative infiltration value of 18 inches per hour. Due to the high permeabilities, distance to line sink, and the large stream width, these infiltration areas will discharge all stormwater rapidly. Please contact my office if you have any questions. EEA;sb Attachment Very truly yours, Edwin E. Andrews, 111, P.G. Consulting Hydrogeologist 4 LITHOLOGIC LOG Windchase Development Site #1 0-0.7 ft. Brown fine sand with organics and silt 0.7-1.0 ft. Yellow brown fine to medium well sorted sand 1-2 ft. Yellow brown fine to medium well sorted sand 2-3 ft. Yellow brown fine to medium well sorted sand 3-6 ft. Light yellow brown fine to medium very well sorted sand Sites #2-8 0-4 ft. Gray l oose oyster shells with sand and shell fragments 4-6 ft. Brown oyster shells with silty sand and shell fragments WINDCHASE Stormwater Retention Plan 100 Year Storm RUNOFF CALCULATIONS For calculation purposes, the entire site was divided into 8 subareas. The amount of area covered by impervious surfaces in each subarea will be determined and runoff volume calculated for the 100 year storm event (10.5" precipitation in 24 hours, 4.5" precipitation max. intensity in 1 hour). After this volume has been determined, a retention system will be designed to insure that no discharge to surface waters will occur from impervious surfaces during the 100 year storm and that the retained runoff will percolate into the soil. See attached color-coded site plan for the various subareas. The soils are Wakulla sand throughout the site having a permeability of 6.3 to 20.0 inches per hour. A permeability of 18 inches per hour was used for the calculations. AREA 1 Runoff from the impervious surfaces in Area 1 will be collected and diverted into a percolation basin. Impervious Surfaces - Rooftops = 2 x 2,400 = 4,800 FT2 Driveways = 146 LF x 10' W = 1,460 FT2 Streets = 390 LF x 16' W = 6,240 FT2 1 Total Impervious Surface Area = 12,500 FT2 10.5" Precip. in 24 hours x .875 FT. Precip./24 hrs 4.5" Precip. (max. intensity Percolation Basin Area = 2,000 FT2 Percolation Basin Depth = 1.6' Watertable Elevation =,2.0 5.9o,. 10,937.5 CF/24 hrs 12,500 FT2 in 1 hr.= x .375 FT. Precip./1 4,687.5 CF/l hr. 7,X91 •? ?•f : R&W-OF-F- 32aoc,? Z,eo© -?fL we P"I 50CC c F/'LA PC-Re- r'q-rF 72,elw cF?2? h?25 hr 12, S; f f X . S83 Fr 7 ADD/Trv??.? ? ?? Area 1 Cont. 1,687.5 CF = 2,400 Ft2 = 0.70' Basin Depth + 0.375' Precip. onto Basin 1.08' Basin Depth Required for 1 hr Intensity + 0.50' Freeboard 1.58' Total Basin Depth Rim Elevation = 6.2' Percolation Rate = 1.5'/hr. Basin will percolate 1.5'/hr x 2,000 Ft2 = 3,000 CF/hr 4,687..5 CF .(i hr Runoff) - 3,000 CF (1 hr Perc.) = 1,687.5 CF Storage Volume Required Total Runoff from 100 year storm = 10,937.5 CF =. 24 = 455 CF/hr. Basin will percolate 3,000 CF/hr therefore no accumulation from 100 year storm of 24 hours duration. AREA 2 Runoff from the.impervious surfaces in Area 2 will be collected and diverted into a retention/percolation swale. Impervious Surfaces - Rooftop = 1 x 2,400 = 2,400 Ft2 Driveway = 125 LF x 10'W = 1,250 Ft2 3,650 Ft2 x .875 Ft Precip/24 hours 3,193.75 CF RO/24 hours 3,650 Ft2 x .375 Ft Precip/l hour 1,368.75 CF RO/l hour Swale Area = 640 Ft2 Swale Depth = 1.5' 21?9•?? C? ?nIOF W.T. Elev. = 2.0' Q /?D G•?• STIR ? Rim Elev. = 6.0' ------ Percolation Rate = 1.5'/hr r 111 J7 C•1• ??D • ADD'srb 2 ?l Z?i.17 c 0 Area 2 Cont. Swale will percolate 1.5'/hr x 640 Ft2 = 960 CF/hr. 1,368.75 CF (1 Hr RO) - 900 CF (1 Hr Perc.) = 408.75 CF Storage Volume Required 408.75 CF = 640 Ft2 = 0.64' Depth Required + 0.375' Precip. onto Swale 1.02' Swale depth required for 1 hour intensity + 0.50' Freeboard 1.52' Total Swale Depth Total runoff from 100 year storm = 3,193.75 CF j 24 = 133 CF/Hr Swale will percolate 960 CF/Hr therefore, no accumulation. AREA 3 Runoff from impervious surfaces in Area 3 will be collected and diverted into a percolation Swale. Impervious Surfaces - Rooftop 1 x 2,400 Ft2 Driveway = 25 LF x 10' W Total Impervious Area = 2,400 Ft2 = 250 Ft2 = 2,650 Ft2 Z6?? x 0.875 Ft Precip./24 hrs 2,318.75 CF/24 hrs /583 G4 2,65-0 Ft2 x 0.375 Ft Precip./1 hr 993.75 CF/l hr Swale Area = 600 Ft2 /JF?S 133 GA' gz)nlOF-F- Swale Depth = 1.0' (A00 G•f S?? , W.T. Elev. = 2.0' ?jy?g3 C. STCa ??•p Rim Elev. = 5.8' Perco. Rate = 1.5'/Hr Swale will percolate 1.5'/Hr x 600 Ft2 = 900 CF/Hr 994 CF (1 Hr RO) - 900 CF (1 Hr Perc.) = 94 CF Required Storage Volume 3 Area 3 Cont. 94 CF j 900 Ft2 = 0.10' Depth Required + 0.375' Precip. onto Swale 0.475' Depth Required for 1 hour intensity + 0.50' Freeboard 0.975' Total Swale Depth Total Runoff from 100 year storm = 2318.75 CF j 24 = 96..CF/Hr Swale will percolate 900 CF/Hr, therefore, no accumulation. AREA 4 Runoff from impervious surfaces in Area 4 will be collected and diverted into a percolation basin. Impervious Surfaces - Rooftops = 3 x 2,400 = 7,200 Ft2 Driveways = 140 LF x 10' W = 1,400 Ft2 Street = 150 LF x 16' W = 2,400 Ft2 Circle = 155 LF x 10' W = 1,550 Ft2 12,550 Ft2 1 Z S-52) x .875 Ft Precip./24 hours 10,981 CF/24 hours '7320• g3 C 12,550 Ft2 x .375 Ft Precip./l hour 4,706 CF RO/1 hour Percolation Basin Area = 2,350 Ft2 Percolation Basin Depth = 1.4' W.T. Elevation = 2.0' Rim Elevation = 5.5' Percolation Rate = 1.5'/Hr VW-9`3 CF: ?etJn/o 3210 57-6 i ------------------ 'Ve 30.83 C •?. '*DD- ST6 . 0,61!p A Basin will percolate 1.51/Hr x 2,350 Ft2 = 3,525 CF/Hr 4,706 CF (1 Hr RO) - 3,525 CF (1 Hr Perc.) = 1,181 CF Storage Volume Required 4 Area 4 Cont. 1,181 CF = 2,350 Ft2 = 0.50' Basin Depth + 0.375' Precip. onto Basin 0.875' Basin Depth Required for 1 Hr Intensity + 0.50' Freeboard 1.375' Total Basin Depth Total Runoff from 100 year storm = 10,981 CF a 24 = 458 CF/Hr Swale will percolate 3,525 CF/Hr, therefore, no accumulation from 100 year storm of 24 hour duration. AREA 5 Runoff from impervious surfaces in Area 5 will be collected and diverted into a percolation basin. Impervious Surfaces - Rooftops = 3 x 2,400 Ft2 = 7,200 Ft2 Driveways = 125 LF x 10' W = 1,250 Ft2 Total Impervious Surface Area = 8,450 Ft2 x 0.875 Ft Precip./24 Hr 7,393 CF RO/24 Hrs 8,450 Ft2 x 0.375 Ft Precip./1 Hr 3,168 CF RO/1 Hr Percolation Basin Area = 2,800 Ft2 Percolation Basin Depth = 0.5' W. T. Elevation = 2.0' Rim Elevation = 5.5' 41q 2q. l & C. f. Rvn/or-lam t Z SO S>C? 34-79.16? 4-PD. Sr4r. AKD Perc. Rate = 1.5'/Hr Basin will percolate 2,500 Ft2 x 1.5'/Hr = 3,750 CF/Hr 3,168 CF (1 Hr RO) - 3,750 CF (1 Hr Perc.) = -582 CF (Excess Capacity) Excavate Basin 0.50' to provide Freeboard. 5 Area 5 Cont. Total runoff from 100 year storm = 7,393 CF j 24 = 308 CF/Hr Basin will percolate 3,750 CF/Hr, therefore, no accumulation. AREA 6 Runoff from impervious surfaces in Area 6 will be collected and diverted into a percolation basin. Impervious Surfaces - Rooftops = 2 x 2,400 Ft2 = 4,800 Ft2 Driveways = 55 LF x 10' W = 550 Ft2 Street = 155 LF x 16' W = 2,480 Ft2 Total Impervious Surface Area = 7,830 Ft2 783b x 0.875 Ft . 5$ 3 6,851 CF/24 Hrs 6 ?- G 7,830 Ft2 x 0.375 Ft 2,936 CF/1 Hr Percolation Basin Area = 2050 Ft2 Percolation Basin Depth = 0.5'x(07 C•F. /?vi?©y1G ? 25 ?•F SY?4. W.T. Elevation = 2.01 Rim Elevation = 5.8' 3s"?f2, s G•F- I?AD• ?Yb •?? Percolation Rate = 1.5'/Hr Basin will percolate 2,050 Ft2 x 1.5'/Hr. = 3,075 CF/Hr 2,936 CF (1 Hr RO) - 3,-075 CF (1 Hr Perc.) = -139 CF (Excess Capacity) Excavate Basin 0.50' to provide Freeboard. Total runoff from 100 year storm = 6,851 CF = 24 Hrs = 285 CF/Hr. Basin will percolate 3,075 CF/Hr, therefore, no accumulation- 6 AREA 7 Runoff from impervious surfaces in Area 7 will be collected and diverted into a percolation swale. Impervious Surfaces - Street = 290 LF x 16' W = 4,640 Ft2 x 0.875 Ft 4,060 CF RO/24 Hrs 4,640 Ft2 x 0.375 Ft 1,522.5 CF RO/1 Hr Swale Area = 1,100 Ft2 Swale Depth = 0.5' W.T. Elevation = 2.0' Rim Elevation = 5.3' Percolation Rate = 1.51/Hr. Swale will percolate 1,100 1,522 (1 Hr R0) - 1,650 CF Excavate swale 0.50' to pry Total runoff from 100 yea-r Swale will percolate 1,-650 storm of 24 hour duration. AREA 8 Z7o?zC .-?. ,QtJNOF? 55o C •?• 5» 46 40 -AfL .5$3? Ft2 x 1.5'/Hr = 1,650 CF/Hr (1 Hr Perc.) _ -128 CF (Excess Capacity) )vide Freeboard. storm = 4,060 CF = 24 Hours = 170 CF/Hr. CF/Hr., therefore, no accumulation from 100 year Runoff from impervious surfaces in Area 8 will be collected and diverted into a percolation basin. Impervious Surfaces - Rooftop = 1,500 Ft2 Parking Lot = 800 Ft2 Driveway = 450 Ft2 Street Circle = 220 LF x 10' W = 2,200 Ft2 4,950 Ft2 x 0.875 Ft 4,331 CF RO in 24 Hrs yq ?a S .f., . S 83 ? ZSBS ?? G? ?Lr/?/?? 7 Area 8 Cont. 4,950 Ft2 x 0.375 Ft 1,856.25 CF RO/1 Hr Percolation Basin Area = 1,300 Ft2 Percolation Basin Depth = 0.5' 2g85-.8 5- C,?, /1,cl?Yd W.T. Elevation = 2.0' Rim Elevation = 5.8' 223s.$S ADD C.f'. 5TG !!D- Percolation Rate = 1.5'/Hr Basin will percolate 1,300 Ft2 x 1.5'/Hr = 1,950 CF/Hr. 1,856 CF (1 Hr RO) - 1,950 CF (1 Hr Perc.) = -94 CF (Excess Capacity) Excavate Basin 0.5' to provide Freeboard. Total runoff from 100 year storm = 4,331 CF = 24 Hrs = 180 CF/Hr. -Basin will percolate 1,950 CF/Hr, therefore, no accumulation. 8 MAP SYMBOL 76B 104 SOIL NAME Wakulla sand 1-8 per cent slope Wakulla Series SOIL SURVEY INTERPRETATION! MIRA 136 Rev. -,BTB.RER __.,. _ .. .. _....._.... _ :. ... 9/72 The Wakulla series consists of somewhat excessively drained sands and loamy sands of the upland Coastal Plain and stream terraces. The surface layer is dark grayish brown over light yellowish brava sand to a depth of about 2 feet. In the subsoil below aboiit 24 inches is strong brown very friable loamy sand that grades into yellowish brown and yellow sand at 42 inches. Slopes range from 0 to 10 percent. vavrw rrn 9NYCT(:AT. ANn (.VVWCAL PROPERTIES Major Coars Percentage Less Than 3 Avail. Shrink- Soil Classification Fracte Inches Passing Sieve No.-- Permea- Water Soil Swell WTisoas USDA >3 in. LL PI bility Cap. Reac- Poten- (inehes) Texture Unified AASno Z 4 10 40 200 in/hr. in/in. tion tial 0-24 Sand SP-SM, A-2 100 100 75-90 5-15 -- NP .3-20.0 <.OS 4.5-6.0 Low i 24-42 Loamy Sand SMr A-2 100 100 80-95 10-25 -- NP .3-20.0 .05-.10 4.5-6.0 Low SP-SM 42-83 Sand SP-SM, A-2 100 100 75-80 5-15. -- NP .3-20.0 <.05 4.5-6.0 Low SM Depth to rock: Rock Pree Hydrologic group: A _.' Flood hazard: None Wetness: None _ i Improbable somrce Good __ .._..._.-._. ?.... _. _ . __._?__ _ Pond teservoir areas -- t --- Severe - rapid permeability - 7-- Pond embankments Severe - rapid permeability Excavated ponds (aquifer fed) ' Severe - depth, to seasonally high water table more than 6 feet. Corrosivity - Uncoated steel law - drainage,texture, reaction Corrosivity - Concrete High - texture, reaction -" - - - Dwellings - 0-41Z slopes slight 8-M slopes - moderate; slope Septic tank filter fields 0-8Z slopes - slight All slope phases may be severe because of possible 0402 slopes- moderate slope- contamination of shallow water supplies. Sewage Lagoons Severe - rapid permeability _ Local roads and streets 0-8Z alopea - slight 8-102: slopes:- moderate slope Light industries 4-SZ slopes _ moderate slope 8-7!q;: slopes* severe slope , anitary landfill Trench method Severe -. permeability Area method Severe.- permeability U. C ocr.rr a REV. 7-70 IOM X 16- WORKSHEET 12-4W 4-N-2141s I ? a 9 X IOM WORK SHEET 12-68 4-9-27413-A 1 OF 7 .__. .. _?_.....__. nrr_Rrr (1F T.TuTTATTr1NS Awn vA-TnR SnTT. FRATMRS AFFECTING -SELECTED I15E. F to ? ? ,tea 3 z. JOSEPH S, HUX, JR. and ASSOCIATES CONSULTING.ENGINEERS and PLANNERS NAILING ADDRESS 1602 HARBOUR DRIVE POST OFFICE BOX 3592SPA. 1' WILMINGTON. NORTH CAROLINA VALMINGTON. N.C. 28403.41SS TELEPHONE 919.799-15" March 20, 1986 Mr. Mike Williams NC Division of Environmental Management 7225 Wrightsville Avenue Wilmington, North Carolina 28403 Subject: Windchase Stormwater Plan Street Revision New Hanover County Dear Mr. Williams: Attached is the revised stormwater plan for Windchase showing that the driveway will be left in an unpaved condition at all points less than 30' from the mean high water line per DEM requirements. Please complete your review of the subject plan as soon as possible. Please do not hesitate to contact me if you have any questions or if you fee-1 that other changes are necessary. Sincerely, JOSEPH S. HILL, JR. and ASSOCIATES Michael S. Marsh MSM/pva enc. JOSEPH S, HII.L, JIL and ASSOCIATES CONSULTING ENGINEERS and PLANNERS 1602 HARBOUR DRIVE WILMINGTON, NORTH CAROLINA TELEPHONE 919.799-1541 January 8, 1985 Mr. Mike Williams N.C. Division of Environmental Management 7225 Wrightsville Avenue Wilmington, N.C. 28403 Subject: Stormwater Management Plan Windchase Subdivision New Hanover County Dear Mr. Williams: WAILING ADDRESS: POST OFFICE BOX 5592-STA. 1 WILMWGTON, N.C. 28103.4155 Please find attached two (2) copies of the Stormwater Management Plan and Calculations for subject project. Please take a look at these items at your earliest convenience. If you have any questions, please contact Mike Marsh or myself. Sincerely, JOSEPH S. HILL, JR. and ASSOCIATES Joseph. S. Hill, Jr., P. E. JSH/pva enc. WINDCHASE Stormwater Retention Plan 100 Year Storm RUNOFF CALCULATIONS For calculation purposes, the entire site was divided into 8 subareas. The amount of area covered by impervious surfaces in each subarea will be determined and runoff volume calculated for the 100 year storm event (10.5" precipitation in 24 hours, 4.5" precipitation max. intensity in 1 hour). After this volume has been determined, a retention system will be designed to insure that no discharge to surface waters will occur from impervious surfaces during the 100 year storm and that the retained runoff will percolate into the soil. See attached color-coded site plan for the various subareas. The soils are Wakulla sand throughout the site having a permeability of 6.3 to 20.0 inches per hour. A permeability of 18 inches per hour was used for the calculations. AREA 1 Runoff from the impervious surfaces in Area 1 will be collected and diverted into a percolation basin. Impervious Surfaces - Rooftops = 2 x 2,400 = 4,800 FT2 Driveways = 146 LF x 10' W = 1,460 FT2 Streets = 390 LF x 16' W = 6,240 FT2 Total Impervious Surface Area = 12,500 FT2 10.5" Precip. in 24 hours = x .875 FT. Precip./24 hrs 10,937.5 CF/24 hrs 12,500 FT2 4.5" Precip. (max. intensity) in 1 hr.= x .375 FT. Precip./1 hr 4,687.5 CF/l hr. Percolation Basin Area = 2,000 FT2 Percolation Basin Depth = 1.6' Watertable Elevation = 2.0' Area 1 Cont. Rim Elevation = 6.2' Percolation Rate = 1.5'/hr. Basin will percolate 1.5'/hr x 2,000 Ft2 = 3,000 CF/hr 4,687.5 CF .(1 hr Runoff) - 3,000 CF (l hr Perc.) = 1,687.5 CF Storage Volume Required 1,687.5 CF 2,400 Ft2 = 0.70' Basin Depth + 0.375' Precip. onto Basin 1.08' Basin Depth Required for 1 hr Intensity + 0.50' Freeboard 1.58' Total Basin Depth Total Runoff from 100 year storm = 10,937.5 CF + 24 = 455 CF/hr. Basin will percolate 3,000 CF/hr therefore no accumulation from 100 year storm of 24 hours duration. AREA 2 Runoff from the-impervious surfaces in Area 2 will be collected and diverted into a retention/percolation swale. Impervious Surfaces - Rooftop = 1 x 2,400 = 2,400 Ft2 Driveway = 125 LF x 10'W = 1,250 Ft2 3,650 Ft2 x .875 Ft Precip/24 hours 3,193.75 CF RO/24 hours 3,650 Ft2 x .375 Ft Precip/l hour 1,368.75 CF RO/1 hour Swale Area Swale Depth W.T. Elev. Rim Elev. _ Percolation 640 Ft2 = 1.5' 2.0' 6.0' Rate = 1.5'/hr 2 Area 2 Cont. Swale will percolate 1.5'/hr x 640 Ft2 = 960 CF/hr. 1,368.75 CF (1 Hr RO) - 900 CF (l Hr Perc.) = 408.75 CF Storage Volume Required 408.75 CF + 640 Ft2 = 0.64' Depth Required + 0.375' Precip. onto Swale 1.02' Swale depth required for 1 hour intensity + 0.50' Freeboard 1.52' Total Swale Depth Total runoff from 100 year storm = 3,193.75 CF + 24 = 133 CF/Hr Swale will percolate 960 CF/Hr therefore, no accumulation. AREA 3 Runoff from impervious surfaces in Area 3 will be collected and diverted into a percolation swale. Impervious Surfaces - Rooftop = 1 x 2,400 Ft2 Driveway = 25 LF x 10' W Total Impervious Area Swale Area = 600 Ft? Swale Depth = 1.0' W.T. Elev. = 2.0' Rim Elev. 5.8' Perco. Rate = 1.5'/Hr = 2,400 Ft2 250 Ft2 = 2,650 Ft2 x 0.875 Ft Precip./24 hrs 2,318.75 CF/24 hrs 2,650 Ft2 x 0.375 Ft Precip./l hr 993.75 CF/l hr Swale will percolate 1.5'/Hr x 600 Ft2 = 900 CF/Hr 994 CF (1 Hr RO) - 900 CF (1 Hr Perc.) = 94 CF Required. Storage Volume 3 Area 3 Cont. 94 CF + 900 Ft2 = 0.10' Depth Required + 0.375' Precip. onto Swale 0.475' Depth Required for 1 hour intensity + 0.50' Freeboard 0.975' Total Swale Depth Total Runoff from 100 year storm = 2318.75 CF + 24 = 96.CF/Hr Swale will percolate 900 CF/Hr, therefore, no accumulation. AREA 4 Runoff from impervious surfaces in Area 4 will be collected and diverted into a percolation basin. Impervious Surfaces - Rooftops = 3.x 2,400 = 7,200 Ft2 Driveways = 140 LF x 10' W = 1,400 Ft2 Street = 150 LF x 16' W = 2,400 Ft2 Circle = 155 LF x 10' W = 1,550 Ft2 12,550 Ft2 x .875 Ft Precip./24 hours 10,981 CF/24 hours 12,550 Ft2 x .375 Ft Precip./l hour 4,706 CF RO/1 hour Percolation Basin Area = 2,350 Ft2 Percolation Basin Depth = 1.4' W.T. Elevation = 2.0' Rim Elevation = 5.5' Percolation Rate = 1.5'/Hr Basin will percolate 1.5'/Hr x 2,350 Ft2 = 3,525 CF/Hr 4,706 CF (1 Hr RO) - 3,525 CF (1 Hr Perc.) = 1,181 CF Storage Volume Required 4 Area 4 Cont. 1,181 CF = 2,350 Ft2 = 0.50' + 0.375' 0.875' + 0.50' 1.375' Basin Depth Precip. onto Basin Basin Depth Required for 1 Hr Intensity Freeboard Total Basin Depth Total Runoff from 100 year storm = 10,981 CF = 24 = 458 CF/Hr Swale will percolate 3,525 CF/Hr, therefore, no accumulation from 100 year storm of 24 hour duration. AREA 5 Runoff from impervious surfaces in Area 5 will be collected and diverted into a percolation basin. Impervious Surfaces - Rooftops = 3 x 2,400 Ft2 = 7,200 Ft2 Driveways = 125 LF x 10' W = 1,250 Ft2 Total Impervious Surface Area = 8,450 Ft2 x 0.875 Ft Precip./24 Hr 7,393 CF RO/24 Hrs 8,450 Ft2 x 0.375 Ft Precip./l Hr 3,168 CF RO/1 Hr Percolation Basin Area = 2,500 Ft2 Percolation Basin Depth = 0.5' W. T. Elevation = 2.0' Rim Elevation = 5.5' Perc. Rate = 1.5'/Hr Basin will percolate 2,500 Ft2 x 1.5'/Hr = 3,750 CF/Hr 3,168 CF (.1 Hr RO) - 3,750 CF (.1 Hr Perc.) = -582 CF (,Excess Capacity) Excavate Basin 0.50' to provide Freeboard. 5 Area 5 Cont. Total runoff from 100 year storm = 7,393 CF = 24 = 308 CF/Hr Basin will percolate 3,750 CF/Hr, therefore, no accumulation. AREA 6 Runoff from impervious surfaces in Area 6 will be collected and diverted into a percolation basin. Impervious Surfaces - Rooftops = 2 x 2,400 Ft2 = 4,800 Ft2 Driveways = 55 LF x 10' W = 550 Ft2 Street = 155 LF x 16' W = 2,480 Ft2 Total Impervious Surface Area = 7,830 Ft2 x 0.875 Ft 6,851 CF/24 Hrs 7,830 Ft2 x 0.375 Ft 2,936 CF/l Hr Percolation Basin Area = 2050 Ft2 Percolation Basin Depth = 0.5' W.T. Elevation = 2.0' Rim Elevation = 5.8' Percolation Rate = 1.5'/Hr Basin will percolate 2,050 Ft2 x 1.5'/Hr. = 3,075 CF/Hr 2,936 CF (1 Hr RO) - 3,075 CF (1 Hr Perc.) = -139 CF (Excess Capacity) Excavate Basin 0.50' to provide Freeboard. Total runoff from 100 year storm = 6,851 CF = 24 Hrs = 285 CF/Hr. Basin will percolate 3,075 CF/Hr, therefore, no accumulation. 6 AREA 7 Runoff from impervious surfaces in Area 7 will be collected and diverted into a percolation swale. Impervious Surfaces - Street = 290 LF x 16' W = 4,640 Ft2 x 0.875 Ft 4,060 CF RO/24 Hrs 4,640 Ft2 x 0.375 Ft 1,522.5 CF RO/1 Hr Swale Area = 1,100 Ft2 Swale Depth = 0.5' W.T. Elevation = 2.0' Rim Elevation = 5.3' Percolation Rate = 1.5'/Hr. Swale will percolate 1,100 Ft2 x 1.5'/Hr = 1,650 CF/Hr 1,522 (1 Hr R0) - 1,650 CF (1 Hr Perc.) = -128 CF (Excess Capacity) Excavate swale 0.50' to provide Freeboard. Total runoff from 100 year storm = 4,060 CF = 24 Hours = 170 CF/Hr. Swale will percolate 1,650 CF/Hr., therefore, no accumulation from 100 year storm of 24 hour duration. AREA 8 Runoff from impervious surfaces in Area 8 will be collected and diverted into a percolation basin. Impervious Surfaces - Rooftop = 1,500 Ft2 Parking Lot = 800 Ft2 Driveway = 450 Ft2 Street Circle = 220 LF x 10' W 2,200 Ft2 4,950 Ft2 x 0.875 Ft 4,331 CF RO in 24 Hrs 7 Area 8 Cont. 4,950 Ft2 x 0.375 Ft 1,856.25 CF RO/1 Hr Percolation Basin Area = 1,300 Ft2 Percolation Basin Depth = 0.5' W.T. Elevation = 2.0' Rim Elevation = 5.8' Percolation Rate = 1.5'/Hr Basin will percolate 1,300 Ft2 x 1.5'/Hr = 1,950 CF/Hr. 1,856 CF (1 Hr RO) - 1,950 CF (1 Hr Perc.) = -94 CF (Excess Capacity) Excavate Basin 0.5' to provide Freeboard. Total runoff from 100 year storm = 4,331 CF = 24 Hrs = 180 CF/Hr- Basin will percolate 1,950 CF/Hr, therefore, no accumulation. 8 104 MAP SYMBOL SOIL NAME 76B Wakulla sand 1-8 per cent slope Wakulla Series SOIL SURVEY INTERPRETATIONS MLRA 136 Rev. -•BTB:REH /7 The Wakulla series consists of somewhat excessively drained sands and loamy sands of the upland Coastal Plain and stream terraces. The surface layer is dark grayish brown over light yellowish brown sand to a depth of about 2 feet. In the subsoil below about 24 inches is strong brown very friable loamy sand that grades into yellowish brown and yellow sand at 42 inches, Slopes range from 0 to 10 percent. .wvn nwe•TPAT Awn rnnrwrsT. PRnP"TTF.S Major e Percentage Less Than 3 Avail. Shrink- Soil Classification Fra?t Inches Passing Sieve No.-- Permits- Water Soil Swell ll6tiaone USDA - >3 in. PI bility Cap. Reac- Poten- (inches) Texture Unified AASHO z 4 10 40 200 in/hr. in/in. tion tial 0-24 i Sand SP-SM, A-2 100 100. 75-90 5-15 -- NP .3-20.0 1C.05 4.5-6.0 Low SM 24-42 Loamy Sand SM, A-2 100 100 80-95 10-25 -- NP .3-20.0 .05-.10 4.5-6.0 Low SP-SM 42-83 Sand SP-SM, A-2 100 100 75-80 5-15. -- NP .3-20.0 -C.05 4.5-6.0 Low i SM Depth to rock: Rock Free Hydrologic group: A._ Flood hazard: Nona ___,_.. ., .. _.. Wetness: None , i Pond teservoir areas. - - Severe - rapid permeability - :,- -_. Pond embankments Severe rapid permeability i j Excavated ponds (aquifer fed) ' Severe - depth, to seasonally high water table more than 6 feet. Corrosivity - Uncoated steel. Low - dra I nage,texture, reaction Corrosivity - Concrete High - texture, reaction Dwellings ?._.. _._ 0-6slopes -slight 8-10$. slopes - moderate, slope Septic tank filter fields 0-8R slopes - slight All slope phases may be.severe because of possible 8-10% slopes-- moderate slope' contamination of shallow water supplies. Sewage lagoons Severe - rapid permeability f _ Local Toads and streets 0-8% slopes - slight 8-10$: slopes:- moderate elope w Light industries 10pes -7-0 g 4-87. slopes'- moderate slope g_TnT_ slopes:- severe' slope Sanitary landfill Trench method Severe.-. permeability Area method Severe.- permeability O. t. C.-MINI a ASMIOIMME SOIL CONS SVATIOM S SRY M FM WORM TOM REV. 7-70 ton X14 WURRanC=. .a-w .- -....., .... _ 9 X 10% WORK SHEET 12-68 4-N-27413-A 1 OF 2 __.....:.._..._...______._._....nRrRRF nF i.TMTTATTOM Arm MAJOR SOIL FEATURES AFFECTING SELECTED USE e. � "` i.'� `� � :� i', �.. f mar �' � �� a �- ,�' � i � �,„ � pis �Y � ' > � � ra. � � "-� �� .. 'm ter" � � �: JOSEPH S. HILL, JR and ASSOCIATES CONSULTING ENGINEERS and PLANNERS MAILING ADDRESS: 1602 HARBOUR DRIVE POST OFFICE BOX 5592-STA. 1 WILMINGTON, NORTH CAROLINA WILMINGTON, N.C. 28403-4155 TELEPHONE 919-799-1544 April 3, 1986 Mr. Mike Williams NC Division of Environmental Management 7225 Wrightsville Avenue Wilmington, North Carolina 28403 Subject:. Windchase Development Stormwater Plan Revisions - Area #4 New Hanover County Dear Mr. Williams: Attached are three (3) copies of the revised site plan and one (1) copy of the revised calculations for Windchase Development - Area #4. The revisions address the problem with the separation distance be- tween the bottom of the originally proposed percolation basin and the water table. I am certain you will find the changes adequate to control the calculated runoff volume. Please complete your review of these revisions as soon as possible. Do not hesitate to contact me if you have any questions or need addit- ional information. Sincerely, JOSEPH S. HILL, JR. and ASSOCIATES Michael S. Marsh MSM/pva enc. WINDCHASE Revised Stormwater Calculations AREA #4 The stormwater percolation basin.originally proposed for Windchase development - Area #4 was found to be inadequate to store and percolate the calculated volume of runoff from impervious surfaces. The separation distance between the bottom of the proposed basin and the top of the water table is 0.7 feet but the minimum required separation is 2.0 feet. This percolation basin has therefore been redesigned as a retention pond, (see attached site plan) eliminating the unsaturated material above the water table and creating greater storage volume. The rim elevation of the pond has also been elevated to increase the storage capacity to accommodate.a 10-year, 24-hour storm (7" in 24 hours) with no filtration assumed over the duration of the actual event. Since the pond.wi,ll dis- charge in excess of 18" per hour,through the saturated zone (see previously submitted hydrogeological evaluation), the runoff generated by a 10-year storm will be discharged to the subsurface in less than 72 hours follow- ing the event. The amount of impervious area remains the same as in the original plan. No grassed areas will contribute runoff to.this particular pond. AREA #4 - Revised Calculations Runoff from impervious surfaces in Area #4 will be collected and diverted into a retention pond. Impervious surface area = 12,550 Sq. Ft. (.previously submitted calculations) x .58 Ft. Precip. 7,279 C.F. Runoff Volume Pond Surface Area = 2,350 Sq. 7,279 = 2,350 Sq. Ft. = 3.1' +..0. 3.7' + 31'41 7 . J. ` Ft. Storage depth req'd. for runoff Precip. onto pond surface Total storage depth required Water.Table elevation Pond elevation after 10-year storm (.Assumes no infiltration during event) Area #4 Revisions Continued Retention Pond Area = 2,350 Sq. Ft. Rim Elevation = 7.2' Depth = 5.2' W.T. Elevation = 3.4' Available Storage Depth = 3.8' (.3.7'required) Discharge Rate (saturated zone) = 1.5'/Hr. x 2,350 Sq. Ft.- 3,525 CF/Hr Total R.O. from 10-year storm = 7,279 CF 7,279 CF(R.O.) = 3,525 CF(Disch arge Rate) = 2 Hr (time required to discharge 10-year storm R.O. to sub- surface) 2