Loading...
HomeMy WebLinkAboutNCG070157_Inspection Report_20190807ROY COOPER Governor MICHAEL S. REGAN Secretary S. DANIEL SMITH Director Asheville Vault Service Attention: Chris Shaw 2239 Smokey Park Highway Candler, North Carolina 28715 NORTH CAROLINA Environmental Quality August 14, 2019 Subject: Compliance Evaluation Inspection Permit: NCG070000 Certificate of Coverage: NCG070157 Buncombe County, North Carolina Dear Mr. Shaw: Enclosed please find a copy of the Compliance Evaluation Inspection Report for the inspection I conducted at the subject facility on August 7, 2019. The report should be self-explanatory, however, should you have any questions concerning this report, please do not hesitate to contact me at (828) 296-4500 or by email at Isaiah.reed@ncdenr.gov. Sind Isaiah Reed, CPSWQ CEPSCI, S4CECI Environmental Specialist Land Quality Section Enclosure: Inspection Report North Carolina Department of Environmental Quality I Division of Energy, Mineral and Land Resources Asheville Regional Office 12090 U.S. Highway 70 1 Swannanoa, North Carolina 28778 xatmcwwurva �^�^^ar^^^^•^�a^"v 828.296.4500 Compliance Inspection Report Permit: NGG070157 Effective: 06/01/18 Expiration: 05/31/23 Owner: Asheville Vault Service SOC: Effective: Expiration: Facility: Asheville Vault Sery County: Buncombe 2239 Smokey Park Hwy Region: Asheville Candler NC 28715 Contact Person: Ralph Toomey Title: Phone: 800-332-6016 Directions to Facility: System Classifications: Primary ORC: Secondary ORC(s): On -Site Representative(s): Related Permits: Inspection Date: 08/07/2019 Primary Inspector: Isaiah L Reed Secondary Inspector(s): Certification: Phone: Entry Time: 03:OOPM Exit Time: 04:OOPM Phone: 828-296-4614 Reason for Inspection: Routine Inspection Type: Compliance Evaluation Permit Inspection Type: Stone, Clay, Glass, and Concrete Products Stormwater Discharge COC Facility Status: ❑ Compliant Not Compliant Question Areas: Storm Water (See attachment summary) Page 1 of 3 Permit: NCG070157 Owner- Facility: Asheville Vault Service Inspection Dale: 08/07/2019 Inspection Type : Compliance Evaluation Reason for Visit: Routine Inspection Summary: On August 7, 2018 this facility was inspected for compliance. I met with Chris Shaw on site. During the inspection, the following items were noted: 1) Since the previous inspection, A SWPPP has been partially assembled. The majority of the SWPPP has still not been produced. The Permittee is directed to immediately begin assembling and implementing an Stormwater Pollution Prevention plan as outlined in the NCG070000 General Permit. 2) The area used to wash out and dump waste concrete has been modified to increase the holding capacity. The Permittee is directed to produce a written plan for long-term operation and maintenance of that area. This facility will be re -inspected on or after September 18, 2019. If the above items have not been addressed, further action will be taken. If you have any questions, please contact this office at (828) 296-4614 Page 2 of 3 Permit: NCG070157 Owner- Facility: Asheville Vault Service Inspection Date: 08/07/2019 Inspection Type : Compliance Evaluation Stormwater Pollution Prevention Plan Does the site have a Stormwater Pollution Prevention Plan? # Does the Plan include a General Location (USGS) map? # Does the Plan include a "Narrative Description of Practices'? # Does the Plan include a detailed site map including outfall locations and drainage areas? # Does the Plan include a list of significant spills occurring during the past 3 years? # Has the facility evaluated feasible alternatives to current practices? # Does the facility provide all necessary secondary containment? # Does the Plan include a BMP summary? # Does the Plan include a Spill Prevention and Response Plan (SPRP)? # Does the Plan include a Preventative Maintenance and Good Housekeeping Plan? # Does the facility provide and document Employee Training? # Does the Plan include a list of Responsible Party(s)? # Is the Plan reviewed and updated annually? # Does the Plan include a Stormwater Facility Inspection Program? Has the Stormwater Pollution Prevention Plan been implemented? Comment: See summary for more information Qualitative Monitorina Has the facility conducted its Qualitative Monitoring semi-annually? Comment: Permit and Outfalls # Is a copy of the Permit and the Certificate of Coverage available at the site? # Were all outfalls observed during the inspection? # If the facility has representative outfall status, is it properly documented by the Division? # Has the facility evaluated all illicit (non stormwater) discharges? Comment: Reason for Visit: Routine Yes No NA NE ❑❑❑■ Yes No NA NE ■❑❑❑ ■❑❑❑ ❑❑■❑ ❑■❑❑ Page 3 of 3