Loading...
HomeMy WebLinkAboutNCG140309_Inspection Report_20190814ROY COOPER Governor MICHAEL S. REGAN Secretary S. DANIEL SMITH Director Southern Concrete Materials Attention: Jeff Lamm Post Office Box 5395 Asheville, North Carolina 28813 NORTH CAROLINA Environmental Quality August 14, 2019 Subject: Compliance Evaluation Inspection Permit: NCG140000 Certificate of Coverage: NCG140309 Buncombe County, North Carolina Dear Mr. Lamm: Enclosed please find a copy of the Compliance Evaluation Inspection Report for the inspection I conducted at the subject facility on August 7, 2019. The report should be self-explanatory; however, should you have any questions concerning this report, please do not hesitate to contact me at (828) 296-4500 or by email at Isaiah.reed@ncdenr.gov. Sincer t Isaiah Reed, CPSWQ, PSCI, MS4CECI Environmental Specialist Land Quality Section Enclosure: Inspection Report D_E A%M North Carolina Department of Environmental Quality I Division of Energy, Mineral and Land Resources Asheville Regional Office 1 2090 U.S. Highway 701 Swannanoa, North Carolina 28778 � i ^.^xna ^°"'�V_ 828.296.4500 Compliance Inspection Report Permit: NCG140309 SOC: County: Buncombe Region: Asheville Effective: 08/01/17 Expiration: 06/30/22 Owner: Southern Concrete Materials Effective: Expiration: Facility: Southern Concrete Materials -Asheville 80 Pond Rd Contact Person: James F Combest Title: Directions to Facility: System Classifications: Primary ORC: Secondary ORC(s): On -Site Representative(s): Related Permits: Inspection Date: 08/07/2019 Entry Time: 10:45AM Primary Inspector: Isaiah L Reed Secondary Inspector(s): Certification: Asheville NC 28806 Phone: 828-253-6421 Phone: Exit Time: 12:OOPM Phone: 828-296-4614 Reason for Inspection: Routine Inspection Type: Compliance Evaluation Permit Inspection Type: Ready Mix Concrete Stormwater/Wastewater Discharge COO Facility Status: Compliant Not Compliant Question Areas: Storm Water (See attachment summary) Page 1 of 3 permit: NCG140309 Owner -Facility: Southern Concrete Materials Inspection Date: 08/07/2019 Inspection Type : Compliance Evaluation Reason for Visit: Routine Inspection Summary: On August 7, 2019 this facility was inspected for compliance. I met with Jeff Lamm on site. During the inspection, the following items were noted: 1) Secondary containment has not been provided for all bulk storage of liquid materials. The permittee is directed to immediately begin evaluating and implementing a plan to provide secondary containment in all areas where bulk storage of liquid materials is stored. 2) Due to vegetation, the outfall was not visible at the time of the inspection. 3) To document that effluent monitoring has been completed, the permittee is directed to submit all analytical monitoring data for the current permit term. this facility will be re -inspected on or after September 17, 2019. If the above items have not been addressed, further action will be taken. If you have any questions, please contact this office at (828) 296-4614 Page 2 of 3 Permit: NCG140309 Owner -Facility: Southern Concrete Materials Inspection Date: 08/07/2019 Inspection Type : Compliance Evaluation Reason for Visit: Routine Stormwater Pollution Prevention Plan Yes No NA NE Does the site have a Stormwater Pollution Prevention Plan? 0 ❑ ❑ ❑ # Does the Plan include a General Location (USGS) map? 0 ❑ ❑ ❑ # Does the Plan include a "Narrative Description of Practices'? 0 ❑ ❑ ❑ # Does the Plan include a detailed site map including outfall locations and drainage areas? 0 ❑ ❑ ❑ # Does the Plan include a list of significant spills occurring during the past 3 years? 0 ❑ ❑ ❑ # Has the facility evaluated feasible alternatives to current practices? N ❑ ❑ ❑ # Does the facility provide all necessary secondary containment? ❑ 0 ❑ ❑ # Does the Plan include a BMP summary? 0 ❑ ❑ ❑ # Does the Plan include a Spill Prevention and Response Plan (SPRP)? E ❑ ❑ ❑ # Does the Plan include a Preventative Maintenance and Good Housekeeping Plan? 0 ❑ ❑ ❑ # Does the facility provide and document Employee Training? E ❑ ❑ ❑ # Does the Plan include a list of Responsible Party(s)? 0 ❑ ❑ ❑ # Is the Plan reviewed and updated annually? 0 ❑ ❑ ❑ # Does the Plan include a Stormwater Facility Inspection Program? 0 ❑ ❑ ❑ Has the Stormwater Pollution Prevention Plan been implemented? ❑ 0 ❑ ❑ Comment: See summary for more information Qualitative Monitoring Yes No NA NE Has the facility conducted its Qualitative Monitoring semi-annually? 0 ❑ ❑ ❑ Comment: Analytical Monitorino Yes No NA NE Has the facility conducted its Analytical monitoring? 0 ❑ ❑ ❑ # Has the facility conducted its Analytical monitoring from Vehicle Maintenance areas? ❑ ❑ 0 ❑ Comment: Permit and Outfalls Yes No NA NE # Is a copy of the Permit and the Certificate of Coverage available at the site? 0 ❑ ❑ ❑ # Were all outfalls observed during the inspection? ❑ ❑ ❑ # If the facility has representative outfall status, is it properly documented by the Division? ❑ ❑ 0 ❑ # Has the facility evaluated all illicit (non stormwater) discharges? ❑ 0 ❑ ❑ Page 3 of 3