Loading...
HomeMy WebLinkAboutNCG210178_Inspection Report_20190814ROY COOPER Governor MICHAEL S. REGAN Secretary S. DANIEL SMITH Director Oak Valley Hardwoods, Inc. Attention: Fayte Honeycutt 8482 US Highway 221 North Marion, North Carolina 28752 NORTH CAROLINA Environmental Quality August 14, 2019 Subject: Compliance Evaluation Inspection Permit: NCG210000 Certificate of Coverage: NCG210178 McDowell County, North Carolina Dear Mr. Honeycutt: Enclosed please find a copy of the Compliance Evaluation Inspection Report for the inspection I conducted at the subject facility on August 6, 2019. The report should be self-explanatory, however, should you have any questions concerning this report, please do not hesitate to contact me at (828) 296-4500 or by email at Isaiah.reed@ncdenr.gov. Sincer Isaiah Reed, CPSWQ, CEPSCI, MS4CECI Environmental Specialist Land Quality Section Enclosure: Inspection Report D_E QA11 North Carolina Department of Environmental Quality I Division of Energy, Mineral and Land Resources ��//p Asheville Regional Office 1 2090 U.S. Highway 70 1 Swannanoa, North Carolina 28778 x cum °+ia°""'°'r'^°'^wih1 Q 828.296.4500 Compliance Inspection Report Permit: NCG210178 Effective: 08/01/18 Expiration: 07/31/23 Owner: Oak Valley Hardwoods Inc SOC: Effective: Expiration: Facility: Oak Valley Hardwoods/Woodlawn County: McDowell 8482 Hwy 221 N Region: Asheville Marion NC 28752 Contact Person: Rick Waite Title: Phone: 704-200-9000 Directions to Facility: System Classifications: Primary ORC: Certification: Phone: Secondary ORC(s): On -Site Representative(s): Related Permits: Inspection Date: 08/06/2019 EntryTime: 10:00AM Exit Time: 11:15AM Primary Inspector: Isaiah L Reed Phone: 828-296-4614 Secondary Inspector(s): Reason for Inspection: Routine Inspection Type: Compliance Evaluation Permit Inspection Type: Timber Products Stormwater Discharge CDC Facility Status: Compliant ❑ Not Compliant Question Areas: Storm Water (See attachment summary) Page 1 of 3 Permit: NCG210178 Owner -Facility: Oak Valley Hardwoods Inc Inspection Date: 08/06/2019 Inspection Type : Compliance Evaluation Reason for Visit: Routine Inspection Summary: On August 6, 2019 this facility was inspected for compliance. I met with Fayte Honeycutt on site. The following items were noted during the inspection: 1) The permittee is directed to evaluate the potential for additional outfalls and monitoring locations. 2) The pond on site may be discharging. The permittee is directed to confirm that the pond on site is not discharging, or to prevent continued discharge if evidence is found that it is discharging. 3) A potential non-stormwater discharge was observed on site. The permittee is directed to evaluate and classify the discharge discussed on site, and produce a plan to prevent non-stormwater discharge from the site. 4) The base elements of the Stormwater Pollution Prevention Plan are on site, and now must be maintained and implemented for continued compliance. Please contact this office if you have any questions. (828) 286-4614 Page 2 of 3 Permit: NCG210178 Owner- Facility; Oak Valley Hardwoods Inc Inspection Date: 08/06/2019 Inspection Type: Compliance Evaluation Reason for Visit: Routine Stormwater Pollution Prevention Plan Yes No NA NE Does the site have a Stormwater Pollution Prevention Plan? M ❑ ❑ ❑ # Does the Plan include a General Location (USGS) map? 0 ❑ ❑ ❑ # Does the Plan include a "Narrative Description of Practices"? 0 ❑ Q ❑ # Does the Plan include a detailed site map including outfall locations and drainage areas? 0 ❑ ❑ # Does the Plan include a list of significant spills occurring during the past 3 years? M El Q ❑ # Has the facility evaluated feasible alternatives to current practices? 0 ❑ ❑ ❑ # Does the facility provide all necessary secondary containment? 0 ❑ ❑ ❑ # Does the Plan include a BMP summary? M ❑ ❑ ❑ # Does the Plan include a Spill Prevention and Response Plan (SPRP)? ❑ ❑ # Does the Plan include a Preventative Maintenance and Good Housekeeping Plan? ❑ ❑ # Does the facility provide and document Employee Training? Q ❑ # Does the Plan include a list of Responsible Party(s)? 0 11 ❑ ❑ # Is the Plan reviewed and updated annually? ❑ ❑ # Does the Plan include a Stormwater Facility Inspection Program? ❑ ❑ Has the Stormwater Pollution Prevention Plan been implemented? ❑ Q Comment Qualitative Monitoring Yes No NA NE Has the facility conducted its Qualitative Monitoring semi-annually? 0 El El ❑ Comment: Analytical Monitoring Yes No NA NE Has the facility conducted its Analytical monitoring? 0 ❑ ❑ ❑ # Has the facility conducted its Analytical monitoring from Vehicle Maintenance areas? ❑ ❑ ❑ Comment: Permit and Outfalls Yes No NA NE # Is a copy of the Permit and the Certificate of Coverage available at the site? 0 ❑ # Were all outfalls observed during the inspection? 11 ❑ ❑ # If the facility has representative outfall status, is it properly documented by the Division? ❑ ❑ 0 ❑ # Has the facility evaluated all illicit (non stormwater) discharges? M ❑ ❑ ❑ Comment: Page 3 of 3