Loading...
HomeMy WebLinkAbout20190602 Ver 1_More Information Received_20190812Staff Review Does this application have all the attachments needed to accept it into the review process? r Yes r No ID#* Version* 1 20190602 Is this project a public transportation project?* r Yes r No Reviewer List:* Sue Homewood:eads\slhomevtood Select Reviewing Office:* Winston-Salem Regional Office - (336) 776-9800 Submittal Type:* Application Attachments Does this project require a request for payment to be sent?* r Yes r No Project Submittal Form Please note: fields marked with a red asterisk below are required. You will not be able to submit the form until all mandatory questions are answered. Project Type: r New Project r Pre -Application Submittal r More Information Response r Other Agency Comments r For the Record Only (Courtesy Copy) r Stream or Buffer Appeal New Project - Please check the new project type if you are trying to submit a new project that needs an official approval decision. Pre -Application Submittal - Please check the pre -application submittal if you just want feedback on your submittal and do not have the expectation that your submittal will be considered a complete application requiring a formal decision. More Information Response - Please check this type if you are responding to a request for information from staff and you have and ID# and version for this response. Other Agency Comments - Please check this if you are submitting comments on an existing project. Is this supplemental information that needs to be sent to the Corps?* r Yes r No Project Contact Information Name: Brandon Fulton Who is subrritting the inforrration? Email Address: bfulton@ecslimited.com Project Information Existing ID #: Existing Version: 20190602 1 20170001 (no dashes) Project Name: Trinity Middle School Is this a public transportation project? r Yes r No Is the project located within a NC DCM Area of Environmental Concern (AEC)? r Yes r No r Unknown County (ies) Randolph Please upload all files that need to be submited. Click the upload button or drag and drop files here to attach docurrent 18-107 Trinity Stream Exhibit_2019-08-05.pdf 1.84MB Trinity Middle School RFI Response 20190602 192.86KB Version 1.pdf Only pdf or Ivrz files are accepted. Describe the attachments: Updated stormwater management plan depicting outfalls much higher on site than previously designed. RFI from Sue Homewood; attached is information related to those concerns. V By checking the box and signing box below, I certify that: • I have given true, accurate, and complete information on this form; • I agree that submission of this form is a "transaction" subject to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act") • I agree to conduct this transaction by electronic means pursuant to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act'); • I understand that an electronic signature has the same legal effect and can be enforced in the same way as a written signature; AND • I intend to electronically sign and submit the online form." Signature: 1-01 ,Oza,e �w, Vell�vvl Submittal Date: Is filled inautorretically. ECS SOUTHEAST, LLP Geotechnical  Construction Materials  Environmental 1812 Center Park Drive, Suite D Charlotte, North Carolina 28217 Telephone 704-525-5152 Fax 704-357-0023 LETTER OF TRANSMITTAL Date: August 12, 2019 Project No. 49: 8352-B Trinity Middle School 0 Surrett Drive Trinity, Randolph County, North Carolina To: Mr. Andy Williams/Jean Gibby Regulatory Project Manager RALEIGH REGULATORY FIELD OFFICE US Army Corps of Engineers 3331 Heritage Trade Drive, Suite 105 Wake Forest, North Carolina 27587 We are sending you the following items via email: 20190602 Version 1 COPIES DATED DESCRIPTION 1 8/12/2019 Nationwide Permit 39 – Response to Request for Information– Trinity Middle School These are transmitted as checked below: X For your use As requested REMARKS Sue, per your previous concerns, the engineers have dug into the stormwater managemen t plan, and were able to provide a significant change in outlet location versus the original plan. This location allows for hydrology to remain for the stream i n large, and for the abutting wetlands. The engineers formal response comments are as follows: 1. The previously submitted design of SCM #2 showed the outlet discharging downstream of existing wetlands and Stream D. Due to the concern of bypassing a significant portion of flow from this stream, causing a potential change in the stream’s hydrology and natural function, this SCM has been re-routed to outlet farther upstream. This introduces flows back into the stream much sooner allowing for the stream and wetlands to function more similarly to its existing conditions. See Trinity Stream Exhibit for plan revisions. 2. Similarly to comment response #1, flows have been re-routed from SCM #2 to be introduced upstream of wetlands and should provide similar hydrological conditions as what is existing. See Trinity Stream Exhibit for plan revisions. If you have any questions please contact Brandon Fulton at (704) 525-5152 or at bfulton@ecslimited.com COPY TO: Sue Homewood (NCDWR) 8/12/2019 SIGNED: REVISED OUTLETLOCATIONORIGINALOUTLETLOCATION