Loading...
HomeMy WebLinkAboutNCG210178_Inspection Report_20190625ROY COOPER Governor MICHAEL S. REGAN Secretary S. DANIEL SMITH Director Oak Valley Hardwoods, Inc. Attention: Rick Waite 8482 US Highway 221 North Marion, North Carolina 28752 NORTH CAROLINA Environmental Quality June 25, 2019 Subject: Compliance Evaluation Inspection Permit: NCG210000 Certificate of Coverage: NCG210178 McDowell County, North Carolina Dear Mr. Waite: Enclosed please find a copy of the Compliance Evaluation Inspection Report for the inspection I conducted at the subject facility on June 13, 2019. The report should be self-explanatory; however, should you have any questions concerning this report, please do not hesitate to contact me at (828) 296-4500 or by email at Isaiah.reed@ncdenr.gov. Sincerely, Isaiah Reed, CPSWQ, CEPSCI, MS4CECI Environmental Specialist Land Quality Section Enclosure: Inspection Report North Carolina Department of Environmental Quality I Division of Energy, Mineral and Land Resources Asheville Regional Office 12090 U.S. Highway 70 1 Swannanoa, North Carolina 28778 rvam1caAcurvn '\� 828.296.4500 Compliance Inspection Report Permit: NCG210178 SOC: County: McDowell Region: Asheville Contact Person: Rick Waite Directions to Facility: System Classifications: Primary ORC: Secondary ORC(s): On -Site Representative(s): Related Permits: Effective: 08/01/18 Expiration: 07/31/23 Owner: Oak Valley Hardwoods Inc Effective: Expiration: Facility: Oak Valley Hardwoods/Woodlawn 8482 Hwy 221 N Inspection Date: 06/13/2019 Primary Inspector: Isaiah L Reed Secondary Inspector(s): Title: Entry Time: 02:OOPM Certification: Marion NC 28752 Phone: 704-200-9000 Phone: Exit Time: 03:OOPM Phone: 828-296-4614 Reason for Inspection: Routine Inspection Type; Compliance Evaluation Permit Inspection Type: Timber Products Stormwater Discharge COC Facility Status: ❑ Compliant Not Compliant Question Areas: Storm Water (See attachment summary) Page 1 of 3 Permit: NCG210178 Owner - Facility: Oak Valley Hardwoods Inc Inspection Date: 06/13/2019 Inspection Type : Compliance Evaluation Reason for Visit: Routine Inspection Summary On June 13, 2019 this facility was inspected for compliance. During the inspection, the following items were noted: 1) The SWPPP had not been maintained and reviewed regularly. 2) The SWPPP was found to be incomplete at the time of the inspection. 3) The facility contact was unable to locate the stormwater outralls on site. The permittee is directed to immediately begin revising and reviewing the SWPPP for completeness and accuracy as described in the NCG210000 General Permit. The permittee is also directed to locate and maintain the ouffalls on site. The permittee is also directed to review the facility's SWPPP for completeness. This facility will be re -inspected on or after July 30, 2019. If the above actions have not been addressed, further action will be taken. If you have any questions, please contact this office at (828) 296-4614 Page 2 of 3 Permit: NCG210178 Owner -Facility: Oak Valley Hardwoods Inc Inspection Date: 06/13/2019 Inspection Type : Compliance Evaluation Reason for Visit: Routine Stormwater Pollution Prevention Plan Yes No NA NE Does the site have a Stormwater Pollution Prevention Plan? E ❑ ❑ ❑ # Does the Plan include a General Location (USGS) map? 0 ❑ ❑ ❑ # Does the Plan include a "Narrative Description of Practices'? 0 ❑ ❑ ❑ # Does the Plan include a detailed site map including outfall locations and drainage areas? ❑ E ❑ ❑ # Does the Plan include a list of significant spills occurring during the past 3 years? ❑ 0 ❑ ❑ # Has the facility evaluated feasible alternatives to current practices? 0 ❑ ❑ ❑ # Does the facility provide all necessary secondary containment? N ❑ ❑ ❑ # Does the Plan include a BMP summary? 0 ❑ ❑ ❑ # Does the Plan include a Spill Prevention and Response Plan (SPRP)? 0 ❑ ❑ ❑ # Does the Plan include a Preventative Maintenance and Good Housekeeping Plan? E ❑ ❑ ❑ # Does the facility provide and document Employee Training? ❑ 0 ❑ ❑ # Does the Plan include a list of Responsible Party(s)? 0 ❑ ❑ ❑ # Is the Plan reviewed and updated annually? ❑ 0 ❑ ❑ # Does the Plan include a Stormwater Facility Inspection Program? 0 ❑ ❑ ❑ Has the Stormwater Pollution Prevention Plan been implemented? ❑ 0 ❑ ❑ Comment: See summary for more information Qualitative Monitoring Yes No NA NE Has the facility conducted its Qualitative Monitoring semi-annually? 0 ❑ ❑ ❑ Comment: Analytical Monitoring Yes No NA NE Has the facility conducted its Analytical monitoring? 0 ❑ ❑ ❑ # Has the facility conducted its Analytical monitoring from Vehicle Maintenance areas? ❑ ❑ 0 ❑ Comment: Permit and Outfalls Yes No NA NE # Is a copy of the Permit and the Certificate of Coverage available at the site? E ❑ ❑ ❑ # Were all outfalls observed during the inspection? ❑ 0 ❑ ❑ # If the facility has representative outfall status, is it properly documented by the Division? ❑ ❑ 0 ❑ # Has the facility evaluated all illicit (non stormwater) discharges? 0 ❑ ❑ ❑ Comment: Page 3 of 3