Loading...
HomeMy WebLinkAboutNCG080748_Compliance Eval_20190802ROY COOPER Governor MICHAEL S. REGAN Secretary S. DANIEL SMITH Director A,.;- �.n r)ENR-LAND QUALITY 8TORvATL;` P:"Rlj�:FT I `ING Rolling Frito Lay Sales LP Attention: Rob Sapienza 2700 Nevada Boulevard Charlotte, North Carolina 28273 NORTH CAROLINA Environmental Quality August 2, 2019 Subject: Compliance Evaluation Inspection Rolling Frito-Lay Sales LP NPDES Stormwater Certificate of Coverage- NCG080748 Union County, North Carolina Dear Mr. Sapienza: Enclosed please find a copy of the Compliance Evaluation Inspection Report for the inspection we conducted at the Monroe Bins facility on July 30, 2019. Please note that in the stormwater inspection report summary we ask that you continue to implement your SPPP. The report should be self-explanatory; however, should you have any questions, please do not hesitate to contact me at (704) 663-1699 or by E-mail at james.moore@ncdenr.gov. Sincerely, Ja es Moore ssistant Regional Engineer Enclosure c- Stormwater Permitting Branch _D North Carolina Department of Environmental Quality I Division of Energy, Mineral and Land Resources lot Mooresville Regional Office 1 610 East Center Avenue, Suite 301 1 Mooresville, North Carolina 28115 taoAm crrjaxa Permit: NCG080748 Effective: 11/01/18 Expiration: 05/31/21 Owner: Rolling Frito-Lay Sales LP SOC: Effective: Expiration: Facility: Monroe Bins County: Union 1608 B Walkup Ave Region: Mooresville Monroe NC 28110 Contact Person: Rob Sapienza Title: Phone: 704-927-7377 Dlrectlons to Facility. System Classifications: Primary ORC: Secondary ORC(s): On -Site Representative(s): Related Permits: Inspection Date: 07/30/2019 Primary Inspector: Lily C Kay Secondary Inspector(s): Certification: Phone: Entry Time: 11:OOAM Exit Time: 11:30AM Phone: 704-663-1699 Reason for Inspection: Routine Inspection Type: Compliance Evaluation Permit Inspection Type: Transportation wNehicle Maintenance/Petroleum Bulk/Oil Water Separator Stotmwater Discharge COC Facility Status: Compliant [] Not Compliant Question Areas: 11 Storm Water (Sea attachment summary) Page 1 of 3 Permit: NCGO80748 Owner - Facility: Rolling Frito-Lay Sales LP Inspection Date: 07/30/2019 Inspection Type: Compliance Evaluation Reason for Visit: Routine Inspection Summary: The SPPP was accurate and complete and the facility has completely implemented it. All qualitative monitoring records were complete. Analytical monitoring is not required because the facility does not use more than 55 gallons of oil a month. The facility is in compliant. If you have any questions, please contact me at Lily.Kay@ncdenr.gov or by phone at (704) 235-2137. Page 2 of 3 Permit: NCG080748 Owner - Facility: Rolling Frito-Lay Sales LP Inspection Date: 07/30/2019 Inspection Type : Compliance Evaluation Reason for Visit: Routine Stormwater Pollution Prevention Plan Yes No NA NE Does the site have a Stormwater Pollution Prevention Plan? E ❑ ❑ ❑ # Does the Plan include a General Location (USGS) map? E ❑ ❑ ❑ # Does the Plan include a "Narrative Description of Practices"? E❑ ❑ ❑ # Does the Plan include a detailed site map including outfail locations and drainage areas? E ❑ ❑ ❑ # Does the Plan include a list of signlficant spills occurring during the past 3 years? ❑ ❑ ❑ # I las the facility evaluated feasible; alternatives to current practices? ❑ ❑ ❑ # Does the facility provide all necessary secondary containment? ❑ ❑ ❑ # Does the Plan include a BMP summary? ❑ ❑ ❑ # Does the Plan include a Spill Prevention and Response Plan (SPRP)? ❑ ❑ ❑ # Does the Plan include a Preventative Maintenance and Good Housekeeping Plan? 10 ❑ ❑ ❑ # Does the facility provide and document Employee Training? In ❑ ❑ ❑ # Does the Plan include a list of Responsible Party(s)? 11 U U U # Is the Plan reviewed and updated annually? IN ❑ ❑ ❑ # Does the Plan include a Stormwater Facility Inspection Program? IS ❑ ❑ ❑ Has the Stormwater Pollution Prevention Plan been implemented? M ❑ ❑ ❑ Comment: The SPPP was accurate and complete and the facility has completely implemented it. Qualitative Monitoring Yes No NA NE Has the facility conducted its Qualitative Monitoring semi-annually? 0 ❑ ❑ ❑ Comment: All qualitative monitoring records were complete. Analytical Monitoring Yes No NA NE Has the facility conducted its Analytical monitoring? ❑ ❑ M ❑ # Has the facility conducted its Analytical monitoring from Vehicle Maintenance areas? ❑ ❑ ❑ Comment: Analytical monitoring is not required because the facility does not use more than 55 gallons of oil a month. Permit and Ouffalis Yes No NA NE # Is a copy of the Permit and the Certificate of Coverage available at the site? ❑ ❑ ❑ # Were all outfalls observed during the inspection? ❑ ❑ ❑ # If the facility has representative outfall status; is it properly documented by the Division? ❑ ❑ ❑ # Has the facility evaluated all illicit (non stormwater) discharges? E ❑ ❑ ❑ Comment: Page 3 of 3