Loading...
HomeMy WebLinkAboutNC0056154_Inspection_20190812 (2)United States Environmental Protection Agency Form Approved. EPA Washington, D.C. 20460 OMB No. 2040-0057 Water Compliance Inspection Report Approval expires 8-31-98 Section A: National Data System Coding (i.e., PCS) Transaction Code NPDES yr/mo/day Inspection Type Inspector Fac Type 1 IN I 2 15 I 3 I NCO056154 111 12 I 19/08/01 I17 18 I S I 19 I G I 201 I 211111 1 1 I I I I II I I I I I I I I I I I I 1 I I I I I I I I I I II I I I I I f6 Inspection Work Days Facility Self -Monitoring Evaluation Rating B1 QA ---------------------- Reserved ------------------- 67 2.0 70 71 [.. I 72 73 L_LJ74 751 I I I I I I I80 u u Section B: Facility Data Name and Location of Facility Inspected (For Industrial Users discharging to POTW, also include Entry Time/Date Permit Effective Date POTW name and NPDES oermit Number) 10:43AM 19/08/01 15/04/01 Bridgeport WWTP NCSR 1102 Langtree Rd Exit Time/Date Permit Expiration Date Cramerton NC 28032 11:50AM 19/08/01 20/03/31 Name(s) of Onsite Representative(s)/Titles(s)/Phone and Fax Number(s) Other Facility Data Dana A Bixby/ORC/704-507-3359/ Dustin Joseph Dillard//828-261-6459 / Name, Address of Responsible Official/Title/Phone and Fax Number Contacted Shannon V Becker,202 Mackenan Ct Cary NC 27511/President/919-653-5570/ No Section C: Areas Evaluated During Inspection (Check only those areas evaluated) Permit Flow Measurement Operations & Maintenance Records/Reports Self -Monitoring Program Sludge Handling Disposal Facility Site Review Effluent/Receiving Waters Laboratory Section D: Summary of Finding/Comments (Attach additional sheets of narrative and checklists as necessary) (See attachment summary) Name(s) and Signature(s) of Inspector(s) Agency/Office/Phone and Fax Numbers Date EDocuSigned by: 8/12/2019 Wes Bell e MRO WQ//704-663-1699 Ext.2192/ �PiY �e& A61696D90CC343T Signature of Management Q A Reviewer Agency/Office/Phone and Fax Numbers Date W. Corey Basinger Division of Water Quality//704-2' EPA Form 3560-3 (Rev 9-94) Previous editions are obsolete. DocuSigned by: eyj 8/12/2019 AtaccsatAFz�azs... Page# NPDES yr/mo/day Inspection Type NCO056154 I11 121 19/08/01 117 18 JCJ Section D: Summary of Finding/Comments (Attach additional sheets of narrative and checklists as necessary) Page# Permit: NCO056154 Inspection Date: 08/01/2019 Owner - Facility: Bridgeport WWTP Inspection Type: Compliance Evaluation Permit Yes No NA NE (If the present permit expires in 6 months or less). Has the permittee submitted a new ❑ ❑ 0 ❑ application? Is the facility as described in the permit? 0 ❑ ❑ ❑ # Are there any special conditions for the permit? M ❑ ❑ ❑ Is access to the plant site restricted to the general public? 0 ❑ ❑ ❑ Is the inspector granted access to all areas for inspection? 0 ❑ ❑ ❑ Comment: The last compliance evaluation inspection by DWR staff was performed on 12/14/16. Record Keeping Yes No NA NE Are records kept and maintained as required by the permit? 0 ❑ ❑ ❑ Is all required information readily available, complete and current? 0 ❑ ❑ ❑ Are all records maintained for 3 years (lab. reg. required 5 years)? ❑ ❑ ❑ Are analytical results consistent with data reported on DMRs? 0 ❑ ❑ ❑ Is the chain -of -custody complete? 0 ❑ ❑ ❑ Dates, times and location of sampling Name of individual performing the sampling Results of analysis and calibration Dates of analysis Name of person performing analyses Transported CM Are DMRs complete: do they include all permit parameters? ❑ ❑ ❑ Has the facility submitted its annual compliance report to users and DWQ? ❑ ❑ ❑ (If the facility is = or > 5 MGD permitted flow) Do they operate 24/7 with a certified operator ❑ ❑ ❑ on each shift? Is the ORC visitation log available and current? ❑ ❑ ❑ Is the ORC certified at grade equal to or higher than the facility classification? ❑ ❑ ❑ Is the backup operator certified at one grade less or greater than the facility classification? ❑ ❑ ❑ Is a copy of the current NPDES permit available on site? ❑ ❑ ❑ Facility has copy of previous year's Annual Report on file for review? ❑ ❑ 0 ❑ Comment: The records reviewed during the inspection were organized and well maintained. Discharge Monitoring Reports (eDMRs) were reviewed for the period July 2018 through June 2019. No effluent limit violations were reported and all monitorina freauencies were correct. Laboratory Yes No NA NE Page# 3 Permit: NCO056154 Owner - Facility: Bridgeport WWTP Inspection Date: 08/01/2019 Inspection Type: Compliance Evaluation Laboratory Yes No NA NE Are field parameters performed by certified personnel or laboratory? 0 ❑ ❑ ❑ Are all other parameters(excluding field parameters) performed by a certified lab? 0 ❑ ❑ ❑ # Is the facility using a contract lab? 0 ❑ ❑ ❑ # Is proper temperature set for sample storage (kept at less than or equal to 6.0 degrees 0 ❑ ❑ ❑ Celsius)? Incubator (Fecal Coliform) set to 44.5 degrees Celsius+/- 0.2 degrees? ❑ ❑ 0 ❑ Incubator (BOD) set to 20.0 degrees Celsius +/- 1.0 degrees? ❑ ❑ 0 ❑ Comment: On -site field analvses (dissolved oxvaen. oH. temDerature. total residual chlorine) are performed under Aqua NC's laboratory certification #5035. Water Tech Labs (all permit parameters except field) has also been contracted to provide analytical support. The ORC was not performing post -analysis calibration checks on the dissolved oxygen and total residual chlorine meters following field analyses at multiple sites. Post -analysis calibration checks must be performed in accordance with the NC Wastewater/Groundwater laboratory certification approved procedures for the analyses of dissolved oxygen and total residual chlorine. The ORC and staff must ensure to report all effluent total residual chlorine values down to the lowest standard verified on the total residual chlorine meter (annual curve verification). Effluent Sampling Yes No NA NE Is composite sampling flow proportional? 0 ❑ ❑ ❑ Is sample collected below all treatment units? 0 ❑ ❑ ❑ Is proper volume collected? 0 ❑ ❑ ❑ Is the tubing clean? 0 ❑ ❑ ❑ # Is proper temperature set for sample storage (kept at less than or equal to 6.0 degrees 0 ❑ ❑ ❑ Celsius)? Is the facility sampling performed as required by the permit (frequency, sampling type 0 ❑ ❑ ❑ representative)? Comment: The subiect permit reauires composite and arab effluent samples. The sampler temperature was less than five degrees Celsius and collecting 300 ml. aliquots at the time of the inspection. The ORC must ensure that all composite samples are collected over a 24-hr. period as required by the permit. In addition, the ORC must ensure to document the monthly aliquot verifications. Operations & Maintenance Yes No NA NE Is the plant generally clean with acceptable housekeeping? 0 ❑ ❑ ❑ Does the facility analyze process control parameters, for ex: MLSS, MCRT, Settleable 0 ❑ ❑ ❑ Solids, pH, DO, Sludge Judge, and other that are applicable? Comment: The wastewater treatment facility appeared to be properly operated and well maintained. Process control measurements were being documented and maintained on -site. The facility's telemetry -type alarm system functioned properly during the on -site test. Page# 4 Permit: NCO056154 Owner - Facility: Inspection Date: 08/01/2019 Inspection Type: Bridgeport WWTP Compliance Evaluation Equalization Basins Yes No NA NE Is the basin aerated? 0 ❑ ❑ ❑ Is the basin free of bypass lines or structures to the natural environment? 0 ❑ ❑ ❑ Is the basin free of excessive grease? 0 ❑ ❑ ❑ Are all pumps present? 0 ❑ ❑ ❑ Are all pumps operable? 0 ❑ ❑ ❑ Are float controls operable? 0 ❑ ❑ ❑ Are audible and visual alarms operable? 0 ❑ ❑ ❑ # Is basin size/volume adequate? 0 ❑ ❑ ❑ Comment: Bar Screens Yes No NA NE Type of bar screen a.Manual b.Mechanical ❑ Are the bars adequately screening debris? 0 ❑ ❑ ❑ Is the screen free of excessive debris? 0 ❑ ❑ ❑ Is disposal of screening in compliance? 0 ❑ ❑ ❑ Is the unit in good condition? 0 ❑ ❑ ❑ Comment: Screenings are transported to the Hwy. 150 WWTP and ultimately disposed at the County Landfill by a contracted company. Aeration Basins Mode of operation Type of aeration system Is the basin free of dead spots? Are surface aerators and mixers operational? Are the diffusers operational? Is the foam the proper color for the treatment process? Does the foam cover less than 25% of the basin's surface? Is the DO level acceptable? Is the DO level acceptable?(1.0 to 3.0 mg/1) Yes No NA NE Ext. Air Diffused ❑ ❑ ❑ ■ ❑ ❑ ❑ • ❑ ❑ ❑ • ❑ ❑ ❑ • ❑ ❑ ❑ ■ ❑ ❑ ❑ ❑ ❑ ■ ❑ Page# 5 Permit: NCO056154 Inspection Date: 08/01/2019 Owner - Facility: Bridgeport WWTP Inspection Type: Compliance Evaluation Aeration Basins Yes No NA NE Comment: Soda ash is added on an as -needed basis to maintain appropriate alkalinity/pH levels. The 30-minute settleability tests (each aeration train) performed during the inspection were 980 & 970 ml/L with clear supernates. The ORC/Permittee must ensure that an adequate sludge wasting program is implemented (via process control program, etc.) to maintain an appropriate solids inventory and sludge age in the aeration basins. Secondary Clarifier Yes No NA NE Is the clarifier free of black and odorous wastewater? 0 ❑ ❑ ❑ Is the site free of excessive buildup of solids in center well of circular clarifier? 0 ❑ ❑ ❑ Are weirs level? 0 ❑ ❑ ❑ Is the site free of weir blockage? 0 ❑ ❑ ❑ Is the site free of evidence of short-circuiting? 0 ❑ ❑ ❑ Is scum removal adequate? 0 ❑ ❑ ❑ Is the site free of excessive floating sludge? 0 ❑ ❑ ❑ Is the drive unit operational? 0 ❑ ❑ ❑ Is the return rate acceptable (low turbulence)? 0 ❑ ❑ ❑ Is the overflow clear of excessive solids/pin floc? 0 ❑ ❑ ❑ Is the sludge blanket level acceptable? (Approximately'/4 of the sidewall depth) 0 ❑ ❑ ❑ Comment: Filtration (High Rate Tertiary) Yes No NA NE Type of operation: Down flow Is the filter media present? ❑ ❑ ❑ Is the filter surface free of clogging? ❑ ❑ ❑ Is the filter free of growth? ❑ ❑ ❑ Is the air scour operational? ❑ ❑ ❑ Is the scouring acceptable? ❑ ❑ ❑ Is the clear well free of excessive solids and filter media? ❑ ❑ ❑ Comment: Disinfection -Tablet Yes No NA NE Are tablet chlorinators operational? 0 ❑ ❑ ❑ Are the tablets the proper size and type? 0 ❑ ❑ ❑ Number of tubes in use? 4 Is the level of chlorine residual acceptable? 0 ❑ ❑ ❑ Page# 6 Permit: NCO056154 Inspection Date: 08/01/2019 Disinfection -Tablet Is the contact chamber free of growth, or sludge buildup? Is there chlorine residual prior to de -chlorination? Comment: Owner - Facility: Bridgeport WWTP Inspection Type: Compliance Evaluation Flow Measurement - Effluent # Is flow meter used for reporting? Is flow meter calibrated annually? Is the flow meter operational? (If units are separated) Does the chart recorder match the flow meter? Comment: The flow meter was last calibrated/verified by the ORC on 2/4/19. Yes No NA NE ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ The V-notch weir was replaced following the previous inspection, however; the head measuring device location (distance upstream of the V-notch weir) still appears to be less than 3 times the maximum expected head on the weir (Reference: ISCO Open Channel Flow Measurement Handbook). This office requests that a third party verification be performed to determine whether or not the head measuring device is in the proper location. De -Chlorination Yes No NA NE Type of system ? Is the feed ratio proportional to chlorine amount (1 to 1)? ❑ ❑ 0 ❑ Is storage appropriate for cylinders? ❑ ❑ 0 ❑ # Is de -chlorination substance stored away from chlorine containers? ❑ ❑ 0 ❑ Comment: Are the tablets the proper size and type? 0 ❑ ❑ ❑ Are tablet de -chlorinators operational? 0 ❑ ❑ ❑ Number of tubes in use? 6 Comment: Pump Station - Effluent Yes No NA NE Is the pump wet well free of bypass lines or structures? 0 ❑ ❑ ❑ Are all pumps present? 0 ❑ ❑ ❑ Are all pumps operable? 0 ❑ ❑ ❑ Are float controls operable? 0 ❑ ❑ ❑ Is SCADA telemetry available and operational? 0 ❑ ❑ ❑ Is audible and visual alarm available and operational? 0 ❑ ❑ ❑ Page# 7 Permit: NC0056154 Owner - Facility: Bridgeport WWTP Inspection Date: 08/01/2019 Inspection Type: Compliance Evaluation Pump Station - Effluent Yes No NA NE Comment: Effluent Pipe Yes No NA NE Is right of way to the outfall properly maintained? ❑ ❑ ❑ Are the receiving water free of foam other than trace amounts and other debris? ❑ ❑ ❑ If effluent (diffuser pipes are required) are they operating properly? ❑ ❑ 0 ❑ Comment: The effluent appeared clear with no floatable solids or foam. The effluent is discharged into the receiving stream via submerged outfall. in the receiving stream. Aerobic Digester Yes No NA NE Is the capacity adequate? 0 ❑ ❑ ❑ Is the mixing adequate? 0 ❑ ❑ ❑ Is the site free of excessive foaming in the tank? 0 ❑ ❑ ❑ # Is the odor acceptable? 0 ❑ ❑ ❑ # Is tankage available for properly waste sludge? 0 ❑ ❑ ❑ Comment: Wastewater solids are removed on an as -needed basis by a contracted company (currently Rick's Septic Tank Service). Standby Power Is automatically activated standby power available? Is the generator tested by interrupting primary power source? Is the generator tested under load? Was generator tested & operational during the inspection? Do the generator(s) have adequate capacity to operate the entire wastewater site? Is there an emergency agreement with a fuel vendor for extended run on back-up power? Is the generator fuel level monitored? Yes No NA NE • ❑ ❑ ❑ • ❑ ❑ ❑ • ❑ ❑ ❑ • ❑ ❑ ❑ ■ ❑ ❑ ❑ ■ ❑ ❑ ❑ ■ ❑ ❑ ❑ Comment: The generator is tested under load on a monthly basis. In addition, the generator is checked annually and serviced once every two years by a contracted company (Palmer Generator) Page# 8