From: Clement Riddle <clement@cwenv.com>
Sent: Monday, August 12, 2019 3:55 PM
To: Homewood, Sue
Cc: Brown, David W SAW
Subject: RE: [External] Canoe Club - Public Hearing - 2018-0582v2
Attachments: 2019-08-12_8068_IP_Im pact Map Mitigation REVISED.PDF
External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to
report.spam@nc.gov
Sue,
On June 15, 2019 ClearWater Environmental submitted a response to NC DWR comments for the Canoe
Club. Attachment C of that submittal included a revised Figure 3.0. That map had an incorrect total of 8.82 acres in the
Mitigation section of the legend as described below in the 8/6/19 email. The Legend Mitigation section has been
updated in the attached Figure 3.0 and correctly states - Wetlands (payment to the DMS) 10.07 ac.
Please do not hesitate to let me know if you need anything else.
Thank you,
Clement
From: Homewood, Sue <sue.homewood@ncdenr.gov>
Sent: Sunday, August 11, 2019 3:36 PM
To: Clement Riddle <clement@cwenv.com>
Subject: RE: [External] Canoe Club - Public Hearing
Hi Clement,
Thanks for going through everything with a fine toothed comb. I certainly need to do that myself in preparation for the
meeting. If you could send me an updated figure as it stands now that would be helpful. The key is to show the
mitigation requirement per the USACE. Mitigation plans change all the time so we can adjust it at a later date if the
easement negotiations are successful.
Thanks,
Sue Homewood
Division of Water Resources, Winston Salem Regional Office
Department of Environmental Quality
336 776 9693 office
336 813 1863 mobile
Sue. Homewood(@ncdenr.eov
450 W. Hanes Mill Rd, Suite 300
Winston Salem NC 27105
1
Email correspondence to and from this address is subject to the
North Carolina Public Records Law and may be disclosed to third parties.
From: Clement Riddle <clement@cwenv.com>
Sent: Tuesday, August 6, 2019 10:55 AM
To: Homewood, Sue <sue.homewood@ncdenr.gov>; Alea Tuttle <alea@cwenv.com>
Subject: [External] Canoe Club - Public Hearing
External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to
report.spam@nc.gov
Sue,
Good morning, I am going through Canoe Club information in anticipation of public hearing and preparing response to
comments. Please let me know if you need anything from us in preparation.
We had discussion last January 2019 about needing to provide additional mitigation for the "1998 to present wetlands"
and proposed adding 1:1 mitigation for these areas and this was submitted as plan to the Corps. The Corps agreed to
this mitigation ratio for the additional 1.25 acres. However, it doesn't appear that we updated our Figure 3 for
the Mitigation Wetlands (Payment to DMS). Figure 3.0 (revised 7/10.2019) currently states Wetlands (Payment to
DMS) 8.82 acres. This total only accounts for the 5.88 acres at a 1.5:1 ratio. With the additional required mitigation at a
1:1 ratio, the wetlands impact "1998 to present" adds an additional 1.25 acres of required mitigation. As a result, the
Mitigation line in Figure 3 should read Wetlands (Payment to DMS) 10.07 acres.
The Canoe Club is in negotiations with the Highlands -Cashiers Land Trust about holding a conservation easement and
preserving the remaining 5.18 acres of wetlands on-site. If they agree to take the easement or preservation is done
through Restrictive covenants, then payment to DMS would be close to 9 acres. As the preservation component is still
being worked out, should we send you an updated Figure 3.0 with the DMS payment of 10.07 acres?
Thank you,
clement
CLearWaLer
32 Clayton Street
Asheville, NC 28801
Office: 828-698-9800
Mobile: 828-606-5168
clement(cDcwenv.com
WWW.CWENV.COM
The information in this email is confidential and may be legally privileged. It is intended solely for the
addressee(s). Disclosure to other parties is prohibited. If you are not the intended recipient, any disclosure, copying,
distribution or any action taken or omitted to be taken in reliance on it, is prohibited and may be unlawful.
Cashiers Lake Development ( +/- 89 AC)
Impact #13
Proposed laydown yard
and maintenance access
Wetland Fill (1951-1998) - 0.36 AC
Impact #14
Proposed Forebay Construction
Wetland Fill (1951-1998) - 0.21 AC
Impact #15
Proposed Temp. (2) 48" CMP Culverts
Wetland Impact: 30 LF
Impact #11
Proposed Bulkhead &
Wetland Fill (1951-1998) - 0.21 AC
Impact #10
Proposed Dredging
Wetland (1951-1998) - 5.07 AC
fr
1
Impact #9
Wetland (1951-1998) Fill - 0.03 AC
proposed bridge
no impact
existing
foot bridge—
proposed bridge
no impact
F®
Tuckaseigee Water &
Sewer Authority
Legend
= Existing Houses
Proposed Site Plan
Proposed Wetland Fill (Without Bulkhead)
_ Proposed Bulkhead & Fill
Out Parcel
Wetlands Avoided
Stream
Proposed Wetland Dredging - 1998 Wetland
Project Boundary
30' ORW Buffer
Jackson County,
North Carolina
��
Of
Forebay
Cashiers
Lake
Impact #5
Dt Proposed Bulkhead &
Open Water Fill - 0.87 AC
LandDesign,.
PROJECT DATA
— 0.91AC
TOTAL PROJECT AREA
— 89AC
JURISDICTIONAL WATERS OF THE US
_ 7.13 AC
Streams
— 5,332 LF
Wetlands
— 12.31 AC
Open Waters
— 18.99 AC
1URSIDICTIONAL IMPACTS
Total Permanent Stream Impacts
— 0 LF
Wetlands (Fill)
— 0.91AC
Wetland (Dredge)
— 6.22AC
Total Wetland Impacts
_ 7.13 AC
Open Water(Fill)
— 1.39 AC
Open Water (Disturbance)
— 3.34 AC
Total Open Water Impacts
— 4.73 AC
AVOIDANCE/MINIMIZATION
Streams
— 5,212 LF
Wetlands
— 5.18 AC
Open Waters
— 14.26 AC
MITIGATION
Streams
N/A
Wetlands (Payment to DMS)
10.07 AC
Impact #12
Proposed Dredging
Wetland (1998 -Present)
- 1.15 AC
Cash°�S<a
ke R
°aa
Impact #1
Proposed Disturbance
Open Water - 3.34 AC
Impact #2
Proposed Bulkhead &
Open Water Fill - 0.52 AC
Impact #3
Proposed Bulkhead &
Wetland (1998 -Present) Fill - 0.10 AC
ii
0 250 500 1,000
Feet
CLearWal:er
32 Clayton Street
Asheville, North Carolina 28801
REVISED 7/10/19
Stream & Wetland
Impact Map
Figure 3.0