HomeMy WebLinkAboutNC0062481_Inspection_20190812ROY COOPER
Governor
MICHAEL S. REGAN
Secretary
LINDA CULPEPPER
Director
Mr. Shannon V. Becker, President
Aqua North Carolina, Inc.
202 Mackenan Court
Cary, North Carolina 27511
Dear Mr. Becker:
NORTH CAROLINA
Environmental Quality
August 12, 2019
Subject: Compliance Evaluation Inspection
Mallard Head WWTP
NPDES Permit No. NCO062481
Iredell County
Enclosed is a copy of the Compliance Evaluation Inspection Report for the inspection conducted at the subject facility on
August 1, 2019, by Mr. Wes Bell of this Office. Please inform the facility's Operator -in -Responsible Charge (ORC) of our
findings by forwarding a copy of the enclosed report.
The report should be self-explanatory; however, should you have any questions concerning this report, please do
not hesitate to contact Mr. Bell at (704) 235-2192 or at wes.bell@ncdenr.gov.
Sincerely,
DocuSigned by:
A14CC681 AF27425...
W. Corey Basinger, Regional Supervisor
Water Quality Regional Operations Section
Division of Water Resources, NCDEQ
Enclosure:
Inspection Report
D Q
� North Carolina Department of Environmental Quality I Division of Water Resources
Mooresville Regional Office 1 610 East Center Avenue, Suite 301 1 Mooresville, North Carolina 28115
NORTH CAROLINA
Da"MoM a enWmn�bl mwnq 704,663.1699
United States Environmental Protection Agency
Form Approved.
EPA Washington, D.C. 20460
OMB No. 2040-0057
Water Compliance Inspection Report
Approval expires 8-31-98
Section A: National Data System Coding (i.e., PCS)
Transaction Code NPDES yr/mo/day Inspection Type Inspector Fac Type
1 IN 2 15 1 3 I NCO062481 111 12 I 19/08/01 I17 18 I S I 19 I G I 201 I
211111 I I I I I I II I I I I I I I I I I I I I I I I I I I I I I I II I I I I I f6
Inspection
Work Days Facility Self -Monitoring Evaluation Rating 131 QA ---------------------- Reserved -------------------
67
2.0 70 71 [.. I 72 73 L_LJ74 751 I I I I I I I80
u u
Section B: Facility Data
Name and Location of Facility Inspected (For Industrial Users discharging to POTW, also include
Entry Time/Date
Permit Effective Date
POTW name and NPDES oermit Number)
02:02PM 19/08/01
15/06/01
Mallard Head WWTP
NCSR 1112 Stutts Rd
Exit Time/Date
Permit Expiration Date
Mooresville NC 28115
03:05PM 19/08/01
20/03/31
Name(s) of Onsite Representative(s)/Titles(s)/Phone and Fax Number(s)
Other Facility Data
Dana A Bixby/ORC/704-507-3359/
Dustin Joseph DillardH828-261-6459 /
Name, Address of Responsible Official/Title/Phone and Fax Number
Contacted
Shannon V Becker,202 Mackenan Ct Cary NC 27511/President/919-653-5570/
No
Section C: Areas Evaluated During Inspection (Check only those areas evaluated)
Permit Flow Measurement Operations & Maintenance Records/Reports
Self -Monitoring Program Sludge Handling Disposal Facility Site Review Effluent/Receiving Waters
Laboratory
Section D: Summary of Finding/Comments (Attach additional sheets of narrative and checklists as necessary)
(See attachment summary)
Name(s) and Signature(s) of Inspector(s) Agency/Office/Phone and Fax Numbers Date
Signedeby: MRO WQ//704-663-1699 Ext.2192/ 8/12/2019
Wes Bell �`,�,'�961D90=437
�...
Signature of Management Q A Reviewer Agency/Office/Phone and Fax Numbers Date
W. Corey Basinger Division of Water Quality//704-2'
EPA Form 3560-3 (Rev 9-94) Previous editions are obsolete.
DocuSigned by:
' 8/12/2019
AtaccsatAFvazs... Page#
NPDES yr/mo/day Inspection Type
NCO062481 I11 121 19/08/01 117 18 JCJ
Section D: Summary of Finding/Comments (Attach additional sheets of narrative and checklists as necessary)
Page#
Permit: NCO062481
Inspection Date: 08/01/2019
Owner - Facility: Mallard Head WWTP
Inspection Type: Compliance Evaluation
Permit
Yes No NA NE
(If the present permit expires in 6 months or less). Has the permittee submitted a new
❑
❑
0
❑
application?
Is the facility as described in the permit?
0
❑
❑
❑
# Are there any special conditions for the permit?
E
❑
❑
❑
Is access to the plant site restricted to the general public?
0
❑
❑
❑
Is the inspector granted access to all areas for inspection?
0
❑
❑
❑
Comment: The last compliance evaluation inspection by DWR staff was performed on 6/17/16.
Record Keeping
Yes No NA NE
Are records kept and maintained as required by the permit?
0
❑
❑
❑
Is all required information readily available, complete and current?
0
❑
❑
❑
Are all records maintained for 3 years (lab. reg. required 5 years)?
❑
❑
❑
Are analytical results consistent with data reported on DMRs?
0
❑
❑
❑
Is the chain -of -custody complete?
0
❑
❑
❑
Dates, times and location of sampling
Name of individual performing the sampling
Results of analysis and calibration
Dates of analysis
Name of person performing analyses
Transported CM
Are DMRs complete: do they include all permit parameters?
❑
❑
❑
Has the facility submitted its annual compliance report to users and DWQ?
❑
❑
❑
(If the facility is = or > 5 MGD permitted flow) Do they operate 24/7 with a certified operator
❑
❑
❑
on each shift?
Is the ORC visitation log available and current?
❑
❑
❑
Is the ORC certified at grade equal to or higher than the facility classification?
❑
❑
❑
Is the backup operator certified at one grade less or greater than the facility classification?
❑
❑
❑
Is a copy of the current NPDES permit available on site?
❑
❑
❑
Facility has copy of previous year's Annual Report on file for review?
❑
❑
0
❑
Comment: The records reviewed during the inspection were organized and well maintained.
Discharge
Monitoring Reports (eDMRs) were reviewed for the period July 2018 through June 2019. No
effluent limit violations were reported and all monitorina freauencies were correct.
Laboratory
Yes No NA NE
Page# 3
Permit: NCO062481 Owner - Facility: Mallard Head WWTP
Inspection Date: 08/01/2019 Inspection Type: Compliance Evaluation
Laboratory
Yes No NA NE
Are field parameters performed by certified personnel or laboratory?
0
❑
❑
❑
Are all other parameters(excluding field parameters) performed by a certified lab?
0
❑
❑
❑
# Is the facility using a contract lab?
0
❑
❑
❑
# Is proper temperature set for sample storage (kept at less than or equal to 6.0 degrees
0
❑
❑
❑
Celsius)?
Incubator (Fecal Coliform) set to 44.5 degrees Celsius+/- 0.2 degrees?
❑
❑
0
❑
Incubator (BOD) set to 20.0 degrees Celsius +/- 1.0 degrees?
❑
❑
0
❑
Comment: On -site field analvses (dissolved oxvaen. oH. temDerature. total residual chlorine) are
performed under Aqua NC's laboratory certification #5035. Water Tech Labs (all permit
parameters except field) has also been contracted to provide analytical support.
The ORC was not performing post -analysis calibration checks on the dissolved oxygen and
total residual chlorine meters following field analyses at multiple sites. Post -analysis
calibration checks must be performed in accordance with the NC Wastewater/Groundwater
laboratory certification approved procedures for the analyses of dissolved oxygen and total
residual chlorine.
The ORC and staff must ensure to report all effluent total residual chlorine values down to
the lowest standard verified on the total residual chlorine meter (annual curve verification).
Effluent Sampling
Yes No NA NE
Is composite sampling flow proportional?
❑
❑
0
❑
Is sample collected below all treatment units?
0
❑
❑
❑
Is proper volume collected?
❑
❑
0
❑
Is the tubing clean?
❑
❑
0
❑
# Is proper temperature set for sample storage (kept at less than or equal to 6.0 degrees
❑
❑
0
❑
Celsius)?
Is the facility sampling performed as required by the permit (frequency, sampling type
0
❑
❑
❑
representative)?
Comment: The subject permit requires effluent grab samples.
Upstream / Downstream Sampling Yes No NA NE
Is the facility sampling performed as required by the permit (frequency, sampling type, and 0 ❑ ❑ ❑
sampling location)?
Comment:
Operations & Maintenance Yes No NA NE
Is the plant generally clean with acceptable housekeeping? 0 ❑ ❑ ❑
Does the facility analyze process control parameters, for ex: MLSS, MCRT, Settleable 0 ❑ ❑ ❑
Solids, pH, DO, Sludge Judge, and other that are applicable?
Page# 4
Permit: NCO062481
Inspection Date: 08/01/2019
Operations & Maintenance
Owner - Facility: Mallard Head WWTP
Inspection Type: Compliance Evaluation
Yes No NA NE
Comment: The wastewater treatment facility appeared to be properly operated and well maintained.
Process control measurements were being documented and maintained on -site.
Bar Screens
Yes No NA NE
Type of bar screen
a.Manual
b.Mechanical
❑
Are the bars adequately screening debris?
❑
0
❑
❑
Is the screen free of excessive debris?
❑
❑
0
❑
Is disposal of screening in compliance?
❑
❑
0
❑
Is the unit in good condition?
❑
0
❑
❑
Comment: The bar screen is submeraed in the aeration basin and only the top of the bar screen frame
can be viewed. Excessive wastewater paper, debris, etc. were not observed in the
downstream treatment processes. The permittee must either request for this treatment unit
be removed from the permit's facility description (listing of treatment units) with justification
or properly install a bar screen system.
Aeration Basins
Mode of operation
Type of aeration system
Is the basin free of dead spots?
Are surface aerators and mixers operational?
Are the diffusers operational?
Is the foam the proper color for the treatment process?
Does the foam cover less than 25% of the basin's surface?
Is the DO level acceptable?
Is the DO level acceptable?(1.0 to 3.0 mg/1)
Yes No NA NE
Ext. Air
Diffused
■
❑
❑
❑
❑
❑
■
❑
■
❑
❑
❑
•
❑
❑
❑
•
❑
❑
❑
•
❑
❑
❑
❑
❑
■
❑
Comment: Soda ash is added on an as -needed basis to maintain appropriate
alkalinity/pH levels.
The 30-minute settleability test performed during the inspection was 810 ml/L with a clear
supernate.
Secondary Clarifier
Yes No NA NE
Is the clarifier free of black and odorous wastewater?
0
❑
❑
❑
Is the site free of excessive buildup of solids in center well of circular clarifier?
❑
❑
0
❑
Are weirs level?
0
❑
❑
❑
Is the site free of weir blockage?
0
❑
❑
❑
Page# 5
Permit: NC0062481 Owner - Facility:
Inspection Date: 08/01/2019 Inspection Type:
Mallard Head WWTP
Compliance Evaluation
Secondary Clarifier
Yes No NA NE
Is the site free of evidence of short-circuiting?
0
❑
❑
❑
Is scum removal adequate?
0
❑
❑
❑
Is the site free of excessive floating sludge?
0
❑
❑
❑
Is the drive unit operational?
❑
❑
0
❑
Is the return rate acceptable (low turbulence)?
0
❑
❑
❑
Is the overflow clear of excessive solids/pin floc?
0
❑
❑
❑
Is the sludge blanket level acceptable? (Approximately'/4 of the sidewall depth)
0
❑
❑
❑
Comment:
Disinfection -Tablet
Yes No NA NE
Are tablet chlorinators operational?
0
❑
❑
❑
Are the tablets the proper size and type?
0
❑
❑
❑
Number of tubes in use?
1
Is the level of chlorine residual acceptable?
0
❑
❑
❑
Is the contact chamber free of growth, or sludge buildup?
0
❑
❑
❑
Is there chlorine residual prior to de -chlorination?
M
❑
❑
❑
Comment:
De -chlorination
Yes No NA NE
Type of system ?
Tablet
Is the feed ratio proportional to chlorine amount (1 to 1)?
❑ ❑
❑
Is storage appropriate for cylinders?
❑ ❑
0
❑
# Is de -chlorination substance stored away from chlorine containers?
❑ ❑
0
❑
Comment:
Are the tablets the proper size and type? 0 ❑ ❑ ❑
Are tablet de -chlorinators operational? 0 ❑ ❑ ❑
Number of tubes in use? 4
Comment:
Flow Measurement - Effluent
Yes No NA NE
# Is flow meter used for reporting?
0
❑
❑
❑
Is flow meter calibrated annually?
0
❑
❑
❑
Is the flow meter operational?
0
❑
❑
❑
Page# 6
Permit: NCO062481 Owner - Facility: Mallard Head WWTP
Inspection Date: 08/01/2019 Inspection Type: Compliance Evaluation
Flow Measurement - Effluent Yes No NA NE
(If units are separated) Does the chart recorder match the flow meter? ❑ ❑ 0 ❑
Comment: The flow meter was last calibrated/verified by the ORC on 6/4/19.
Effluent Pipe
Yes No NA NE
Is right of way to the outfall properly maintained?
0
❑
❑
❑
Are the receiving water free of foam other than trace amounts and other debris?
E
❑
❑
❑
If effluent (diffuser pipes are required) are they operating properly?
❑
❑
0
❑
Comment: The effluent appeared clear with no floatable solids or foam. The receiving
stream did not
appear to be negatively impacted.
Aerobic Digester
Yes No NA NE
Is the capacity adequate?
0
❑
❑
❑
Is the mixing adequate?
0
❑
❑
❑
Is the site free of excessive foaming in the tank?
0
❑
❑
❑
# Is the odor acceptable?
0
❑
❑
❑
# Is tankage available for properly waste sludge?
M
❑
❑
❑
Comment: Wastewater solids are removed on an as -needed basis by a contracted company (currently
Rick's Septic Tank Service).
Standby Power
Is automatically activated standby power available?
Is the generator tested by interrupting primary power source?
Is the generator tested under load?
Was generator tested & operational during the inspection?
Do the generator(s) have adequate capacity to operate the entire wastewater site?
Is there an emergency agreement with a fuel vendor for extended run on back-up power?
Is the generator fuel level monitored?
Yes No NA NE
■ ❑ ❑ ❑
■ ❑ ❑ ❑
■ ❑ ❑ ❑
■ ❑ ❑ ❑
■ ❑ ❑ ❑
■ ❑ ❑ ❑
■ ❑ ❑ ❑
Comment: The generator is tested under load on a monthly basis. In addition, the generator is checked
annually and serviced once every two years by a contracted company (Palmer GeneratorL
Page# 7