Loading...
HomeMy WebLinkAboutWQ0039043_Sewer Extension Files_20170221ROY COOPER MICHAEI. S. RE GAN S. JAY ZIMMERMAN Water- Resout-ces i:NVIRONMENIAL QUALITY February 21, 2017 Patrick Jennings, Senior Engineer, PE Old North Utility Service, Inc. P. 0. Box 73316 Fort Bragg, NC 28307 Subject: Permit No. WQ0039043 Old North Utility Service, Inc. INTEL Training Facility and INTEL Training Annex Wastewater Collection System Extension Permit Cumberland County Dear Mr. Jennings: In accordance with your application received February 10, 2017, we are forwarding herewith Permit No. WQ0039043 dated February 21, 2017, to Old North Utility Service, Inc. for the construction and operation upon certification of the subject wastewater collection system extension. This permit shall be effective from the date of issuance until rescinded, and shall be subject to the conditions and limitations as specified therein. This cover letter shall be considered a part of this permit and is therefore incorporated therein by reference. Please pay particular attention to the following conditions contained within this permit: Condition 111: This permit shall not be automatically transferable; a request must be made and approved. Condition 11.4: Requires that the wastewater collection facilities be properly operated and maintained in accordance with 15A NCAC 2T .0403 or any individual system -wide collection system permit issued to the Permittee. It shall be responsibility of the Permittee to ensure that the as -constructed project meets the appropriate design criteria and rules. Failure to comply may result in penalties in accordance with North Carolina 225 Green Street, Suite 714, Fayetteville, NC 28301 Phone: 910-433-3300 \ Internet: www,ncwaterguality.org An Equal Opportunity \ Affirmative Action Employer — Made in part by recycled paper Old North Utility Service, Inc. Permit No. WQ0039043 General Statute §143-215.6A through §143-215.6C, construction of additional or replacement wastewater collection facilities, and/or referral of the North Carolina -licensed Professional Engineer to the licensing board. If any parts, requirements, or limitations contained in this permit are unacceptable, you have the right to request an adjudicatory hearing upon written request within 30 days following receipt of this permit. This request must be in the form of a written petition, conforming to Chapter 150E of North Carolina General Statutes, and filed with the Office of Administrative Hearings, 6714 Mail Service Center, Raleigh, NC 27699-6714. Unless such demands are made, this permit shall be final and binding. If you need additional information concerning this matter, please contact Trent Allen at (910) 433-3336 or via e-mail at trent.allen@ncdenr.gov. Sincerely, Trent Allen, Assist. Regional Supervisor Water Quality Regional Operations Section Fayetteville Regional Office Division of Water Resources, NCDEQ cc: Patrick Jennings, American States Utility Services, Inc., 3400 Walsh Parkway, Suite 244, Fayetteville, NC 28311 Fayetteville Regional Office Files Water Resources Central Files PERCS (electronic copy) Page 2 of 8 STATE OF NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION DEPARTMENT OF ENVIRONMENTAL QUALITY WASTEWATER COLLECTION SYSTEM EXTENSION PERMIT In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as amended, and other applicable Laws, Rules, and Regulations, permission is hereby granted to the Old North Utility Services, Inc. Cumberland County for the construction and operation of approximately 224 linear feet of 6-inch gravity sewer, and 1,120 linear feet of 8-inch gravity sewer as part of the INTEL Training Facility and INTEL Training Annex project, and the discharge of 5,150 gallons per day of collected domestic wastewater into the South Harnett Regional Wastewater Treatment Plant existing sewerage system, pursuant to the application received on February 10, 2017, and in conformity with 15A NCAC 2T; the Division's Gravity Sewer Minimum Design Criteria adopted February 12, 1996 as applicable; the Division's Minimum Design Criteria for the Fast - Track Permitting of Pump Stations and Force Mains adopted June 1, 2000 as applicable; and other supporting data subsequently filed and approved by the Department of Environmental Quality and considered a part of this permit. This permit shall be effective from the date of issuance until rescinded and shall be subject to the specified conditions and limitations contained therein. Trent Allen, Assist. Regional Supervisor Division of Water Resources, NCDEQ By Authority of The Environmental Management Commission Permit Number: WQ0039043 Permit Issued: February 21, 2017 Page 3 of 8 SUPPLEMENT TO PERMIT COVER SHEET Old North Utility Service, Inc. is hereby authorized to: Construct, and then operate upon certification the aforementioned wastewater collection extension. The sewage and wastewater collected by this system shall be treated in the South Harnett Regional Wastewater Treatment Plant in accordance with Permit Number NCO088366 Permitting of this project does not constitute an acceptance of any part of the project that does not meet 15A NCAC 2T; the Division's Gravity Sewer Minimum Design Criteria adopted February 12, 1996 as applicable; and the Division's Minimum Design Criteria for the Fast -Track Permitting of Pump Stations and Force Mains adopted June 1, 2000 as applicable, unless specifically mentioned herein. Division approval is based on acceptance of the certification provided by a North Carolina -licensed Professional Engineer in the application. It shall be the Permittee's responsibility to ensure that the as -constructed project meets the appropriate design criteria and rules. II. STANDARD CONDITIONS 1. This permit shall not be transferable. In the event there is a desire for the wastewater collection facilities to change ownership, or there is a name change of the Permittee, a formal permit request shall be submitted to the Division accompanied by documentation from the parties involved, and other supporting materials as may be appropriate. The approval of this request shall be considered on its merits and may or may not be approved. [15A NCAC 02T.0104; G.S 143-215.1(d3)] 2. This permit shall, become voidable unless the wastewater collection facilities are'constructed in accordance with the conditions of this permit; 15A NCAC 2T; the Division's Gravity Sewer Minimum Design Criteria adopted February 12, 1996 as applicable; the Division's Minimum Design Criteria for the Fast -Track Permitting of Pump Stations and Force Mains adopted June 1, 2000 as applicable; and other supporting materials unless specifically mentioned herein. [15A NCAC 02T.0110] 3. This permit shall be effective only with respect to the nature and volume of wastes described in the application and other supporting data. [15A NCAC 02T .0110] 4. The wastewater collection facilities shall be properly maintained and operated at all times. The Permittee shall maintain compliance with an individual system -wide collection system permit for the operation and maintenance of these facilities as required by 15A NCAC 2T .0403. If an individual permit is not required, the following'performance criteria shall be met: [15A NCAC 02T .0108(b)]: Page 4 of 8 2. The sewer system shall be effectively maintained and operated at all times to prevent discharge to land or surface waters, and to prevent any contravention of groundwater standards or surface water standards. b. A map of the sewer system shall be developed and shall be actively maintained. c. An operation and maintenance plan including pump station inspection frequency, preventative maintenance schedule, spare parts inventory and overflow'response has been developed and implemented. d. Pump statiors that are not connected to a telemetry system shall be inspected every day (i.e. 365 days per year). Pump stations that are connected to a telemetry system shall be inspected at least once per week. e. High -priority sewer lines shall be inspected at least once per every six -months and inspections are documented. f. A general observation of the entire sewer system shall be conducted at least once per year. g. Overflows and bypasses shall be reported to the appropriate Division regional office in accordance with 15A NCAC 2B .0506(a), and public notice shall be provided as required by North Carolina General Statute §143-215.1C. h. A Grease Control Program is in place as follows: 1. For public owned collection systems, the Grease Control Program shall include at least biannual distribution of educational materials for both commercial and residential users and the legal means to require grease interceptors at existing establishments. The plan shall also include legal means for inspections of the grease interceptors, enforcement for violators and the legal means to control grease entering the system from other public and private satellite sewer systems. 2. For privately owned collection systems, the Grease Control Program shall include at least bi- annual distribution of grease education materials to users of the collection- system by the permittee or its representative. 3. Grease education materials shall be distributed more often than required'in Parts (1) and (2) of this Subparagraph if necessary to prevent grease -related sanitary sewer overflows. i. Right-of-ways and easements shall be maintained in the full easement width for personnel and equipment accessibility. j. Documentation shall be kept for Subparagraphs (a) through (i) of this Rule for a minimum of three years with exception of the map, which shall be maintained for the life of the system. 5. The Permittee shall report by telephone to a water resources staff member at the Fayetteville Regional Office, telephone number (910) 433-3300, as soon as possible, but in no case more than 24 hours, following the occurrence or first knowledge of the occurrence of either of the following: Page 5 of 8 a. Any process unit failure, due to known or unknown reasons, that renders the facility incapable of adequate wastewater transport, such as mechanical or electrical failures of pumps, line blockage or breakage, etc.; or b. Any SSO and/or spill over 1,000 gallons; or c. Any SSO and/or spill, regardless of volume, that reaches surface water Voice mail messages or faxed information is permissible, but this shall not be considered as the initial verbal report. Overflows and spills occurring outside normal business hours may also be reported to the Division of Emergency Management at telephone number (800) 858-0368 or (919) 733-3300. Persons reporting any of the above occurrences shall file a spill report by completing and submitting Part I of Form CS-SSO (or the most current Division approved form) within five days following first knowledge of the occurrence. This report must outline the actions taken or proposed to be taken to ensure that the problem does not recur. Part II of Form CS-SSO (or the most current Division approved form) can also be completed to show that the SSO was beyond control. [G.S. 143-215.1C(a1)] 6. Construction of the gravity sewers, pump stations, and force mains shall be scheduled so as not to interrupt service by the existing utilities nor result in an overflow or bypass discharge of wastewater to -the surface waters of the State. [15A NCAC 02T.0108(b)] Upon completion of construction and prior to operation of these permitted facilities, the completed Engineering Certification form attached to this permit shall be submitted with the required supporting documents to the address provided on the form. A complete certification is one where the form is fully executed and the supporting documents are provided as applicable. Any wastewater flow made tributary to the wastewater collection system extension prior to completion of this Engineer's Certification shall be considered a violation of the permit and shall subject the Permittee to appropriate enforcement actions. If the permit is issued to a private entity with an Operational Agreement, then a copy of the Articles of Incorporation, Declarations/Covenants/Restrictions, and Bylaws that have been appropriately filed with the applicable County's Register of Deeds office shall be submitted with the certification. A complete certification is one where the form is fully executed and the supporting documents are provided as applicable. Supporting documentation shall include the following: One copy of the project construction record drawings (plan & profile views of sewer lines & force mains) of the wastewater collection system extension. Final record drawings should be clear on the plans or on digital media (CD or DVD disk) and are defined as the design drawings that are marked up or annotated with after construction information and show required buffers, separation distances, material changes, etc. One copy of the supporting applicable design calculations including pipe and pump sizing, velocity, pump cycle times, and level control settings, pump station buoyancy, wet well'storage, surge protection, detention time in the wet well, and force main, ability to flush low points in force mains with a pump cycle, and downstream sewer capacity analysis. If a portable power source or pump is dedicated to multiple stations, an evaluation of all the pump stations' storage capacities and the rotation schedule of the portable power source or pump, include travel timeframes, shall be provided. Page 6 of 8 c. Changes to the project that do not result in non-compliance with this permit, regulations, or the Minimum Design Criteria should be clearly identified on the record drawings, on the certification in the space provided, or in written summary form. Prior to Certification (Final or Partial): Permit modifications are required for any changes resulting in non-compliance with this permit (including pipe length increases of 10% or greater, increased flow, pump station design capacity design increases of 5% or greater, and increases in the number/type of connections), regulations, or the Minimum Design Criteria. Requested modifications or variances to the Minimum Design Criteria will be reviewed on a case -by -case basis and each on its own merit. Please note that variances to the Minimum Design Criteria should be requested and approved during the permitting process prior to construction. After -construction requests are discouraged by the Division and may not be approved, thus requiring replacement or repair prior to certification & activation. [15A NCAC 02T .0116] 8. Gravity sewers installed greater than ten percent below the minimum required slope per the Division's Gravity Sewer Minimum Design Criteria shall not be acceptable and shall not be certified until corrected. If there is an unforeseen obstacle in the field where all viable solutions have been examined, a slope variance can be requested from the Division with firm supporting documentation. This shall be done through a permit modification with fee. Such variance requests will be evaluated on a case -by -case basis. Resolution of such request shall be evident priorto completing and submitting the construction certification. [ 15A NCAC 02T.0105(n)] 9. A copy of the construction record drawings shall be maintained on file by the Permittee for the life of the wastewater collection facilities. [15A NCAC 02T .0116] 10. Failure to abide by the conditions and limitations contained in this permit; 15A NCAC 2T; the Division's Gravity Sewer Design Criteria adopted February 12,1996 as applicable; the Division's Minimum Design Criteria for the Fast -Track Permitting (if Pump Station and Force Mains adopted June 1, 2000 as applicable; and other supporting materials may subject the Permittee to an enforcement action by the Division, in accordance with North Carolina General Statutes §143-215.6A through §143-215.6C, construction of additional or replacement wastewater collection facilities, and/or referral of the North Carolina -licensed Professional Engineer to the licensing board. [15A NCAC 02T .0104; 15A NCAC 02T .0108(b-c)] 11. In the event that the wastewater collection facilities fail to perform satisfactorily, including the creation of nuisance conditions, the Permittee shall take immediate corrective action, including those as may be required by this Division, such as the construction of additional or replacement facilities. [15A NCAC 02T .0110; 15A NCAC 02T .0108(b)] 12. The issuance of this permit shall not exempt the Permittee from complying with any and all statutes, rules, regulations, or ordinances that may be imposed by the Division any other Federal, State, or Local government agencies which have jurisdiction or obtaining other permits which maybe required by the Division or any other Federal, State, of Local government agencies. [G.S. 143-215.1(b)] Page 7 of 8 FAST TRACK SEWER ENGINEERING CERTIFICATION PERMITTEE: Old North Utility Service, Inc. PERMIT #: WQ0039043 PROJECT: INTEL Training Facility and INTEL Training Annex ISSUE DATE: February 21, 2017 This project shall not be considered complete nor allowed to operate in accordance with Condition 7 of this permit until the Division has received this Certification and all required supporting documentation. It should be submitted in a manner that documents the Division's receipt. Send the required documentation the Regional Supervisor, Water Quality Regional Operations Section at the address at the bottom. Any wastewater flow made tributary to the wastewater collection system extension prior to completion of this Certification shall be considered a violation of the permit and shall subject the Permittee to appropriate enforcement actions. The Permittee is responsible for tracking all partial certifications up until a final certification is received. A Final Certification shall be a complete set of record drawings and design calculations regardless of whether partials have been submitted. PERMITTEE'S CERTIFICATION I, the undersigned agent for the Permittee, hereby state that this project has been constructed pursuant to the applicable standards & requirements, the Professional Engineer below has provided applicable design/construction information to the Permittee, and the Permittee is prepared to operate & maintain the wastewater collection system permitted herein or portions thereof. Printed Name, Title, Signature Date ENGINEERS CERTIFICATION I, , as a duly registered Professional Engineer in the State of North Carolina, having been authorized to observe (❑ periodically, ❑ weekly, ❑ full time) the construction of the project name and location as referenced above for the above Permittee hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance of this permit; 15A NCAC 02T; the Division of Water Resources' (Division) Gravity Sewer Minimum Design Criteria adopted February 12,1996 as applicable; the Division's Minimum Design Criteria for the Fast -Track Permitting of Pump Stations and Force Mains adopted June 1, 2000 as applicable; and other supporting materials. ........................ ................................................. North Carolina Professional Engineer's Seal w/signature & date: ❑ Final ❑ Partial (include description) Certification Comments/Qualifiers (attach if necessary): ... ........................................ ....... ..................... RECEIVED State of North Carolina DEO/DWR Department of Environmental Quality DIWR FE"B 10 2] 7 Division of Water Resources 15A NCAC 02T .0300 — FAST TRACK SEWER SYSTEM EXTENSION APPLICATION Dlvislon of Water Resources INSTRUCTIONS FOR FORM: FTA 04-16 & SUPPORTING DOCUMENTATION WQROS cI This application is for sewer extensions involving gravity sewers, pump stations and force mains, or any combination that has been certified by a professional engineer and the applicant that the project meets the requirements of 15A NCAC 02T and the Division's Minimum Design Criteria and that plans, specifications and supporting documents have been prepared in accordance with, 15A NCAC 02T, 15A NCAC 02T .0300, Division policies and good engineering practices. While no upfront engineering design documents are required for submittal, in accordance with 15A NCAC 02T .0305(b), design documents must be prepared prior to submittal of a fast track permit application to the Division. This would include plans, design calculations, and project specifications referenced in 15A NCAC 02T .0305 and the applicable minimum design criteria. These documents shall be available upon request by the Division. Projects that are deemed permitted (do not require a permit from the Division) are explained in 15A NCAC 02T.0303. Projects not eligible for review via the fast track process (must be submitted for full technical review): ➢ Projects that require an environmental assessment in accordance with 15A NCAC 1C .0100; ➢ Projects that do not meet any part of the minimum design criteria (MDC) document; ➢ Projects that involve a variance from the requirements of 15A NCAC 2T; ➢ Pressure sewer systems utilizing septic tank -effluent pumps (STEPS) or simplex grinder pumps; ➢ STEP or simplex grinder pumps connecting to pressurized systems (e.g. force mains); ➢ Vacuum sewer systems. General — When submitting an application, please use the following instructions as a checklist in order to ensure all required items are submitted. Adherence to these instructions and checking the provided boxes will help produce a quicker review time and reduce the amount of requested additional information. Failure to submit all required items will necessitate additional processing and review time, and may result in return of the application. Unless otherwise noted, the Applicant shall submit one original and one copy of the application and supporting documentation. A. One Original and One Copy of Application and Supporting Documents E Required unless otherwise noted B. Cover Letter (Required for All Application Packages): E List all items included in the application package, as well as a brief description of the requested permitting action. ➢ Be specific as to the system type, number of homes served, flow allocation required, etc. ➢ If necessary for clarity, include attachments to the application form. C. Application Fee (All New and Major Modification Application Packages): ® Submit a check or money order in the amount of $480.00 dated within 90 days of application submittal. ➢ Payable to North Carolina Department of Environmental Quality (NCDEQ) D. Fast Track (Form: FTA 04-16) Application (Required for All Application Packages): ® Submit the completed and appropriately executed application. ➢ If necessary for clarity or due to space restrictions, attachments to the application may be made. ❑ If the Applicant Type in Item I.2 is a corporation or company, provide documentation it is registered for business with the North Carolina Secretary of State. ❑ If the Applicant Type in Item I.2 is a partnership or d/b/a, enclose a copy of the certificate filed with the Register of Deeds in the county of business. ❑ The Project Name in Item II.1 shall be consistent with the project name on the flow acceptance letters, agreements, etc. ❑ The Professional Engineer's Certification on Page 5 of the application shall be signed, sealed and dated by a North Carolina licensed Professional Engineer. ❑ The Applicant's Certification on Page 5 of the application shall be signed in accordance with 15A NCAC 02T .0106(b). Per 15A NCAC 02T .0106(c), an alternate person may be designated as the signing official if a delegation letter is provided from a person who meets the criteria in 15A NCAC 02T .0106(b). INSTRUCTIONS FOR FORM: FTA 04-16 & SUPPORTING DOCUMENTATION Page 1 of 3 E. Flow Tracking/Acceptance Form (Form: FTSE 04-16) (If Applicable): ® Submit the completed and executed FTSE form from the owners of the downstream sewers and treatment facility. ➢ Multiple forms maybe required where the downstream sewer owner and wastewater treatment facility are different. ➢ The flow acceptance indicated in form FTSE must not expire prior to permit issuance and must be dated less than one year prior to the application date. ➢ Submittal of this application and form FTSE indicates that owner has adequate capacity and will not violate G.S. 143- 215.67 a . ➢ Intergovernmental agreements or other contracts will not be accepted in lieu of a project -specific FTSE. F. Site Maps (All Application Packages): ® Submit an 8.5-inch x 11-inch color copy of a USGS Topographic Map of sufficient scale to identify the entire project area and closest surface waters. ➢ Location of the project (gravity sewer, pump stations & force main) ➢ Downstream connection points and permit number (if known) for the receiving sewer ® Include a street level map showing general project area. G. Existing Permit (All Modification Packages): ❑ Submit the most recently issued existing permit. ❑ Provide a list of any items within the permit the Applicant would like the Division to address during the permit modification (i.e., permit description, flow allocation, treatment facility, etc.). H. Power Reliability Plan (Required if portable reliability option utilized for Pump Station): ❑ Per 15A NCAC 02T .0305(h)(1), submit documentation of power reliability for pumping stations. ➢ This alternative is only available for average daily flows less than 15,000 gallons per day ➢ It shall be demonstrated to the Division that the portable source is owned or contracted by the applicant and is compatible with the station. The Division will accept a letter signed by the applicant (see 15A NCAC 02T .0106(b)) or proposed contractor, stating that "the portable power generation unit or portable, independently -powered pumping units, associated appurtenances and personnel are available for distribution and operation of this pump station." ➢ If the portable power source or pump is dedicated to multiple pump stations, an evaluation of all the pump stations' storage capacities and the rotation schedule of the portable power source or pump, including travel timeframes, shall be provided in the case of a multiple station power outage. (Required at time of certification) I. Certificate of Public Convenience and Necessity (All Application Packages for Privately -Owned Public Utilities): ❑ Per 15A NCAC 02T .0115(a)(1) provide the Certificate of Public Convenience and Necessity from the North Carolina Utilities Commission demonstrating the Applicant is authorized to hold the utility franchise for the area to be served by the sewer extension, or ❑ Provide a letter from the North Carolina Utilities Commission's Water and Sewer Division Public Staff stating an application for a franchise has been received and that the service area is contiguous to an existing franchised area or that franchise approval is expected. J. Operational Agreements (Applications from HOA/POA and Developers for lots to be sold): ❑ Home/Property Owners' Associations ❑ Per 15A NCAC 02T .0115(c), submit the properly executed Operational Agreement (FORM: HOA). ❑ Per 15A NCAC 02T .0115(c), submit a copy of the Articles of Incorporation, Declarations and By-laws. ❑ Developers of lots to be sold ❑ Per 15A NCAC 02T .0115(b), submit the properly executed Operational Agreement (FORM: DEV). For more information, visit the Division's collection systems website INSTRUCTIONS FOR FORM: FTA 04-16 & SUPPORTING DOCUMENTATION Page 2 of 3 THE COMPLETED APPLICATION PACKAGE INCLDING ALL SUPPORTING INFORMATION AND MATERIALS, SHOULD BE SENT TO THE APPROPRIATE REGIONAL OFFICE: REGIONAL OFFICE ADDRESS COUNTIES SERVED Asheville Regional Office 2090 US Highway 70 Avery, Buncombe, Burke, Caldwell, Cherokee, Water Quality Section Swannanoa, North Carolina 28778 Clay, Graham, Haywood, Henderson, Jackson, (828) 296-4500 Macon, Madison, McDowell, Mitchell, Polk, (828) 299-7043 Fax Rutherford, Swain, Transylvania, Yancey Fayetteville Regional Office 225 Green Street Suite 714 Anson, Bladen, Cumberland, Harnett, Hoke, Water Quality Section Fayetteville, North Carolina 28301-5094 Montgomery, Moore, Robeson, Richmond, (910) 433-3300 Sampson, Scotland (910) 486-0707 Fax Mooresville Regional Office 610 E. Center Avenue Alexander, Cabarrus, Catawba, Cleveland, Water Quality Section Mooresville, North Carolina 28115 Gaston, Iredell, Lincoln, Mecklenburg, Rowan, (704) 663-1699 Stanly, Union (704) 663-6040 Fax Raleigh Regional Office 1628 Mail Service Center Chatham, Durham, Edgecombe, Franklin, Water Quality Section Raleigh, North Carolina 27699-1628 Granville, Halifax, Johnston, Lee, Nash, (919) 791-4200 Northampton, Orange, Person, Vance, Wake, (919) 788-7159 Fax Warren, Wilson Washington Regional Office 943 Washington Square Mall Beaufort, Bertie, Camden, Chowan, Craven, Water Quality Section Washington, North Carolina 27889 Currituck, Dare, Gates, Greene, Hertford, Hyde, (252) 946-6481 Jones, Lenoir, Martin, Pamlico, Pasquotank, (252) 975-3716 Fax Perquimans, Pitt, Tyrrell, Washington, Wayne Wilmington Regional Office 127 Cardinal Drive Extension Brunswick, Carteret, Columbus, Duplin, New Water Quality Section Wilmington, North Carolina 28405 Hanover, Onslow, Pender (910)796-7215 (910)350-2004 Fax Winston-Salem Regional Office 450 W. Hanes Mill Road Alamance, Alleghany, Ashe, Caswell, Davidson, Water Quality Section Suite 300 Davie, Forsyth, Guilford, Rockingham, Randolph, Winston-Salem, North Carolina 27105 Stokes, Surry, Watauga, Wilkes, Yadkin (336)776-9800 INSTRUCTIONS FOR FORM: FTA 04-16 & SUPPORTING DOCUMENTATION Page 3 of 3 State of North Carolina Department of Environmental Quality DW. R _ Division of Water Resources 15A NCAC 02T .0300 — FAST TRACK SEWER SYSTEM EXTENSION APPLICATION Division of Water Resources FTA 04-16 & SUPPORTING DOCUMENTATION Application Number: W0003 / 0 %, (to be completed by DWR) All items must be completed or the application will be returned I. APPLICANT INFORMATION: 1. Applicant's name: Old North Utility Services, Inc. (company, municipality, HOA, utility, etc.) 2. Applicant type: ❑ Individual ® Corporation ❑ General Partnership ❑ Privately -Owned Public Utility ❑ Federal ❑ State/County ❑ Municipal ❑ Other 3. Signature authority's name: Patrick Jennings per 15A NCAC 02T .0106(b) Title: Senior Engineer, PE 4. Applicant's mailing address: P.O. Box 73316 City: Fort Bragg State: NC Zip: 28307- 5. Applicant's contact information: Phone number: 910) 495-1311 Email Address: Patrick.Jennings(a),asusinc.com II. PROJECT INFORMATION: 1. Project name: INTEL Training Facility and INTEL Training Annex 2. Application/Project status: ® Proposed (New Permit) ❑ Existing Permit/Project If a modification, provide the existing permit number: WQ00 and issued date: If new construction but part of a master plan, provide the existing permit number: WQ00 3. County where project is located: Cumberland 4. Approximate Coordinates (Decimal Degrees): Latitude: N.35.12° Longitude:-W.79.0° 5. Parcel ID (if applicable): (or Parcel ID to closest downstream sewer) III. CONSULTANT INFORMATION: 1. Professional Engineer: Patrick Jennings License Number: 20842 Firm: American States Utility Services, Inc. Mailing address: 3400 Walsh Parkway, Suite 244 City: Fayetteville State: NC Zip: 28311- Phone number: 336) 686-4886 Email Address: Patrick.Jennings(a,asusinc.com IV. WASTEWATER TREATMENT FACILITY (WWTF) INFORMATION: 1. Facility Name: South Harnett Regional Waste Water Treatment Plant Permit Number: NC00088366 Owner Name: Harnett County V. RECEIVING DOWNSTREAM SEWER INFORMATION (if different than WWTF): 1. Permit Number(s): WQ System Wide Collection System Permit Number(s) (if applicable): WQCS Owner Name(s): FORM: FTA 04-16 Page 1 of 5 VI. GENERAL REQUIREMENTS 1. If the Applicant is a Privately -Owned Public Utility, has a Certificate of Public Convenience and Necessity been attached? ❑ Yes ❑No ®N/A 2. If the Applicant is a Developer of lots to be sold, has a Developer's Operational Agreement (FORM: DEV) been attached? ❑ Yes ❑No ®N/A 3. If the Applicant is a Home/Property Owners' Association, has an Operational Agreement (FORM: HOA) been attached? ❑ Yes ❑No ®N/A 4. Origin of wastewater: (check all that apply): ❑ Residential Owned ❑ Retail (stores, centers, malls) ❑ Car Wash ❑ Residential Leased ❑ Retail with food preparation/service ❑ Hotel and/or Motels ❑ School / preschool / day care ❑ Medical / dental / veterinary facilities ❑ Swimming Pool /Clubhouse ❑ Food and drink facilities ❑ Church ❑ Swimming Pool/Filter Backwash ® Businesses / offices / factories ❑ Nursing Home ❑ Other (Explain in Attachment) 5. Nature of wastewater: 100 % Domestic/Commercial % Commercial _ % Industrial (See 15A NCAC 02T .0103(20)) %, Is there a Pretreatment Program in effect? ❑ Yes [:]No 6. Hasa flow reduction been approved under 15A NCAC 02T .0114(f)? ❑ Yes ®No ➢ If Yes, provide a copy of flow reduction approval letter 7. Summarize wastewater generated by project: Establishment Type (see 02T.0114(fl) Daily Design Flow "b No. of Units Flow Businesses, Offices, and Factories 3750 gal/day (see calcs. for flow) 1 1650 GPD Businesses, Offices, and Factories 3500 gal/day 1 3500 GPD gal/ GPD gal/ GPD gal/ GPD gal/ GPD Total 5150 GPD a See 15A NCAC 02T .0114(b), (d), (e)(1) and (e)(2) for caveats to wastewater design flow rates (i.e., minimum flow per dwelling; proposed unknown non-residential development uses; public access facilities located near high public use areas; and residential property located south or east of the Atlantic Intracoastal Waterway to be used as vacation rentals as defined in G.S. 42A-4). b Per 15A NCAC 02T .0114(c), design flow rates for establishments not identified [in table 15A NCAC 02T.01141 shall be determined using available flow data, water using fixtures, occupancy or operation patterns, and other measured data. 8. Wastewater generated by project: 5150 GPD (per 15A NCAC 02T .0114) ➢ Do not include future flows or previously permitted allocations If permitted flow is zero, indicate why: ❑ Pump Station or Gravity Sewer where flow will be permitted in subsequent permits that connect to this line ❑ Flow has already been allocated in Permit Number: ❑ Rehabilitation or replacement of existing sewer with no new flow expected ❑ Other (Explain): FORM: FTA 04-16 Page 2 of 5 VII. ' GRAVITY SEWER DESIGN CRITERIA (If Applicable) - 02T .0305 & MDC (Gravity Sewers): 1. Summarize gravity sewer to be permitted: Size (inches) Length (feet) Material 4 15 PVC 6 224 PVC 8 1120 PVC ➢ Section II & III of the MDC for Permitting of Gravity Sewers contains information related to design criteria ➢ Section III contains information related to minimum slopes for gravity sewer(s) ➢ Oversizing lines to meet minimum slope requirement is not allowed and a violation of the MDC VIII. PUMP STATION DESIGN CRITERIA (If Applicable) — 02T .0305 & MDC (Pump Stations/Force Mains): COMPLETE FOR EACH PUMP STATION INCLUDED IN THIS PROJECT 1. Pump station number or name: 2. Approximate Coordinates (Decimal Degrees): Latitude: Longitude: - ° 3. Design flow of the pump station: millions gallons per day (firm capacity) 4. Operational point(s) of the pump(s): gallons per minute at feet total dynamic head (TDH) 5. Summarize the force main to be permitted (for this Pump Station): Size (inches) Length (feet) Material 6. Power reliability in accordance with 15A NCAC 02T .0305(h)(1): ❑ Standby power source or pump with automatic activation and telemetry - 15A NCAC 02T .0305(h)(1)(B)_ ➢ Required for all pump stations with an average daily flow greater than or equal to 15,000 gallons per day ➢ Must be permanent to facility Or if the pump station has an average daily flow less than 15,000 gallons per day: ❑ Portable power source with manual activation, quick -connection receptacle and telemetry - 15A NCAC 02T .0305(h)(1)(C) or ❑ Portable pumping unit with plugged emergency pump connection and telemetry - 15A NCAC 02T .0305(h)(1)(C): ➢ It shall be demonstrated to the Division that the portable source is owned or contracted by the applicant (draft agreement) and is compatible with the station. ➢ If the portable power source or pump is dedicated to multiple pump stations, an evaluation of all the pump stations' storage capacities and the rotation schedule of the portable power source or pump, including travel timeframes, shall be provided in the case of a multiple station power outage. FORM: FTA 04-16 Page 3 of 5 IX. SETBACKS & SEPARATIONS — (02B .0200 & 15A NCAC 02T .0305(f)): 1. Does the project comply with all separations found in 15A NCAC 02T .0305(f) & (g) ® Yes [-]No ➢ 15A NCAC 02T.0305(fl contains minimum separations that shall be provided for sewer systems: Setback Parameter* Separation Required Storm sewers and other utilities not listed below (vertical) 24 inches Water mains (vertical -water over sewer including in benched trenches) 18 inches Water mains (horizontal) 10 feet Reclaimed water lines (vertical - reclaimed over sewer) 18 inches Reclaimed water lines (horizontal - reclaimed over sewer) 2 feet **Any private or public water supply source, including any wells, WS-I waters of Class I or Class II impounded reservoirs used as a source of drinking water 100 feet **Waters classified WS (except WS-I or WS-V), B, SA, ORW, HQW, or SB from normal high water (or tide elevation) and wetlands (see item IX.2) 50 feet **Any other stream, lake, impoundment, or ground water lowering and surface drainage ditches 10 feet Any building foundation 5 feet Any basement 10 feet Top slope of embankment or cuts of 2 feet or more vertical height 10 feet Drainage systems and interceptor drains 5 feet Any swimming pools 10 feet Final earth grade (vertical) 36 inches ➢ 15A NCAC 02T.0305(Q) contains alternatives where separations in 02T.0305(fl cannot be achieved. ➢ **Stream classifications can be identified using the Division's NC Surface Water Classifications webpaQe ➢ If noncompliance with 02T.0305(f) or (g), see Section X of this application Does the project comply with separation requirements for wetlands? (50 feet of separation) ® Yes [:]No ➢ See the Division's draft separation requirements for situations where separation cannot be meet ➢ No variance is required if the alternative design criteria specified is utilized in design and construction ➢ As built documents should reference the location of areas effected 3. Does the project comply with all setbacks found in the river basin rules per 15A NCAC 02B .0200? ® Yes ❑ No ➢ This would include Trout Buffered Streams per 15A NCAC 213.0202 4. Does the project comply with an individual 404 Permit or any 401 Certifications? ® Yes ❑ No ➢ Wetland -related permits shall be requested, obtained, and adhered to for projects that impact wetlands or surface waters ➢ Information can be obtained from the 401 & Buffer Permitting Branch 5. Does project comply with 15A NCAC 02T.0105(c)(6) (additional permits/certifications)? 104EMMIME. Per 15A NCAC 02T.0105(c)(6), directly related environmental permits or certification applications are being prepared, have been applied for, or have been obtained. Issuance of this permit is contingent on issuance of dependent permits (erosion and sedimentation control plans, stormwater management plans, etc.). 6. Does this project include any sewer collection lines that are deemed "high -priority?" Per 15A NCAC 02T.0402, "high -priority sewer" means "any aerial sewer, sewer contacting surface waters, siphon, or sewer positioned parallel to streambanks that is subject to erosion that undermines or deteriorates the sewer. ❑ Yes ® No ➢ If yes, include an attachment with details for each line, including type (aerial line, size, material, and location). High priority lines shall be inspected by the permittee or its representative at least once every six -months and inspections documented per 15A NCAC 02T.0403(a)(5) or the permitee's individual System -Wide Collection permit. FORM: FTA 04-16 Page 4 of 5 X. CERTIFICATIONS: 1. Does the submitted system comply with 15A NCAC 02T, the Minimum Design Criteria for the Permitting of Pump Stations and Force Mains (latest version), and the Gravity Sewer Minimum Design Criteria (latest version) as applicable? 2. ® Yes ❑ No If No, complete and submit the Variance/Alternative Design Request application (VADC 10-14) and supporting documents for review. Approval of the request is required prior to submittal of the Fast Track Application and supportine documents. I, v V " attest that this application for (Prq#essional gi er's name from Application Item I11.1.) has bekn reviewed by hw and i ccurate, complete and consistent with the information supplied in the plans, specifications, engineering calculations, an all other supporting documentation to the best of my knowledge. I further attest that to the best of my knowledge the proposed design has been prepared in accordance with the applicable regulations, Gravity Sewer Minimum Design Criteria for Gravity Sewers (latest version), and the Minimum Design Criteria for the Fast -Track Permitting of Pump Stations and Force Mains (latest version). Although other professionals may have developed certain portions of this submittal package, inclusion of these materials under my signature and seal signifies that I have reviewed this material and have judged it to be consistent with the proposed design. NOTE — In accordance with General Statutes 143-215.6A and 143-215.613, any person who knowingly makes any false statement, representation, or certification in any application package shall be guilty of a Class 2 misdemeanor, which may include a fine not to exceed $10,000, as well as civil penalties up to $25,000 per violation. North Carolina Professional Engineer's seal, signature, and date: 3. Applict''; Geqatipn Rer 15A NCAC 02T .0106(b): I, name & title from Application Item I.3.) c A R0,*��i ►OQ.; OF ES S 70%<i',, 9�'� SEAL 20842 01(26/201 attest that this application for has been reviewed by mew is accurate and complete to the best of my knowledge. I understand that if all required parts of this application are not completed and that if all required supporting documentation and attachments are not included, this application package is subject to being returned as incomplete. I understand that any discharge of wastewater from this non - discharge system to surface waters or the land will result in an immediate enforcement action that may include civil penalties, injunctive relief, and/or criminal prosecution. I will make no claim against the Division of Water Resources should a condition of this permit be violated. I also understand that if all required parts of this application package are not completed and that if all required supporting information and attachments are not included, this application package will be returned to me as incomplete. NOTE — In accordance with General Statutes 143-215.6A and 143-215.6B, any person who knowingly makes any false statement, representation, or certification in any application package shall be guilty of a Class 2 misdemeanor, which may include a fine eed $10,Y000 as well as civil penalties up to $25,000 per violation. 1 Signature: Date: (0111-tolim FORM: FTA 04-16 Page 5 of 5 Old North !� UTILITY SERVICES, IN:,. • • • • • A S,2-0 e v 0 A—n— 5 at•- U91 ty se"'— nc INTEL Trainine Facility Flow Calculations Three buildings will be removed and replaced with the INTEL Training Facility. The buildings to be removed are as follows: D2612 Daily flow: 368 GPD D2609 Daily flow: 380 GPD D2312 Daily flow: 1,352 GPD Total daily flow of buildings to be removed= 368 + 381 + 1,354 = 2,100 GPD INTEL Trainine Facil Daily flow: 3,750 GPD Additional Daily Flow into Sewer System: 3,750 GPD — 2,100 GPD = 1,650 GPD Old North Utility Services, Inc. P.O. Box 73316, Fort Bragg, NC 28307 Tel: (910) 495-1311 Fax: (910) 495-1310 OF W AT§R State of North Carolina \O� QG Department of Environment and Natural Resources Tr Division of Water Quality c Flow Tracking/Acceptance for Sewer Extension Permit Applications (FTSE 06-13) Project Applicant Name: Old North Utility Services, Inc Project Name for which flow is being requested: PN 79439 Training Facility & Annex More than one FTSE may be required for a single project if the owner of the WWTP is not responsible for all pump stations along the route of the proposed wasteivatei- lom I. Complete this section only if you are the owner of the wastewater treatment plant. a. WWTP Facility Name: South Harnett Regional WWTP b. WWTP Facility Permit #: NCO088366 c. WWTP facility's permitted flow d. Estimated obligated flow not yet tributary to the WWTP e. WWTP facility's actual avg. flow f. Total flow for this specific request g. Total actual and obligated flows to the facility h. Percent of permitted flow used A11 flows are in MGD 15 5.127 5.336 0.005 10.582 63.79% II. Complete this section for each pump station you are responsible for along the route of this proposed wastewater flow. List pump stations located between the project connection point and the WWTP: (A) (B) (C) (D)=(B+C) (E)=(A-D) Design Obligated, Pump Average Daily Approx. Not Yet Total Current Station Firm Flow** Current Avg. Tributary Flow Plus (Name or Capacity,* (Finn / pf), Daily Flow, Daily Flow, Obligated Available Number) MGD MGD MGD MGD Flow Capacity*** SLS 74 19.5 7.8 4.1 2.098 6.1933 1.602 Contact ONUS For Upstream SLS Flow Tracking * The Firm Capacity of any pump station is defined as the maximum pumped flow that can be achieved with the largest pump taken out of service. ** Design Average Daily Flow is the firm capacity of the pump station divided by a peaking factor (pf) not less than 2.5. *** A Planning Assessment Addendum shall be attached for each pump station located between the project connection point and the WWTP where the Available Capacity is < 0. Page 1 of 6 FTSE 06-13 Certification Statement: I Steve Ward certify to the best of my knowledge that the addition of the volume of wastewater to be pennitted in this project has been evaluated along the route to the receiving wastewater treatment facility and that the flow from this project is not anticipated to cause any capacity related sanitary sewer overflows or overburden any downstream pump station en route to the receiving treatment plant under normal circumstances, given the implementation of the planned improvements identified in the planning assessment where applicable. This analysis has been performed in accordance with local established policies and procedures using the best available data. This certification applies to those items listed above in Sections I and II plus all attached planning assessment ddendums for which I am the responsible party. Signature of this form indicates acceptance of is wastewater flow. Signing Official Signature — &-1 Date Page 2 of 6 FTSE U6-13 State of North Carolina Department of Environmental Quality Division of Water Resources Flow Tracking/Acceptance for Sewer Extension Applications (FTSE 04-16) Entity Requesting Allocation: Old North Utility Services Project Name for which flow is being requested: PN 79439 INTEL Training Facility More than one FTSE may be required for a single project if the owner of the WWTP is not responsible for all pump stations along the route of the proposed wastewater flow. I. Complete this section only if you are the owner of the wastewater treatment plant. a. WWTP Facility Name: South Harnett Regional Waste Water Treatment Plant b. WWTP Facility Permit #: NC00088366 All flows are in MGD c. WWTP facility's permitted flow d. Estimated obligated flow not yet tributary to the WWTP e. WWTP facility's actual avg. flow f. Total flow for this specific request 0.00165 g. Total actual and obligated flows to the facility h. Percent of permitted flow used II. Complete this section for each pump station you are responsible for along the route of this proposed wastewater flow. List pump stations located between the project connection point and the WWTP: (A) (B) (C) (D)=(B+C) (E)=(A-D) Design Obligated, Pump Average Daily Approx. Not Yet Total Current Station Firm Flow** Current Avg. Tributary Flow Plus (Name or Capacity, * (Firm / po, Daily Flow, Daily Flow, Obligated Available Number) MGD MGD MGD MGD Flow Capacity*** LS3 1.44 0.576 0.039325 0.00165 0.040975 0.535025 * The Firm Capacity of any pump station is defined as the maximum pumped flow that can be achieved with the largest pump taken out of service. ** Design Average Daily Flow is the firm capacity of the pump station divided by a peaking factor (pf) not less than 2.5. *** A Planning Assessment Addendum shall be attached for each pump station located between the project connection point and the WWTP where the Available Capacity is < 0. Downstream Facility Name (Sewer): South Harnett Regional WWTP Downstream Permit Number: NCO088306 Page 1 of 6 FTSE 04-16 III. Certification Statement: I Lisanne Dorsch certify to the best of my knowledge that the addition of the volume of wastewater to be permitted in this project has been evaluated along the route to the receiving wastewater treatment facility and that the flow from this project is not anticipated to cause any capacity related sanitary sewer overflows or overburden any downstream pump station en route to the receiving treatment plant under normal circumstances, given the implementation of the planned improvements identified in the planning assessment where applicable. This analysis has been performed in accordance with local established policies and procedures using the best available data. This certification applies to those items listed above in Sections I and II. plus all attached planning assessment addendums for which I am, the responsible party. Signature of this form indicates acceptance of this wastewater flow. Lisanne ®o rs c h` Digitally signed by Lisanne Dorsch Date: 2017.02.07 16:17:30-05'00' Signing Official Signature Date Page 2 of 6 FTSE 04-16 State of North Carolina Department of Environmental Quality Division of Water Resources Flow Tracking/Acceptance for Sewer Extension Applications (FTSE 04-16) Entity Requesting Allocation: Old North Utility Services Project Name for which flow is being requested: PN 79439 INTEL Annex More than one FTSE may be required for a single project if the owner of the WWTP is not responsible for all pump stations along the route of the proposed wastewater flow. I. Complete this section only if you are the owner of the wastewater treatment plant. a. WWTP Facility Name: South Harnett Regional Waste Water Treatment Plant b. WWTP Facility Permit #: NC00088366 All flows are in MGD c. WWTP facility's permitted flow d. Estimated obligated flow not yet tributary to the WWTP e. WWTP facility's actual avg. flow f. Total flow for this specific request 0.0035 g. Total actual and obligated flows to the facility h. Percent of permitted flow used lI. Complete this section for each pump station you are responsible for along the route of this proposed wastewater flow. List pump stations located between the project connection point and the WWTP: (A) (B) (C) (D)=(B+C) (E)=(A-D) Design Obligated, Pump Average Daily Approx. Not Yet Total Current Station Firm Flow** Current Avg. Tributary Flow Plus (Name or Capacity, * (Firm / p f), Daily Flow, Daily Flow, Obligated Available Number) MGD MGD MGD MGD Flow Capacity*** LS2 1.44 0.576 0.035825 0.0035 0.039325 0.536675 * The Firm Capacity of any pump station is defined as the maximum pumped flow that can be achieved with the largest pump taken out of service. ** Design Average Daily Flow is the firm capacity of the pump station divided by a peaking factor (pf) not less than 2.5. *** A Planning Assessment Addendum shall be attached for each pump station located between the project connection point and the WWTP where the Available Capacity is < 0. Downstream Facility Name (Sewer): South Harnett Regional WWTP Downstream Permit Number: NCO088306 Page 1 of 6 FTSE 04-16 III Certification Statement: I Lisanne Dorsch, EHS certify to the best of my knowledge that the addition of the volume of wastewater to be permitted in this project has been evaluated along the route to the receiving wastewater treatment facility and that the flow from this project is not anticipated to cause any capacity related sanitary sewer overflows or overburden any downstream pump station en route to the receiving treatment plant under normal circumstances, given the implementation of the planned improvements identified in the planning assessment where applicable. This analysis has been performed in accordance with local established policies and procedures using the best available data. This certification applies to those items listed above in Sections I and II plus all attached planning assessment addendums for which I am the responsible party. Signature of this form indicates acceptance of this wastewater flow. Lisanne Do rsc h,,,Digitally signed by Lisanne Dorsch Date: 2017.01.27 12:48:52 -05 00 Signing Official Signature Date Page 2 of 6 FTSE 04-16 INTEL Training Facility Street Level Map � ,aa 4t*.[ ;45 tUftl INTEL Training Facility USGS Map INTEL Annex Street Level Map INTEL Annex USGS Map February 8, 2016 NCDEQ-DWR Fayetteville Regional Office 225 Green Street, Suite 714 Fayetteville, NC 28301 RE: INTEL Training Facility and INTEL Annex Fast Track Sewer System Extension Application Cumberland County, North Carolina 9Old* North • • • UTILITY SERVICC3, IN -- A 5'1s c fry c• A-- 5 IV :<*: -•�•. �� RECEIVED DEO/DWR =EB 10 201 WQROS FAYETTEVILLE REGIONAL OFFICE We are providing the enclosed information for the permitting of new sewer infrastructure to support the INTEL Training Facility and the INTEL Annex. The INTEL Training Facility will be located at Zabitosky Road and Ardennes Street in Fort Bragg, NC. The INTEL Annex will be located at Ammo Pointe Road and Urban Freedom Pass in Fort Bragg, NC. A 6-inch sewer lateral will be installed for the INTEL Training Facility and an 8-inch gravity sewer main will be installed for the INTEL Annex. Both building will discharge into manholes in the existing gravity sewer system. The Training Facility will have a demand of 1,650 GPD after demolition of the existing buildings to be replaced by the Training Facility, and the Annex will have a demand of 3,500 GPD. The total demand for both new buildings will be 5,150 GPD. Enclosed please find the original and one copy of the following: • Fast Track Sewer System Extension Application • Flow Tracking/Acceptance Form Completed by Harnett County • Flow Tracking/Acceptance Form Completed by Old North Utility Services • Check for $480.00 • USGS and Street Level Maps Showing the Project Areas Thank you for your consideration in this matter. If you require further information, please do not hesitate to contact me at Patrick.Jennings@asusinc.com Sincerely, Patrick Jennings, PE Senior Engineer Old North Utility Services, Inc. P.O. Box 73316, Fort Bragg, NC 28307 Tel: (910) 495-1311 Fax: (910) 495-1310 State of North Carolina DWR Department of Environmental Quality IV W Division of Water Resources Division of Water Resources 15A NCAC 02T .0300 — FAST TRACK SEWER SYSTEM EXTENSION APPLICATION FTA 04-16 & SUPPORTING DOCUMENTATION Application Number: (to be completed by DWR) All items must be com leted or the application will be returned I. APPLICANT INFORMATION: 1. Applicant's name: Old North Utility Services Inc (company, municipality, HOA, utility, etc.) 2. Applicant type: ❑Individual ® Corporation ❑ General Partnership ❑Privately -Owned Public Utility ❑ Federal ❑ State/County ❑ Municipal 3. Signature authority's name: Patrick Jennings; :. "I, Other per_.A_It._ -1 Title: Senior Engineer, PE 4. Applicant's mailing address: P.O. Box 73316 City: Fort Bragg State: NC Zip: 28307- 5. Applicant's contact information: Phone number: 910) 495-1311 Email Address: Patrick.Jenningsna asusinc com U. PROJECT INFORMATION: 1. Project name: INTEL Training Facility and INTEL Training Annex 2. Application/Project status: ® Proposed (New Permit) If a modification, provide the existing permit number: WQ00 RECEIVED DEQ/DWR FLED ?r�,,T 3%vsp FAYETTEVILLE REGIONAL OFFICE ❑ Existing Permit/Project and issued date: If new construction but part of a master plan, provide the existing permit number: WQ00 3. County where project is located: Cumberland 4. Approximate Coordinates (Decimal Deerees): i Atit,,AA. xT zc ,io r _._. •. . __. _- %>, 630 T For rnrLL BLVD SAN DIMAS CA 91779-1111 Pay DATE AMOUNT 12,9/16 .....480.00 FOUR HUNDRED EIGHTY AND 00/100" ""...*'•"***""......,,*" YUIU At 1 tN. 6 MUN I -FIN TO NC DEPT OF ENVIRONMENTAL QUALITY THE 1606 MAIL SERVICE CENTER ORDER 512 N SALISBURY STREET OF RALEIGH NC 27604-1148 FORM: FTA 04-16 Central Files: APS _ SWP _ 2/21/2017 Permit Number WQ0039043 Program Category Non -discharge Permit Type Gravity Sewer Extension, Pump Stations, & Pressure Sewer Extensions Primary Reviewer trent.allen Coastal SWRule Permitted Flow 5,150 Facility Permit Tracking Slip Status Project Type Active New Project Version Permit Classification 1.00 Individual Permit Contact Affiliation Facility Name Major/Minor Region INTEL Training FAcility and INTEL Training Annex Minor Fayetteville Location Address County Cumberland Owner Owner Name Old North Utility Services Inc Facility Contact Affiliation Owner Type Non -Government Owner Affiliation Patrick Jennings PO Box 73316 DateslEvents Fort Bragg NC 28307 Scheduled Orig Issue App Received Draft Initiated Issuance Public Notice Issue Effective Expiration 2/21/2017 2/10/2017 2/21/2017 2/21/2017 Regulated Activities Requested /Received Events Wastewater collection Additional information requested Additional information received Outfall Waterbody Name Streamindex Number Current Class Subbasin