HomeMy WebLinkAboutWQ0039043_Sewer Extension Files_20170221ROY COOPER
MICHAEI. S. RE GAN
S. JAY ZIMMERMAN
Water- Resout-ces
i:NVIRONMENIAL QUALITY
February 21, 2017
Patrick Jennings, Senior Engineer, PE
Old North Utility Service, Inc.
P. 0. Box 73316
Fort Bragg, NC 28307
Subject: Permit No. WQ0039043
Old North Utility Service, Inc.
INTEL Training Facility and INTEL Training Annex
Wastewater Collection System Extension Permit
Cumberland County
Dear Mr. Jennings:
In accordance with your application received February 10, 2017, we are forwarding herewith Permit No.
WQ0039043 dated February 21, 2017, to Old North Utility Service, Inc. for the construction and operation
upon certification of the subject wastewater collection system extension. This permit shall be effective
from the date of issuance until rescinded, and shall be subject to the conditions and limitations as specified
therein. This cover letter shall be considered a part of this permit and is therefore incorporated therein
by reference.
Please pay particular attention to the following conditions contained within this permit:
Condition 111: This permit shall not be automatically transferable; a request must be made and
approved.
Condition 11.4: Requires that the wastewater collection facilities be properly operated and maintained
in accordance with 15A NCAC 2T .0403 or any individual system -wide collection system
permit issued to the Permittee.
It shall be responsibility of the Permittee to ensure that the as -constructed project meets the appropriate
design criteria and rules. Failure to comply may result in penalties in accordance with North Carolina
225 Green Street, Suite 714, Fayetteville, NC 28301
Phone: 910-433-3300 \ Internet: www,ncwaterguality.org
An Equal Opportunity \ Affirmative Action Employer — Made in part by recycled paper
Old North Utility Service, Inc.
Permit No. WQ0039043
General Statute §143-215.6A through §143-215.6C, construction of additional or replacement
wastewater collection facilities, and/or referral of the North Carolina -licensed Professional Engineer to
the licensing board.
If any parts, requirements, or limitations contained in this permit are unacceptable, you have the right to
request an adjudicatory hearing upon written request within 30 days following receipt of this permit. This
request must be in the form of a written petition, conforming to Chapter 150E of North Carolina General
Statutes, and filed with the Office of Administrative Hearings, 6714 Mail Service Center, Raleigh, NC
27699-6714. Unless such demands are made, this permit shall be final and binding.
If you need additional information concerning this matter, please contact Trent Allen at (910) 433-3336
or via e-mail at trent.allen@ncdenr.gov.
Sincerely,
Trent Allen, Assist. Regional Supervisor
Water Quality Regional Operations Section
Fayetteville Regional Office
Division of Water Resources, NCDEQ
cc: Patrick Jennings, American States Utility Services, Inc., 3400 Walsh Parkway, Suite 244,
Fayetteville, NC 28311
Fayetteville Regional Office Files
Water Resources Central Files
PERCS (electronic copy)
Page 2 of 8
STATE OF NORTH CAROLINA
ENVIRONMENTAL MANAGEMENT COMMISSION
DEPARTMENT OF ENVIRONMENTAL QUALITY
WASTEWATER COLLECTION SYSTEM EXTENSION PERMIT
In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as
amended, and other applicable Laws, Rules, and Regulations, permission is hereby granted to the
Old North Utility Services, Inc.
Cumberland County
for the construction and operation of approximately 224 linear feet of 6-inch gravity sewer, and 1,120
linear feet of 8-inch gravity sewer as part of the INTEL Training Facility and INTEL Training Annex project,
and the discharge of 5,150 gallons per day of collected domestic wastewater into the South Harnett
Regional Wastewater Treatment Plant existing sewerage system, pursuant to the application received on
February 10, 2017, and in conformity with 15A NCAC 2T; the Division's Gravity Sewer Minimum Design
Criteria adopted February 12, 1996 as applicable; the Division's Minimum Design Criteria for the Fast -
Track Permitting of Pump Stations and Force Mains adopted June 1, 2000 as applicable; and other
supporting data subsequently filed and approved by the Department of Environmental Quality and
considered a part of this permit.
This permit shall be effective from the date of issuance until rescinded and shall be subject to the specified
conditions and limitations contained therein.
Trent Allen, Assist. Regional Supervisor
Division of Water Resources, NCDEQ
By Authority of The Environmental Management Commission
Permit Number: WQ0039043
Permit Issued: February 21, 2017
Page 3 of 8
SUPPLEMENT TO PERMIT COVER SHEET
Old North Utility Service, Inc.
is hereby authorized to:
Construct, and then operate upon certification the aforementioned wastewater collection extension. The
sewage and wastewater collected by this system shall be treated in the South Harnett Regional
Wastewater Treatment Plant in accordance with Permit Number NCO088366
Permitting of this project does not constitute an acceptance of any part of the project that does not meet
15A NCAC 2T; the Division's Gravity Sewer Minimum Design Criteria adopted February 12, 1996 as
applicable; and the Division's Minimum Design Criteria for the Fast -Track Permitting of Pump Stations and
Force Mains adopted June 1, 2000 as applicable, unless specifically mentioned herein. Division approval
is based on acceptance of the certification provided by a North Carolina -licensed Professional Engineer in
the application. It shall be the Permittee's responsibility to ensure that the as -constructed project meets
the appropriate design criteria and rules.
II. STANDARD CONDITIONS
1. This permit shall not be transferable. In the event there is a desire for the wastewater collection
facilities to change ownership, or there is a name change of the Permittee, a formal permit request
shall be submitted to the Division accompanied by documentation from the parties involved, and
other supporting materials as may be appropriate. The approval of this request shall be considered
on its merits and may or may not be approved. [15A NCAC 02T.0104; G.S 143-215.1(d3)]
2. This permit shall, become voidable unless the wastewater collection facilities are'constructed in
accordance with the conditions of this permit; 15A NCAC 2T; the Division's Gravity Sewer Minimum
Design Criteria adopted February 12, 1996 as applicable; the Division's Minimum Design Criteria for
the Fast -Track Permitting of Pump Stations and Force Mains adopted June 1, 2000 as applicable; and
other supporting materials unless specifically mentioned herein. [15A NCAC 02T.0110]
3. This permit shall be effective only with respect to the nature and volume of wastes described in the
application and other supporting data. [15A NCAC 02T .0110]
4. The wastewater collection facilities shall be properly maintained and operated at all times. The
Permittee shall maintain compliance with an individual system -wide collection system permit for the
operation and maintenance of these facilities as required by 15A NCAC 2T .0403. If an individual
permit is not required, the following'performance criteria shall be met: [15A NCAC 02T .0108(b)]:
Page 4 of 8
2. The sewer system shall be effectively maintained and operated at all times to prevent discharge
to land or surface waters, and to prevent any contravention of groundwater standards or surface
water standards.
b. A map of the sewer system shall be developed and shall be actively maintained.
c. An operation and maintenance plan including pump station inspection frequency, preventative
maintenance schedule, spare parts inventory and overflow'response has been developed and
implemented.
d. Pump statiors that are not connected to a telemetry system shall be inspected every day (i.e. 365
days per year). Pump stations that are connected to a telemetry system shall be inspected at
least once per week.
e. High -priority sewer lines shall be inspected at least once per every six -months and inspections are
documented.
f. A general observation of the entire sewer system shall be conducted at least once per year.
g. Overflows and bypasses shall be reported to the appropriate Division regional office in accordance
with 15A NCAC 2B .0506(a), and public notice shall be provided as required by North Carolina
General Statute §143-215.1C.
h. A Grease Control Program is in place as follows:
1. For public owned collection systems, the Grease Control Program shall include at least
biannual distribution of educational materials for both commercial and residential users and
the legal means to require grease interceptors at existing establishments. The plan shall also
include legal means for inspections of the grease interceptors, enforcement for violators and
the legal means to control grease entering the system from other public and private satellite
sewer systems.
2. For privately owned collection systems, the Grease Control Program shall include at least bi-
annual distribution of grease education materials to users of the collection- system by the
permittee or its representative.
3. Grease education materials shall be distributed more often than required'in Parts (1) and (2)
of this Subparagraph if necessary to prevent grease -related sanitary sewer overflows.
i. Right-of-ways and easements shall be maintained in the full easement width for personnel and
equipment accessibility.
j. Documentation shall be kept for Subparagraphs (a) through (i) of this Rule for a minimum of three
years with exception of the map, which shall be maintained for the life of the system.
5. The Permittee shall report by telephone to a water resources staff member at the Fayetteville
Regional Office, telephone number (910) 433-3300, as soon as possible, but in no case more than 24
hours, following the occurrence or first knowledge of the occurrence of either of the following:
Page 5 of 8
a. Any process unit failure, due to known or unknown reasons, that renders the facility incapable
of adequate wastewater transport, such as mechanical or electrical failures of pumps, line
blockage or breakage, etc.; or
b. Any SSO and/or spill over 1,000 gallons; or
c. Any SSO and/or spill, regardless of volume, that reaches surface water
Voice mail messages or faxed information is permissible, but this shall not be considered as the initial
verbal report. Overflows and spills occurring outside normal business hours may also be reported to
the Division of Emergency Management at telephone number (800) 858-0368 or (919) 733-3300.
Persons reporting any of the above occurrences shall file a spill report by completing and submitting
Part I of Form CS-SSO (or the most current Division approved form) within five days following first
knowledge of the occurrence. This report must outline the actions taken or proposed to be taken to
ensure that the problem does not recur. Part II of Form CS-SSO (or the most current Division approved
form) can also be completed to show that the SSO was beyond control. [G.S. 143-215.1C(a1)]
6. Construction of the gravity sewers, pump stations, and force mains shall be scheduled so as not to
interrupt service by the existing utilities nor result in an overflow or bypass discharge of wastewater
to -the surface waters of the State. [15A NCAC 02T.0108(b)]
Upon completion of construction and prior to operation of these permitted facilities, the completed
Engineering Certification form attached to this permit shall be submitted with the required supporting
documents to the address provided on the form. A complete certification is one where the form is
fully executed and the supporting documents are provided as applicable. Any wastewater flow made
tributary to the wastewater collection system extension prior to completion of this Engineer's
Certification shall be considered a violation of the permit and shall subject the Permittee to
appropriate enforcement actions.
If the permit is issued to a private entity with an Operational Agreement, then a copy of the Articles
of Incorporation, Declarations/Covenants/Restrictions, and Bylaws that have been appropriately
filed with the applicable County's Register of Deeds office shall be submitted with the certification.
A complete certification is one where the form is fully executed and the supporting documents are
provided as applicable. Supporting documentation shall include the following:
One copy of the project construction record drawings (plan & profile views of sewer lines & force
mains) of the wastewater collection system extension. Final record drawings should be clear on
the plans or on digital media (CD or DVD disk) and are defined as the design drawings that are
marked up or annotated with after construction information and show required buffers,
separation distances, material changes, etc.
One copy of the supporting applicable design calculations including pipe and pump sizing, velocity,
pump cycle times, and level control settings, pump station buoyancy, wet well'storage, surge
protection, detention time in the wet well, and force main, ability to flush low points in force
mains with a pump cycle, and downstream sewer capacity analysis. If a portable power source or
pump is dedicated to multiple stations, an evaluation of all the pump stations' storage capacities
and the rotation schedule of the portable power source or pump, include travel timeframes, shall
be provided.
Page 6 of 8
c. Changes to the project that do not result in non-compliance with this permit, regulations, or the
Minimum Design Criteria should be clearly identified on the record drawings, on the certification
in the space provided, or in written summary form.
Prior to Certification (Final or Partial): Permit modifications are required for any changes resulting in
non-compliance with this permit (including pipe length increases of 10% or greater, increased flow,
pump station design capacity design increases of 5% or greater, and increases in the number/type of
connections), regulations, or the Minimum Design Criteria. Requested modifications or variances to
the Minimum Design Criteria will be reviewed on a case -by -case basis and each on its own merit.
Please note that variances to the Minimum Design Criteria should be requested and approved during
the permitting process prior to construction. After -construction requests are discouraged by the
Division and may not be approved, thus requiring replacement or repair prior to certification &
activation. [15A NCAC 02T .0116]
8. Gravity sewers installed greater than ten percent below the minimum required slope per the Division's
Gravity Sewer Minimum Design Criteria shall not be acceptable and shall not be certified until
corrected. If there is an unforeseen obstacle in the field where all viable solutions have been
examined, a slope variance can be requested from the Division with firm supporting documentation.
This shall be done through a permit modification with fee. Such variance requests will be evaluated
on a case -by -case basis. Resolution of such request shall be evident priorto completing and submitting
the construction certification. [ 15A NCAC 02T.0105(n)]
9. A copy of the construction record drawings shall be maintained on file by the Permittee for the life of
the wastewater collection facilities. [15A NCAC 02T .0116]
10. Failure to abide by the conditions and limitations contained in this permit; 15A NCAC 2T; the Division's
Gravity Sewer Design Criteria adopted February 12,1996 as applicable; the Division's Minimum Design
Criteria for the Fast -Track Permitting (if Pump Station and Force Mains adopted June 1, 2000 as
applicable; and other supporting materials may subject the Permittee to an enforcement action by
the Division, in accordance with North Carolina General Statutes §143-215.6A through §143-215.6C,
construction of additional or replacement wastewater collection facilities, and/or referral of the North
Carolina -licensed Professional Engineer to the licensing board. [15A NCAC 02T .0104; 15A NCAC 02T
.0108(b-c)]
11. In the event that the wastewater collection facilities fail to perform satisfactorily, including the
creation of nuisance conditions, the Permittee shall take immediate corrective action, including those
as may be required by this Division, such as the construction of additional or replacement facilities.
[15A NCAC 02T .0110; 15A NCAC 02T .0108(b)]
12. The issuance of this permit shall not exempt the Permittee from complying with any and all statutes,
rules, regulations, or ordinances that may be imposed by the Division any other Federal, State, or Local
government agencies which have jurisdiction or obtaining other permits which maybe required by the
Division or any other Federal, State, of Local government agencies. [G.S. 143-215.1(b)]
Page 7 of 8
FAST TRACK SEWER ENGINEERING CERTIFICATION
PERMITTEE: Old North Utility Service, Inc.
PERMIT #: WQ0039043
PROJECT: INTEL Training Facility and INTEL Training Annex
ISSUE DATE: February 21, 2017
This project shall not be considered complete nor allowed to operate in accordance with Condition 7 of
this permit until the Division has received this Certification and all required supporting documentation. It
should be submitted in a manner that documents the Division's receipt. Send the required documentation
the Regional Supervisor, Water Quality Regional Operations Section at the address at the bottom.
Any wastewater flow made tributary to the wastewater collection system extension prior to completion
of this Certification shall be considered a violation of the permit and shall subject the Permittee to
appropriate enforcement actions. The Permittee is responsible for tracking all partial certifications up
until a final certification is received. A Final Certification shall be a complete set of record drawings and
design calculations regardless of whether partials have been submitted.
PERMITTEE'S CERTIFICATION
I, the undersigned agent for the Permittee, hereby state that this project has been constructed pursuant
to the applicable standards & requirements, the Professional Engineer below has provided applicable
design/construction information to the Permittee, and the Permittee is prepared to operate & maintain
the wastewater collection system permitted herein or portions thereof.
Printed Name, Title, Signature Date
ENGINEERS CERTIFICATION
I, , as a duly registered Professional Engineer in the State of North Carolina,
having been authorized to observe (❑ periodically, ❑ weekly, ❑ full time) the construction of the
project name and location as referenced above for the above Permittee hereby state that, to the best of
my abilities, due care and diligence was used in the observation of the construction such that the
construction was observed to be built within substantial compliance of this permit; 15A NCAC 02T; the
Division of Water Resources' (Division) Gravity Sewer Minimum Design Criteria adopted February 12,1996
as applicable; the Division's Minimum Design Criteria for the Fast -Track Permitting of Pump Stations and
Force Mains adopted June 1, 2000 as applicable; and other supporting materials.
........................ .................................................
North Carolina Professional Engineer's Seal w/signature & date:
❑ Final ❑ Partial (include description)
Certification Comments/Qualifiers (attach if necessary):
... ........................................ ....... .....................
RECEIVED State of North Carolina
DEO/DWR Department of Environmental Quality
DIWR FE"B 10 2] 7 Division of Water Resources
15A NCAC 02T .0300 — FAST TRACK SEWER SYSTEM EXTENSION APPLICATION
Dlvislon of Water Resources INSTRUCTIONS FOR FORM: FTA 04-16 & SUPPORTING DOCUMENTATION
WQROS
cI
This application is for sewer extensions involving gravity sewers, pump stations and force mains, or any combination that has been
certified by a professional engineer and the applicant that the project meets the requirements of 15A NCAC 02T and the Division's
Minimum Design Criteria and that plans, specifications and supporting documents have been prepared in accordance with, 15A
NCAC 02T, 15A NCAC 02T .0300, Division policies and good engineering practices.
While no upfront engineering design documents are required for submittal, in accordance with 15A NCAC 02T .0305(b), design
documents must be prepared prior to submittal of a fast track permit application to the Division. This would include plans, design
calculations, and project specifications referenced in 15A NCAC 02T .0305 and the applicable minimum design criteria. These
documents shall be available upon request by the Division.
Projects that are deemed permitted (do not require a permit from the Division) are explained in 15A NCAC 02T.0303.
Projects not eligible for review via the fast track process (must be submitted for full technical review):
➢ Projects that require an environmental assessment in accordance with 15A NCAC 1C .0100;
➢ Projects that do not meet any part of the minimum design criteria (MDC) document;
➢ Projects that involve a variance from the requirements of 15A NCAC 2T;
➢ Pressure sewer systems utilizing septic tank -effluent pumps (STEPS) or simplex grinder pumps;
➢ STEP or simplex grinder pumps connecting to pressurized systems (e.g. force mains);
➢ Vacuum sewer systems.
General — When submitting an application, please use the following instructions as a checklist in order to ensure all required
items are submitted. Adherence to these instructions and checking the provided boxes will help produce a quicker review time
and reduce the amount of requested additional information. Failure to submit all required items will necessitate additional
processing and review time, and may result in return of the application. Unless otherwise noted, the Applicant shall submit
one original and one copy of the application and supporting documentation.
A. One Original and One Copy of Application and Supporting Documents
E Required unless otherwise noted
B. Cover Letter (Required for All Application Packages):
E List all items included in the application package, as well as a brief description of the requested permitting action.
➢ Be specific as to the system type, number of homes served, flow allocation required, etc.
➢ If necessary for clarity, include attachments to the application form.
C. Application Fee (All New and Major Modification Application Packages):
® Submit a check or money order in the amount of $480.00 dated within 90 days of application submittal.
➢ Payable to North Carolina Department of Environmental Quality (NCDEQ)
D. Fast Track (Form: FTA 04-16) Application (Required for All Application Packages):
® Submit the completed and appropriately executed application.
➢ If necessary for clarity or due to space restrictions, attachments to the application may be made.
❑ If the Applicant Type in Item I.2 is a corporation or company, provide documentation it is registered for business with
the North Carolina Secretary of State.
❑ If the Applicant Type in Item I.2 is a partnership or d/b/a, enclose a copy of the certificate filed with the Register of
Deeds in the county of business.
❑ The Project Name in Item II.1 shall be consistent with the project name on the flow acceptance letters, agreements, etc.
❑ The Professional Engineer's Certification on Page 5 of the application shall be signed, sealed and dated by a North
Carolina licensed Professional Engineer.
❑ The Applicant's Certification on Page 5 of the application shall be signed in accordance with 15A NCAC 02T .0106(b).
Per 15A NCAC 02T .0106(c), an alternate person may be designated as the signing official if a delegation letter is
provided from a person who meets the criteria in 15A NCAC 02T .0106(b).
INSTRUCTIONS FOR FORM: FTA 04-16 & SUPPORTING DOCUMENTATION Page 1 of 3
E. Flow Tracking/Acceptance Form (Form: FTSE 04-16) (If Applicable):
® Submit the completed and executed FTSE form from the owners of the downstream sewers and treatment facility.
➢ Multiple forms maybe required where the downstream sewer owner and wastewater treatment facility are different.
➢ The flow acceptance indicated in form FTSE must not expire prior to permit issuance and must be dated less than one
year prior to the application date.
➢ Submittal of this application and form FTSE indicates that owner has adequate capacity and will not violate G.S. 143-
215.67 a .
➢ Intergovernmental agreements or other contracts will not be accepted in lieu of a project -specific FTSE.
F. Site Maps (All Application Packages):
® Submit an 8.5-inch x 11-inch color copy of a USGS Topographic Map of sufficient scale to identify the entire project
area and closest surface waters.
➢ Location of the project (gravity sewer, pump stations & force main)
➢ Downstream connection points and permit number (if known) for the receiving sewer
® Include a street level map showing general project area.
G. Existing Permit (All Modification Packages):
❑ Submit the most recently issued existing permit.
❑ Provide a list of any items within the permit the Applicant would like the Division to address during the permit
modification (i.e., permit description, flow allocation, treatment facility, etc.).
H. Power Reliability Plan (Required if portable reliability option utilized for Pump Station):
❑ Per 15A NCAC 02T .0305(h)(1), submit documentation of power reliability for pumping stations.
➢ This alternative is only available for average daily flows less than 15,000 gallons per day
➢ It shall be demonstrated to the Division that the portable source is owned or contracted by the applicant and is
compatible with the station. The Division will accept a letter signed by the applicant (see 15A NCAC 02T .0106(b)) or
proposed contractor, stating that "the portable power generation unit or portable, independently -powered pumping
units, associated appurtenances and personnel are available for distribution and operation of this pump station."
➢ If the portable power source or pump is dedicated to multiple pump stations, an evaluation of all the pump
stations' storage capacities and the rotation schedule of the portable power source or pump, including travel
timeframes, shall be provided in the case of a multiple station power outage. (Required at time of certification)
I. Certificate of Public Convenience and Necessity (All Application Packages for Privately -Owned Public Utilities):
❑ Per 15A NCAC 02T .0115(a)(1) provide the Certificate of Public Convenience and Necessity from the North Carolina
Utilities Commission demonstrating the Applicant is authorized to hold the utility franchise for the area to be served by
the sewer extension, or
❑ Provide a letter from the North Carolina Utilities Commission's Water and Sewer Division Public Staff stating an
application for a franchise has been received and that the service area is contiguous to an existing franchised area or
that franchise approval is expected.
J. Operational Agreements (Applications from HOA/POA and Developers for lots to be sold):
❑ Home/Property Owners' Associations
❑ Per 15A NCAC 02T .0115(c), submit the properly executed Operational Agreement (FORM: HOA).
❑ Per 15A NCAC 02T .0115(c), submit a copy of the Articles of Incorporation, Declarations and By-laws.
❑ Developers of lots to be sold
❑ Per 15A NCAC 02T .0115(b), submit the properly executed Operational Agreement (FORM: DEV).
For more information, visit the Division's collection systems website
INSTRUCTIONS FOR FORM: FTA 04-16 & SUPPORTING DOCUMENTATION Page 2 of 3
THE COMPLETED APPLICATION PACKAGE INCLDING ALL SUPPORTING INFORMATION AND
MATERIALS, SHOULD BE SENT TO THE APPROPRIATE REGIONAL OFFICE:
REGIONAL OFFICE
ADDRESS
COUNTIES SERVED
Asheville Regional Office
2090 US Highway 70
Avery, Buncombe, Burke, Caldwell, Cherokee,
Water Quality Section
Swannanoa, North Carolina 28778
Clay, Graham, Haywood, Henderson, Jackson,
(828) 296-4500
Macon, Madison, McDowell, Mitchell, Polk,
(828) 299-7043 Fax
Rutherford, Swain, Transylvania, Yancey
Fayetteville Regional Office
225 Green Street Suite 714
Anson, Bladen, Cumberland, Harnett, Hoke,
Water Quality Section
Fayetteville, North Carolina 28301-5094
Montgomery, Moore, Robeson, Richmond,
(910) 433-3300
Sampson, Scotland
(910) 486-0707 Fax
Mooresville Regional Office
610 E. Center Avenue
Alexander, Cabarrus, Catawba, Cleveland,
Water Quality Section
Mooresville, North Carolina 28115
Gaston, Iredell, Lincoln, Mecklenburg, Rowan,
(704) 663-1699
Stanly, Union
(704) 663-6040 Fax
Raleigh Regional Office
1628 Mail Service Center
Chatham, Durham, Edgecombe, Franklin,
Water Quality Section
Raleigh, North Carolina 27699-1628
Granville, Halifax, Johnston, Lee, Nash,
(919) 791-4200
Northampton, Orange, Person, Vance, Wake,
(919) 788-7159 Fax
Warren, Wilson
Washington Regional Office
943 Washington Square Mall
Beaufort, Bertie, Camden, Chowan, Craven,
Water Quality Section
Washington, North Carolina 27889
Currituck, Dare, Gates, Greene, Hertford, Hyde,
(252) 946-6481
Jones, Lenoir, Martin, Pamlico, Pasquotank,
(252) 975-3716 Fax
Perquimans, Pitt, Tyrrell, Washington, Wayne
Wilmington Regional Office
127 Cardinal Drive Extension
Brunswick, Carteret, Columbus, Duplin, New
Water Quality Section
Wilmington, North Carolina 28405
Hanover, Onslow, Pender
(910)796-7215
(910)350-2004 Fax
Winston-Salem Regional Office
450 W. Hanes Mill Road
Alamance, Alleghany, Ashe, Caswell, Davidson,
Water Quality Section
Suite 300
Davie, Forsyth, Guilford, Rockingham, Randolph,
Winston-Salem, North Carolina 27105
Stokes, Surry, Watauga, Wilkes, Yadkin
(336)776-9800
INSTRUCTIONS FOR FORM: FTA 04-16 & SUPPORTING DOCUMENTATION Page 3 of 3
State of North Carolina
Department of Environmental Quality
DW. R _ Division of Water Resources
15A NCAC 02T .0300 — FAST TRACK SEWER SYSTEM EXTENSION APPLICATION
Division of Water Resources FTA 04-16 & SUPPORTING DOCUMENTATION
Application Number: W0003 / 0 %, (to be completed by DWR)
All items must be completed or the application will be returned
I. APPLICANT INFORMATION:
1. Applicant's name: Old North Utility Services, Inc. (company, municipality, HOA, utility, etc.)
2. Applicant type: ❑ Individual ® Corporation ❑ General Partnership ❑ Privately -Owned Public Utility
❑ Federal ❑ State/County ❑ Municipal ❑ Other
3. Signature authority's name: Patrick Jennings per 15A NCAC 02T .0106(b)
Title: Senior Engineer, PE
4. Applicant's mailing address: P.O. Box 73316
City: Fort Bragg State: NC Zip: 28307-
5. Applicant's contact information:
Phone number: 910) 495-1311 Email Address: Patrick.Jennings(a),asusinc.com
II. PROJECT INFORMATION:
1. Project name: INTEL Training Facility and INTEL Training Annex
2. Application/Project status: ® Proposed (New Permit) ❑ Existing Permit/Project
If a modification, provide the existing permit number: WQ00 and issued date:
If new construction but part of a master plan, provide the existing permit number: WQ00
3. County where project is located: Cumberland
4. Approximate Coordinates (Decimal Degrees): Latitude: N.35.12° Longitude:-W.79.0°
5. Parcel ID (if applicable):
(or Parcel ID to closest downstream sewer)
III. CONSULTANT INFORMATION:
1. Professional Engineer: Patrick Jennings License Number: 20842
Firm: American States Utility Services, Inc.
Mailing address: 3400 Walsh Parkway, Suite 244
City: Fayetteville State: NC Zip: 28311-
Phone number: 336) 686-4886 Email Address: Patrick.Jennings(a,asusinc.com
IV. WASTEWATER TREATMENT FACILITY (WWTF) INFORMATION:
1. Facility Name: South Harnett Regional Waste Water Treatment Plant Permit Number: NC00088366
Owner Name: Harnett County
V. RECEIVING DOWNSTREAM SEWER INFORMATION (if different than WWTF):
1. Permit Number(s): WQ
System Wide Collection System Permit Number(s) (if applicable): WQCS
Owner Name(s):
FORM: FTA 04-16 Page 1 of 5
VI. GENERAL REQUIREMENTS
1. If the Applicant is a Privately -Owned Public Utility, has a Certificate of Public Convenience and Necessity been attached?
❑ Yes ❑No ®N/A
2. If the Applicant is a Developer of lots to be sold, has a Developer's Operational Agreement (FORM: DEV) been attached?
❑ Yes ❑No ®N/A
3. If the Applicant is a Home/Property Owners' Association, has an Operational Agreement (FORM: HOA) been attached?
❑ Yes ❑No ®N/A
4. Origin of wastewater: (check all that apply):
❑ Residential Owned ❑ Retail (stores, centers, malls) ❑ Car Wash
❑ Residential Leased ❑ Retail with food preparation/service ❑ Hotel and/or Motels
❑ School / preschool / day care ❑ Medical / dental / veterinary facilities ❑ Swimming Pool /Clubhouse
❑ Food and drink facilities ❑ Church ❑ Swimming Pool/Filter Backwash
® Businesses / offices / factories ❑ Nursing Home ❑ Other (Explain in Attachment)
5. Nature of wastewater: 100 % Domestic/Commercial % Commercial
_ % Industrial (See 15A NCAC 02T .0103(20))
%, Is there a Pretreatment Program in effect? ❑ Yes [:]No
6. Hasa flow reduction been approved under 15A NCAC 02T .0114(f)? ❑ Yes ®No
➢ If Yes, provide a copy of flow reduction approval letter
7. Summarize wastewater generated by project:
Establishment Type (see 02T.0114(fl)
Daily Design Flow "b
No. of Units
Flow
Businesses, Offices, and Factories
3750 gal/day (see calcs. for flow)
1
1650 GPD
Businesses, Offices, and Factories
3500 gal/day
1
3500 GPD
gal/
GPD
gal/
GPD
gal/
GPD
gal/
GPD
Total
5150 GPD
a See 15A NCAC 02T .0114(b), (d), (e)(1) and (e)(2) for caveats to wastewater design flow rates (i.e., minimum flow per
dwelling; proposed unknown non-residential development uses; public access facilities located near high public use
areas; and residential property located south or east of the Atlantic Intracoastal Waterway to be used as vacation rentals
as defined in G.S. 42A-4).
b Per 15A NCAC 02T .0114(c), design flow rates for establishments not identified [in table 15A NCAC 02T.01141 shall
be determined using available flow data, water using fixtures, occupancy or operation patterns, and other measured data.
8. Wastewater generated by project: 5150 GPD (per 15A NCAC 02T .0114)
➢ Do not include future flows or previously permitted allocations
If permitted flow is zero, indicate why:
❑ Pump Station or Gravity Sewer where flow will be permitted in subsequent permits that connect to this line
❑ Flow has already been allocated in Permit Number:
❑ Rehabilitation or replacement of existing sewer with no new flow expected
❑ Other (Explain):
FORM: FTA 04-16 Page 2 of 5
VII. ' GRAVITY SEWER DESIGN CRITERIA (If Applicable) - 02T .0305 & MDC (Gravity Sewers):
1. Summarize gravity sewer to be permitted:
Size (inches)
Length (feet)
Material
4
15
PVC
6
224
PVC
8
1120
PVC
➢ Section II & III of the MDC for Permitting of Gravity Sewers contains information related to design criteria
➢ Section III contains information related to minimum slopes for gravity sewer(s)
➢ Oversizing lines to meet minimum slope requirement is not allowed and a violation of the MDC
VIII. PUMP STATION DESIGN CRITERIA (If Applicable) — 02T .0305 & MDC (Pump Stations/Force Mains):
COMPLETE FOR EACH PUMP STATION INCLUDED IN THIS PROJECT
1. Pump station number or name:
2. Approximate Coordinates (Decimal Degrees): Latitude: Longitude: - °
3. Design flow of the pump station: millions gallons per day (firm capacity)
4. Operational point(s) of the pump(s): gallons per minute at feet total dynamic head (TDH)
5. Summarize the force main to be permitted (for this Pump Station):
Size (inches) Length (feet) Material
6. Power reliability in accordance with 15A NCAC 02T .0305(h)(1):
❑ Standby power source or pump with automatic activation and telemetry - 15A NCAC 02T .0305(h)(1)(B)_
➢ Required for all pump stations with an average daily flow greater than or equal to 15,000 gallons per day
➢ Must be permanent to facility
Or if the pump station has an average daily flow less than 15,000 gallons per day:
❑ Portable power source with manual activation, quick -connection receptacle and telemetry - 15A NCAC 02T
.0305(h)(1)(C)
or
❑ Portable pumping unit with plugged emergency pump connection and telemetry - 15A NCAC 02T .0305(h)(1)(C):
➢ It shall be demonstrated to the Division that the portable source is owned or contracted by the applicant (draft agreement)
and is compatible with the station.
➢ If the portable power source or pump is dedicated to multiple pump stations, an evaluation of all the pump stations'
storage capacities and the rotation schedule of the portable power source or pump, including travel timeframes, shall be
provided in the case of a multiple station power outage.
FORM: FTA 04-16 Page 3 of 5
IX. SETBACKS & SEPARATIONS — (02B .0200 & 15A NCAC 02T .0305(f)):
1. Does the project comply with all separations found in 15A NCAC 02T .0305(f) & (g) ® Yes [-]No
➢ 15A NCAC 02T.0305(fl contains minimum separations that shall be provided for sewer systems:
Setback Parameter*
Separation Required
Storm sewers and other utilities not listed below (vertical)
24 inches
Water mains (vertical -water over sewer including in benched trenches)
18 inches
Water mains (horizontal)
10 feet
Reclaimed water lines (vertical - reclaimed over sewer)
18 inches
Reclaimed water lines (horizontal - reclaimed over sewer)
2 feet
**Any private or public water supply source, including any wells, WS-I waters of Class I or
Class II impounded reservoirs used as a source of drinking water
100 feet
**Waters classified WS (except WS-I or WS-V), B, SA, ORW, HQW, or SB from normal
high water (or tide elevation) and wetlands (see item IX.2)
50 feet
**Any other stream, lake, impoundment, or ground water lowering and surface drainage
ditches
10 feet
Any building foundation
5 feet
Any basement
10 feet
Top slope of embankment or cuts of 2 feet or more vertical height
10 feet
Drainage systems and interceptor drains
5 feet
Any swimming pools
10 feet
Final earth grade (vertical)
36 inches
➢ 15A NCAC 02T.0305(Q) contains alternatives where separations in 02T.0305(fl cannot be achieved.
➢ **Stream classifications can be identified using the Division's NC Surface Water Classifications webpaQe
➢ If noncompliance with 02T.0305(f) or (g), see Section X of this application
Does the project comply with separation requirements for wetlands? (50 feet of separation) ® Yes [:]No
➢ See the Division's draft separation requirements for situations where separation cannot be meet
➢ No variance is required if the alternative design criteria specified is utilized in design and construction
➢ As built documents should reference the location of areas effected
3. Does the project comply with all setbacks found in the river basin rules per 15A NCAC 02B .0200? ® Yes ❑ No
➢ This would include Trout Buffered Streams per 15A NCAC 213.0202
4. Does the project comply with an individual 404 Permit or any 401 Certifications? ® Yes ❑ No
➢ Wetland -related permits shall be requested, obtained, and adhered to for projects that impact wetlands or surface waters
➢ Information can be obtained from the 401 & Buffer Permitting Branch
5. Does project comply with 15A NCAC 02T.0105(c)(6) (additional permits/certifications)?
104EMMIME.
Per 15A NCAC 02T.0105(c)(6), directly related environmental permits or certification applications are being prepared, have
been applied for, or have been obtained. Issuance of this permit is contingent on issuance of dependent permits (erosion and
sedimentation control plans, stormwater management plans, etc.).
6. Does this project include any sewer collection lines that are deemed "high -priority?"
Per 15A NCAC 02T.0402, "high -priority sewer" means "any aerial sewer, sewer contacting surface waters, siphon, or sewer
positioned parallel to streambanks that is subject to erosion that undermines or deteriorates the sewer.
❑ Yes ® No
➢ If yes, include an attachment with details for each line, including type (aerial line, size, material, and location).
High priority lines shall be inspected by the permittee or its representative at least once every six -months and
inspections documented per 15A NCAC 02T.0403(a)(5) or the permitee's individual System -Wide Collection permit.
FORM: FTA 04-16 Page 4 of 5
X. CERTIFICATIONS:
1. Does the submitted system comply with 15A NCAC 02T, the Minimum Design Criteria for the Permitting of Pump Stations
and Force Mains (latest version), and the Gravity Sewer Minimum Design Criteria (latest version) as applicable?
2.
® Yes ❑ No
If No, complete and submit the Variance/Alternative Design Request application (VADC 10-14) and supporting documents
for review. Approval of the request is required prior to submittal of the Fast Track Application and supportine
documents.
I, v V " attest that this application for
(Prq#essional gi er's name from Application Item I11.1.)
has bekn reviewed by hw and i ccurate, complete and consistent with the information supplied in the plans, specifications,
engineering calculations, an all other supporting documentation to the best of my knowledge. I further attest that to the best
of my knowledge the proposed design has been prepared in accordance with the applicable regulations, Gravity Sewer
Minimum Design Criteria for Gravity Sewers (latest version), and the Minimum Design Criteria for the Fast -Track
Permitting of Pump Stations and Force Mains (latest version). Although other professionals may have developed certain
portions of this submittal package, inclusion of these materials under my signature and seal signifies that I have reviewed this
material and have judged it to be consistent with the proposed design.
NOTE — In accordance with General Statutes 143-215.6A and 143-215.613, any person who knowingly makes any false
statement, representation, or certification in any application package shall be guilty of a Class 2 misdemeanor, which may
include a fine not to exceed $10,000, as well as civil penalties up to $25,000 per violation.
North Carolina Professional Engineer's seal, signature, and date:
3. Applict''; Geqatipn Rer 15A NCAC 02T .0106(b):
I,
name & title from Application Item I.3.)
c A R0,*��i
►OQ.; OF ES S 70%<i',,
9�'�
SEAL
20842
01(26/201
attest that this application for
has been reviewed by mew is accurate and complete to the best of my knowledge. I understand that if all required parts of
this application are not completed and that if all required supporting documentation and attachments are not included, this
application package is subject to being returned as incomplete. I understand that any discharge of wastewater from this non -
discharge system to surface waters or the land will result in an immediate enforcement action that may include civil penalties,
injunctive relief, and/or criminal prosecution. I will make no claim against the Division of Water Resources should a
condition of this permit be violated. I also understand that if all required parts of this application package are not completed
and that if all required supporting information and attachments are not included, this application package will be returned to
me as incomplete.
NOTE — In accordance with General Statutes 143-215.6A and 143-215.6B, any person who knowingly makes any false
statement, representation, or certification in any application package shall be guilty of a Class 2 misdemeanor, which may
include a fine eed $10,Y000 as well as civil penalties up to $25,000 per violation.
1
Signature: Date: (0111-tolim
FORM: FTA 04-16 Page 5 of 5
Old North
!� UTILITY SERVICES, IN:,.
• • • • • A S,2-0 e v 0 A—n— 5 at•- U91 ty se"'— nc
INTEL Trainine Facility Flow Calculations
Three buildings will be removed and replaced with the INTEL Training Facility. The buildings to be
removed are as follows:
D2612
Daily flow: 368 GPD
D2609
Daily flow: 380 GPD
D2312
Daily flow: 1,352 GPD
Total daily flow of buildings to be removed= 368 + 381 + 1,354 = 2,100 GPD
INTEL Trainine Facil
Daily flow: 3,750 GPD
Additional Daily Flow into Sewer System:
3,750 GPD — 2,100 GPD = 1,650 GPD
Old North Utility Services, Inc.
P.O. Box 73316, Fort Bragg, NC 28307
Tel: (910) 495-1311 Fax: (910) 495-1310
OF W AT§R State of North Carolina
\O� QG Department of Environment and Natural Resources
Tr Division of Water Quality
c Flow Tracking/Acceptance for Sewer Extension Permit Applications
(FTSE 06-13)
Project Applicant Name: Old North Utility Services, Inc
Project Name for which flow is being requested: PN 79439 Training Facility & Annex
More than one FTSE may be required for a single project if the owner of the WWTP is not responsible for all pump
stations along the route of the proposed wasteivatei- lom
I. Complete this section only if you are the owner of the wastewater treatment plant.
a. WWTP Facility Name: South Harnett Regional WWTP
b. WWTP Facility Permit #: NCO088366
c. WWTP facility's permitted flow
d. Estimated obligated flow not yet tributary to the WWTP
e. WWTP facility's actual avg. flow
f. Total flow for this specific request
g. Total actual and obligated flows to the facility
h. Percent of permitted flow used
A11 flows are in MGD
15
5.127
5.336
0.005
10.582
63.79%
II. Complete this section for each pump station you are responsible for along the route of this
proposed wastewater flow.
List pump stations located between the project connection point and the WWTP:
(A)
(B)
(C)
(D)=(B+C)
(E)=(A-D)
Design
Obligated,
Pump Average Daily
Approx.
Not Yet
Total Current
Station Firm Flow**
Current Avg.
Tributary
Flow Plus
(Name or Capacity,* (Finn / pf),
Daily Flow,
Daily Flow,
Obligated
Available
Number) MGD MGD
MGD
MGD
Flow
Capacity***
SLS 74 19.5 7.8
4.1
2.098
6.1933
1.602
Contact ONUS For
Upstream
SLS
Flow
Tracking
* The Firm Capacity of any pump station is defined as the maximum pumped flow that
can be achieved with the largest pump taken out of service.
** Design Average Daily Flow is the firm capacity of the pump station divided by a peaking
factor (pf) not less than 2.5.
*** A Planning Assessment Addendum shall be attached for each pump station located
between the project connection point and the WWTP where the Available Capacity is < 0.
Page 1 of 6
FTSE 06-13
Certification Statement:
I Steve Ward certify to the best of my knowledge that the addition of
the volume of wastewater to be pennitted in this project has been evaluated along the route to the
receiving wastewater treatment facility and that the flow from this project is not anticipated to
cause any capacity related sanitary sewer overflows or overburden any downstream pump station
en route to the receiving treatment plant under normal circumstances, given the implementation of
the planned improvements identified in the planning assessment where applicable. This analysis
has been performed in accordance with local established policies and procedures using the best
available data. This certification applies to those items listed above in Sections I and II plus all
attached planning assessment ddendums for which I am the responsible party. Signature of this
form indicates acceptance of is wastewater flow.
Signing Official Signature
— &-1
Date
Page 2 of 6
FTSE U6-13
State of North Carolina
Department of Environmental Quality
Division of Water Resources
Flow Tracking/Acceptance for Sewer Extension Applications
(FTSE 04-16)
Entity Requesting Allocation: Old North Utility Services
Project Name for which flow is being requested: PN 79439 INTEL Training Facility
More than one FTSE may be required for a single project if the owner of the WWTP is not responsible for all pump
stations along the route of the proposed wastewater flow.
I. Complete this section only if you are the owner of the wastewater treatment plant.
a. WWTP Facility Name: South Harnett Regional Waste Water Treatment Plant
b. WWTP Facility Permit #: NC00088366
All flows are in MGD
c. WWTP facility's permitted flow
d. Estimated obligated flow not yet tributary to the WWTP
e. WWTP facility's actual avg. flow
f. Total flow for this specific request 0.00165
g. Total actual and obligated flows to the facility
h. Percent of permitted flow used
II. Complete this section for each pump station you are responsible for along the route of this
proposed wastewater flow.
List pump stations located between the project connection point and the WWTP:
(A) (B) (C) (D)=(B+C) (E)=(A-D)
Design Obligated,
Pump Average Daily Approx. Not Yet Total Current
Station Firm Flow** Current Avg. Tributary Flow Plus
(Name or Capacity, * (Firm / po, Daily Flow, Daily Flow, Obligated Available
Number) MGD MGD MGD MGD Flow Capacity***
LS3 1.44 0.576 0.039325 0.00165 0.040975 0.535025
* The Firm Capacity of any pump station is defined as the maximum pumped flow that
can be achieved with the largest pump taken out of service.
** Design Average Daily Flow is the firm capacity of the pump station divided by a peaking
factor (pf) not less than 2.5.
*** A Planning Assessment Addendum shall be attached for each pump station located
between the project connection point and the WWTP where the Available Capacity is < 0.
Downstream Facility Name (Sewer): South Harnett Regional WWTP
Downstream Permit Number: NCO088306
Page 1 of 6
FTSE 04-16
III. Certification Statement:
I Lisanne Dorsch certify to the best of my knowledge that the addition of
the volume of wastewater to be permitted in this project has been evaluated along the route to the
receiving wastewater treatment facility and that the flow from this project is not anticipated to
cause any capacity related sanitary sewer overflows or overburden any downstream pump station
en route to the receiving treatment plant under normal circumstances, given the implementation
of the planned improvements identified in the planning assessment where applicable. This
analysis has been performed in accordance with local established policies and procedures using
the best available data. This certification applies to those items listed above in Sections I and II.
plus all attached planning assessment addendums for which I am, the responsible party.
Signature of this form indicates acceptance of this wastewater flow.
Lisanne ®o rs c h` Digitally signed by Lisanne Dorsch
Date: 2017.02.07 16:17:30-05'00'
Signing Official Signature
Date
Page 2 of 6
FTSE 04-16
State of North Carolina
Department of Environmental Quality
Division of Water Resources
Flow Tracking/Acceptance for Sewer Extension Applications
(FTSE 04-16)
Entity Requesting Allocation: Old North Utility Services
Project Name for which flow is being requested: PN 79439 INTEL Annex
More than one FTSE may be required for a single project if the owner of the WWTP is not responsible for all pump
stations along the route of the proposed wastewater flow.
I. Complete this section only if you are the owner of the wastewater treatment plant.
a. WWTP Facility Name: South Harnett Regional Waste Water Treatment Plant
b. WWTP Facility Permit #: NC00088366
All flows are in MGD
c. WWTP facility's permitted flow
d. Estimated obligated flow not yet tributary to the WWTP
e. WWTP facility's actual avg. flow
f. Total flow for this specific request 0.0035
g. Total actual and obligated flows to the facility
h. Percent of permitted flow used
lI. Complete this section for each pump station you are responsible for along the route of this
proposed wastewater flow.
List pump stations located between the project connection point and the WWTP:
(A) (B) (C) (D)=(B+C) (E)=(A-D)
Design Obligated,
Pump Average Daily Approx. Not Yet Total Current
Station Firm Flow** Current Avg. Tributary Flow Plus
(Name or Capacity, * (Firm / p f), Daily Flow, Daily Flow, Obligated Available
Number) MGD MGD MGD MGD Flow Capacity***
LS2 1.44 0.576 0.035825 0.0035 0.039325 0.536675
* The Firm Capacity of any pump station is defined as the maximum pumped flow that
can be achieved with the largest pump taken out of service.
** Design Average Daily Flow is the firm capacity of the pump station divided by a peaking
factor (pf) not less than 2.5.
*** A Planning Assessment Addendum shall be attached for each pump station located
between the project connection point and the WWTP where the Available Capacity is < 0.
Downstream Facility Name (Sewer): South Harnett Regional WWTP
Downstream Permit Number: NCO088306
Page 1 of 6
FTSE 04-16
III Certification Statement:
I Lisanne Dorsch, EHS certify to the best of my knowledge that the addition of
the volume of wastewater to be permitted in this project has been evaluated along the route to the
receiving wastewater treatment facility and that the flow from this project is not anticipated to
cause any capacity related sanitary sewer overflows or overburden any downstream pump station
en route to the receiving treatment plant under normal circumstances, given the implementation
of the planned improvements identified in the planning assessment where applicable. This
analysis has been performed in accordance with local established policies and procedures using
the best available data. This certification applies to those items listed above in Sections I and II
plus all attached planning assessment addendums for which I am the responsible party.
Signature of this form indicates acceptance of this wastewater flow.
Lisanne Do rsc h,,,Digitally signed by Lisanne Dorsch
Date: 2017.01.27 12:48:52 -05 00
Signing Official Signature
Date
Page 2 of 6
FTSE 04-16
INTEL Training Facility Street Level Map
� ,aa
4t*.[
;45
tUftl
INTEL Training Facility USGS Map
INTEL Annex Street Level Map
INTEL Annex USGS Map
February 8, 2016
NCDEQ-DWR
Fayetteville Regional Office
225 Green Street, Suite 714
Fayetteville, NC 28301
RE: INTEL Training Facility and INTEL Annex
Fast Track Sewer System Extension Application
Cumberland County, North Carolina
9Old*
North
• • •
UTILITY SERVICC3, IN --
A 5'1s c fry c• A-- 5 IV :<*: -•�•. ��
RECEIVED
DEO/DWR
=EB 10 201
WQROS
FAYETTEVILLE REGIONAL OFFICE
We are providing the enclosed information for the permitting of new sewer infrastructure to
support the INTEL Training Facility and the INTEL Annex. The INTEL Training Facility will be located at
Zabitosky Road and Ardennes Street in Fort Bragg, NC. The INTEL Annex will be located at Ammo Pointe
Road and Urban Freedom Pass in Fort Bragg, NC.
A 6-inch sewer lateral will be installed for the INTEL Training Facility and an 8-inch gravity sewer
main will be installed for the INTEL Annex. Both building will discharge into manholes in the existing
gravity sewer system. The Training Facility will have a demand of 1,650 GPD after demolition of the
existing buildings to be replaced by the Training Facility, and the Annex will have a demand of 3,500
GPD. The total demand for both new buildings will be 5,150 GPD.
Enclosed please find the original and one copy of the following:
• Fast Track Sewer System Extension Application
• Flow Tracking/Acceptance Form Completed by Harnett County
• Flow Tracking/Acceptance Form Completed by Old North Utility Services
• Check for $480.00
• USGS and Street Level Maps Showing the Project Areas
Thank you for your consideration in this matter. If you require further information, please do not
hesitate to contact me at Patrick.Jennings@asusinc.com
Sincerely,
Patrick Jennings, PE
Senior Engineer
Old North Utility Services, Inc.
P.O. Box 73316, Fort Bragg, NC 28307
Tel: (910) 495-1311 Fax: (910) 495-1310
State of North Carolina
DWR Department of Environmental Quality
IV W Division of Water Resources
Division of Water Resources 15A NCAC 02T .0300 — FAST TRACK SEWER SYSTEM EXTENSION APPLICATION
FTA 04-16 & SUPPORTING DOCUMENTATION
Application Number:
(to be completed by DWR)
All items must be com leted or the application will be returned
I. APPLICANT INFORMATION:
1. Applicant's name: Old North Utility Services Inc (company, municipality, HOA, utility, etc.)
2. Applicant type: ❑Individual
® Corporation ❑ General Partnership ❑Privately -Owned Public Utility
❑ Federal ❑ State/County ❑ Municipal
3. Signature authority's name: Patrick Jennings; :. "I,
Other
per_.A_It._ -1
Title: Senior Engineer, PE
4. Applicant's mailing address: P.O. Box 73316
City: Fort Bragg State: NC Zip: 28307-
5. Applicant's contact information:
Phone number: 910) 495-1311 Email Address: Patrick.Jenningsna asusinc com
U. PROJECT INFORMATION:
1. Project name: INTEL Training Facility and INTEL Training Annex
2. Application/Project status:
® Proposed (New Permit)
If a modification, provide the existing permit number: WQ00
RECEIVED
DEQ/DWR
FLED ?r�,,T
3%vsp
FAYETTEVILLE REGIONAL OFFICE
❑ Existing Permit/Project
and issued date:
If new construction but part of a master plan, provide the existing permit number: WQ00
3. County where project is located: Cumberland
4. Approximate Coordinates (Decimal Deerees): i Atit,,AA. xT zc ,io r _._. •. . __. _-
%>, 630 T For rnrLL BLVD
SAN DIMAS CA 91779-1111
Pay
DATE
AMOUNT
12,9/16
.....480.00
FOUR HUNDRED EIGHTY AND 00/100" ""...*'•"***""......,,*"
YUIU At 1 tN. 6 MUN I -FIN
TO NC DEPT OF ENVIRONMENTAL QUALITY
THE 1606 MAIL SERVICE CENTER
ORDER 512 N SALISBURY STREET
OF RALEIGH NC 27604-1148
FORM: FTA 04-16
Central Files: APS _ SWP _
2/21/2017
Permit Number WQ0039043
Program Category
Non -discharge
Permit Type
Gravity Sewer Extension, Pump Stations, & Pressure Sewer Extensions
Primary Reviewer
trent.allen
Coastal SWRule
Permitted Flow
5,150
Facility
Permit Tracking Slip
Status
Project Type
Active
New Project
Version
Permit Classification
1.00
Individual
Permit Contact Affiliation
Facility Name Major/Minor Region
INTEL Training FAcility and INTEL Training Annex Minor Fayetteville
Location Address County
Cumberland
Owner
Owner Name
Old North Utility Services Inc
Facility Contact Affiliation
Owner Type
Non -Government
Owner Affiliation
Patrick Jennings
PO Box 73316
DateslEvents Fort Bragg NC 28307
Scheduled
Orig Issue App Received Draft Initiated Issuance Public Notice Issue Effective Expiration
2/21/2017 2/10/2017 2/21/2017 2/21/2017
Regulated Activities Requested /Received Events
Wastewater collection Additional information requested
Additional information received
Outfall
Waterbody Name Streamindex Number Current Class Subbasin