Loading...
HomeMy WebLinkAboutWQ0040992_Application (FTSE)_20190702State of North Carolina DWR Department of Environmental Quality Division of Water Resources 15A NCAC 02T.0300 —FAST TRACK SEWER SYSTEM EXTENSION APPLICATION Division of Water Resources FTA 04-16 & SUPPORTING DOCUMENTATION Application Number: W ()0 `d qqL (to 6e completed by DWR) All items must be completed or the application will be returned I. APPLICANT INFORMATION: 1. Applicant's name: Town of Clayton (company, municipality, HOA, utility, etc.) 2. Applicant type: ❑ Individual ❑ Corporation ❑General Partnership ❑ Privately -Owned Public Utility ❑ Federal ❑ State/County ® Municipal ❑ Other 3. Signature authority's name: Adam Lindsay per 15A N('AC 02T .0106(b) Title: Town Manager 4, Applicant's mailing address: I I I E. Second Street City: Clayton State: NC Zip: 27520- 5. Applicant's contact information: Phone number. (219) 553-5002 Email Address: crowland a townoMa tonnc.o Eg 11. PROJECT INFORMATION: 1. Project name: RWAC - Walton Farm Phase 4 & Community Center 2. Application/Project status: ® Proposed (New Permit) ❑ Existing Permit/Project If a modification, provide the existing permit number. WQ00 and issued date: m If new construction but part of a master plan, provide the existing permit number: WQ00 a 3. County where project is located: Johnston =° 4. Approximate Coordinates (Decimal Degrees): Latitude: 35.681918' Longitude:-78.426292' N q 5. Parcel ID (if applicable): 16103027 ° n+ •Q (or Parcel ID to closest downstream sewer) III. CONSULTANT INFORMATION•. 1. Professional Engineer. Donald C. Adams Jr. PE License Number: 2546g C Firm: Adams & Hodge Engineering, PC (Firm # C4187) U Mailing address: 314 East Main Street City: Clayton State: NL Zip: 27520- Phone number: (2.L9) 243-1332 Email Address: donnie - adamsandhod, e.com IV. WASTEWATER TREATMENT FACILITY (WWTF) INFORMATION: 1. Facility Name: Little Creek WRF Permit Number: 0-254 3 Owner Name: Town of Clayton V. RECEIVING DOWNSTREAM SEWER INFORMATION (if different than WWTF): 1. Permit Number(s): W 004 273 Downstream (Receiving) Sewer Size: 8 inch System Wide_ Collection System Pcrmil Number(sl (ifaicahle): WQCS00147 Owner Name(s): Town of Clayton FORM: FTA 04-16 Page I of 5 I VI. GENERAL REQUIREMENTS 1. If the Applicant is a Privately -Owned Public Utility, has a Certificate of Public Convenience and Necessity been attached? [--]Yes ❑No ®N/A 2. If the Applicant is a Developer of lots to be sold, has a Developer's Operational A geement FORM: DEV been attached? ❑ Yes ❑No ®N/A 3. If the Applicant is a Homc:'Pronerty Owners' Association, has an Operational Agreement (FORM: HOA) been attached? ❑ Yes ❑No ®N/A 4. Origin of wastewater: (check all that apply): ® Residential Owned ❑ Retail (stores, centers, malls) ❑ Car Wash ❑ Residential Leased ❑ Retail with food preparation/service ❑ Hotel and/or Motels ❑ School / preschool / day care ❑ Medical / dental / veterinary facilities ❑ Swimming Pool /CIubhouse ❑ Food and drink facilities ❑ Church ❑ Businesses / offices r factories ❑Swimming Pool/Filter Backwash ❑ Nursing Home ❑ Other (Explain in Attachment) 5. Nature of wastewater: 100 % Domestic/Commercial % Commercial Industrial (See 15A NCAC 02T .0103(20)) �--I Is there a Pretreatment Program in effect? ❑ Yes ❑ No 6. Hasa flow reduction been approved under 15A NCAC 02T .01 14 ? ® Yes []No > If yes, virovide a COPY of flow reduction approval letter 7. Summarize wastewater generated by project: Establishment Type (see 02T�y Single Family Homes Daily Design Flow 0 No. of Units Flow 250 gal/day/unit 29 7250 GPD gal/ GPD gall GPD gal/ GPD gal/ GPD gal/ GPD T01a! 7250 GPD a See 15A NCAC 02T .0114(b). (d). (e)(1) and (e)(2) for caveats to wastewater design flow rates (i.e., minimum flow per dwelling; proposed unknown non-residential development uses; public access facilities located near high public use areas; and residential property located south or east of the Atlantic Intracoastal Waterway to be used as vacation rentals as defined in G.S. 42A-4). b Per 15A NCAC 02T .0114(c), design flow rates for establishments not identified [in table 15A NCAC 02T.01141 shall be determined using available flow data, water using fixtures, occupancy or operation patterns, and other measured data 8. Wastewater generated by project: 7250 GPD (per 15A NCAC 02T .0114) > Do not include future flows or previously permitted allocations If permitted flow is zero, indicate why: ❑ Pump Station or Gravity Sewer where flow will be permitted in subsequent permits that connect to this line ❑ Flow has already been allocated in Permit Number: ❑ Rehabilitation or replacement of existing sewer with no new flow expected ❑ Other (Explain): FORM: FTA 04-16 Page 2 of VI I. VIII. GRAVITY SEWER DESIGN CRITERIA (If Applicable) - 02T .0305 & MDC (Gravity Sewers): Summarize gravity sewer to be permitted: Size (inches) Length (feet) Material g615 PVC Section lI & Ill of the MDC for Permitting of Gravity Sewers contains information related to design criteria 9 Section III contains information related to minimum slopes for gravity sewer(s) D Oversizing lines to meet minimum slope requirement is not allowed and a violation of the MDC PUMP STATION DESIGN CRITERIA (If Applicable) — 02T .0305 & MDC(Pump Stations/Force Mains); COMPLETE FOR EACH PUMP STATION INCLUDED IN THIS PROJECT 1. Pump station number or name: 2. Approximate Coordinates (Decimal Degrees): Latitude: Longitude: - 3. Design flow of the pump station: millions gallons per day (firm capacity) 4. Operational point(s) of the pump(s): gallons per minute at feet total dynamic head (TDH) 5. Summarize the force main to be permitted (for this Pump Station): Size (inches) Length (feet) Material 6. Power reliability in accordance with 15A NCAC 02T-0305(h)(1): ❑ Standby power source or pump with automatic activation and telemetry - 15A NCAC 02T .0305(h)(1)(B)_ Required for all pump stations with an average daily flow greater than or equal to 15,000 gallons per day Must be permanent to facility Or if the pump station has an average daily flow less than 15,000 gallons per day: ❑ Portable power source with manual activation, quick -connection receptacle and telemetry - I5A NCAC 02T .0305(hx l)(C) or ❑ Portable pumping unit with plugged emergency pump connection and telemetry - 15A NCAC 02T .0305(h)(i XQ: It shall be demonstrated to the Division that the portable source is owned or contracted by the applicant (draft agreement) and is compatible with the station. D If the portable power source or pump is dedicated to multiple pump stations, an evaluation of all the pump stations' storage capacities and the rotation schedule of the portable power source or pump, including travel timeframes, shall be provided in the case of a multiple station power outage. FORM: FTA 04-16 Page 3 of5 IX. SETBACKS & SEPARATIONS— (028.0200 & 15A NCAC 02T.0305(f)): 1. Does the project comply with all separations found in 15A NCAC 02T.0305(f) & ➢ 15A NCAC 02T.0305(f) contains minimum semrntinnc that ehn11 hp nmv1rlPrl ® Yes [:]No Setback Parameter* Sepanition Required Storm sewers and other utilities not listed below vertical 24 inches Water mains (vertical -water over sewer including in benched trenches) Water mains horizontal 18 inches 10 feet Reclaimed water lines vertical - reclaimed over sewer 18 inches Reclaimed water lines horizontal - reclaimed over sewer 2 feet **Any private or public water supply source, including any wells, WS-1 waters of Class I or Class lI impounded reservoirs used as a source ofdrinking water 100 feet **Waters classified WS (except WS-1 or WS-V), B, SA, ORW, HQW, or SB from normal high water or tide elevation and wetlands see item IX.2 50 feet **Any other stream, lake, impoundment, or ground water lowering and surface drainage ditches I0 feet Any building foundation 5 feet Any basement 10 feet Top slope of embankment or cuts of 2 feet or more vertical height 10 feet Drainage systems and interceptor drains 5 feet Any swimming pools 10 feet Final earth grade (vertical) 36 inches ➢ 15A NCAC 02T.0305(e)el contains alternatives where separations in 02T.0305(f) cannot be achieved. ➢ **Stream classifications can be identified using the Division's NC Surface Water Classifications web a e ➢ If noncompliance with 02T.0305(f) or (g),, see Section X of this application 2. Does the project comply with separation requirements for wetlands? (50 feet of separation) ®Yes [:]No ❑ NIA D See the Division's draft separation requirements for situations where separation cannot be meet ➢ No variance is required if the alternative design criteria specified is utilized in design and construction ➢ As built documents should reference the location of areas effected 3. Does the project comply with setbacks found in the river basin rules per 15A NCAC 02B _0200? ®Yes [:]No ❑ NIA ➢ This would include Trout Buffered Streams per 15A NCAC 213.0202 4. Does the project require coverage/authorization under a 404 Nationwide or ❑ Yes ® No individual permits or 40I Water Quality Certifications? ➢ Information can be obtained from the 401 & Buffer Permittine Branch 5. Does project comply with 15A NCAC 02T.0105(c)(6) (additional permits/certifications)? ® Yes ❑ No Per 15A NCAC 02T.0105 c 6 , directly related environmental permits or certification applications are being prepared, have been applied for, or have been obtained. Issuance of this permit is contingent on issuance of dependent permits (erosion and sedimentation control plans, stormwater management plans, etc.). 6. Does this project include any sewer collection lines that are deemed "high -priority?" Per 15A NCAC 02T.0402, "high -priority sewer" means "any aerial sewer, sewer contacting surface waters, siphon, or sewer positioned parallel to streambanks that is subject to erosion that undermines or deteriorates the sewer. [:)Yes ® No ❑ N/A ➢ If yes, include an attachment with details for each line, including type (aerial line, size, material, and location). High priority lines shall be inspected by the permittee or its representative at least once every six -months and inspections documented per 15A NCAC 02T.0403(a)(5) or the permitee's individual System -Wide Collection permit. FORM: FTA 04-16 Page 4 of 5 X. CERTIFICATIONS: 1. Does the submitted system comply with 15A NCAC 02T, the Minimum Design Criteria for the Permitting of Pump Stations and Force Mains (latest version), and the Gravity Sewer Minimum Design Criteria (latest version) as applicable? ® Yes ❑ No IfNo, complete and submit the Variance/Alternative Design Request application (VADC 10-14) and supporting documents for review. Approval ofthe request is required orior to submittal of the Fast Track Application and supporting documents. 2. Professional Engineer's Certification: I� Donnie Adams Jr, PE attest that this application for (Professional Engineer's name from Application Item III.1.) has been reviewed by me and is accurate, complete and consistent with the information supplied in the plans, specifications, engineering calculations, and all other supporting documentation to the best of my knowledge. I further attest that to the best of my knowledge the proposed design has been prepared in accordance with the applicable regulations, Gravity Sewer Minimum Design Criteria for Gravity Sewers (latest version), and the Minimum Design Criteria for the Fast -Track Permitting of Pump Stations and Force Mains (latest version). Although other professionals may have developed certain portions of this submittal package, inclusion of these materials under my signature and seal signifies that I have reviewed this material and have judged it to be consistent with the proposed design. NOTE — In accordance with General Statutes 143-215.6A and 143-215.613, any person who knowingly makes any false statement, representation, or certification in any application package shall be guilty of a Class 2 misdemeanor, which may include a fine not to exceed $10,000, as well as civil penalties up to $25,000 per violation. North Carolina Professional Engineer's scat, signature, and date: - - -- Ssln•t� ii GINS ��.• C. A�►,�a 3/28/2019 3. Applicant's Certification per 15A NCAC 02T .0106(b); 1, Adam Lindsay, Town Manager attest that this application for (Signature Authority's name & title from Application Item 1.3.) has been reviewed by me and is accurate and complete to the best of my knowledge. I understand that if all required parts of this application are not completed and that if all required supporting documentation and attachments are not included, this application package is subject to being returned as incomplete. I understand that any discharge of wastewater from this non - discharge system to surface waters or the land will result in an immediate enforcement action that may include civil penalties, injunctive relief, and/or criminal prosecution. 1 will make no claim against the Division of Water Resources should a condition of this permit be violated. I also understand that if all required parts of this application package are not completed and that if all required supporting information and attachments are not included, this application package will be returned to me as incomplete. NOTE — In accordance with General Statutes 143-215.6A and 143-215.6B, any person who knowingly makes any false statement, representation, or certification in any application package shall be guilty of a Class 2 misdemeanor, which may include a fine not to exceed $10,000 as well as civil penalties up to $25,000 per violation. Signature: Date: _ . �/• 2�4• �� FORM: FTA 04-16 Page 5 of 5 NC Dept of Environmental Quality State of North Carolina Department of Environmental Quality JUL - 2 2019 Division of Water Resources R.alcigh Regional Ot t jv Tracking for Sewer Extension Applications (FTSE 10-18) Entity Requesting Allocation: Town of Clayton Project Name for which flow is being requested: Walton Farm Ph. 4 and Community Ctr. Afore than one FTSE maybe required for a single project if the owner of the iViVTP is not responsible for all pump stations along the route of the proposed wastewater flow. I. Complete this section only if you are the owner of the wastewater treatment plant. a. WWTP Facility Name: Little Creek WRF b. WWTP Facility Permit #: 0025453 All flaws are in MCD c. WWTP facility's permitted flow LCWRF 2.5 + JoCo 1.34 + Ralei 1.0 d. Estimated obligated flow not yet tributary to the WWTP 0.8269 e. WWTP facility's actual avg. flow 2.8263 f. Total flow for this specific request 0.A073 g. Total actual and obligated flows to the facility 3.6605 h. Percent of permitted flow used 76.26% II. Complete this section for each pump station you are responsible for along the route of this wastewater flow. proposed List pump stations located between the project connection point and the WWTP: (A) (B) (C) (D)=(B+C) (E)=(A-D) Design Obligated, Pump Pump Average Approx. Not Yet Total Currenr Station Station Firm Daily Flow** Current Tributary Flow Plus (Name or Pemut Capacity, * (Firm f pf), Avg. Daily Daily Flow, Obligated Available Number) No. MOD MOD Flow, MOD MOD Flow Capacity*** Clayton- W 31521 2.5056 1.0022 0.2350 0.2759 0.5109 0.4913 NRLS #1 W 18329 1.0800 0.4320 0.2048 0.0837 0.2885 0.1435 * The Firm Capacity (design flow) of any pump station is deflned as the maximum pumped flow that can be achieved with the largest pump taken out of service. ** Design Average Daily Flow is the firm capacity of the pump station divided by a peaking factor (pf) not less than 2.5, per Section 2.02(A)(4)(c) of the Minimum Design Criteria. *** A Planning Assessment Addendum shall be attached for each pump station located between the project connection point and the WWTP where the Available Capacity is < 0. Downstream Facility Name (Sewer): Walton Farm 1-3 and 8-11 Downstream Permit Number: WQ0040273 Page 1 of 6 FTS E 10-18 III. Certification Statement: I Adam J. Lindsay, Town Manager certify to the best of my knowledge that the addition of the volume of wastewater to be permitted in this project has been evaluated along the route to the receiving wastewater treatment facility and that the flow from this project is not anticipated to cause any capacity related sanitary sewer overflows or overburden any downstream pump station en route to the receiving treatment plant under normal circumstances, given the implementation of the planned improvements identified in the planning assessment where applicable. This analysis has been performed in accordance with local established policies and procedures using the best available data. This certification applies to those items listed above in Sections I and II plus all attached planning assessment addendums for which I am the responsible party. Signature of this form certifies that the receiving collection system or treatment works has adequate capacity to transport and treat the proposed new wastewater. Signing Title of Signing Q.fflcial Date Page 2 of 6 FTS E 10-18 LAM63 Af�Af�S &HODGE July 2, 2019 Ted Cashion NC DWQ 3800 Barrett Dr Raleigh, North Carolina 27609 Subject: RWAC - Walton Farm Phase 4 & Community Center Town of Clayton Johnston County Please find attached one original and one copy of the following: NC Dept of Environmental Quality JUL - 2 2019 Raleigh Regional Office l . Complete Fast Track Application for Gravity Sewers, Pump Stations, and Forcemains (Form FTA 04-16), signed by Engineer & Town of Clayton 2. $480.00 Check for Application Fee 3. Flow Tracking/Acceptance for Sewer Extension (Form FTSE 10-18) 4. USGS Quad Map showing approximate site location 5. Street Level Map Project Narrative: RWAC - Walton Farm Phase 4 & Community Center includes 29 new residential lots and-.L1-6151f of new 8" gravity sewer. Requested flow is 7,250 GPD. The project will flow to an existing public gravity system owned and maintained by Town of Clayton. The flow will end up at the Little Creek WRF permit 00-25453. If you have any questions or comments, please give me a call at 9I9-369-I938 or email to andrew@adamsandhodge.com. Sincerely, Andrew Hodge, PE .r �N �4 �2 ESsroyC'ti Q SEgL y 21094 712119 ADAMS & HGDGE ENGINEERING, PC • 314 East Main Street, Clayton, NC 27520 • 919-243-1332 • Firm # C-4187 Deck, Erin M From: Andrew Hodge <andrew@adamsandhodge.com> Sent: Thursday, August 8, 2019 8:47 AM To: Deck, Erin M Cc: Chris Rowland; Donnie Adams Subject: [External] RE: RWAC- Walton Farm Phase 4 & Community Center Fast Track Sewer Extension Application Attachments: WALTON FARMS PH 1-3 & 8-11 - SEWER PERMIT.pdf • xtemal email. -Do nbtallck:links or open attachments unless you verify. Sent all suspicious email as an attaehment,te Good Morning Erin, My apologies, in hind sight I can see that I should have included the following statement in the cover sheet narrative for "RWAC-Walton Farm Phase 4 & Community Center": The flow for the Community Center was allocated with permit #WQ0040273 "Walton Farm Phl-3, 8-11". We referred to the building as an Amenity Center in this permit. The service line for the Community Center will connect to the sewer main that is being installed as part of Walton Farms Phl-3, 8-11. Although the Community Center site will be built along with Walton Farm Phase 4 project. Attached is a copy of the WQ0040273 permit for your convenience. Please let me know if you need anything else. Thanks! Andrew Hodge, PE Adams & Hodge Engineering, PC 314 E. Main Street Clayton, NC 27520 (M) 919-369-1938 Firm # C4187 From: Donnie Adams <donnie@adamsandhodge.com> Sent: Wednesday, August 07, 2019 7:06 PM To: Andrew Hodge <andrew@adamsandhodge.com>; Rudy Wells <rudy@adamsandhodge.com> Subject: Fwd: RWAC- Walton Farm Phase 4 & Community Center Fast Track Sewer Extension Application Get Outlook for iOS From: Deck, Erin M <erin.deck@ncdenr.Qov> Sent: Wednesday, August 7, 2019 4:05:20 PM To: Donnie Adams <donnie@adamsandhodee.com>; crowland@townofclavtonnc.ore <crowland @townofclavtonnc.org> Subject: RWAC- Walton Farm Phase 4 & Community Center Fast Track Sewer Extension Application Good Afternoon, We are in the process of reviewing the subject application and require additional information. The project name indicates that a Community Center will be built along with the residential development, however there is no flow allocated for this and the narrative does not reference the Community Center. Please explain. Thank you, Erin Deck Department of Environmental Quality Division of Water Resources Raleigh Regional Office Office: 919-791-4258 Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. USGS MAP - RWAC-WALTON FARM '+ PHASE 4 & COMMUNITY CENTER �- , 4_ 1 WlNDLeIS rRL I �LL1 WOR RTH D,' 1 [FtAITLEsrp " I FOREST OAKS DR. AMSTERAAM DR J RWAC-WALTON FARM PHASE 4 & COMMUNITY CENTER - `Y hvvF.RP 1 2. � o 1 i Jti - TRANMAM TR - r e Scale: 1 in. = 2000 feet 1 (The scale is only accurate when printed portrait AOAMS S. HOOGE on a 8 112 x 11 size sheet with no page scaling.) E-1-1n.lRING, PC I VICINITY MAP - RWAC - WALTON FARM PHASE 4 & COMMUNITY CENTER * * * DISCLAIMER * * * IN IP-4 Johnston County assumes no legal responsibility for the Information represented here. •As/ILILVA ►v=IM10