Loading...
HomeMy WebLinkAbout20191056 Ver 1_utley_Permit Drawings_07182019_20190807TOWN OF HOLLY SPRINGS N°Jyspnngsa NORTH CA RO LI N A 1"=50' 50 25 0 50 100 PLANS UTLEY CREEK GREENWAY CONNECTION LOCATION: FROM MORGAN PARK SUBDIVISION TO BALLENTINE STREET TYPE OF WORK: GRADING, PAVING, STRUCTURE, DRAINAGE, & EROSION CONTROL INDEX OF SHEETS 1 TITLE 1A SYMBOLOGY SHEET 2 TYPICAL SECTIONS 4 - 5 PLAN AND PROFILE SHEETS EC-1 - EC-7 EROSION CONTROL X-1 - X-7 CROSS SECTIONS WETLAND AND ►A1RoII1►1111CIAI,,,1 �1� SURFACE WATER IMPACTS PERMIT TOWN OF HOLLY SPRINGS PROJECT #: 14-021 esource NCDOT TIP # C-5604JA 4 V 1 HOLLY SPRINGS PERMIT DRAWING cNr-GT 1 nF A GRAPHIC SCALES I I PROJECT LENGTH 1"=50' 50 25 0 50 100 10 5 0 10 20 PROFILE (HORIZONTAL) PROFILE (VERTICAL) LENGTH OF ASPHALT TRAIL = 1471.65 FEET LENGTH OF BRIDGE = 100.00 FEET LENGTH OF PROJECT = 1541.65 FEET 128 S. MAIN ST, PO BOX 8 HOLLY SPRINGS, NC 27540 919-557-3931 CONTACT: DIRK SIEBENBRODT, PE PROJECT ENGINEER PLANS PREPARED BY: ENGINEERING 1223 Jones Franklin Rd. Raleigh, N.C. 27606 License N0. F-0377 Bus: 919 851 8077 Fax: 919 851 8107 INCO �PgETE PLANS 3CUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED 4TE: JANUARY 18, 2019 VISIONS: NO. DATE 'EI PROJECT NO.: 18344.01 ALE WETLAND PERMIT IMPACT SUMMARY WETLAND IMPACTS SURFACE WATER IMPACTS Site No. Station (From/To) Structure Size / Type Permanent Fill In Wetlands (ac) Temp. Fill In Wetlands (ac) Excavation in Wetlands (ac) Mechanized Clearing in Wetlands (ac) Hand Clearing in Wetlands (ac) Permanent SW impacts (ac) Temp. SW impacts (ac) Existing Channel Impacts Permanent (ft) Existing Channel Impacts Temp. (ft) Natural Stream Design (ft) 1 -1-1- 13+50 50' bridge < 0.01 < 0.01 30 46 2 -1-1- 20+30 2@48" RCP -III < 0.01 < 0.01 57 15 3 -1-2- 17+60 RR along embankment < 0.01 10 TOTALS`: 0.02 < 0.01 97 61 0 "Rounded totals are sum of actual impacts NOTES: