HomeMy WebLinkAbout20191056 Ver 1_utley_Permit Drawings_07182019_20190807TOWN OF HOLLY SPRINGS
N°Jyspnngsa NORTH CA RO LI N A
1"=50'
50 25 0 50 100
PLANS
UTLEY CREEK GREENWAY CONNECTION
LOCATION:
FROM MORGAN PARK SUBDIVISION TO BALLENTINE STREET
TYPE OF WORK:
GRADING, PAVING, STRUCTURE, DRAINAGE, & EROSION CONTROL
INDEX OF SHEETS
1
TITLE
1A
SYMBOLOGY SHEET
2
TYPICAL SECTIONS
4 - 5
PLAN AND PROFILE SHEETS
EC-1 - EC-7
EROSION CONTROL
X-1 - X-7
CROSS SECTIONS
WETLAND AND
►A1RoII1►1111CIAI,,,1 �1�
SURFACE WATER IMPACTS PERMIT
TOWN OF HOLLY SPRINGS PROJECT #: 14-021 esource
NCDOT TIP # C-5604JA
4
V 1
HOLLY SPRINGS
PERMIT DRAWING
cNr-GT 1 nF A
GRAPHIC SCALES I I PROJECT LENGTH
1"=50'
50 25 0 50 100 10 5 0 10 20
PROFILE (HORIZONTAL) PROFILE (VERTICAL)
LENGTH OF ASPHALT TRAIL = 1471.65 FEET
LENGTH OF BRIDGE = 100.00 FEET
LENGTH OF PROJECT = 1541.65 FEET
128 S. MAIN ST,
PO BOX 8
HOLLY SPRINGS, NC 27540
919-557-3931
CONTACT:
DIRK SIEBENBRODT, PE
PROJECT ENGINEER
PLANS PREPARED BY:
ENGINEERING
1223 Jones Franklin Rd.
Raleigh, N.C. 27606
License N0. F-0377
Bus: 919 851 8077
Fax: 919 851 8107
INCO �PgETE PLANS
3CUMENT NOT CONSIDERED
FINAL UNLESS ALL
SIGNATURES COMPLETED
4TE: JANUARY 18, 2019
VISIONS:
NO. DATE
'EI PROJECT NO.:
18344.01
ALE
WETLAND PERMIT IMPACT SUMMARY
WETLAND IMPACTS SURFACE WATER IMPACTS
Site
No.
Station
(From/To)
Structure
Size / Type
Permanent
Fill In
Wetlands
(ac)
Temp.
Fill In
Wetlands
(ac)
Excavation
in
Wetlands
(ac)
Mechanized
Clearing
in Wetlands
(ac)
Hand
Clearing
in
Wetlands
(ac)
Permanent
SW
impacts
(ac)
Temp.
SW
impacts
(ac)
Existing
Channel
Impacts
Permanent
(ft)
Existing
Channel
Impacts
Temp.
(ft)
Natural
Stream
Design
(ft)
1
-1-1- 13+50
50' bridge
< 0.01
< 0.01
30
46
2
-1-1- 20+30
2@48" RCP -III
< 0.01
< 0.01
57
15
3
-1-2- 17+60
RR along embankment
< 0.01
10
TOTALS`:
0.02
< 0.01
97
61
0
"Rounded totals are sum of actual impacts
NOTES: