Loading...
HomeMy WebLinkAbout20190499 Ver 2_Riparian Buffer Authorization_20190801DWR State of North Carolina Department of Environment and Natural Resources Division of Water Resources Division of Water Resources 15A NCAC 02B .0233 (8)(b), .0243 (8)(b), .0250 (11)(b), .0259 (8)(b), .0267 (11)(c), .0607 (e)(2) - Buffer Authorization FORM: BA 10-2013 A. Applicant Riparian Buffer Authorization Form Information 1. Project Information: This application is for approval of encroachment into the riparian buffer as shown. Permit for project already obtained 1a. Name of project: Milano Avenue 1b. County: Wake 1c. Nearest municipality: Town of Apex 1d. Subdivision name: n/a 1e. Is the project located in any of North Carolina's twenty coastal counties. If yes, answer 1f below. ❑ Yes ® No 1f. Is the project located within a NC Division of Coastal Management Area of Environmental Concern (AEC)? ❑ Yes ® No 2. Owner Information 2a. Name on Recorded Deed: Town of Apex 2b. Deed Book and Page No. 0136890 2c. Map Book and Page No. (include a copy of the recorded map that indicates when the lot was created): BM2009-00930 2d. Responsible Party (for Corporations): 2e. Street address: PO Box 250 2f. City, state, zip: Apex, NC 27502-0250 2g. Telephone no.: 919 249-3303 2h. Fax no.: 2i. Email address: 3. Applicant Information (if different from owner) 3a. Applicant is: ❑ Agent ® Other, specify: Consultant 3b. Name: 3c. Business name (if applicable): 3d. Street address: 3e. City, state, zip: 3f. Telephone no.: 3g. Fax no.: 3h. Email address: 4. Agent/Consultant Information (if applicable) 4a. Name: Alex Aycrigg, PWS 4b. Business name (if applicable): Froehling & Robertson, Inc 4c. Street address: 310 Hubert Street 4d. City, state, zip: Raleigh, NC 27603 4e. Telephone no.: 919 719-1088 4f. Fax no.: 4g. Email address: aavcrigg@_fandr.com FORM: BA 10-2013 Page 1 of 6 B. Project Information and Prior Project History 1. Property Identification 1a. Property identification no. (tax PIN or parcel ID): PIN 0721451759 1 b. Site coordinates (in decimal degrees): Latitude: 35.717359 Longitude: -78.918258 1c. Property size: 14.63 acres 2. Surface Waters 2a. Name of nearest body of water to proposed project: Beaver Creek 2b. Water Quality Classification of nearest receiving WS -IV water: 2c. River basin: Cape Fear 3. Project Description 3a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application: There is an existing structure on the property that will be integrated with the proposed. A WQC has already been issued (#19-0499); however, there has been a change to the stormwater outfall. The new outfall daylights within the stream buffer. 3b. Attach an 8'/2 x 11 excerpt from the most recent version of the USGS topographic map indicating the location of the site 3c. Attach an 8'/2 x 11 excerpt from the most recent version of the published County NRCS Soil Survey Map depicting the project site 3d. List the total estimated linear feet of all existing streams (intermittent and perennial) on the property: 180' 3e. Explain the purpose of the proposed project: The Town of Apex is in need of a new electric operations center to serve the existing community population as well as its continued growth. The Town of Apex has been anticipating its need for a larger office space, storage space for utility equipment and utility vehicles associated with the influx of development and residents. This project already has a WQC. 3f. Describe the overall project in detail, including the type of equipment to be used: Standard construction equipment will be used. 4. Jurisdictional Determinations 4a. Have jurisdictional wetland or stream determinations by the ® Yes ❑ No ❑ Unknown Corps or State been requested or obtained for this property/ Comments: Previous approval: #19-0499 project (including all prior phases) in the past? 4b. If yes, who delineated the jurisdictional areas? Agency/ Consultant Company: Froehling Name (if known): Elias N. Ruhl and Robertson Other: 4c. If yes, list the dates of the Corps jurisdictional determinations or State determinations and attach documentation. SAW -2018-02106 on 5/7/19 and WQC #19-0499 and RRO #18-393 5. Project History 5a. Have permits or certifications been requested or obtained for ® Yes ❑ No ❑ Unknown this project (including all prior phases) in the past? 5b. If yes, explain and detail according to "help file" instructions. PJD above was issued along with WQC #19-0499 and Nationwide. FORM: BA 10-2013 Page 2 of 6 B. Project Information and Prior Project History 6. Future Project Plans 6a. Is this a phased project? ❑ Yes ® No 6b. If yes, explain. FORM: SSGP3080 8-13 Page 3 of 6 C. Proposed Impacts Inventory 1. Avoidance and Minimization 1a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing project. Project was initially designed and approved with the pond discharge outside of buffer. Design considerations involving the adjacent property required relocation into the buffer. 1. Buffer Impacts 2. Buffer Mitigation 2a. Will the project result in an impact within a protected riparian buffer that requires buffer mitigation? 1a. Project is in which protected 2b. If yes, then identify the square feet of impact to each zone of the riparian buffer that requires mitigation and calculate the amount of mitigation required in the table below. ❑ Neuse ❑ Tar -Pamlico ❑ Catawba basin? ❑ Randleman ® Jordan ❑ Goose Creek 1 b. Individually list all buffer impacts below. If any impacts require mitigation, then you MUST fill out Section D of this form. ❑ Yes ❑ No 2d. If yes, attach the acceptance letter from the mitigation bank or NC EEP. Buffer impact Reason for Type of impact Stream name Buffer Zone 1 Zone 2 number — impact (exempt, allowable, mitigation impact impact Permanent (P) allowable w/ required? (sq ft) (sq ft) or Temporary mitigation) T 131 ® P ❑ T Stormwater Allowable Not named ❑ Yes ® No 78 400 Pond Discharge 132 ❑ P ❑ T ❑ Yes ❑ No 133 ❑ P ❑ T ❑ Yes ❑ No B4 ❑ P ❑ T ❑ Yes ❑ No B5 ❑ P ❑ T ❑ Yes ❑ No B6 ❑ P ❑ T ❑ Yes ❑ No Total buffer impacts 78 400 1c. Comments: Discharge relocated so as to not discharge onto the property to the north. D. Impact Justification and Mitigation 1. Avoidance and Minimization 1a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing project. Project was initially designed and approved with the pond discharge outside of buffer. Design considerations involving the adjacent property required relocation into the buffer. 1 b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques. Footprint is minimized and impact is due to rip rap. 2. Buffer Mitigation 2a. Will the project result in an impact within a protected riparian buffer that requires buffer mitigation? ❑ Yes ® No 2b. If yes, then identify the square feet of impact to each zone of the riparian buffer that requires mitigation and calculate the amount of mitigation required in the table below. Zone Reason for impact Total impact Multiplier (square feet Required mitigation (square feet Zone 1 3 (2 for Catawba) Zone 2 1.5 Total buffer mitigation required: 2c. If buffer mitigation is required, is payment to a mitigation bank or NC EEP proposed? ❑ Yes ❑ No 2d. If yes, attach the acceptance letter from the mitigation bank or NC EEP. 2e. If no, then discuss what type of mitigation is proposed. 2f. Comments: FORM: BA 10-2013 Page 4 of 6 C. Impact Justification and Mitigation, continued FORM: SSGP3080 8-13 Page 5 of 6 E. Diffuse Flow Plan All buffer impacts and high ground impacts require diffuse flow or other form of ❑ Diffuse flow stormwater treatment. Include a plan that fully documents how diffuse flow will be ® Other BMP maintained. If a Level Spreader is proposed, attach a Level Spreader Supplement Form. 1a. If due to site constraints, a BMP other than a level spreader is proposed, please provide a ® Yes ❑ No plan for stormwater treatment as outlined in Chapter 8 of the NC Stormwater BMP of public (federal/state) land? Manual and attach a BMP Supplement Form. 1 b. F. Supplementary Information 1. Environmental Documentation 1a. Does the project involve an expenditure of public (federal/state/local) funds or the use ® Yes ❑ No of public (federal/state) land? 1 b. If you answered "yes" to the above, does the project require preparation of an ❑ Yes ® No environmental document pursuant to the requirements of the National or State (North Carolina) Environmental Policy Act (NEPA/SEPA)? 1 c. If you answered "yes" to the above, has the document been finalized by the State ❑ Yes ❑ No Clearing House? (If so, attach a copy of the NEPA or SEPA final approval letter.) Comments: 2. Violations 2a. Is the site in violation of DWR Wetland Rules (15A NCAC 02H .0500), Isolated Wetland ❑ Yes ® No Rules (15A NCAC 02H .1300), DWR Surface Water or Wetland Standards, or Riparian Buffer Rules (15A NCAC 02B .0200)? 2b. Is this an after -the -fact permit application? ❑ Yes ® No 2c. If you answered "yes" to one or both of the above questions, provide an explanation of the violation(s): Applicant/Agent's Printed Name Applicant/Agent's Signature Date (Agent's signature is valid only if an authorization letter from the applicant is provided.) Send 3 complete sets of this form and accompanying documents to the following: For government transportation projects sent by First Class Mail via the US Postal Service: NC DWR, Transportation Permitting Unit 1617 Mail Service Center Raleigh, NC 27699 - 1617 For all other projects sent by First Class Mail via the US Postal Service Karen Higgins NCDWR — 401 & Buffer Permitting Branch 1617 Mail Service Center Raleigh, NC 27699 - 1617 For government transportation projects sent by delivery service (UPS, FedEx, etc): OR NC DWR, Transportation Permitting Unit 512 N. Salisbury Street Raleigh, NC 27604 For all other projects sent by delivery service (UPS, FedEx, etc): OR Karen Higgins NCDWR — 401 & Buffer Permitting Branch 512 N. Salisbury Street Raleigh, NC 27604 FORM: BA 10-2013 Page 6 of 6 ~ � 1 ■ Project Area `i L%.-.01 a V'"- W / I r dF r / r 41 /J AP/,L Legend 1 Milano Parcel �• 1 , - k LN USGS Topographical Map °° z°° '°° 8°° t,z°° t,6 Feet FR O E H L I N G & ROBERTSON, INC. Client: CRA Associates Disclaimer: F&R makes no warranties or guarantees regarding the accuracy or Project: Milano Avenue Site completeness of geographic features shown on this map. Spatial accuracy of Engineering Stability Since 1881 Location 2850 Milano Ave, Apex, NC measurement provided by source agencies can be obtained by contacting F&R. 310 Hubert Street F&R Project No.: 66W-0183 Raleigh, North Carolina 27603-2302 1 USA Data: USGS 7.5 Minute Map "New Hill, NC" 1993 FIGURE T 919.828.34411 F 919.828.5751 No.: Date: October 2018 1 Scale: 1:4,800 1 inch = 400 feet II�IJEF l.Io N ! ti Ir'lYsl916lWQ�+ l91 � !' - I�I If1r.+ e'er. YI P •: 1� 1 # I r I 4 L71 4� �'6sy hN1 PrJ l I I fl�j,: , - 1151,.:;,°,a I ~' 0r+P: .� l ,u e r _ � •^q I •,� • �' � I ! r ' �' I�' . _ "n- fill � �' 1 I r 1= � '�°tib " . , ' • •. w � -- r' ' °� �. _ _ � . . d r 1 pIP0��4 eG, P(�cl b r d� • f -L II .. - - I1� , f _ -_ - 1 11 : Jam' 1`41C21% 1� zFo " � { I ff T f � • _ —SPI % r f' r+ 1?LrP ' I�V� ;ri I',•.Y�r■ P %0 �iLll s•_r �,'J as ! ^I r Is fr a j I I— LIN 6i ti., % y� I h4:,LirPICr° r r• _ In 1 I_ •� eY r r � F � .' ..rr ger• r ,y� 0',`, I��r1}P�,'r�d _ 4 1,. CrUA , . • r r �� �• I' � �,� �, � � e � P� �� � —1 ,fir• � _• '�r�q e ,� � � ti + 1 d +1 Ai d_�::•PC � I7I ' r CPR I �r.l F �.'i.�e _ ' I. • � Ia� . •.•:..��qti ° 1 ����'�� }1• ^�17�A 1,: L `.. r JJ . � 1e..r; = Ir � 1 1 fir' ., i��r•� �I �:1 '. I '_- L• a rr Y111� r i 1 ,r 'Ir •1 612 -s 5 r ' rcp \S CSEJ ly � I ,• r ," 1,�-� � ,. �� — - r.' -,Moe 1 ":,•' I e -1- ,11 a 12 r-7 L I •°a 3 e Ln I _ 6r rC ere 66 Soil Survey Map FROEHLING & ROBERTSON, INC. SoilMilano eyMapnue e f Engineering ■ Environmental ■ Geotechnical CRA Associates Ir 310 Hubert Street Apex, North Carolina Raleigh, North Carolina 27603 1 USA SINCE -1881 T 919.828.34411 F 919.828.5751 Drawn: PMH Scale: Not Shown Project No.: 66W-0183 Checked: ENR Date: Oct. 2018 Drawing No.: 4 FROEHLINES & ROBERTSON, INC. Engineering • Environmental • Geotechnical K310 Hubert Street Raleigh, North Carolina 27603 1 USA SINCE 1 861 T 919.828.34411 F 919.828.5751 N ❑❑❑ M m CD 0 rJ CJ M M M EJ @ a 0 Ilr9I3 jJ J ❑ ❑ A � National Wetland Inventory Map Milano Avenue Site CRA Associates Apex, North Carolina Drawn: PMH Scale: Not Shown Project No.: 66W-0183 Checked: ENR Date: Oct. 2018 Drawing No.: 5 s T1 a 7 a 47 ❑ ❑ A � National Wetland Inventory Map Milano Avenue Site CRA Associates Apex, North Carolina Drawn: PMH Scale: Not Shown Project No.: 66W-0183 Checked: ENR Date: Oct. 2018 Drawing No.: 5 September 13, 2018 FROEHLING & ROBERTS❑N, INC. Engineering Stability Since 1881 United States Army Corps of Engineers 3331 Heritage Trade Drive, Suite 105 Wake Forest, NC 27587 Re: USACE Agent Authorization Letter Milano Avenue Site 2850 Milano Avenue Apex, Wake County, North Carolina Parcel ID No. 0721451759 310 Hubert Street Raleigh, North Carolina 27603-2302 T 919.828.34411 F 919.828.5751 NC License #F-0266 The undersigned, registered property owner(s) of the above -note property, do hereby authorize Froehling & Robertson, Inc. (F&R) to act on behalf of the current property owner(s) as the agent for all actions necessary for the processing, issuance, and acceptance of permits or certifications pertaining to Waters of the United States at the above referenced project site. This agent authorization letter supersedes all previous agent authorizations. Owner Signatur : / 2nd Signature: (required) (optional) Printed Name: David Hughes Printed Name: for Town of Apex Date: 0 9 .2 0 . 2 018 Date: Organization: Town of Apex Organization: Mailing Address: PO Box 250 Mailing Address: Apex, NC 27502 Phone Number: 919. 249. 3414 Phone Number: Corporate HQ: 3015 Dumbarton Road Richmond, Virginia 23228 T 804.264.2701 F 804.264.1202 www.fandr.com VIRGINIA • NORTH CAROLINA • SOUTH CAROLINA • MARYLAND • DISTRICT OF COLUMBIA A Minoritv-Owned Business STORM DRAINAGE SCHEDULE EXISTING IRON PIPE IPS O Apex Electrical Ops Center Stormwater Inlet Analysis UTILITY POLE STRUCTURES SANITARY SEWER MANHOLE R/W EXISITING RIGHT OF WAY STORM DRAINAGE PIPE REINFORCED CONCRETE PIPE STRUCTU FLARED END SECTION CMP CORRUGATED METAL PIPE �i GUY ANCHOR - - WATER VALVE FH FIRE HYDRANT WATER VALVE OHU OVERHEAD UTILITY RE TELEPHONE PEDESTAL CA TV INVERT \I/ - O - AREA LIGHT POST /I\ LENGTH PROPERTY LINE NUMBER RIM ELEV INVERT IN OUT DETAIL TYPE FROM TO SIZE TYPE (feet) SLOPE(%) 1 287.80 - 285.80 - CI 1 2 15 RCP 76 0.75% 2 288.50 285.23 285.03 - CI 2 3 15 RCP 71 1.00% 3 286.70 284.32 284.12 - DI 3 4 15 RCP 112 1.00% 4 288.40 283.00 282.80 - CI 4 5 15 RCP 18 1.00% 5 288.40 282.62 282.42 - CI 5 7 15 RCP 224 1.01% 6 284.67 - 282.34 - DI 6 7 15 RCP 173 0.75% 7 283.20 281.0425, 280.1688 279.97 - DI 7 8 18 RCP 129 3.00% 8A 284.60 - 281.60 - CI 8A 8 15 RCP 148 2.00% 8 283.25 276.0988, 278.64 269.35 - CI 8 9 18 RCP 66 2.00% 9 270.30 268.03 267.83 - DI 9 10 18 RCP 124 3.69% 10 265.50 263.26 263.26 - DI 10 11 18 RCP 26 1.00% 11 - 263.00 - - FES 12 13 15 RCP 101 2.00% 12 287.50 - 284.20 - DI 13 14 15 RCP 118 3.47% 13 286.65 282.18 281.98 - CI 14 15 15 RCP 108 4.12% 14 282.50 277.89 277.69 - DI 14 14A 6 DIP 106 2.00% 14A 285.90 - 280.62 - DI 15 17 15 RCP 103 6.26% 15 276.30 273.24 273.04 - CI 16 17 15 RCP 32 9.53% 16 283.70 - 269.64 - CI 17 18 18 RCP 157 1.75% 17 269.50 266.588, 266.5904 266.59 - DI 18 19 24 RCP 136 0.63% 18 268.10 263.85 263.85 - DI 20 21 15 RCP 28 0.75% 19 - 263.00 - - FES 21 23 15 RCP 168 4.70% 20 288.88 - 284.76 - CI 22 23 15 RCP 28 0.75% 21 288.88 284.55 284.35 - CI 23 EXYI 15 RCP 101 4.03% 22 280.67 - 276.66 - CI 24 EXYI 36 RCP 130 2.80% 23 280.67 276.45, 276.454 276.25 - CI 24 - - 275.82 - FES a I a / i STREAM 4 INTERMITTENT BUFFERED I PARKSIDE AT BO" CASA B.M. 2017 PG 228 - PHASE 14 SITE PLAN NOTES 1. NO SITE DEVELOPMENT ACTIVITY INCLUDING, BUT NOT LIMITED TO, TESTING, CLEARING, INSTALLATION OF SOIL AND EROSION MEASURES, OR GRADING SHALL OCCUR UNTIL REQUIRED PROTECTION FENCING HAS BEEN INSTALLED AND INSPECTED. A PROTECTION FENCING INSTALLATION PERMIT MAY BE OBTAINED AT THE PLANNING DEPARTMENT. 2. PROTECTION FENCING MUST BE PLACED AWAY FROM ANY SAVED TREE ONE FOOT FOR EACH INCH OF CALIPER. PROTECTION FENCING MUST BE PLACED AT LEAST 10 FEET AWAY FROM ANY OTHER DESIGNATED RCA SUCH AS, BUT NOT LIMITED TO, HISTORIC BUILDINGS AND STRUCTURES, WETLANDS, AND PONDS. PROTECTION FENCING MUST BE PLACED ALONG THE OUTSIDE LINE OF THE 100 YEAR FLOODPLAIN AND THE OUTSIDE EDGE OF ANY RIPARIAN BUFFER. ADDITIONAL PROTECTION FENCING MAY BE REQUIRED IN OTHER LOCATIONS CLOSE TO CONSTRUCTION ACTIVITY WHERE IT IS DEEMED NECESSARY BY THE ZONING ENFORCEMENT OFFICER. SUCH AREAS MAY INCLUDE COMMON PROPERTY LINES OR NEAR PUBLIC AREAS (SIDEWALKS, ETC.). 3. ALL GRADING AND SUPPORT STRUCTURES ASSOCIATED WITH ANY RETAINING STRUCTURE SHALL NOT ENCROACH INTO ANY REQUIRED BUFFER OR PROTECTED AREA (I.E. RCA AND CRITICAL ROOT ZONES OF TREES, PUBLIC UTILITY EASEMENTS AND RIGHTS-OF-WAY), AND SHALL BE CONTAINED ENTIRELY ON SITE. 4. SITE ELEMENTS REQUIRED TO SATISFY RECREATIONAL REQUIREMENTS SUCH AS, BUT NOT LIMITED TO, PLAY FIELDS, GREENWAY TRAILS AND ITEMS TYPICALLY ASSOCIATED WITH THEM (BENCHES, TRASH CONTAINERS, SIGNS, ETC.) MUST MEET ANY APPLICABLE STANDARDS FOUND IN THE TOA STANDARD SPECIFICATIONS AND CONSTRUCTION DETAILS AND THE REQUIREMENTS OF THE TOA PARKS AND RECREATION DEPARTMENT. 5. RETAINING SYSTEMS PROVIDING A CUMULATIVE VERTICAL RELIEF GREATER THAN FIVE FEET IN HEIGHT WITHIN A HORIZONTAL DISTANCE OF 50 FEET OR LESS, INCLUDING RETAINING WALLS OR MECHANICALLY STABILIZED EARTH WALLS SHALL BE DESIGNED AND CONSTRUCTED UNDER THE RESPONSIBLE CHARGE OF A REGISTERED PROFESSIONAL ENGINEER AND COMPLY IN ALLASPECTS WITH THE NC BUILDING CODE, SECTION 1610. RETAINING SYSTEMS MEETING THIS CRITERIA WILL REQUIRE A SEPARATE BUILDING PERMIT PRIOR TO START OF WORK. RETAINING STRUCTURE MATERIALS MUST BE AN INTEGRALLY TINTED BROWN, RUST, OR EARTH -TONE COLOR. 6. PRIOR TO APPROVAL OF A FINAL PLAT OR ISSUANCE OF A CERTIFICATE OF OCCUPANCY FOR ANY DEVELOPMENT WHERE A STORMWATER CONTROL MEASURE (SCM) IS REQUIRED, CONTACT THE ENVIRONMENTAL PROGRAMS MANAGER AT 919-249-3413 TO DEMONSTRATE THAT THE REQUIRED STRUCTURE IS IN PLACE, IS OPERATIONAL, AND COMPLIES WITH ALL RELEVANT PORTIONS OF LIDO SEC. 6.1.12 ENGINEERED STORMWATER CONTROLS. IF THE SCM IS USED AS PART OF A TEMPORARY EROSION CONTROL MEASURE, THE INSPECTION WILL OCCUR DURING THE APPROPRIATE PHASE OF CONSTRUCTION. 7. SITE IS IN THE PRIMARY WATERSHED PROTECTION OVERLAY DISTRICT. 8. THE SCREENING OF LOAD DOCKS, ROLL-OUT TRASH CONTAINERS, DUMPSTERS, OUTDOOR STORAGE, MECHANICAL AND HVAC EQUIPMENT AND SIMILAR FACILITIES ON THE ROOF, OR BUILDING SHALL MEETTHE REQUIREMENTS OF LIDO SEC. 8.2.8. SPECIFICALLY, SCREENING MUST BE DONE SO THAT: A. IT IS INCORPORATED INTO THE OVERALL DESIGN THEME OF THE BUILDING AND LANDSCAPE. B. SCREENING MATERIALS ARE NOT DIFFERENT FROM OR INFERIOR TO THE PRINCIPAL MATERIALS OF THE BUILDING OR LANDSCAPE, AND ARE SIMILAR IN MATERIALS AND COLOR. C. SCREENED ITEMS ARE OUT OF VIEW FROM ADJACENT PROPERTIES AND PUBLIC STREETS, AND A TOTALLY SCREEN IS ACHIEVED. D. ANY GROUND -MOUNTED HVAC OR OTHER MECHANICAL OR UTILITY EQUIPMENT SIX (6) FEET TALL OR HIGHER MUST BE FENCED AND LANDSCAPED E. DUMPSTER ENCLOSURES MUST MEET THE ABOVE REQUIREMENTS PLUS BE EIGHT (8) FEET TALL OR THE HEIGHT OF THE DUMPSTER, WHICHEVER IS GREATER, AND BE BUILT OF MASONRY MATERIAL WITH OPAQUE GATES. WHERE PRACTICABLE, SHRUBS OR OTHER PLANTS MUST BE PLANTED OUTSIDE THE ENCLOSURE TO VISUALLY SOFTEN THE APPEARANCE. 9. ALL REQUIRED SITE ELEMENTS SHOWN WITHIN A PARTICULAR PHASE MUST BE INSTALLED BEFORE A FINAL CERTIFICATE OF OCCUPANCY MAY BE ISSUED FOR ANY BUILDING WITHIN THAT PHASE. 10. A GRADING PERMIT, WHEN APPLICABLE, MAY ONLY BE ISSUED BY THE BUILDING INSPECTIONS DIVISION AFTER THE INSTALLATION AND APPROVAL OF TREE PROTECTION FENCING AND S&E MEASURES AND A CERTIFICATE OF COMPLIANCE HAS BEEN ISSUED BY THE WATER RESOURCES DEPARTMENT. EXISTING LEGEND EAP • EXISTING IRON PIPE IPS O IRON PIPE SET UTILITY POLE O$ SANITARY SEWER MANHOLE R/W EXISITING RIGHT OF WAY RCP REINFORCED CONCRETE PIPE FES FLARED END SECTION CMP CORRUGATED METAL PIPE �i GUY ANCHOR - - WATER VALVE FH FIRE HYDRANT WATER VALVE OHU OVERHEAD UTILITY T --PED TELEPHONE PEDESTAL CA TV CABLE TV BOX \I/ - O - AREA LIGHT POST /I\ PROPERTY LINE GRADING LEGEND SCALE: 1" = 60'-0" 60 30 0 60 120 Construction Document Bid Set 222 cloister court chapel hill, nc 27514 919.401.8586 www.cra-ae.com C A R0''•., ESS / O'.,�� ° SEAL �. 13350 • - t'd • .I 44 q 4_4 i' �J 4:1 • t�I U r� W 06/26/19 no. revisions 10 NCDEQ REVISIONS FOR STORM BUFFER 7/29/19 The use of these plans and specifications shall be restricted to the original site for which they were prepared and publication thereof is expressly limited to such use. Re -use, reproduction, or publication by any method, in whole or in part, is prohibited. Title to the plans and specifications remain in the architect without prejudice. It is to be returned upon request to the architect. Visual contact with those plans and specifications shall constitute prima facie evidence of the acceptance of these restrictions. drawn checked OVERALL GRADING AND STORM DRAINAGE PLAN sheet C3.0 project no. 1804 date 6/26/19 CONCRETE SIDEWALK NEW BUILDING TEMPORARY CONSTRUCTION EASEMENT 648 CONTOUR & LABEL 651.5 SPOT ELEVATION TP TREE PROTECTION FENCE SD NEW STORM DRAIN SD SD ROOF LEADER - - LIMITS OF DISTURBANCE $ CLEANOUT 0 CURB INLET ❑o DROP INLET 1:1 JUNCTION BOX SCALE: 1" = 60'-0" 60 30 0 60 120 Construction Document Bid Set 222 cloister court chapel hill, nc 27514 919.401.8586 www.cra-ae.com C A R0''•., ESS / O'.,�� ° SEAL �. 13350 • - t'd • .I 44 q 4_4 i' �J 4:1 • t�I U r� W 06/26/19 no. revisions 10 NCDEQ REVISIONS FOR STORM BUFFER 7/29/19 The use of these plans and specifications shall be restricted to the original site for which they were prepared and publication thereof is expressly limited to such use. Re -use, reproduction, or publication by any method, in whole or in part, is prohibited. Title to the plans and specifications remain in the architect without prejudice. It is to be returned upon request to the architect. Visual contact with those plans and specifications shall constitute prima facie evidence of the acceptance of these restrictions. drawn checked OVERALL GRADING AND STORM DRAINAGE PLAN sheet C3.0 project no. 1804 date 6/26/19 8" PVC MA SS - i -SD - - 1`� M M M M I I II II II � I I I II R Ell DUKE I DUKE E K L. METAL L ��T� - POLE / POLE 4t� 1 WOODED I / 1 I I \ DUKE l / \ DUKE METAL I / POLE METAL I POLE SWITCH / l DUKE � I METAL / OtE _ I I I I \ E7A I I POLE DUKE I I METAL � POLE I I I I � /_ CHARLES WALDEN, ET AL \ \ D. B. 10538, PG. 817 B.M. 2003, PG. 1678 \ RIPRAP ` L=17' W'=18.5' ' TYPE A BUFFER N 280.9 CONCRETE SIDEWALK NEW BUILDING ZQ\_ TEMPORARY CONSTRUCTION EASEMENT 648 CONTOUR & LABEL 651.5 SPOT ELEVATION TP TREE PROTECTION FENCE SD FES /NV= I ----_----- SD SD \ STORMWATER LIMITS OF DISTURBANCE $ 271.11' CONTROL CURB INLET I POND 6' CHAIN LINK FENCE RIPRAP L=18' W=19.5' I THICKNESS = 1.35" 't SUBSTATION POD #5 RIPRA THICKNESS _ / I SWITCHDUKE I N DUKE METAL I I = = I METAL POLE I I �4 POLE Z I I I a RCA I c c I I I I I 10 1.04 AC \ I To `o x 4,x x I I I. I �� a II I I I'll JPO ^ ?66 J Ih' O m a O ELECTRIC BOX I (3) UTILITY PANELS I a I ELECTRIC BOX I W I / UTILITY BOX 6' CHAIN LINK FENCE I - -----IUKE - ( ,. GATE � _ - I i POLE A \ \ moo_ no /moo - ' ELECTRIC BO v R C� DUKE DUKE \ x � BBX` - - - -266 (FLUSH) -bV1T 15 I IMETAL I METAL 264.89' c� FES l V= f- POLE - - -POLE t5" RCP -o S INV- - - 268 - - - - ) tzo �3 O ---XD 266.14' \ o 0 0 TW 278.0 TW 278.0' i ZD Q_ BW 270.0 0 ` BW 271.0 <TW M BW 274.0 0 3:1 SLOPE TW 280.0 17 BW 272.0.' i s 4" FOUNDATION DRAIN / FROM WASH PIT 4 AT MIN 1.0% j \ 16 / �4" FOUNDATION DRAIN PIPE $ - V� INV OUT: 279.83' \ qP c TW 283. BW 278.0 \ 8" ROOF / I V LEADER ti / - I VEHICLE / WASH . BAY s 5 TW 282.5 s \ BW 280.7 VEHICLE / I e TORAGE GARAGE s TW 282.0 I I BW 282.0 a FFE 286.0 I \ \ s N MATCHLINE - SEE SHEET C3.1 I T- I -A Boz CIO. D so ' \\ , I < \ s RCA O. 2.22 AC U \ °� �° moo. \ \ 2� ` o J 00 I r01 / I INTERIM, NT STREAM FOREBAY BERM y y J y RIP RAP ARMOR y y y y y y y y I \ y y y - WETLAND 1 y y y I y 1 y % y y y I \ y Iy I -266 y `I' y -x -x -x= x ---------- o o I y y y 0 0 0 0 0 0 0 o 0 0 0 o 0 0 0 o LIMITS OF 0 0 I \\ DISTURBANCE o 0 0 0 o I \ (TYP.) 0 0 0 T__ 268 0 0 �IIJIII 0 I 0 0 0 0 o Io I o 0 o I SERVICE AREA LLL_ M 09 o V I I Z 0 0 o I 0 0 0 C Z O 0 0 0 0 0 Q TW 278.0 TW 278.0 w O N BW 272.2 o rq 28 -3: I I ^ ti 3:1 SLOPE I TW 281.0 BW 274.0 \ I C Sb \ / 28�� 06 5.00 284' Sb 28.20 - I EW MEDIUM OR I I \ \RK BROWN OR �� \ RUST COLORED a 48\ 'ETAINING WALL I \� 8' CHAIN LINK s 2j FENCE (RW1) COVERED s I TW 282.0 I e s MATERIAL e " BW 278.0 STORAGE I \ 8" ROOF LEADER(S) s >, 285.,00 286.00 s i 28"�' I TW 282. _ I BW 282.0 C I o - a 285.00 \ ' I " ROOF _ _ 20' TOA PUE (SEWER) LEADER - - - B.M. 2016, PG. 1719 AST SSMH / RIM=283.0 / I \ 20 \ INV OUT=274.0 INV I14=274.2 R \ I-� SITE PLAN NOTES 1. NO SITE DEVELOPMENT ACTIVITY INCLUDING, BUT NOT LIMITED TO, TESTING, CLEARING, INSTALLATION OF SOIL AND EROSION MEASURES, OR GRADING SHALL OCCUR UNTIL REQUIRED PROTECTION FENCING HAS BEEN INSTALLED AND INSPECTED. A PROTECTION FENCING INSTALLATION PERMIT MAY BE OBTAINED AT THE PLANNING DEPARTMENT. 2. PROTECTION FENCING MUST BE PLACED AWAY FROM ANY SAVED TREE ONE FOOT FOR EACH INCH OF CALIPER. PROTECTION FENCING MUST BE PLACED AT LEAST 10 FEET AWAY FROM ANY OTHER DESIGNATED RCA SUCH AS, BUT NOT LIMITED TO, HISTORIC BUILDINGS AND STRUCTURES, WETLANDS, AND PONDS. PROTECTION FENCING MUST BE PLACED ALONG THE OUTSIDE LINE OF THE 100 YEAR FLOODPLAIN AND THE OUTSIDE EDGE OF ANY RIPARIAN BUFFER. ADDITIONAL PROTECTION FENCING MAY BE REQUIRED IN OTHER LOCATIONS CLOSE TO CONSTRUCTION ACTIVITY WHERE IT IS DEEMED NECESSARY BY THE ZONING ENFORCEMENT OFFICER. SUCH AREAS MAY INCLUDE COMMON PROPERTY LINES OR NEAR PUBLIC AREAS (SIDEWALKS, ETC.). 3. ALL GRADING AND SUPPORT STRUCTURES ASSOCIATED WITH ANY RETAINING STRUCTURE SHALL NOT ENCROACH INTO ANY REQUIRED BUFFER OR PROTECTED AREA (I.E. RCA AND CRITICAL ROOT ZONES OF TREES, PUBLIC UTILITY EASEMENTS AND RIGHTS-OF-WAY), AND SHALL BE CONTAINED ENTIRELY ON SITE. 4. SITE ELEMENTS REQUIRED TO SATISFY RECREATIONAL REQUIREMENTS SUCH AS, BUT NOT LIMITED TO, PLAY FIELDS, GREENWAY TRAILS AND ITEMS TYPICALLY ASSOCIATED WITH THEM (BENCHES, TRASH CONTAINERS, SIGNS, ETC.) MUST MEET ANY APPLICABLE STANDARDS FOUND IN THE TOA STANDARD SPECIFICATIONS AND CONSTRUCTION DETAILS AND THE REQUIREMENTS OF THE TOA PARKS AND RECREATION DEPARTMENT. 5. RETAINING SYSTEMS PROVIDING A CUMULATIVE VERTICAL RELIEF GREATER THAN FIVE FEET IN HEIGHT WITHIN A HORIZONTAL DISTANCE OF 50 FEET OR LESS, INCLUDING RETAINING WALLS OR MECHANICALLY STABILIZED EARTH WALLS SHALL BE DESIGNED AND CONSTRUCTED UNDER THE RESPONSIBLE CHARGE OF A REGISTERED PROFESSIONAL ENGINEER AND COMPLY IN ALL ASPECTS WITH THE NC BUILDING CODE, SECTION 1610. RETAINING SYSTEMS MEETING THIS CRITERIA WILL REQUIRE A SEPARATE BUILDING PERMIT PRIOR TO START OF WORK. RETAINING STRUCTURE MATERIALS MUST BE AN INTEGRALLY TINTED BROWN, RUST, OR EARTH -TONE COLOR. 6. PRIOR TO APPROVAL OF A FINAL PLAT OR ISSUANCE OF A CERTIFICATE OF OCCUPANCY FOR ANY DEVELOPMENT WHERE A STORMWATER CONTROL MEASURE (SCM) IS REQUIRED, CONTACT THE ENVIRONMENTAL PROGRAMS MANAGER AT 919-249-3413 TO DEMONSTRATE THAT THE REQUIRED STRUCTURE IS IN PLACE, IS OPERATIONAL, AND COMPLIES WITH ALL RELEVANT PORTIONS OF UDO SEC. 6.1.12 ENGINEERED STORMWATER CONTROLS. IF THE SCM IS USED AS PART OF A TEMPORARY EROSION CONTROL MEASURE, THE INSPECTION WILL OCCUR DURING THE APPROPRIATE PHASE OF CONSTRUCTION. 7. SITE IS IN THE PRIMARY WATERSHED PROTECTION OVERLAY DISTRICT. 8. THE SCREENING OF LOAD DOCKS, ROLL-OUT TRASH CONTAINERS, DUMPSTERS, OUTDOOR STORAGE, MECHANICAL AND HVAC EQUIPMENT AND SIMILAR FACILITIES ON THE ROOF, OR BUILDING SHALL MEET THE REQUIREMENTS OF LIDO SEC. 8.2.8. SPECIFICALLY, SCREENING MUST BE DONE SO THAT: A. IT IS INCORPORATED INTO THE OVERALL DESIGN THEME OF THE BUILDING AND LANDSCAPE. B. SCREENING MATERIALS ARE NOT DIFFERENT FROM OR INFERIOR TO THE PRINCIPAL MATERIALS OF THE BUILDING OR LANDSCAPE, AND ARE SIMILAR IN MATERIALS AND COLOR. C. SCREENED ITEMS ARE OUT OF VIEW FROM ADJACENT PROPERTIES AND PUBLIC STREETS, AND A TOTALLY SCREEN IS ACHIEVED. D. ANY GROUND -MOUNTED HVAC OR OTHER MECHANICAL OR UTILITY EQUIPMENT SIX (6) FEET TALL OR HIGHER MUST BE FENCED AND LANDSCAPED E. DUMPSTER ENCLOSURES MUST MEET THE ABOVE REQUIREMENTS PLUS BE EIGHT (8) FEET TALL OR THE HEIGHT OF THE DUMPSTER, WHICHEVER IS GREATER, AND BE BUILT OF MASONRY MATERIAL WITH OPAQUE GATES. WHERE PRACTICABLE, SHRUBS OR OTHER PLANTS MUST BE PLANTED OUTSIDE THE ENCLOSURE TO VISUALLY SOFTEN THE APPEARANCE. 9. ALL REQUIRED SITE ELEMENTS SHOWN WITHIN A PARTICULAR PHASE MUST BE INSTALLED BEFORE A FINAL CERTIFICATE OF OCCUPANCY MAY BE ISSUED FOR ANY BUILDING WITHIN THAT PHASE. 10. A GRADING PERMIT, WHEN APPLICABLE, MAY ONLY BE ISSUED BY THE BUILDING INSPECTIONS DIVISION AFTER THE INSTALLATION AND APPROVAL OF TREE PROTECTION FENCING AND S&E MEASURES AND A CERTIFICATE OF COMPLIANCE HAS BEEN ISSUED BY THE WATER RESOURCES DEPARTMENT. EXISTING LEGEND E/P • EXISTING IRON PIPE IPS O IRON PIPE SET UTILITY POLE 0 SANITARY SEWER MANHOLE R/W EXISITING RIGHT OF WAY RCP REINFORCED CONCRETE PIPE FES FLARED END SECTION CMP CORRUGATED METAL PIPE )� GUY ANCHOR WATER VALVE FHV FIRE HYDRANT WATER VALVE X OHC/ OVERHEAD UTILITY T -PED TELEPHONE PEDESTAL CA TV CABLE TV BOX I -O AREA LIGHT POST PROPERTY LINE GRADING LEGEND CONCRETE SIDEWALK NEW BUILDING TEMPORARY CONSTRUCTION EASEMENT 648 CONTOUR & LABEL 651.5 SPOT ELEVATION TP TREE PROTECTION FENCE SD FES /NV= I DRAIN SD SD ROOF LEADER - - LIMITS OF DISTURBANCE $ 271.11' 0 CURB INLET I / I V / I 2 4.5�\ / W L I /Lv / Q �I a_ / Cf) W Q / ,I Q: LQN I o / J O n Qi � v BW 274.0 0 3:1 SLOPE TW 280.0 17 BW 272.0.' i s 4" FOUNDATION DRAIN / FROM WASH PIT 4 AT MIN 1.0% j \ 16 / �4" FOUNDATION DRAIN PIPE $ - V� INV OUT: 279.83' \ qP c TW 283. BW 278.0 \ 8" ROOF / I V LEADER ti / - I VEHICLE / WASH . BAY s 5 TW 282.5 s \ BW 280.7 VEHICLE / I e TORAGE GARAGE s TW 282.0 I I BW 282.0 a FFE 286.0 I \ \ s N MATCHLINE - SEE SHEET C3.1 I T- I -A Boz CIO. D so ' \\ , I < \ s RCA O. 2.22 AC U \ °� �° moo. \ \ 2� ` o J 00 I r01 / I INTERIM, NT STREAM FOREBAY BERM y y J y RIP RAP ARMOR y y y y y y y y I \ y y y - WETLAND 1 y y y I y 1 y % y y y I \ y Iy I -266 y `I' y -x -x -x= x ---------- o o I y y y 0 0 0 0 0 0 0 o 0 0 0 o 0 0 0 o LIMITS OF 0 0 I \\ DISTURBANCE o 0 0 0 o I \ (TYP.) 0 0 0 T__ 268 0 0 �IIJIII 0 I 0 0 0 0 o Io I o 0 o I SERVICE AREA LLL_ M 09 o V I I Z 0 0 o I 0 0 0 C Z O 0 0 0 0 0 Q TW 278.0 TW 278.0 w O N BW 272.2 o rq 28 -3: I I ^ ti 3:1 SLOPE I TW 281.0 BW 274.0 \ I C Sb \ / 28�� 06 5.00 284' Sb 28.20 - I EW MEDIUM OR I I \ \RK BROWN OR �� \ RUST COLORED a 48\ 'ETAINING WALL I \� 8' CHAIN LINK s 2j FENCE (RW1) COVERED s I TW 282.0 I e s MATERIAL e " BW 278.0 STORAGE I \ 8" ROOF LEADER(S) s >, 285.,00 286.00 s i 28"�' I TW 282. _ I BW 282.0 C I o - a 285.00 \ ' I " ROOF _ _ 20' TOA PUE (SEWER) LEADER - - - B.M. 2016, PG. 1719 AST SSMH / RIM=283.0 / I \ 20 \ INV OUT=274.0 INV I14=274.2 R \ I-� SITE PLAN NOTES 1. NO SITE DEVELOPMENT ACTIVITY INCLUDING, BUT NOT LIMITED TO, TESTING, CLEARING, INSTALLATION OF SOIL AND EROSION MEASURES, OR GRADING SHALL OCCUR UNTIL REQUIRED PROTECTION FENCING HAS BEEN INSTALLED AND INSPECTED. A PROTECTION FENCING INSTALLATION PERMIT MAY BE OBTAINED AT THE PLANNING DEPARTMENT. 2. PROTECTION FENCING MUST BE PLACED AWAY FROM ANY SAVED TREE ONE FOOT FOR EACH INCH OF CALIPER. PROTECTION FENCING MUST BE PLACED AT LEAST 10 FEET AWAY FROM ANY OTHER DESIGNATED RCA SUCH AS, BUT NOT LIMITED TO, HISTORIC BUILDINGS AND STRUCTURES, WETLANDS, AND PONDS. PROTECTION FENCING MUST BE PLACED ALONG THE OUTSIDE LINE OF THE 100 YEAR FLOODPLAIN AND THE OUTSIDE EDGE OF ANY RIPARIAN BUFFER. ADDITIONAL PROTECTION FENCING MAY BE REQUIRED IN OTHER LOCATIONS CLOSE TO CONSTRUCTION ACTIVITY WHERE IT IS DEEMED NECESSARY BY THE ZONING ENFORCEMENT OFFICER. SUCH AREAS MAY INCLUDE COMMON PROPERTY LINES OR NEAR PUBLIC AREAS (SIDEWALKS, ETC.). 3. ALL GRADING AND SUPPORT STRUCTURES ASSOCIATED WITH ANY RETAINING STRUCTURE SHALL NOT ENCROACH INTO ANY REQUIRED BUFFER OR PROTECTED AREA (I.E. RCA AND CRITICAL ROOT ZONES OF TREES, PUBLIC UTILITY EASEMENTS AND RIGHTS-OF-WAY), AND SHALL BE CONTAINED ENTIRELY ON SITE. 4. SITE ELEMENTS REQUIRED TO SATISFY RECREATIONAL REQUIREMENTS SUCH AS, BUT NOT LIMITED TO, PLAY FIELDS, GREENWAY TRAILS AND ITEMS TYPICALLY ASSOCIATED WITH THEM (BENCHES, TRASH CONTAINERS, SIGNS, ETC.) MUST MEET ANY APPLICABLE STANDARDS FOUND IN THE TOA STANDARD SPECIFICATIONS AND CONSTRUCTION DETAILS AND THE REQUIREMENTS OF THE TOA PARKS AND RECREATION DEPARTMENT. 5. RETAINING SYSTEMS PROVIDING A CUMULATIVE VERTICAL RELIEF GREATER THAN FIVE FEET IN HEIGHT WITHIN A HORIZONTAL DISTANCE OF 50 FEET OR LESS, INCLUDING RETAINING WALLS OR MECHANICALLY STABILIZED EARTH WALLS SHALL BE DESIGNED AND CONSTRUCTED UNDER THE RESPONSIBLE CHARGE OF A REGISTERED PROFESSIONAL ENGINEER AND COMPLY IN ALL ASPECTS WITH THE NC BUILDING CODE, SECTION 1610. RETAINING SYSTEMS MEETING THIS CRITERIA WILL REQUIRE A SEPARATE BUILDING PERMIT PRIOR TO START OF WORK. RETAINING STRUCTURE MATERIALS MUST BE AN INTEGRALLY TINTED BROWN, RUST, OR EARTH -TONE COLOR. 6. PRIOR TO APPROVAL OF A FINAL PLAT OR ISSUANCE OF A CERTIFICATE OF OCCUPANCY FOR ANY DEVELOPMENT WHERE A STORMWATER CONTROL MEASURE (SCM) IS REQUIRED, CONTACT THE ENVIRONMENTAL PROGRAMS MANAGER AT 919-249-3413 TO DEMONSTRATE THAT THE REQUIRED STRUCTURE IS IN PLACE, IS OPERATIONAL, AND COMPLIES WITH ALL RELEVANT PORTIONS OF UDO SEC. 6.1.12 ENGINEERED STORMWATER CONTROLS. IF THE SCM IS USED AS PART OF A TEMPORARY EROSION CONTROL MEASURE, THE INSPECTION WILL OCCUR DURING THE APPROPRIATE PHASE OF CONSTRUCTION. 7. SITE IS IN THE PRIMARY WATERSHED PROTECTION OVERLAY DISTRICT. 8. THE SCREENING OF LOAD DOCKS, ROLL-OUT TRASH CONTAINERS, DUMPSTERS, OUTDOOR STORAGE, MECHANICAL AND HVAC EQUIPMENT AND SIMILAR FACILITIES ON THE ROOF, OR BUILDING SHALL MEET THE REQUIREMENTS OF LIDO SEC. 8.2.8. SPECIFICALLY, SCREENING MUST BE DONE SO THAT: A. IT IS INCORPORATED INTO THE OVERALL DESIGN THEME OF THE BUILDING AND LANDSCAPE. B. SCREENING MATERIALS ARE NOT DIFFERENT FROM OR INFERIOR TO THE PRINCIPAL MATERIALS OF THE BUILDING OR LANDSCAPE, AND ARE SIMILAR IN MATERIALS AND COLOR. C. SCREENED ITEMS ARE OUT OF VIEW FROM ADJACENT PROPERTIES AND PUBLIC STREETS, AND A TOTALLY SCREEN IS ACHIEVED. D. ANY GROUND -MOUNTED HVAC OR OTHER MECHANICAL OR UTILITY EQUIPMENT SIX (6) FEET TALL OR HIGHER MUST BE FENCED AND LANDSCAPED E. DUMPSTER ENCLOSURES MUST MEET THE ABOVE REQUIREMENTS PLUS BE EIGHT (8) FEET TALL OR THE HEIGHT OF THE DUMPSTER, WHICHEVER IS GREATER, AND BE BUILT OF MASONRY MATERIAL WITH OPAQUE GATES. WHERE PRACTICABLE, SHRUBS OR OTHER PLANTS MUST BE PLANTED OUTSIDE THE ENCLOSURE TO VISUALLY SOFTEN THE APPEARANCE. 9. ALL REQUIRED SITE ELEMENTS SHOWN WITHIN A PARTICULAR PHASE MUST BE INSTALLED BEFORE A FINAL CERTIFICATE OF OCCUPANCY MAY BE ISSUED FOR ANY BUILDING WITHIN THAT PHASE. 10. A GRADING PERMIT, WHEN APPLICABLE, MAY ONLY BE ISSUED BY THE BUILDING INSPECTIONS DIVISION AFTER THE INSTALLATION AND APPROVAL OF TREE PROTECTION FENCING AND S&E MEASURES AND A CERTIFICATE OF COMPLIANCE HAS BEEN ISSUED BY THE WATER RESOURCES DEPARTMENT. EXISTING LEGEND E/P • EXISTING IRON PIPE IPS O IRON PIPE SET UTILITY POLE 0 SANITARY SEWER MANHOLE R/W EXISITING RIGHT OF WAY RCP REINFORCED CONCRETE PIPE FES FLARED END SECTION CMP CORRUGATED METAL PIPE )� GUY ANCHOR WATER VALVE FHV FIRE HYDRANT WATER VALVE X OHC/ OVERHEAD UTILITY T -PED TELEPHONE PEDESTAL CA TV CABLE TV BOX I -O AREA LIGHT POST PROPERTY LINE GRADING LEGEND SCALE:1" = 40'-0" 40 20 0 40 80 Construction Document Bid Set 222 cloister court chapel hill, nc 27514 919.401.8586 www.cra-ae.com CARO N, S5 "; - SAL . g 13350 :v: •.ti�n•FA..2� ,: 06/26/19 4_4 U Vl . O 4_4 O O no. revisions 10 ADDENDUM #1 - 7/16/19 72 NCDEQ REVISIONS FOR STORM BUFFER 7/29/19 The use of these plans and specifications shall be restricted to the original site for which they were prepared and publication thereof is expressly limited to such use. Re -use, reproduction, or publication by any method, in whole or in part, is prohibited. Title to the plans and specifications remain in the architect without prejudice. It is to be returned upon request to the architect. Visual contact with those plans and specifications shall constitute prima facie evidence of the acceptance of these restrictions. drawn checked ENLARGED GRADING AND STORM DRAINAGE PLAN sheet 2 ■ project no. 1804 date 6/26/19 CONCRETE SIDEWALK NEW BUILDING TEMPORARY CONSTRUCTION EASEMENT 648 CONTOUR & LABEL 651.5 SPOT ELEVATION TP TREE PROTECTION FENCE SD NEW STORM DRAIN SD SD ROOF LEADER - - LIMITS OF DISTURBANCE $ CLEANOUT 0 CURB INLET SCALE:1" = 40'-0" 40 20 0 40 80 Construction Document Bid Set 222 cloister court chapel hill, nc 27514 919.401.8586 www.cra-ae.com CARO N, S5 "; - SAL . g 13350 :v: •.ti�n•FA..2� ,: 06/26/19 4_4 U Vl . O 4_4 O O no. revisions 10 ADDENDUM #1 - 7/16/19 72 NCDEQ REVISIONS FOR STORM BUFFER 7/29/19 The use of these plans and specifications shall be restricted to the original site for which they were prepared and publication thereof is expressly limited to such use. Re -use, reproduction, or publication by any method, in whole or in part, is prohibited. Title to the plans and specifications remain in the architect without prejudice. It is to be returned upon request to the architect. Visual contact with those plans and specifications shall constitute prima facie evidence of the acceptance of these restrictions. drawn checked ENLARGED GRADING AND STORM DRAINAGE PLAN sheet 2 ■ project no. 1804 date 6/26/19 CHARLES WALDSIV, ET AL D. B. 105J8, PG. 817 W B.M. 2003 PG. 1 678 , IL 9UKE /2�6 0 RIPRAP , 9ETAL / L=17 / 'QLE — —'' WOODED W'= 18.5; / THICKNESS = 1.35 / I TYPE A BUFFER 260 —/ -- �— — -- _264 —_J 9UKE / / -- --------- �\ \ 4ETAL l // --------------- SOLE STORMWATER WETPOND 6 CHAIN LINK FENCE RIPRAP I I I L=18' I I W=19.5 I I THICKNESS = 1.35" I �v I I I SII I I 263.00 I I I I RIPRAP I L=13' j W'=15' I II I I j l 11 I I I THICKNESS = 0.9" I I 26o-" I I I I I I I I ► I 111 119 I I I I I I I -� v v I I I I I W Z 1111 .I OUTLET STRUCTURE WITH TRASH RACK TOP ELEV: 265.00' 48" RECTANGULAR WEIR: H=6" W=30" RISER STRUCTURE ON 2 (TWO) SIDES ELEV: 263.69' TURNED -DOWN ELBOW WATER QUALITY ORIFICE 1.5"0 ELEV: 263.00' MIN. 6" 100 -YR STORM: 265.00 �J n TEMPORARY POOL: 263.69 n 0 0 0 PERMANENT P�OL:263.0 - - - ELEV: 263.50 INLET X—ELEV: 262.50' PIPES) ENERGY DISSIPATOR FOREBAY 260.0' 260.5' SEDIMENT SEDIMENT STORAGE STORAGE MIN. 6" MIN. 6" NOTE: BOTTOM OF POND FOREBAY ENTRANCE TO BE ELEV: 258.00 INV. OUT: DEEPER THAN EXIT. DRAIN VALVE AND 258.00' HANDWHEEL ASSEMBLY W/ SUPPORT BRACKETS ANTI -FLOATATION �STORMWATER CONTROL MEASURE DETAIL — WETPOND C3.3/ SCALE: N.T.S. MIN. 10' BERM AROUND POND ELEV: 266.00' EMERGENCY SPILLWAY 103 LF 18" RCP @ 0.37% ANTI -SEEP COLLAR —VEGETATED SHELF MIN. WIDTH: 6 FT MAX. SLOPE: 6H: 1 V WATER -TIGHT JOINTS FES INV. 260.0' / \ V I / / I I J V -NT STREAM 11 � I � WETLAND 1 DISTURBED AREA ZONE 1 78 S.F. ZONE 2 400 S.F. T"4SH RACK STORMWATER CONTROL MEASURE NOTES THE FOLLOWING MUST OCCUR PRIOR TO FINAL PLAT AND/ OR CERTIFICATION OF OCCUPANCY (CO): 1. ALL STORMWATER CONTROL MEASURES (SCMs) MUST BE INSTALLED IN ACCORDANCE WITH THE APPROVED CONSTRUCTION DRAWINGS. 2. DURING THE SCM CONVERSION PROCESS, ALL EFFORTS SHALL BE MADE TO PROTECT DOWNSTREAM WATER RESOURCES. THE DRAIN VALVE SHALL NOT BE LEFT OPEN AT ANY TIME DURING THE SCM CONVERSION. A SKIMMER DRAWDOWN SYSTEM SHALL BE INSTALLED AND UTILIZED UNTIL THE SCM IS FULLY CONVERTED. 3. THE DESIGN ENGINEER MUST SUBMIT AN AS -BUILT PACKAGE WHICH MEETS ALL REQUIREMENTS PRESENTED IN THE TOWN SPEC BOOK INCLUDING A SIGNED AND SEAL CERTIFICATION STATEMENT. 4. FOR SUBDIVISIONS ONLY, A 25% MAINTENANCE GUARANTEE IS REQUIRED TO BE SUBMITTED TO JEAN WEATHERMAN IN DEVELOPMENT SERVICES AT (919) 249-3394. 5. THE APPROPRIATE EXECUTED SCM O&M AGREEMENT MUST BE eRECORDED THROUGH JEAN WEATHERMAN IN DEVELOPMENT SERVICES. 6. A FINAL INSPECTION BY THE STORMWATER & UTILITY ENGINEERING STAFF SHALL BE CONDUCTED ONCE THE AS -BUILT SUBMITTAL HAS BEEN RECEIVED. ONCE APPROVED, STAFF WILL SEND A OFFICIAL AN OFFICIAL SCM APPROVAL LETTER TO THE OWNER. 7. IN LIEU OF SCM COMPLETION AND FINAL APPROVAL BY STAFF, THE TOWN MAY ACCEPT A 125% PERFORMANCE GUARANTEE IN ACCORDANCE WITH UDO SECTION 6.1.12(G). THIS GUARANTEE WILL BE COLLECTED BY JEAN WEATHERMAN IN DEVELOPMENT SERVICES AT (919) 249-3394. 8. ALL SCMs ARE REQUIRED TO BE COMPLETED PRIOR TO A FINAL CO FOR A SITE PLAN AND ISSUANCE OF 90% OF COs WITHIN A SUBDIVISION. IF THE SUBDIVISION IS TO BE PHASED, ALL SCMs SHALL BE COMPLETED PRIOR TO ISSUANCE OF 90% OF COs WITHIN THAT PHASE. 9. IF AN SCM COUNTS TOWARDS RCA, THE REQUIRED LANDSCAPING SHALL BE INSTALLED DURING THE APPROPRIATED GROWING SEASON AND COORDINATED WITH TOWN ZONING COMPLIANCE OFFICER AT (919) 249-3426. EXISTING LEGEND DP • EXISTING IRON PIPE IPS O IRON PIPE SET TEMPORARY CONSTRUCTION EASEMENT UTILITY POLE 0 SANITARY SEWER MANHOLE R/W EXISITING RIGHT OF WAY RCP REINFORCED CONCRETE PIPE FES FLARED END SECTION CMP CORRUGATED METAL PIPE �i GUY ANCHOR LIMITS OF DISTURBANCE WATER VALVE FH FIRE HYDRANT WATER VALVE OH(/ OVERHEAD UTILITY T—PED TELEPHONE PEDESTAL CA TV CABLE TV BOX I �0 AREA LIGHT POST I — PROPERTY LINE OUTLET STRUCTURE FOR BIO -CELL SCALE N.T.S. GRADING LEGEND SCALE: 1" = 20'-0" --------------- 20 10 0 20 40 Construction Document Bid Set 222 cloister court chapel hill, nc 27514 919.401.8586 www.cra-ae.com _ SEAL 13350 • s • \ 06/26/19 4� U C/1 .C) � O 4_4 o O,ssssssill Essissill no. revisions 10 NCDEQ REVISIONS FOR STORM BUFFER 7/29/19 The use of these plans and specifications shall be restricted to the original site for which they were prepared and publication thereof is expressly limited to such use. Re—use, reproduction, or publication by any method, in whole or in part, is prohibited. Title to the plans and specifications remain in the architect without prejudice. It is to be returned upon request to the architect. Visual contact with those plans and specifications shall constitute prima facie evidence of the acceptance of these restrictions. drawn checked ENLARGED STORMWATER CONTROL MEASURE PLAN sheet C303 project no. 1804 date 6/26/19 CONCRETE SIDEWALK NEW BUILDING TEMPORARY CONSTRUCTION EASEMENT 648 CONTOUR & LABEL 651.5 SPOT ELEVATION TP TREE PROTECTION FENCE SD NEW STORM DRAIN SD SD ROOF LEADER — — LIMITS OF DISTURBANCE $ CLEANOUT Q CURB INLET SCALE: 1" = 20'-0" --------------- 20 10 0 20 40 Construction Document Bid Set 222 cloister court chapel hill, nc 27514 919.401.8586 www.cra-ae.com _ SEAL 13350 • s • \ 06/26/19 4� U C/1 .C) � O 4_4 o O,ssssssill Essissill no. revisions 10 NCDEQ REVISIONS FOR STORM BUFFER 7/29/19 The use of these plans and specifications shall be restricted to the original site for which they were prepared and publication thereof is expressly limited to such use. Re—use, reproduction, or publication by any method, in whole or in part, is prohibited. Title to the plans and specifications remain in the architect without prejudice. It is to be returned upon request to the architect. Visual contact with those plans and specifications shall constitute prima facie evidence of the acceptance of these restrictions. drawn checked ENLARGED STORMWATER CONTROL MEASURE PLAN sheet C303 project no. 1804 date 6/26/19 I i � m � # �e,e v�mn umxtwwa#mw..exiavbµ siuww�,u [aNivar .41I w.i�os¢� EJ05 TMfG lEGEHD a m GRADING LEGEND � 65:5 .m urw.w D BGnL& T - WD K_ Water Resources Environmental Quality October 26, 2018 Town of Apex Ann. Michael Denton PO Box 250 Apex, NC 27502 ROY COOPER MICHAEL S. REGAN .ls=s'r'el�'1r' i LINDA CULPEPPER Infer -fin Dw. cl . Subject: Buffer Determination Letter RRO # 18-393 Wake County Determination Type: Buffer Intermittent/Perennial E Neuse (I 5A NCAC 2B .0233) Stop@ r_1 Tar -Pamlico {ISA NCAC 2B .0259) ® intermittent/Perennial Determination (where local A buffer ordinances apply) ❑ Jordan (15A NCAC 2B .0267) (governmental X Throughout and/or interjurisdictional projects) Project Name: 2850 Milano Avenue, A Address/Location: 2850 Milano Avenue, A Stream(s): Beaver Creek & UTs Determination Date: 10/26/2018 NC 27502 Staff: Jeremiah Dow Stream Feature E/1/01) Not Subject(2) Subject Startg, Stop@ Soil survey [LSCS To o A I X Throughout X B E X NA NA X C E X NA NA X (1) E = Ephemeral, l = Intermittent, P e Perennial, NP= Not Present (2) Refers to State riparian buffer rules only. Stream, wetland, or pond impacts are still subject to applicable water quality standards and permitting requirements. Explanation: The streams)/pond(s) listed above has been located on the most recent published NRCS Soil Survey of Wake County, North Carolina and/or the most recent copy of the USGS Topographic map at a 1: 24,000 scale. Each feature that is checked "Not Subject' has been determined to not be an intermittent stream, perennial stream, a pond connected to a stream feature, or the feature is determined not to be present. Stream features that are checked "Subject" have been located on the property and possess characteristics that qualify it to be subject to the buffer rules. There may be other streams located on the property that do not show up on the maps referenced above and are therefore not subject to the buffer rules. However, if the stream features are present on the tract they are subject to all other applicable North Carolina stream standards and permitting requirements as outlined in 15A NCAC 02B, and may be considered jurisdictional according to the US Army Corps of Engineers. `—Nothing Compares - _. State of North Carolina I Environmental Quality I Water Resources ! Raleigh Regional office 1628 Mail service Center , Raleigh, North Carolina 27699-1628 9197914200 2850 Milano Ave., Apex Wake County 10/26/2018 Page 2 of 2 This on-site determination shall expire live (5) years from the date of this letter. Landowners or affected parties that dispute a determination made by the DWR may request a determination by the Director. An appeal request must be made within sixty (60) days of date of this letter. A request for a determination by the Director shall be referred to the Director in writing. Ifsending via US Postal Service: c/o Karen Higgins; DWR — 401 & Buffer Permitting Unit; 1617 Mail Service Center; Raleigh, NC 27699-1617. If sending via delivery service (UPS, FedEx, etc.): Karen Higgins; DWR — 401 & Buffer Permitting Unit, 512 N. Salisbury Street; Raleigh, NC 27604. This determination is final and binding unless, as detailed above, an appeal is requested within sixty (64) days. This project may require a Section 4041401 Permit for the proposed activity. Any inquiries should be directed to the US Army Corp of Engineers (Raleigh Regulatory Field Office) at (919)-554-4884. If you j a questions regarding this rrnination, please feel free to contact Jeremiah Dow at (919) 791-4248. Sir}Eerely, II� Y �/iii ``" • �7 Danny Smit Supervisor, ater Quality Regional Operations Center cc: RRO DWR File Copy Paul Hughes, Froehling & Robertson, via email at phughes@fandr.com 2850 Milano Ave., Apex (Wake) Strum Determination # 18-393 Legend Approximate Site Boundary 187.5 375 750 Feet Map provided by NCDEQ Division of Water Resources Locations are approximate and are provided for reference only :: 2850 Milano Ave., Apex (Wake) Stream Determination #18-393 Legend Approximate Site Boundary 0 250 540 1 A0 Feet L'" i ree k f' USGS The National Map: National Boundaries Dataset, National Elevation Dataset, Geographic Names Information System, National Hydrography Dataset, National Land Cover Database, National Structures Dataset, and National Transportation Dataset; U.S. Census Bureau -TIGER/Line, HERE Road Data. Data Refreshed July, 2017. Map provided by NCDEQ Division of Water Resources Locations are approximate and are provided for reference only ::