Loading...
HomeMy WebLinkAbout20190751 Ver 1_Approval Letter_20190806QI]Y COOPER uve,rm MICHAEL S`R£GAN """et=/ LDNDACOLPEPPER Director ' Au8ust 6,3O19 Fern Solar, LLC ' Attn: Patrick grown 9lVonKa m /h'Avenue,Suite 1050 Irvine, CA926 NORTH CAROLINA Environmental Quality / D\8/R# 1 Eclgecombp[ounty Subject ' OF 401 WATER QUALITY CERTIFICATION WITH ADDITIONAL CONDITIONS � AUTHORIZATION CERTIFICATE PER THE TAR-PAM000RIVER BASIN RIPARIAN BUFFER ^ ` /PROTECTION RULES (15A NCAC 02B'0259) WITH ADDITIONAL CONDITIONS ��n Solar � ' ar Dear Mr. Brown: You haVeoura9prova|for the impacts Ustedbe|oxvforthepurposedeschbedinyour appUceton ^v��the�Dkis'mn Water � ur�es (Din) ' — t dl�� 9aynlentrecekxedon]unel9.2OI9� These irnpactsare covered bvth�attached Water -Quality !] General Certification Number 4133 and 4139 and the conditions listed below.', This Certification is associated' withthe use ofNationwide Permit Num ber12and51Onoeitisissuedtoyou6« ' fe� i.dl U.S. Army Corps .ofEngineers (U� \ | that .sh u|� .'h state or local*rnl�sbefmrep with your project, inducling,thmserequired hv(but not |] limited to) irnentand Erosion ' noiNon-Discharge,�\8/ n�aterWatershed regulations. / This approval requires you tmfoUoxvi1heconditions listed |nthe enclosed certification and the following additional conditions: l. The following impacts are hereby approved provided that all ofthe other specific and general conditions ofthe Certification and Buffer Rules are met. Noother innpa�tsare pproved.incudingincjdenta|innpnr��` [l5AN� . CACO�B `O8/- ' andl5AN' ' ' '— 02B.0259k9U . Raleigh Regionalmn: |sunomn(At Drive |ualluu,North Carolina 2-16nv Fern Solar DWR #19-0751 401_ AND BUFFER APPROVAL Page 2 of 5 Type of Impact Amount Approved. .(units) Permanent Amount Approved (units) Temporary Wetlands: W1: Road and Utility .Line Installation 0.001 (acres) 0 (acres) W2: Road and Utility Line Installation 0.027 (acres) 0 (acres) W3: Road.and Utility Line Installation 0.013 (acres) 0 (acres) W4: Sediment Basin Grading 0.047 (acres) 0 (acres) W5: Sediment Basin Grading 0.006.(acres) 0 (acres). W24: Road and Utility Line Installation 0.003 (acres) 0 (acres) Stream . S6: Road Crossing/Culvert Update & Utility Crossing 41 (linear feet), 0 (linear feet) .S7: Road Crossing/Culvert Update ',35 (linear feet) 0 (linear feet) S8: Road Crossing/Culvert Update & Utility Crossing .36 (linear feet) 0 (linear feet) S9: Road Crossing/Culvert Update 32 (linear feet) 0 (linear feet) S10: Road Crossing/Culvert Update 36 (linear feet) 0 (linear feet) S11: Road Crossing/Culvert Update & Utility Crossing. ,;-36 (linear feet) 0 (linear feet) S12: Road Crossing 57 (linear feet) 0 (linear feet) S13: Road' Crossing/Culvert Update & Utility'Crossing 32 (linear feet) 0 (linear feet) S14: Road Crossing/Culvert Update & Utility,Crossing (linear feet) 0 (linear feet) S15: Road and Utility -Crossing ii 56 (linear feet) 0 '(linea,r feet) S16: Road and. Utility Crossing 96 (linear feet) 0 (linear feet) Buffers = Zone;1 B17: Road. Crossing 3,211 (square feet) 0 (square feet) B18: Road Crossing - 1 i 2,844 (square feet) 0 (square feet) B19: Road Crossing 2,955 (square feet) 0 (square feet) B20: Road Crossing 2,991 (square feet) 0,(sq uare feet) 1321: Road Crossing 2,968 (square feet) 0,(square feet) B22: Road Crossing 2,924 (square feet) 0 (square 'feet) B23: Road Crossing 2,610 (square feet) 0 (square feet) Buffers - Zone2 B17: Road Crossing 2,140 (square feet) 0,(sq uare feet) B18: Road Crossing 1;896 (square feet) 0 (square feet) B19: Road Crossing 1,970 (square feet) 0 (square feet) B20: Road Crossing 1,994 (square feet) 0 (square feet) B21: Road Crossing 1,979 (square feet) 0 (square feet) B22: Road'Crossing 1,950 (square feet) 0 (square feet) B23: Road Crossing 1,740 (square feet) 0 (square feet) Fern Solar DWR #19-0751 401 AND BUFFER APPROVAL Page 3 of 5 2. Diffuse Flow All stormwater must be directed and_maintained as diffuse flow at non-erosive velocities through the, protected stream buffers such that, it will not re -concentrate before discharging into a stream. [15A NCAC 02H .0506(b)(5)] 3. Stormwater Management -Plan- (SMP) Approval from Local Community Required The stormwater. "management plan (SMP); must be approved by Edgecombe County and meet the requirements of this Certification.. The SM,P may not,be,modified without prior written authorization from the Edgecohib;e County. [15A NCACI02H .0506(b)(3)] 4. The permittee shall report to the Raleigh Regional Office any noncompliance with this certification, _any violation of stream' or -wetland standards [15A NCAC 02B..0200] including but not limited to sediment impacts,, and any, violation of state regulated riparian buffer rules [15A NCAC 02B .0200]. Information shall be provided orally within 24 hours (or the next business'day if a weekend or holiday) from the time the applicant became aware of the circumstances. A written submission�shall also be provided within 5 business days of the time the applicant becomes aware ofAhe circumstances. The written submission shall contain a description of the noncompliance, and its causes; the period of noncompliance, .including exact dates and times; if the noncompliance has not been corrected, the anticipated time compliance is expected to continue; and steps taken or planned -to reduce, eliminate, and.prevent reoccurrence of the noncompliance. The Division may waive the written submission requirement on a case-by-case basis. 5. Protective Fencing The outside buffer, wetland •or water boundary and along the construction corridor within these boundaries approved under this authorization shall 'be clearly marked with orange warning fencing (or similar high visibility material) for the areas that have been approved to infringe within the buffer, wetland or water prior to any: land disturbing activities to ensure compliance with 15 NCAC 02H..0500. [15A NCAC 02H.0506 (b)(2) and (c)(2) and 15A NCAC 02H .0507 (c)] 6. This approval is for thepurpose and design described in your application. The plans and specifications for this project are incorporated by reference as part -,of the Certification and Buffer,Autho'rization. If you .change your project, you,must notify the Division and you may ,be required to submit a, neve application package with the appropriate fee. If the property is sold, the new owner must be given a copy of .this approval letter and General Certification and is responsible for complying with all conditions. [15A NCAC 02B .0507(d)(2)] This approval and its conditions are final and binding unless contested. [G.S. 143-215.5] Fern Solar DWR #19-0751 401_ AND BUFFER APPROVAL Page 4 of 5 This Certification and Buffer Authorization can be contested as provided in General Statute . 150B by filing a written petition for an administrative hearing to the Office. of.Administrative Hearings (hereby known as OAH) within sixty (60). calendar days. A petition form may be obtained from the OAH at http://\ivww.incoah.com/ or by calling the OAH Clerk's Office at' (919) 431-3000 for information. A 'petition is considered filed when the original and one (1) copy along with any applicable OAH filing, fee is received in the OAH during normal office hours (Monday through Friday between 8:00am and 5,:00p6i, excluding official state 'holidays). The petition may be faxed;to the OAH at (919) 431-3100, provided the original and one copy of the petition along With any applicable OAH filing fee is'received by the OAH within five (5) business days following the faxed transmission. Mailing address for the OAH: If sending by First Class Mail via the US. Postal Service: Office of Administrative Hearings 6714 Mail Service Center Raleigh, NC 27699-6714 If sending via delivery service (e.g. UPS, FedEx): Office of Administrative Hearings 1711 New Hope Church Road Raleigh, NC 27609-6285 One (1) copy of the petition must also be served to Department of Environmental Quality: William F. Lane, General Counsel Department of Environmental Quality 1601 Mail Service Center Raleigh, NC 27699-1601 Please send one (1) copy of the petition to DWR: If sending by First Class Mail via the US Postal Service: Karen Higgins NC'DWR — 401 & Buffer Permitting Branch 1617 Mail Service Center Raleigh, NC 27699-1617 If sending. via delivery service (e.g. UPS, -FedEx): Karen Higgins . NC OWR-401.&'Buffer Permitting. Branch 512 N. Salisbury Street Raleigh, NC 27604 Fern Solar DWR #19-0751 401 AND BUFFER APPROVAL Page 5 of 5 This letter completes the review of the Division under section 401 of the Clean Water Act and the Tar -Pamlico Riparian Buffer Rules as described in 15A NCAC 02B .0259. Please contact Stephanie Goss at 919-791-4256 or stephanie.goss@ncdenr.gov if you have any questions or concerns. Sincerely, ick Bolich, LG Assistant Supervisor, Water Quality Regional Operations Section Enclosure: GC 4133 GC 4139 cc: U.S. Army Corps of Engineers; Raleigh Regulatory Field Office; 3331 Heritage Trade Drive, Ste. 105; Wake Forest, NC 27597 DWR RRO 401 file DWR 401 & Buffer Permitting Unit via Laserfiche jBen Sagara via e-mail at ben.sagara@timmons.com