Loading...
HomeMy WebLinkAboutNCC191247_NOI Application_20190807Action History (UTC-05:00) Eastern Time (US & Canada) Submit by Anonymous User 8/2/2019 3:26:23 PM (NCG01 NOI Submission) Approve by Georgoulias, Bethany 8/6/2019 11:31:49 AM (Review- Construction NOI 14493) In Revievwr revised the waterbody index number from 27-23-(1.5), which is Smith Creek/Wake Forest Reservoir, to the segment of Smith Creek closer to the project site. • Georgoulias, Bethany reassigned the task to Georgoulias, Bethany 8/6/2019 11:15 AM • Georgoulias, Bethany reassigned the task to Morman, Alaina 8/6/2019 11:15 AM * This is the last one. Disregard. • The task was assigned to Georgoulias, Bethany by round robin distribution 8/2/2019 3:26 PM • The task was assigned to DEMLR NCG01 NOI Review Team. The due date is: August 6, 2019 5:00 PM 8/2/2019 3:26 PM Submit by Lucas, Annette 8/7/2019 8:11:55 AM (Payment Verification for NCC191247) • Lucas, Annette assigned the task to Lucas, Annette 8/7/2019 8:11 AM • The task was assigned to DEMLR NCG01 Payment Team. The due date is: August 20, 2019 5:00 PM 8/6/2019 11:31 AM STME NORTH CAROLINA Ernvlronmentol qualily A. Project Information Part A. Project Location and Waterbody Inforrration 1. Project Name * Holding Village lot 301 2. County* Wake 3. Highway or Street 1516 Highpoint Street Address * Street name only is acceptable if no address nurrber assigned yet 4. City or Township* Wake Forest 5. State * NC 1r-i)iTII�T7i)MFill f_T1IIa10141 6. Zip Code* 27587 7. Latitude * Enter the latitude in decirral degrees 35.9591 8. Longitude * Enter the longitude in decirral degrees (MIST be negative) -78.5149 If you do not know the latitude and longitude coordinates for this project, you can search the location on this map of North Carolina. Look for the coordinates in the bottom left corner. 9. Date to Begin* 08/02/2019 Estimated Construction Project Start Date 10. Date to End* 12/02/2019 Estimated Construction Project End Date 11. SIC (Primary)* Residential, Single Family Houses (SFE) (1521) Standard Industrial aassification for Development 12. Acres to be 0.13 disturbed* (including off -site borrow and waste areas) 13. Total site area 0.19 (acres)* 14. Post- 0.00 construction (Estimated) impervious area (acres) * NCC Project NCC-WAKE-2019-Holding Village lot 301 Tracking ID Assigned autorratically Below you must enter waterbody information for surface waters affected by this project. Please consult DWR's Surface Water Classifications Map Viewer to find waterbody name and corresponding index number. You may enter up to 3 waterbodies. 15a. Receiving Smith Creek Wate rbody* N n-e of waterbody into which stornvwater runoff will discharge 15b. Waterbody 27-23-(2) Index No. * NCWaterbody Index Nmber Stormwater fJ No discharges will flow r Yes to additional wate rs * 16a. Is this project F Yes subject to the INC r No, not subject to NC SPCA Sediment Pollution Control Act? * B. Permittee Information Part B. Perrrittee Information - Legally Responsible Entity and Individual ..................................................................................................................................................................... h Important: The person who signs the NOI Certification Form and signs the Certification in Section E of this application form should be the same person as listed in THIS SECTION, or an authorized responsible individual within the same organization. That person must be a responsible corporate officer who owns or operates the construction activity, such as a president, secretary, treasurer, or vice president, or a manager that is authorized in accordance with Part IV, Section B, Item (6) of the NCG010000 General Permit. For more information on signatory requirements, see Part IV, Section B, Item (6) of that permit. 1. Organization The Drees Company Name * 2. First Name* Jerry ff Corporation, enter Registered Agent First l\b e 3. Last Name * Dean ff Corporation, enter Registered Agent Last Barre 3b. Title Division President 4. Permitee E-mail Imartin@dreeshomes.com Address* 5. Permittee 919.256.5432 Telephone No.* 6. Permittee Mailing Street Address Address* 7701 Six Forks Road Address Line 2 City Raleigh Postal / Zip Code 27615 Check box if the street address the same as mailing address 7. Permittee Street Address* fJ Yes Street Address 7701 Six Forks Road Address Line 2 City Raleigh Fbstal / Zip Code 27615 State / Province / Region NC Country us State / Province / Region NC Country us C. Site Contact Information Part C. Roiect Site Contact hforrration 1. Type of Individual Ownership* 2. Primary Site Casey Contact - First Name * 3. Primary Site Brown Contact - Last Name * 4. Title 5. Site Contact E- cbbrown@dreeshomes.com mail Address* 6. Site Contact 919.996.9132 Telephone No.* 7. Organization Name 8. Site Contact Street Address Mailing Address* 7701 Six Forks Road Address Line 2 city Raleigh Fbstal / Zip Code 27615 State / Province / Region NC Country us D. E&SC Plan Part D. Erosion & Sediment Control (E&SC) Ran Approval Information ....................................................................................................................................................................................................................................... 1. Date E&SC Plan 07/30/2019 Approved * 2. E&SC Plan Project RSF 2019-00001369 Number/ID* Assigned by agency or local program 3. E&SC Plan f State DEQ Office Approved by r Local Program 4. Local Program* Town of Wake Forest Documentation of E&SC Plan approval and the signed Notice of Intent (NOI) Certification Form is required for a complete application. 5. E&SC Plan HDV 301 Town of Wake Forest approval letter Approval 72.1 KB erosion control.pdf letter/documentation Mast be RDF forrrat 6. NOI Certification HDV 301 NOI Certification form.pdf 519.05KB Form Mist be RDFforrrat This is an Express r No Review Project* r Yes E. Certification North Carolina General Statute 143-215.6B (1) provides that: Anyperson who knowinglymakes any false statement, representation, or certification in anyapplication, record, report, plan, or other documentfiled or required to be maintained under this Article or a rule implementing this Article; or who knowinglymakes a false statement of a material fact in a rulemaking proceeding or contested case under this Article; or who falsifies, tampers with, or knowingly renders inaccurate any recording or monitoring deice or method required to be operated or maintained under this Article or rules of the Commission implementing this Article shall be guiltyofa Class 2 misdemeanor which mayinclude a fine not to exceed ten thousand dollars ($10,000). Under penalty of law, I certify that: rJ I am the person responsible for the construction activities of this project, for satisfying the requirements of this permit, and for any civil or criminal penalties incurred due to violations of this permit. * V The information submitted in this NOI is, to the best of my knowledge and belief, true, accurate, and complete based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information. * I7 I will abide by all conditions of the NCG010000 General Permit and the approved Erosion and Sediment Control Plan. * V If the Erosion and Sediment Control Plan approved by the delegated program is not compliant with Part II (Stormwater Pollution Prevention Plan) of the NCG010000 General Permit, I will nonetheless ensure that all conditions of Part II of the permit are met on the project at all times. * I7 I hereby request coverage under the NCG010000 General Permit and understand that coverage under this permit will constitute the permit requirements for the discharge(s) and is enforceable in the same manner as an individual permit. Specify if you are:* r The Responsible Person named on this Notice of Intent r Authorized Responsible Person* Important: The person who signs this Certification above and signs the NOI Certification Form should be the same person (or authorized responsible person within the same organization) as listed in Section B (Permittee Information) of this form. *An authorized individual is a responsible corporate officer who owns or operates the construction activity, such as a president, secretary, treasurer, or vice president, or a manager that is authorized in accordance with Part IV, Section B, Item (6) of the NCG010000 General Permit. For more information on signatory requirements, see Part IV, Section B, Item (6) of that permit. Signature Type Name* Jerry Dean Title Division President Organization The Drees Company Date * 08/02/2019 F. Tracking and COC Info NOI Tracking No. 14493 NC Reference No. NCG01-2019-1247 Uses 'count _nunber'variable (increrrented by SP) Certificate of NCC191247 Coverage (COC) Uses'count_nunber'variable (incremented by SF) No. * Count Number 1247 Sequential nunber for subrrittal that is increrrented by Stored Procedure COC Year 2019 Year of date reviewed (used to assign YY digits after "NGC' in OOCno.)