Loading...
HomeMy WebLinkAbout20191029 Ver 1_I-5700_Permit Drawings_(2019-05-02)_20190802Highway North Carolina Department of Transportation Highway Stormwater Program mo STORMWATER MANAGEMENT PLAN (Version 2.07; Released October 2016) FOR NCDOT PROJECTS WBS Element: 50118.1.FS1 TIP No.: 1-5700 Count ies): Wake Page 1 of 4 General Project Information WBS Element: 50118.1.FS1 TIP Number: 1-5700 Project Type: Roadway Relocation Date: 5/2/2019 NCDOT Contact: Heather Montague Contractor / Desi ner: Dan Robinson Address: NCDOT Environmental Address: Kimley-Horn 2612 North Duke Street 421 Fayetteville Street Suite #600 Durham, 27704 Raleigh, NC, 27601 Phone: 919 220-4600 Phone: 919 677-2178 Email: hwmonta ue ncdot. ov Email: dan.robinson kimle -horn.com City/Town: Morrisville Count ies): Wake River Basins : Neuse CAMA County? No Wetlands within Project Limits? Yes Project Description Project Length (lin. miles or feet): 0.80 Surroundin Land Use: Commercial and residential use. Proposed Project Existing Site Project Built -Upon Area ac. 37.1 ac. 33.8 ac. Typical Cross Section Description: For -L- Airport Boulevard: Typical section includes 3 12'-15' lanes with turn lanes when necessary. For -L- Airport Boulevard: 2 12' travel lanes with TWLTL. Diverging diamond at interchange and 10' sidewalk. For -Y- 1-40: Four 12' lanes on East and West bound with 12' exit ramps and on For -Y- 1-40: Existing four lanes with added 12' auxiliary lane and 12' paved shoulder. 17' from ramps. auxiliary lane to guardrail. Existing site consists of commercial buildings, lightly wooded areas, and Interstate 40. For Ramps: 12' lane with 6:1 side slopes Wetlands exist in the project corridor. Annual Avg Daily Traffic (veh/hr/day): Design/Future: 46,500 Year: 2040 1 Existing: 33,660 Year: 2019 General Project Narrative: This is a Division 5 managed project. Existing drainage patterns to be maintained to the best extent practical. Drainage systems sized with future development taken into (Description of Minimization of Water account. The following items were incorporated for the Minimization of water quality Impacts: Quality Impacts) Proposed culvert at Sta. 29+90 -Y3- was buried 1' and has a 'I'sill. Alignment was designed to minimize wetland and stream crossing impacts. 2:1 Slopes were used to reduce structure length and limit wetland impacts. Grass swales utilized to the maximum extent practical. Use of open channel design with Rip Rap on Banks only where practical in areas of parallel jurisdictional stream impacts. Channel Improvements and bank stabilization were used at culvert inlets and outlets to help stabilize channels and minimize erosion. Countersunk rip rap pads with armored slopes/banks are used at pipe outlets to prevent scour holes, erosion, and to protect the existing channel. The filtration basin (Sta. 19+52 -RPC-) will provide water quality treatment for a broad spectrum of water quality parameters of concern. As stormwater is temporarily detained, suspended sediments and some phosphorus are captured through sedimentation. During infiltration and other chemical processes, metals and additional phosphorus are removed. Microbial activity that occurs in the media helps to reduce nitrogen and hydrocarbons. As the surface layer is exposed to sunlight and allowed to dry, pathogens are treated. Median filters with relatively deep media layers can help abate runoff temperatures. Waterbody Information Surface Water Body 1 : Stirrup Iron Creek NCDWR Stream Index No.: 27-33-4-2 NCDWR Surface Water Classification for Water Body Primary Classification: Class C Supplemental Classification: Nutrient Sensitive Waters NSW Other Stream Classification: None Impairments: None Aquatic T&E Species? No Comments: NRTR Stream ID: iStirrup Iron Creek Buffer Rules in Effect: Neuse Project Includes Bridge Spanning Water Body? INo I Deck Drains Discharge Over Buffer? INo Dissi ator Pads Provided in Buffer? INo Deck Drains Discharge Over Water Body? INo (If yes, provide justification in the General Project Narrative) (If yes, describe in the General Project Narrative; if no, justify in the General Project Narrative) (If yes, provide justification in the General Project Narrative) �HI j1Wa St01 t lW (Version 2.07; Released October 2016) North Carolina Department of Transportation Highway Stormwater Program STORMWATER MANAGEMENT PLAN FOR NCDOT PROJECTS WBS Element: 50118.1.FS1 TIP No.: 1-5700 Count ies : Wake Page 2 of 4 Additional Waterbody Information Surface Water Body 2 : Brier Creek NCDWR Stream Index No.: 27-33-4 NCDWR Surface Water Classification for Water Body Primary Classification: Class C Supplemental Classification: Nutrient Sensitive Waters NSW Other Stream Classification: None Impairments: biological impairment Aquatic T&E Species? Comments: Biological Impairment for PCB Fish Tissue Advisor (Advisory, FC, NC . NRTR Stream ID: Brier Creek Buffer Rules in Effect: Neuse Project Includes Bridge Spanning Water Body? No Deck Drains Discharge Over Buffer? INo Dissi ator Pads Provided in Buffer? INo Deck Drains Discharge Over Water Body? No (If yes, provide justification in the General Project Narrative) (If yes, describe in the General Project Narrative; if no, General Project Narrative) justify in the (If yes, provide justification in the General Project Narrative) Hj hwa North Carolina Department of Transportation Stormwater (_ Highway Stormwater Program STORMWATER MANAGEMENT PLAN (Version 2.07; Released October 2016) FOR NCDOT PROJECTS WBS Element: 50118.1.FS1 TIP No.: 1-5700 County(ies): Wake Page 3 of 4 Swales Sheet No. Station & Coordinates (Road and Non Road Projects) Surface Water Body Base Width (ft) Front Slope (H:1) Back Slope (H:1) Drainage Area (ac) Recommended Treatm't Length (ft) Actual Length (ft) Longitudinal Slope N Q2 (cfs) V2 (fps) Q10 (cfs) V10 (fps) Rock Checks Used BMP Associated w/ Buffer Rules? 4 22+25 -L- (LT) (1) Stirrup Iron Creek 0.0 3.0 3.0 0.2 23 75 1.70 % 0.3 1.4 0.4 1.5 No Yes 23+00 -L- (LT) 6 69+25 -Y- (RT) (2) Brier Creek 0.0 4.0 4.0 0.6 55 175 1.40 % 0.8 1.5 1.0 1.6 No Yes 70+50 -Y- (RT) 6 15+54 -RPC (LT) (2) Brier Creek 0.0 6.0 6.0 1.3 129 296 1.00 % 3.0 1.7 3.8 1.9 No Yes 18+50 -RPC- LT) 6 20+50 -RPC- LT) (2) Brier Creek 0.0 3.0 3.0 0.7 74 200 0.70 % 1.0 1.3 1.3 1.4 No Yes 22+50 -RPC- LT 6 23+79 -RPD- RT (2) Brier Creek 0.0 3.0 3.0 1.4 138 101 0.80 % 3.2 1.9 4.2 2.0 No Yes 24+80 -RPD- (RT) 6 24+80 -RPD- (RT) (2) Brier Creek 0.0 3.0 3.0 0.5 48 220 1.70 % 0.7 1.7 0.8 1.8 No Yes 27+00 -RPD- (RT) 9 34+50 -Y- (LT) (1) Stirrup Iron Creek 0.0 4.0 6.0 0.4 41 200 0.50 % 1.3 1.1 1.7 1.2 No Yes 36+50 -Y- (LT) 14 15+50 -Y3- RT (2)Brier Creek 0.0 6.0 3.0 0.3 27 300 1.20 % 0.4 1.2 0.6 1.3 No Yes 18+50 -Y3- RT Additional Comments HiShwa North Carolina Department of Transportation gStormwater Highway Stormwater Program STORMWATER MANAGEMENT PLAN (Version 2.07; Released October 2016) FOR NCDOT PROJECTS WBS Element: 50118.1.FS1 TIP No.: 1-5700 County(ies): Wake Page 4 of 4 Level Spreaders, Hazardous Spill Basins, and Forebays Sheet No. Station & Coordinates (Road and Non Road Projects) Surface Water Body Level Spreader, Hazardous Spill Basin, or Forebay? Drainage Area (ac) New Built - Upon Area (ac) Required / Minimum Treatment Treatment Achieved BMP Associated w/ Buffer Rules? 6 -RPC- 19+52 LT (1)Stirrup Iron Creek Filtration Basin 5.35 2.06 1.5 inches of runoff from NBUA 11543.0 17829.0 N/A 6 -RPC- 18+93 LT (1)Stirrup Iron Creek Forebay 1.29 0.43 0.1 inches of runoff from NBUA 165.0 cf 516.0 cf N/A 6 -RPC- 19+90 LT (1)Stirrup Iron Creek Forebay 1.86 0.84 0.1 inches of runoff from NBUA 308.0 cf 846.0 cf N/A 6 -RPC- 20+18 LT (1)Stirrup Iron Creek Forebay 1.52 0.74 0.1 inches of runoff from NBUA 269.0 cf 1010.0 cf N/A *Hazardous spill basins are pollution prevention measures designed for spill containment rather than stormwater treatment. Under Required / Minimum Treatment and Treatment Achieved, provide the minimum required volume and the actual HSB volume, respectively. Refer to the NCDOT Stormwater Best Management Practices Toolbox (2014) for design guidance. Additional Comments W O See Sheet 1A For Index of Sheets See Sheet 1B For Conventional Plan Suet Symbols See Sheet 1C-1 For Survev Control Sheet PERMIT DRAWING SHEET 1 OF 27 ° 3 PtE STA. 15+18.7! Z ASgN BEGIN CONSTRUCTION T GROpe c/N �'- -Y- STA. 25+32.85 SITE 5D \ SITE 4 AIRGATE DR.) END BRIDGE -L- STA 45+ 9+- E TO DURHAM - _\ STATE OF NORTH CAROLINA DIVISION OI,. HIGHWAYS WAKE COUNTY LOCATION: I-40 AND SR 3015 (AIRPORT BLVD.), REVISE INTERCHANGE AND CONSTRUCT AUXILIARY LANE ON I-40 WESTBOUND FROM SR 3015 (AIRPORT BLVD. TO I-540. TYPE OF WORK: ITS, DRAINAGE, GRADING, PAVING, SIGNALS CULVERTS AND STRUCTURES END TIP PROJECT 1-5700 STA. 61 + 00.00 —L— SITE 8A SITE 1SITE 9 C °CbIIN UM USL / -L- STA 42+68+/- y/ 1 SITE 3A (FACTORY SHOPS RD.) \ SITE 2 4 \\ SITE 2A -Y-BE IN N T. ` TA. 10+70.00 " u (SR 1641 SLATER RD.) ISO cy�Rch o GRaR L 'P SITE 1 A PORTION OF THIS PROJECT IS WITHIN THE MUNICIPAL BOUNDARIES OF MORRISVILLE. CLEARING ON THIS PROJECT SHALL BE PERFORMED TO THE LIMITS ESTABLISHED BY METHOD THIS IS A PARTIAL CONTROLLED— ACCESS PROJECT WITH ACCESS BEING LIMITED TO POINTS SHOWN ON THE PLANS. 5E ONST. .00 5C RTATE flTATO PRUJe(1' RRPeRBNt. WO SI@ET NQ TOTAL SHBETS N. 1-5700 �.' *,A— PRnh a. RAPRpEWa OEP�Ra _ 50118.1.FS1 NHPP-040-1(259)286 PE DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED WETLAND AND STREAM PERMIT PACKAGE MAY 2, 2019 ^� END CONSTRUCTION / SITE -Y- STA. 113+06.23 L:ND 9TARIDGE 4r—SITE 112 SITE 6 6 1 SITE 5A 11 —Y— (Ile) `SI E 4B SITE 11 7BEGINBRIDGESITE 43+03+/- 10B SITE l0A C1.34 (AERIAL CENTER DR.) SITE IOC 3B BEGIN TIP PROJECT 1-5700 STA. 18 + 85.00 —L— SITE 12 TO RALEIGH * PROPOSED SIGNALS PRELIMINARY PLANS DO NOT USE FOR CONSTRUCTION INCOMPLETE PLANS DO NOT USE FOR R/W ACQUISITION GRAPHIC SCALES DESIGN DATA PROJECT LENGTH Prepared for the North Carolina Department in the O of TransportationOffice of.. HYDRAULICS ENGINEER Y 50 25 0 50 100 2019 = 33,660 ADT 2040 = 46,500 K = 9 % 0 D = 65 /Q T = 6 % * V = 50 MPH * TTST = 2% DUAL = 4°/D FUNC CLASS=ARTERIAL STATEWIDE TIER LENGTH ROADWAY TIP PROJECT 1-5700 = 0.741 MILES LENGTH STRUCTURE TIP PROJECT 1-5700 = 0.057 MILES TOTAL LENGTH OF TIP PROJECT 1-5700 = 0.798 MILES Rono ENGINEERING x,,h, acz606 a== 19a51�" 1e5180' PE. SIGNATURE. ®F NORry� P. % e �r ®p TRIk, � J 2018 STANDARD SPECIFICATIONS EDWARD G. WETHERILL, PE PLANS 50 25 0 50 100 RIGHT OF WAY DATE: SEPTEMBER 21, 2018 PROJECT ENGINEER BOB A. MAY, PE ROADWAY DESIGN ENGINEER P.E. SIGNATURE: LETTING DATE: SEPTEMBER 17, 2019 PROFILE (HORIZONTAL) 10 5 0 10 20 PROJECT DESIGN ENGINEER NCDOT CONTACT: TATIA WHITE, PE, PI ROADWAY DESIGN, PROJECT ENGINEER PROFILE (VERTICAL) DETAIL 1 INLET C1 PROVEMENTS Ex/STING GROUND 1 NOT TO SCALE) 3 S la X la RCBC UPSTREAM EXTENSION CLASS IIRIP RAP KEYED -IN TO BANKS ONLY (TYPJ 2J OR FLATTER EXTEND 2'BELOW BED 33'CHANNEL WIDTH ALONG CULVERT FACE GEOTEXTILE NO ELV. = 28121A 1 SERVED 2//I81 STA. 33.31 -L- (LT) DETAIL 5 SPECIAL LATERAL N' DITCH (No. Sco1e) Natural DFill Ground 3.y D f ode SIoPe FROM STA. 19+GO TO STA. 20+25 -Y8- L FROM STA. 20+65 TO STA. 21+20 -Y8- L FROM STA. 20+50 TO STA. 21+20 -Y8- (R FROM STA. 14+08 TO STA. 14+50 -RPB- L FROM STA. 14+30 TO STA. 18+50 -RPC- LT FROM STA. 20+50 TO STA. 22+50 -RPC- Ll FROM STA. 22+50 TO STA 24+80 -RP0. Rl FROM STA. 24+80 TO STA. 27+00 -RP0. Rl FROM STA. 50+50 TO STA. 51+50 -L- (L EXISTING xDE�TAIL v2c� GROUND OUTLET CH��FAPROVEMENTS 3 a I2'X I2'RCBC (NOT TO SCALE) DOWNSTREAM EXTENSION T CLASS II RIP RAP KPYEAIN INSTALL 2.90F CLASS IIRIP RAP ON BANKS ONLY TO GREATER OF THE EXISTING YPJ TBE TOP OF BANK OR AN ELEVATION EXTEND 2OR OW BED OF 2895'UPSTREAM AND GEOTEXTILE 288H DOWNSTREAM CLASS /'RsIIP RAP APP'OX. !7 CHANNEL WIDTH PLE7EUA WTNK H CTLASS BBRIP RAP ALONG CULVERT FACE TO FILL VOIDS �'1 INLET AND EXISTING GROUND ��sLyyS ELyy�- 282.4'� (tlBSERVEO 3/23/18) Y CONCRETE SILL STA. 52.40 -L- (FIT) H7RgNEL IMPROVEMENTS TO SCALE) to l2' X la RCBC 1T `-I (BURIED I') �) CLASS II RIP RAP KEYED -IN TO BANKS ONLY (TYPJ 2IOR FLATTER EXTEND 0BELOW BED 15'CHANNEL WIDTH ALONG CULVERT FACE STA. 29.90 -Y3- (LT) STA. 29.90 -Y3- (RT) OUTLET xDE�TA-IL-R4�� CH��FIPROVEMENTS (NOT TO SCALE) 3 R 9' X B' RCBC DOWNSTREAM EXTENSION EXISTING GROUND 35'WIDE CHANNEL MEASURED ALONG SKEWED CULVERT FACE }p \ I`Ihb c - I )� IL I CLASS IMP RAP 2 KEYED IN TO BANKS IL ONLY (TYPJ 2:IOR FLATTER Y SILLS AND Of WIDE 2 EXTEND 2' BELOW BED FLOODPLAIN BENCH GEOTEXTILE MEASURED ALONG IS ESERLV.= 2825'VlVflal B PLAN VIEW I- *� SECTION A -A Ts 1- -Is ncsrE�rallrra DETAIL 6 SPECIAL CUT DITCH I Not fo S 10 Front DHd,pe N or SIo Ground 3.7 D�Tet Min. D=1.0 R. FROM STA. 22+25 TO STA. 23+00 -L- L FROM STA. 34+50 TO STA. 36+50 -Y- L FROM STA.15+50 TO STA. 18+50 -Y3- RT) FROM STA. 26+50 TO STA. 28+25 -Y3- (RT) DETAIL 8 LATERAL 'V' DITCH I Not I. Scol^) Ground {D 1'Ai. Slope d FROM STA. 99+65 TO STA. 100+37 -Y- (RT) DETAIL 12 FALSE SUMP n (Not to Scale) Outside Ditch O Traffic Fl- I 2 GI -S_ etc. S-Ditch Slope (i Proposed Ditch STA. 47+35 -Y- (LT) STA. 59+75 -Y- (LT) STA 61+65 -Y- (LT) STA. 68+64 -Y- (LT) STA. 70+93 -Y- (LT) STA. 102+37 -Y- MT) STA. 105+81 -Y- (RT) STA. 21+65 -Y3- (LT) STA. 23+62 -Y3- (LT) STA. 16+96 -RPA- (RT) DETAIL 7 BERM DITCH (No b Sca1e1 N.-1 _1 d °�/ D °', RDWY GeofeMile� Min. D=1.0 Ft. Max. d=1.0 ff. b=5.0 R. Troe of Liner= Class Ri. -Rao FROM STA. 23+00 TO STA. 24+50 -L- (L FROM STA. 14+20 TO STA. 16+50 -RPB- (L DETAIL 9 SPECIAL LATERAL N' DITCH (No. Scale) Fill Nofuml T,'�O of Slope Ground D F d GvoMdile Min. D=1.1 Ft. Type of Uner= Class I Rip -Pap Moz. d=1.5 R. FROM STA. 20+10 TO STA. 20+50 -Y8- (R FROM STA. 16+16 TO STA. 18+07 -RPD- (L FROM STA. 49+97 TO STA. 50+50 -L- (L FROM STA. 13+00 TO STA. 14+00 -RPB- (L DETAIL 13 PIPE OUTLET CHANNEL (No ro Smle) As s d Length = 25 R. Clary I w�RaP B CHANN LBED CeaMenunk t = 1.5 Ft. (V-1,16) d= 2 Ft. Est.= 40 Tons of Class I Rip -Rap, 55 SY GFD FROM STA. 51+25 TO STA. 51+43 -L- (RT) 1223 ]ones Franklin Rd. ETHERILL Raleigh, N.C. 27606 111111111111110FE INEERING License No. F-0377 Bus: 919 851 8077 Fax: 919 8518107 TRANSPORTATION PIANNING/DESIGN - BRIDGE/STRUCTURE DESIGN CTIILISITE DESIGN - GIS/GP9 - CONSTRUCTION OBSERVATION DETAIL 10 LATERAL BASE DITCH (Not Scale) b Nmuro1 Fill Ground D 1"iFf. SI d GEOTExaIE B P. Min. D=3.0 F1. Max. d=3.0 R. •When B is < 6.0' B=5.0 R. Type of Liner= Class I Rip-Rop b=5.0 Ft. FROM STA. 29+00 TO STA. 29+75 (LT) DETAIL 14 LATERAL BASE DITCH (Now Smle) b Nofuml t_ Fill Groan :) D f'H' Slope d GEOTE%TILE Min. D=1.5 R. Maz. d=2 R. ^When B is < 6.W B=3.0 Ft. Type of Liner= Class I Rip-Rop b=5.0 Ft. FROM STA. 29+10 TO STA. 29+75 -Y3- (RT) DETAIL 17 DETAIL 18 DETAIL 19 RIP RAP AT EMBANKMENT STANDARD RASE DITCH FALSE SUMP (Nora wale) (NO fo So,W) Outside Ditch lNa fa 5 Iv) 10'min. Nmurol Nofuml �rrr Gmu :7 ,4.\ Gwun I raT11C rIOW DikhGmde7GE10TUnLE dD20;1 GeeteNNleMin. D=1.5 F. y[t Maz. d=1.5 R. t S- PER LoA OWES •When B is < 6.0' B=3.0 R. S=Ditch Slope (} Proposed Ditch Type M Liner- class II RIi ftp Type of Liner= Class I Ri 14+50 -RPB- (LT) FROM STA. 33+40 -L- (RT) FROM STA. 33+30 TO STA. 33+80 FROM STA. 14+65 -RPA- (RT) DETAIL 22 SPECIAL OUTLET PROTECTION (NIT To a iE) INLET Eo 48-WELDED STEEL (NOT (N'OT SCALEF20VEMENTS OS25'WALL THICKNESS EXISTING GROUND TRENCHLESS INSTALLATION EXIST 3a RCP ( - 77 CLASS I RIP RAP KEYED -IN NO OBSERVED NWS TO BANKS ONLY (TYPJ 2:IOR FLATTER NOTE:INVERT OF NEW 48'WS EXTEND 2'BELOW BED LIMITS OF EXCAVATION MUST MATCH INVERT OF EXIST 30'RCP STA. 53.40 -Y- (LT) 6a WELDED STEEL (NOT BURIED) DETAIL 26 INLET C OB75'WALL THICKNESS TRENCHLESS INSTALLATION (NOT TO SCALE) EXISTING ExlsrlNG GROUND EXIST 54'CMP - ADJUST TRIBUTARY TIE-IN AND `Y %Tlr�llf CHANNEL BANKS AS NECESSARY AND SUPPLEMENT WITH CLASS I/ NW.- VERTAPPRO 3' NEW 6aWS NOTE:VUST RIP RAP KEYED -IN TO BANKS ONLY T MUST MATCH INVERT OF EXIST 54'CMP (TYPJ 2I OR FLATTER EXTEND 2'BELOW BED LIMITS OF EXCAVATION STA. 101.13 -Y- (LT) Kimley >)Horn P.O. BOX 33068 • RALEIGH, N.C. 27636-3068 PERMIT DRAWING SHEET 2 OF 27 PROJECT REFERENCE NO. 1-5700 KW SHEET NO. ROADWAY DESIGN ENGINEER SHEET NO. 2D-/ HYDRAULICS ENGINEER DOCUMENT NOT CONSIDERED FINAL UI NLESS ALL SIGNATURES COMPLETED DETAIL 11 I FALSE SUMP (Now S 1a) Outside Ditch - _ 12, ,0D•I_ .,I` GI �-5- S=Ditch Slope Proposed Ditch DETAIL 15 TOE PROTECTION I No I. Scole) F\tea. N-1 Ground d d=2.0 R. b=2.0 Ft. Geotextile Type of Liner- Class 'B' Rip-Rop FROM STA. 100+38 TO STA. 102+00 -Y- FROM STA. 25+25 TO STA. 29+69 -Y3- FROM STA. 25+00 TO STA. 25+85 -Y3- FROM STA. 25+85 TO STA. 26+50 -Y3- FROM STA. 28+50 TO STA. 29+10 -Y3- FROM STA. 17+49 TO STA. 18+05 -Y8- DETAIL 20 PIPE OUTLET CHANNEL (No. Scale) rd Ao� S -mod S° d Length- 25 Ft. t = 1.5 R. CHANNEL c°aM.aank IVodable)ED d = 2.5 Ft. Est.= 30 Tons of Class I Rip -Rap, 45 SY GFD FROM STA.29+10 TO STA.29+35 -L- (LTI DETAIL 23 STANDARD 'V' DITCH (Nara sc°Ie) N' Vrol 1 Nafuml d 7./ D ,�.� Ground Min. D=1.5 R. FROM STA. 69+25 TO STA. 70+50 -Y- (RT) STA. 61+40 -Y- in STA. 67+70 -Y- (RT) STA. 21+40 -Y3- (R STA. 28+37 -Y3- (R STA. 17+87 -RPB- RT STA. 18+30 -RP0- L STA. 15+75 -RPC- R DETAIL 16 BERM 'V' DITCH (Nato Sca1le-)I�,-mot Noun l I 3./ D'\ RDWY N Min. D=2.0 R. b=5.0 R. FROM STA.16+50 TO STA 17+50 -RPB- (LT) FROM STA.17+50 TO STA. 18+45 -RPB- (LT) FROM STA.18+45 TO STA.21+45 -RPB- (LT) DETAIL 21 STANDARD BASE DITCH (Now sw v) Nnbml NWural D Min. D=1.5 Ft. B=2 Ft. FROM STA. 14+30 TO STA. 14+80 -RPC- (RT) DETAIL 24 GRASS SWALE (Nab Smle) Nronl 1 Nabrol d 4/ b,� Ground D Min. D= 2 R. FROM STA. 19+50 TO STA. 15+95 -RPA- (LT) DETAIL 27 SPECIAL LATERAL 'V' DITCH ( Nof to Scale) Fill NaturalSlope Ground ') D F o a GvofuHle Min. D=1.5 R. Type of Linar= Class B Rip -Rap Moz. d=1.5 Ft. FROM STA.19+50 TO STA.25+00 -RP0. LT) FROM STA. 20+25 TO STA. 20+65 -Y8- ( B RIP RAP AT EMBANKMENT (No fa Smle) 10'min. Ditch 1.0'mi,I�l ,.5• G.aae f NtdLLyy GEOTyyEXTyyILEpp pER LOCATIOryES Type of One.= Class IRip-Rap r LEGEND PERMIT DRAWING 122370nes Franklin Rd. PROJECT REFERENCE NO. SHEET NO. r SHEET 3 OF 27 ETHERILL Raleigh, N.C.27606 /-5700 4ao. EN NEERING License No. F-0377 o ® DENOTES TEMPORARY ® DENOTES IMPACTS IN F �y Fax: 9198518107 R•W SHEET NO. Bus: 919 851 8077 IMPACTS IN SURFACE WATER SURFACE WATER ROADWAY DESIGN HYDRAULICS RAnOL/STATIONP -GING/DE9GN-B UI 01TRUGTUREDESIGN ENGINEER ENGINEER f F�kl7f CIN41SITE DEIGN-GIS/GP5-CONSTRUCTION OBSERVATION KimleylMorn \ Sf eq\\ ©zoo P.O. BOX 33068 RALEIGH, N.C. 2763E-3068 E / IVQO NC C /O \ \ - - + E�\ K p CB 63 Nq \ Ive TOP 8' OUT=309.24"=316.44' ��// \ \ Q 1 \ CRACKER BARREL OLD COUNTRY STORE INC \\\\ / �12�OU1=5I3.nt/ OP=290.7I' NN E ? /2T Fo,-'2T284�09' CB�'7 229868n _ ?OUT3099.90' 4�N 01TD`2' c'.�`Q �\ P`Q CULVERT zr2 E O 5? PT3z9a. I\�a� vao \ TWO BARRELS \ OP=304 Q\ \\ / r, \ 6' op- 14 \ \ Ci `�IP4o„ / J_ , 1 r'.1 3SSTUCCO BUS TOP=317.16' \ 4 2q• ////�+y j'� 12'IN=312.8E / 6,S ? Z l R CB (0- "' / IS' OUT=312.66' BUCKHEAD -/- \a. Pg / / / �� D' PROPERTIES ILL TIN-304.72 15'IN=302.32' \� ,,,/ W ✓ 24' OUT=302.22' /� \ \ '•1 0 i��\ � � \ m I / 7 \\ 9 e � Q � BERM 'V' DITCH \ \ \p n r \ \ Co>�+y �y P' W/CLASS 'B' RIP RAP. 2A' 64 G I 7 I \ q - ( EST 50 TONS 1/ \ 1\' g yll \ C PA24" CP- I -EST 110 GFD IyBS SEE DETAIL 7/SHEET 2D-Al T/PA 1 2q• IS 1B /M I I Ip�I ' 30\" CP 12O32972E=TOP=300.59#OUs4 6OPEIICBTOP-299.63' Q 24' 60T=96.m9' 12C6Iry 29©"15 RC -I / I m' ,/ 2' HOPE __ c,>5� I Imo+^- SPECI CUUy�JITCH / C © - oQG'36" RCP -III I CB 11 -> _�\ SEE T AIL'63HEET 2D-1 /C Z •'\ p¢ E e 49 O I Ca �. �i fTl (� \ °� NV=289. P� - 'T t29458' I \ RCP �II C - a C CB CB CB F- - _ r Tr IB' IN-290.47' 4 I C MOVE 1 ., w `18' OUT=288.42' f I I 6� KIRSHNA HOTEL, LL \, �¢ o p4..g" 76" RCP -IV \ 0 OI RETAIN -IS Nz294.4 RETAIP� OVE \\. c _ -=15� CB N \ S? TO S 1OP=301.37' 36'RCP 24• 287.42' 24' IN=288.96'-, 24 _ - F ` _ - -L_ B D ;J 12• 11 -28 21 IB' OU 287.32, 24 OUT=288.8E F =r \ 16 OUT= .16' � INV= 87.62' F � _ - 15" RCPIV N F _ _ _ _ - - _ ��N - ✓� / \ \ jx �P ®4 _ _ F _ - - - - S➢l5 NRPORT R + V /_ �o5.7r SORRELLS GROVE BAPTIST CHURCH \ \ �s �, SPECI = _ _ - -10 N e 3,e6 CB S I \ 15• RCP E • C&G _ _ p Ce RCP -IV. 1 Lcj __ �_ � 0 /\ O O %/ c �_ \ - F ,;P-35'B5T CB EIP I' SB'CONC m C�9i.05' _ - _ TIE TO EXI� 32' ST I IT _ I� yV�9 / 639 Q 2Y BST N / / P r/ Ex� / E Qc. 9' 4 1 '_� m 15' 00T= 0.40' COLLAR AND EXTE i-I 29 3'CB 16'Ih F SI4 /.1 J j O II Q�T22925_ 12 ____ ______ 1'I N2291.6T i B. LF 08 15 �RICP-III34550 ti 4 .C&G I �� / .Se p I G - \---- 15' OUT=291.62' c+ IN2'T II`IACCESSiBL� r;ll 0 S 15" CMP W/15 SK.59' \ % Tp P= 91 4' ,. Cm A \ cn \C• Z -p IryACCES EST PA f. 14i I1 I III l f 69' h 1 //¢ 111v \\ c c coNc' n I� illfYl �I� II /i/ %\//% / �///�%/ c' /SS55/ .0%'0 /aj�2,ro-8TiOP1N..3312�1.30.48' ' ��3366'' T'IINIpIY p 2299D1I04.39098'' ' SS / // P __\ ^/r1/�\ a \- 3 'P _ 0 6 49' SK / \`Vj�•�i% 1 `p�\ a\\\ \\ 1 - �r 2 'I bI I IOPUaT293.81' O01 °18'=291.26• 11 IIIIIll, m SALGG- . Sro� _ TOP_C 83, .25+45ISBK BUS 12OUT49.33388•O'3'1I322' 9.32` .72' \m ,KpO \yc 35 T U5 1 / 8. O RCP TOP=307.72 B S4�j9 �6' 36•IN'29� // \ O - IS III'II° G' 36' OUTj297.z7• / 2 \\\ + XDM LTD \ pN TOP-3 8.3 POC Sto. 2/+3 6 J t i i 0 /_ p 38 OP2Z IO OUT33 547. S C }gip-3 . 6 \ \ p �9 s / 51w 4.6 -S WP 5 % � s OU 6 ® I � / I \qq I II4 30 09' SE \ �/2� � IP I 5� �� I � SOP G / I I \ \ 1 5'OU7= / �x r+ ''•� I T �473 48RCPIN00.13' I I G\ TE\l GJ -�I- °' OPU=T09: INC, d�WETLAND TOP=319.29' 290.40' p TOP=29410' A9 \N' `33S 48' ININ 313.47' OU4=290.20' 3 q8 48' OI17=313.30 I `�' \ / �' 4f m �Q REMOVE EX CB c �6 � pep 1 \yy V A 1 @ COLLAR AND EXTEND O EX 15" RCP AND TIE Ih g 0 39 mo 9I I I o 9A \ ETLAND INTO NEW CB o Cam/ d x m� I I CB AN O T EX 15" �q4P �i 25'l0 1 ll� TOP=308.5 ' DD CLA55 'B' RIP RAAP GURUDEV LLC �IN4otl0f _ 15• our=3G3.6 ' m a \ \ STORE MASTER FUNDING II LLC \\ t • S ' .3 II OP 30 .35'� E T 2 ON$ S5 /2A 3 OU�f=3 0.7E p9 m I EST S GFD HOL RDU HOTEL INC TOP=307.06�' O \ 5A353 q' [� I5'OUT=303.21' f\ j� \SeSU�3SE+p 48 OUTz 314:17 II CLASS TRIP RAP e\ �\ DI S O SZUGGp 0�SEST 20 O NS EST 39 SYGFD EIP \� S 42" 4 JB WiMH �-OIPN �COLLAR AND EXTEND 36" RCP -III =289.'' ' \ SDI LIMITED PRTNRSMP 1 I 'OUT=320.07' \ ISITE T -IMPACT ZOOM -IN B.IO' (SCALE; T" = 50) NORTH EAST ELEV. CUL1 767148.95 2052518.25 282.44 CUL2 767144.33 2052512.96 282.89 CUL3 767143.64 2052512.15 2 3. CUL4 767138.93 2052506.95 82 41 767144.39 2052513.01 290.56 NE -67143.86 2052512.58 29 .52 767069.89 2052651.60 28 .50 CUL 767065.54 2052646.14 ^281,.33 CULT 767064.53 2052645.5E 281.64 CUL8 767060.05 2052639.88 28 .32 CE2 767064.73 2052645.45 89.7E HW2 767065.15 2052645.59 1. 2 DOCUMENT NOT CONSIDERED FINAL I UNLESS ALL SIGNATURES COMPLETED GRAPHIC SCALE 50 25 0 50 100 PLANS PROPOSED TRAFFIC SIGNAL SEE SHTS. 15 & 16 FOR -L- PROFILE I SEE SHT. 19 FOR -Y5- PROFILE LEGEND PERMIT DRAWING % SHEET 4 OF 27 /^ ®DENOTE$ TEMPORARY DENOTES IMPACTS IN f gee IMPACTS IN SURFACE WATER ® SURFACE WATER \ f� + El \ CRACKER BARREL OLD COUNTRY STORE INC �\ Q \ 0 1-284.9' 1223 ]Ones Franklin Rd. PROJECT REFERENCE NO. SHEET NO. ---JI ETHERILL Raleigh, N.C. 27606 /-5700 4 EN INEERI NG License No. F-0377 Bus: 9198518077 L Q R'W SHEET NO. Fax: 9198518107 \\ I ROADWAY DESIGN HYDRAULICS / I TMNSPORTATIONP NNING/DESIGN- BRIDGE/STRUCTURE DESIGN ENGINEER ENGINEER Cn0L/SITE DESIGN - GIS/GPS- CONSTRUCTION O&SER 10N Kimleyl)Horn P.O. BOX 33068 RALEIGH, N.C. 27636-3068 " 1Av'_ NR/� - DOCUMENT NOT CONSIDERED FINAL ,4 - UNLESS ALL SIGNATURES COMPLETED /Ao s IB?OP C- 0 4' �O// -- -I TO 3 2' P 12' t=284.09' , I \ E a- - --- �F./ (I \\ •I P-3 OUT=298.90' 2' CULVERT 42 �/=0 " >� 0oui=z9e. V� / �c m tic 0= 3o4a� 7 TWO BARRELS \ \ 6' OtJT=294.0T 14 1. �C%- / �'.� 3SSTUCCO BUS TOP 317.16' NORTH EAST ELEV. CUL1 767148.95 2052518.25 282.44 CUL2 767144.33 2052512.96 282.89 CUL3 767143.64 2052512.15 2 3. CUL4 667138.93 2052506.95 82 41 767144.39767143.86 NCULE 2052512.58 29 .52 767069.89 2052651.60 28 .50 CUL 767065.54 2052646.14 28 CUL7 767064.53 2052645.56 1.64 CULB 767060.05 205263 .88 .32 CE2 767064.73 2052 45 45 6 HW2 76706 .15 20526 5. 9 2 h 12 \ \ / / `c a -2 - Q_� �J`�� / o/ sZ ///JI\ \ \I5BT''OIINN==r'3.1 222'\ ' 4f `•Yy . �/ IN - - IS' 3128 R/O�TIE s7P0.47 3Z3/ '( 2 \'- ,n �9 I� ✓ z oUT=30z.zz.' \� \ ~ - - • I2 2 / \\ P rBE 'V' DIT H y \ l \q _ ��. .� \ 2q• O&G I \ /� 3tEST 50 TONS ^N' 24" RCP -III ° J_ EST 110 GFD ' I G ST/ BP� SEE DETAIL 7/SHEET 2D 1 \ 7 CB 1B /MH ,� - - - $TOP 301.72' \ I� O / 30" RCP16 � 12' OUT-297.69�' STOP 299.63' t 12 IN=296.06' 1''� 12' IN296.79' 12. NOPE © RC m _ - ' � 24' OUT =295.99' � Iz' IN;296.64 15" IV I b \J�E _ � ,` �� /\ (•i CB 6 N / I y ) \ �✓ f7 C_ l p4,°5 I 1 � q\ \I CUT DITCH � 4r' iC✓ / r �- $EE 1�65HEET2Ek1\ A RCP III - STOP= I Ca CB 1 ��� < � C\�\��\ ��--� Z S 1a• =z9a 47 - V - I rn R DI m 's A \ s Pp �L I5' 95.fig 36" CPC C a G CB GB CB �S - a - IS'0u294.58 4 I v \ - n VE _�735' _ _ _V r 1_SHNA [HOTEL. L P w \ rm \ 18' UT 288.42' r - O 1 - 18" RCf-11C " I � DI _ Ta' 1 � \ \ �' RETAIN 24_Rf� -15 4 11 15 0` RETAIN - J-�N - B -V CB _ \ 75„ 301.37' '\RCP 24' c / -L- \ v32 j- N �m r. + m I r d � _ CB SPE gIA O Ce 15„ RCP-1V. N _ \ c / CB - IS' RC E� C&G RETAIN - -35'B TIE 15" RCP Q 2 J" TOP= 4.10' 2YB 7 N / •' / / '^ �� l T .OB 15" RCP -III E I G saz 1 1 o 15' OUT= 0.40' b OP 3 l / O - 94 32' 6 �O"} 2292 9 �F 2 COLLAR AND EXTEND m \ T P--29 GS G - ------ - 15' T 2916.62' / 15" CMP W/15" CSP --. _. \\ _V' CCESSIBLS�� {/�& JL _ ` 4� ` I105 `,/ _\ B 12 OP 299327 \\ 1 1 \ 8 TOP 295.2 I -Fp In 15OUT-201. 3 ' / P 4 UI 1 vN I ' �" 1 ¢ �/ fC\ n g I m II�IY s 30' I. f,.�Y- ° \ w a• c / / funs \` o c cDNc 1 g III �o, III 6 i'" .1S -. n 1 c43.86' SK � � � D � � 11e•ou�_ 91.z6' i 6� 4� Tpp 10.48' \ 1 , IpI m SAG ro 29 \'. \ \ \� / \ i� ISBK BUS TOP 2 4.83' `\ \\✓< \\ 35 12'OUT=g i I ✓ / � ` D1 � Q§1TOP o7.7z'� �,°�. � \ � �� IST eus N3z9 \ �z. -Y - � + 44 3 OU 7.2�' - \ t . �\\ o P=3o3' -L- POC Sto.2/+34.46 XDM L o�P22's /- 0 3 4A 31< A� � \ WP �� J a< �x... / "' 11 cu' I I �P130g.73 .• �.I�\ \ \\ � f'.i Ci ' I 2"C/'/l-L frs - /�\1(l/r,o.3\ ?• >\,\ T ' ==331 1 297' ' { II \ I I C\ �• a�II ,l �\ \ F\�.' D I IIIIB1' 'OD2I 29 J0WETLAND " 1U0.0' ,rAe\\ 448' REMOVE EX COLLAR AND EXTEND \\ G S aI I I r \ \ -/apP\pa2sy,�;•77�-$y•✓ o vJ_///��• � a am^'tltla1 •l =3P"qJ I( �15•Oo\ 9q r 'BP RAP T EX 15" RCP AND TIEO LAND -- INTO NEW CB AD T I a xoIh GURUDEV LUX IPB0.36kSS D+ - CNISSTORE ING IILLC 0.76 EST GFD '� \ HOL RDU HOTEL INC TOP=3�0706'' \ f 3 GRAPHIC SCALE 01 V • 0 3 -314.1 I 15. OUT=303.21' CLASS I RIP RAP \ 50 25 0 50 100 5 0 0�S 4. EST 20 TONS "o _ • - I > �% EST 39 SO GFD i ss 42„ \} AE1 PLANS \ wo \ p COLLAR AND EXTEND 36" RCP -III 1Q•01N=2877;3 ' D1 LIMITED PRTNRSITEHIP n \ TOP 20.0 "� \ _ au1 2o.or / *PROPOSED TRAFFIC SIGNAL \ /SITE -IMPACT ZOOM -IN SEE SHTS. 15 & 16 FOR -L- PROFILE a.1o' (SCALE: T" = 50) SEE SHT. 19 FOR -Y5- PROFILE NORTH EAST ELEV. CUL1 767996.90 2053907.59 282.7 of CUL2 767992.17 2053899.10 280. CUL3 767991.64 2053898.27 280 9 CUL4 767986.83 2053889.93 98 97 CUL5 767986.36 2053888.99 .42 205388P- 1.31 205385 C 1.02 CUL6 767981.56 CE1 767989.21 WW1 767989.54 2053894.66 W93.14 767866.33 2053980.45 2 ®284 PCi48 767861.79 2053971.2 280.84 CUL9 767861.44 20539"' 280.97 2053` 5 281.07 205-' q1.22 2 S0� Sto. /2+42.460.91 CUL10 767856.49 CUL11 767855.96 CUL12 CE2 767851 .50 767859.7 POC Sto. 3 +60.00 12 HW2 767859.89 of N� Pr N� r LEGEND PERMIT DRAWING r SHEET 6 OF 27 \ r1 DENOTES EXCAVATION DENOTES IMPACTS IN t95\\ zv ® IN WETLAND ® SURFACE WATER ®DENOTES TEMPORARY I \ - REMOVE 24" RCP IMPACTS IN SURFACE WATER & REPLACE W/ 36" RCP IV CLASS I RIP RAP ON BA CLASS I RIP RAP COUNT / IN STREAM BED EST 30 TONS CLASS EST 45 SY GFD SEE DETAIL 20/SHEET 2 l 9 El / I` ' � O �T 118" IN- 85.66'_ 1223 ]Ones Franklin Rd. PROJECT REFERENCE NO. SHEET NO. Igy ETHERILL Raleigh, N.C. 27606 EN INEERING Base91985 nse No. F 0377 1-5700 5 18107 R'W SHEET NO. Fax: ,I ROADWAY DESIGN HYDRAULICS % TRMI­ON _NNING/DESIGN-BRIDGE/STRUCTURE DESIGN ENGINEER ENGINEER CIVI41SITE DESIGN - GIS/GPS- CONSTRUCTION OB.SER 10N �STI Kimle �>-Horn Y IV P.O. BOX 33068 RALEIGH, N.C. 27636-3068 R zL access EnsENEN11" �. MV=281 \ � '�I � DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED tP� O �L- // N �y o IN_ r�cw 35 w FK '8 PARTNERS. SEE DETAIL IISH � SITE 3A Cp I', `LL 15 ' •, I DI �' SEE DETAIL 15HEE{2D-1 / LAD + D - - icx TOP 290.85' I 15' IN-278.05' / L(i - 1- P T + R4 SITE 2A ` - 5 5' v277.95' E rT1 -L- t0. + Z p E T F I _ (b I� //���/ `M1oo RCBC EXTENSION NOT BURIED S(SITCEA2LAE: -1IM-PACT ZOOM -IN s SO) II za� SBLKB P 0. ��P �c I/ v RETAIN T ])� l Tsoc TOPy�-�1 01 93 7'. _ _- S - - Z v BST RET F '2 4 93 9. 3 _ ��- " z4 cac \� 24' N/G OR ET9D 18' /IiC IV I 1- _ `.r I E __ - TkE fi0� RCBC 1 r iN< oe- 2p CB - _� 36'RC� EXT N ION F _ F - - - \ M RE IN ' �/ \ F _ _ _ ,s -M1S P IV CB 24L RC 'a oea e' 00 -281.8.6' F r - +`+ €� i'tAT-1 I ® 15" RCP -IV -- - E` - - S 1g" RCP -IV CB ELi_ I - ® Ce REMO m I CB -_=�1 7c m CB- 1 P- CB 1r 15" RCP N CB r CB 8" RCP-�V REMOVE D D r REMOVE N - _ ---- --- --- �" N \ 24" RCP- 15ICP_III CB _ 15" R + RCP -III CB CB lO�j - 16 - O O - - - - �, _ --�- - - 8' STEEL - C8 Q - MOVE - -„ RCP -III GREF1- iL I? - - - - - i - - - - \ f-F -- r �- - \ I Z F F / F F � '^ F JB W/Mh COVER F - m 1P \y 24 k RETAIN I I 6\ �q 1 5 s- Q CO_ NVfRF-C REMOVE C/' O CONTRACTOR TO - IT Z - '{YJp_ - 1B�//MF�y- [ '47' - / - FY PIPE 3r BST _ _��� g%OUT 2 i.9 - I� _` - -- _ - -- i'fl - I - n ® I - \ ABANDOlG� _ \� -- INVERTLOCATION T'il C 5' FIL 12" CMPI3 -s INd CCESSIBLE - E P I - I _ o z r zg _ _ P T -l'7 N �p v ro#?L� Err- I F I I OFF ' 01 � �. � ,IL J � I I / / 9,5 RETAI I REFAIN <%(eAs�hE '; ��.�\ �6% - T 5 GTE G _i_ - E r L ^' _ _ P e,c P B a \, TR �� �.� 4 / / P E P % + J ( _RdPll ���� � � I5� r � z4�c SITE .3�` / � �-L- POC Sfo. 3 +66.90 � / STAN AIRD RI 3' AS� D CH 71111 IIJI MBAV/PROTEE�CFION W/ SS R�iP / I -Yl - PC Sto. 14+1/.34 CLASS II RIP P CONTRACTOR TO EST 15 TO / SLOP 1.25%FIELD VERIFY OTCB EST 30 SY GFD /'t/EON$ / I INVERT AND TIE IN, 24.II SEE DET L 185HEET 2D EST 80 SY GFD / CLEAN OUT SYSTEM SEE DETAIL 19AO€ET.2 PIV I B , / CLEANOUT XISJL366- RCP -v/ TF v TOP=z a4' !( ' i L / o`, � r 8 out/ 4.31 I I 15•IN= fi.44' ADD T RAP W I ((�� >- i x / a / EST 15 T N$ O AS EST 1`�r♦Vca I � � I i I � I ) J � � �/ / til 1 GFD - 5' OU 276.3 �� EST 30 _ 4 / I / m I WETLAND d CONVERT CB r CLEANOUT Iq U�� I; �, - /- P ° Sto. R Cn ` 1 ADD C S I I� TOP= TO 1B W/MH I I '�"" � / 15 OUT 75' ' 'V J I I I I .�$T TONS � I � I � � 1 �` I EST 30 SY GFD TOP 293.4r - 'WAFFLE R ISE IfVC �. 15• IN ze7..3 SITE 3B - IMPACT ZOOM -IN = 992. (SCALE: 1" sot � I rt" 90 43 GRAPHIC SCALE I I � • N/// � - � 3 OUT=2 14' --- RDU CHDIC I I m'0- v\� 50 25 0 50 100 PROPERTIES C J )� �m o -Y4A 0 Sto. 10+00.00 l v oe �� ■NN■■ J I I 0 p/� EIP EIP J J 4-402 15- PLANS I I ` m� //moo /�/ \/ �\ ro� a� *PROPOSED TRAFFIC SIGNAL 9 0/.,i TOP= 0.80' 33. OUTz2840 -2• \\ \/ 93 /l n TOP=290 71' \ v$• p 9 \ i-`' TOP=289.30's• our=�e7.4r �-,p/ SEE SHTS. 15 & 16 FOR -L- PROFILE FHp 339"1482.60' G, w A/ °Hk R•our=zaz.3o• � ��� � / �Va��� � �' y � !� SEE SHT.17 FOR -Y1- PROFILE c- a s SEE SHT. 18 FOR -Y2- PROFILE ORTH ST L 7Q79 go- 2 390 .3 82.701 rUL T;�992.17 2 5 s39. 0 -767.997-b4- - 538 .27 280 9 3 20 89. 3-_ 8 97 76798 _- 2 888/ 99 CUL6 __7679 1.56 03 8 3 1. 7 C - - - 7989.21 2053894. C 1.21 W1 767989.5 4_66 �L93_ 1-4 76786 2053980 84 ICIII8 767861.70 2053971.2 28 C [ - 759 .44 2053970. 2 0.9 CUL10 767856.49 2053962 5 81.07 2" 1.22 L POT Sto. 12+42.4 0. 1 Sto. 3 2053 2. CHANNEL-IMPROVEMEN Fi 5 \ L11 76 55.96 CE2 767859. 7 HW2 767859 89 �1 - PERMIT DRAWING SHEET 7 OF 27 — — 2 3 O O O 100-YR DESIGN (25 W.S.EL. = SFE UA CULVERT 0 200 150 0 50 OUANTITY ESTi AT SCAL CLASS 'W RIPRAP 50 TONS /" = 50'H EXCAVATION l" _ /0' V CULVERT 204 t CY CHANNEL 306 CY EXISTING 3 @ 101xI0' RCBC NORMAL TO .-L- 2 (2.1:1 AL W,S,EL. = 294;1' 1 T 292,4' EXTENS 50 1co STA +505 GRADE GINT ELEV SKEW 9' 50' 09" 3 @ /0' RCBC 1223 ]Ones Franklin Rd. PROJECT REFERENCE NO. SHEET NO. ETHERILL Raleigh, N.C. 27606 EN INEERING License No. F-0377 /-5700 Bus: 9198518077 RM1V SHEET NO. Fax: 919 851 8107 ROADWAY DESIGN HYDRAULICS T—SPORTATION_NNING/DEIGN - BRIDGE/STRUCTURE DESIGN ENGINEER ENGINEER CNI41S-DESIGN-GIS/GPS- CONSTRUCTION OEER 10N Kimley�/,>*Horn P.O. BOX 33068 RALEIGH, N.C. 27636-3068 DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED OR 11510 200 2150 TOP OF BAN .0009 ff 6.0009 ft%f E AV ............. 10, M -01 10, or, or. -01 10, i MT. -01 i i i i i i 10, ! MT. -01 i i i i i i or 10, or, m, i i i i i i 10, Or MT. -01 i i i i i i or -01 mr.10 i i i i i i or -01 or I i i i i i i so R or I i i i i i i we ! or I i i i i i i OF Z04 or I i i i i i i i R or is i i i i i i me in or I i i i i i i me in or I i i i i i i i .10 mommirloommoomm.1 .somm000K.Irloommoommozolorimiiiiiiil!lmrmliiiiiiwmzmimrmiiiiiiimv!mrmliiiiiimm-m�ormiiiiiimw-mlmrmliiiiiiwm,-MlmrmliiiiminmormT.-Mliiiiii9miKolor.7miiiiiirml!MT.-Mliiiiii[IF.T, 00 00 moos 00 0 00 00 mommoom oom 00 moos . I I A 0 nommommommon :E3mpqmw=qmmp.p4 1h somn,l IFAMENEENEENEENEEN 'Pim MENEM ......... . R" ....... .............................. on Ninmommimlqm moms 00 no .................. ME 500000 mspm mmmmmmmp!d"w IIANL mommommommoom MENOMONEE&;: sommommommommommoom NONE MEMEMEMEME mom moon moov.11TOOMMENEENEENEommoom NONE msMoon 'in OMEN. MOOMM ............................ MMMMMMMMMMMMMMMMM moms MMMMMMMMm 0MM=zcMMM3mN,MMMM mom .............................. 10.0 poomilamillillillilliillillililloommommomm mommommommoommoom MENEM NO L; ON moNFAff A 101 in I M, loommoom 00 mmomis moommommommog.64 ONEVAL-'ARLIV&VAM mommom mom 00 00 I MENEM... ............................... I .... MENEM mommommmo .......... -------- INES ..................... =�==��=m�-MmffigMiffiaimmimwmim 1111211 ------------ No in-- .00 No EMEN ..................................................................IN 1F PE011 m MENEEMEMENEENE MENNEN " -EWOMMEN 1MMMMMMMMMMMMMM ........... .............................. ........ 000000000 mommommommommommo 1-"MMMMMMMMMMMMMMMM Messer MMMMMMMMMMMMMMM =VMS mommommommommom .............................. ..... 0 moommommommommommom me moon MENEM moon Amom MERIP-1111. ..........................................................IN ..................... ............. MEMO Moon MENEM moon .............................................................In mommommommommom ....................................................................IN mommommommom .......................................................................IN 1 ... ............. MMMMMMMMMMMMMMMMMM r, .... ......... 2.qmm IMF-r-F A AM Is T A moon MENEM... soma,] .11000000000000000000ommommommommommommommoommommommommommoommommommommommommoommommommommommommommoommommommommommommommoommol-IN9 mom, .... so 0 m- mom inNo 00 00 .. moommommommom 00 mommommommommommon MMMMMMMMMM ME .................................................IN mommommommommoomm INNEEMEN MENEM I mom 00 moo! MMMMMM-q ... moommommommommom ...............................IN mopes .............................. mom .... moommommommomm mmmmmi ..... MEMO L.Sommoommom No moon moon mommongs -wrimmaimmiummur MEMO 0000000 'A go .............. .................. ... NO ........... moommomE. moommommommommomm 00 0 0 momon soNC7 MENNEN MC25F.000000000MEN ms'a 0 ..................... moos mommommommom mon-m-N raK=mr3n!!El!-Im-EP ........................................In .................. ............................. mommommommommommom .................... ......... soon,] moo,, MMMMMMMMMMMMMMM MENNEN ...... No .........................................................IN ..........................................................IN MEMMEMEMEMMEM .... ... MEMMEMEMEMEMEM 00 0.114'AMMI Moon agm MagMEM ..... - - - - -- "Mom mom MMMMMMMMMMMMMMMMMM No No No mom- NONE No No No I ....... ...... ....... 00 00 MENOMONEE ............................. mom mm MGM =EE!!Im.mplqmmom No No 0 0 1 MENNEN 011, ............ 1 MEMEMEME .............. sommolmim 00 00 MMMMMMMMMMMMMMM moommommommommoom moomm I .......................... ............................................IN ........... .............. 7V Sg'" E 101 in I 1IMMEMEMEMEMEMEMEM moon ............. ...... MONEL- ...... ...........................................................................................................IN .......... moon MMMMMMMMMMMMM1 ........................... ....................................................................................................IN mommommommomm, ....................................IN .........................................................................IN .........................................................................IN ............... MENEM ......................................IN moon ............... 1rumm ...................... MEMEMEMEME moon mom EMEMEMEMEMEMEMEMP moommommommoomm ....... --- - - - :1LMMMMMMMMMMMMM ..... MENNEN ..... moommommommommommom ......... inMMMM:M M.MMMM.mmmmmmb. ob.do ocoms ... mommoc! mommommommom mmr7m mmmRDl4 'FAMENEEMENEEME 00 M:Mpq = 00 00 00 ..... Emmert m2mcTim, moommommomm .................................................IN MEMMEMEMENNEN ... ..................... 00 00 00 0 .... MENEM 11 FAMM1 loom moommommommommommom mom 00 momm SC= mommommoommomME20 mom mommommoli A.M. .....................................................IN moommommommommommom MEMEMEMEMEMEMEM moommommomma MENOMONEE on MMMMMMMMMM1 mmmmc=mm on I I 00 MMMMMMMMMMmA, moommommommomm No 0 mom moommommommommomm mom No moommommommommoom mom moon mommommon MMMMMMMMMM mommommi in:100000000000mmum ...... KAI --EELI-A MqQm,1 ....... pm ............... A1.NNE!Aff=Mm ME mummummoommom mommom ............... MENOMONEE-MENEM 0 MENEM 0 on No No !NONE dommommomm� no MMMMMMM1 pm moommommommommomm mom mr -rommommommommon on MEMEMEMEMEM moommomm NONE 05, 00 ;�'Fjmmm mom mommommommommommoommoplppin ...... moon so mom MENNEN MENEM pm mom 0 'Mommommoo.dmm= mommommommom .... mom mosmogap-10- .....................................IN 0 mom 00 pm MMMMMMMMMMM 0000 00 mmom 0 mommommommommom .................................................IN MEPMENEEMEMENEEN MENEM moommommomm MMMMMMMwM mommommommon I NMMMMMMMMM= C=M=ZE=E=ME=mr.2sz : loommoommomm MMMMMMM mommommommommom mom momom mommomms NONE .................... moon ........... I ...... ........ — ...... ....... mommommommoommoom — ........ — ........ ........ I ......... ........................... I .......... ....... ...... 11 ......... mommommommon 7 .................... ..... 11 ........ — ......... I ......... I ......... I ......... 11 ......... 11 ........ ....... ...... ...... ...... ...... moon ........ SKETCH SHOWING PAVEMENTI,STRUCTURE RELATIONSHIP DENOTES MECHANIZED DENOTES IMPACTS IN CLEARING SURFACE WATER DENOTES TEMIORA- IMPACTS IN SURFACE WATER. ..... .'sue �� j w KNOWL.WMAMM all 1,1110 kow 4 ft-,Lv. W�IIIIIII 19, ell *-4 SITE 5A - IMPACT ZOOM -IN (SCALE: V = 25) SITE 5A 1. Kimley))Hom = > =on GRAPHIC SCALE 11110 1 0 SKETCH SHOWING PAVEMENT\STRUCTURE RELATIONSHIP LEGEND PERMIT DRAWING SHEET io OF 27 DENOTES MECHANIZED CLEARING ® DENOTES IMPACTS IN SURFACE WATER ®DENOTES TEMPORARY IMPACTS IN SURFACE WATER Y SITE 5A - IMPACT ZOOM -IN •�� � IIII� Illul i • IW 1 _ o BEGIN JS < aAo�re JS �/ ~ • IER C EEK I X PROPOSED TRAFFIC SIGNAL _x SITE 46 -IMPACT ZOOM -IN iwLI a<RnE�1 (SCALE: T = 257 / \ SEE SHIS IS 8 16 FOR L PROFILE SEE SHtt 20 THRU 23 FOR Y PROFILE SEE SHi 24 FOR RPA- PROFILE SEE SHT 24 FO I PROFILE SHT. SEE 2S FORPC R- PROFILE ,EE SHTS 26 1 2 FORRPD_PROFILE SHT 2SEE SHT.2626 FOR RPBSPUR PROF LE SEE SHT. 26 FOR RPCSPUR PROFILE n. R z s V�vwn. ro T,, — PROFILE Io�>Tr9 L�3� _'���� GRAPHIC SCALE F ��SYYY 'j290crvzo ev. i R l�/ 140 �cuo er. mrt. A � N PLANS E r si DENOTES FILL IN WETLAND LEGEND PERMIT DRAWING SHEET 12 OF 27 — — DENOTES IMPACTS IN ® SURFACE WATER SITE 6 REMOVED FROM 48 PLANS. SITE 7 REMOVED FROM 4B PLANS. NOT IMPACTED BY PROPOSED WORK INCORPORATED INTO SITE 5C 1223 ]Ones Franklin Rd. ETHERILL Raleigh, N.C.27606 EN INEERING License No. F-0377 Bus: 9198518077 Fax: 9198518107 PROJECT REFERENCE NO. SHEET NO. /-5700 7 R•W SHEET NO. ROADWAY DESIGN HYDRAULICS TRANSPORTATION PLANNING/DESIGN- BRIDGE/STRUCTURE DESIGN ENGINEER ENGINEER CI -/SITE DESIGN - GIS/GPS - CONSTRUCTION OBSERVATION DENOTES MECHANIZED MECH CLEARING DENOTES TEMPORARY IMPACTS IN SURFACE WATER +00 00 SEEF V3- TA' ?� F SHT.14 __ Kimley�>>Horn / P.O. BOX 33068 • RALEIGH, N.C. 27636-3068 W tLA4ND TCH`1NE 81 CP CB TOE PROTECTION F F CLASS 'B' RIP RAP F BST 50 TONS SPECS CUT DITCH I F EST�00 SY GFD DOCUMENT NOT CONSIDERED FINAL SEE DETAIL 65HEET 2D-1 m v _ 1z SEP DETAIL 15,SHEET 2D-1 UNLESS ALL SIGNATURES COMPLETED y �= F F / LATERAL BASE DITCH 0 01 i H / W/CLASS I RIP RAP TOE PROTECTION REMOVE SYSTEM 7n ) EST 140 TON$ O - 18" RCP- I 1 < CLASS 'B' RIP RAP EST 195 SY GFD 1 \ CANVAS EST,1 FS SEE7E DETAI 11 F F 8 SEE DETAIL IMHEET 2D-1 (� CANOPT SEEEST D 55HEET 2D-1 EDITH U. WILS & 2D 1 O CB CB 1 T I 5 DEBORAH BAS F F SITE 8A t I sF Bus s 0 m REMOVE EL I T. _ IQ A I�I J 0 1 F - PT I to. 28-FSQ.61 �Q� 93 /O I + 1 18" RCP- IV D1 1 ,4 I I II �)r� - - -/ 24" CSP W/ELBOWS GRADE PAVE ENT I 1 I N N -- Q, 'I' n F �* .. CLASS I RIP RAP REMOVAL AR ',�TI1,''D 1 II I •( N FF.RT. coND .. : cN EST 7 TONS SH * * �N�O� PROPOSED 176 LF OF pyuu EXIST CURB INE TO I I j5' . EST 15 SY GF - e'' DRAIN TO I'S I I Iti I ',` BST 0 p05 GMP W/SCOUR HOLE - * * 1 @ 12' X 10' RCBC / hI r f CLASSII RIP RAP ON BANK (BURIED 1 FT) I I I l I I.I 9 CLASS II RIP RAP COUNTERSUNK IN STREAM BED i 'v S S SUPPLEMENT WITH CLASS I RIP RAP AS NECESSARY 9A0 DEGREE SKE EMEN /re ez v * D x ( 1 )C TANSFRIP--RAt�-Bz e z 18" RCP- II ��/\ \ 1 I </ -L EST 70 SY GFD 00 I CB CLASS II RIP RAP .e ✓S . \ ' CONVERT TO Dl ,tl \ 160 ,U, CB 1 - SEE S T 11 15 \ J� �18 ISB'� SE Sift ITC / -5.8 TO BOT TO ✓—� \ ' 15 a x x -x x I x x 48—W/ ISBW B m�. _ 7 Exlsr zR W/ LASS I RIF�RAP S, C —/ AI - -� Sb uui__- .7' 8" RCP -IV e ( 1 �36•C111P .. .. EST 80T B - 18" RCP- *ate.. JS—SEE'DE7AT�ib��lEET4B-1,—r — , re US .. X ) "I I TOW"JIAIp�I �N.V 28J,g6, .. EXISTING!R/WJS�GRA E EXIST CURB NN ,{g�� BRIER CREEK-F/'- 155011T 30'7.98 4e R ON LINEDREND SBGz X X—�I INV=2 r Y >=3i4.38' I I 1 I 1' I ms s CHANNEL IMPROVEMENTS CB i6 GI AT STA. 30+13F Y3- - F- n \PST= 15.59' �; I II 1 m TOP 92 / / az• / 4 \ �F F F \ F C 11� ;" 8' 91.23' er /Pe'P az I e �� n I 1 I I . IS' IN 0. — SE DE AIL ETET 2D� F 11I \ 36' OUT= .33'/ - - - n?G 15" RCP- N E 7 3/SHE r - F F F- Z - _-2(i1 - - - - - - - - - - ----- 7— — — ------ IT--- ----2GI ------ — — — — — — — — — -- 15" q � CB CB 15" RCP -IV CB RCP -IV CB ---- ----------- - — — — ------ I,E _ ----- ---- _ _ RETAI TOP=306.08' D - - - _ �� - - _ ONC B' OUT=303.28' CBYI-117 8' IN=300.79' _ 18' RCP 01 18' OUT=300.77' \ APPRp% B 18 RCP LOCATIO� 18'RCP REMOVEB TOP=306.44' 7 -n ,� I LEY BLVD BST VARIES Q7 �z �z _ i6• P - - - - -- 15" RCP- IV ��� �� o - _ 6403'1 -0'F ---------__ 2GI Rsulp _ B' S TEEL 18DP 298 98' 1 OU =29 IT i / 2GI - - 0µ. 18- RCP RCP- I F F 1 .. F - _ - _ ,�` LA J �� / GODS N �, F _ F F _ F _ - - _ =c _ �16 _ _ 169 5 F Is, OPU m m , 01 L PDE w\ P SA S CLASS 'B' RIP RAP \ \\\ \ ,d: r (� p / 3/@ 12' X 12' RCBC EXTENSTION EST 2 TO EE DETAIL 25HEET 2D-1 NS END SBG AT to j JD EST 7 SY GFD STA. 17+48-NBLRPA NOT BURIED) CLA 'B' RIP RAP / S JS EST TONS _ EST SY GFD 6'OiP -L - - POT }t t 0+00.00 0 1 - - � 1 G W aF y -IT OFF. = 37' LT. SITE 7 �� + SAG `A \W' cn L-y;r-1p0T Sta. _+L_ cn \ m �CA � --111Vl (~ { STA. 590].54 \ 1. \ Iy o -LL- SfG.58*25.5 �T 1S * L.TI y� -N BRPA- y ` N SiA. 14+]O.dl ONE B EL d SITE SC N� a NORTH [16Ar55TIRIP RA EL RIP RAP ON- B" CLASS RIP RAP COUNTEIj CUMIN STREAM BED CE1EST 0 To INS CLASSiL" 20 7 28 . 47 NI. 2055709.89 281 C P 2055717.03 287.25C HW1 5sY-PFD 98,63 2055716.67 289.99 CUL3 8 4. 2055628.39 280.17 CUL4 768812.81 2055642.94 280.12 CE2 768808.50 2055635.48 292.22 HW2 1 768808.72 1 2055636.33 294.64 ANNEL IMPROVEMENTS \\ 10 SS II RIP RAP E DETAIL 2/SHEET 2D-1 RAL EIGH DURHAM AIRPORT AUTHORITY Vt / GRAPHIC SCALE / 50 25 0 50 100 *PROPOSED TRAFFIC SIGNAL PLANS SEE SHTS. 15 & 16 FOR -L- PROFILE SEE SHTS. 18 & 19 FOR -Y3- PROFILE SEE SHT. 17 FOR -NBL- PROFILE r LEGEND PERMIT DRAWING 1223 ]Ones Franklin Rd. PROJECT REFERENCE NO. SHEET NO. SHEET 13 OF 27 ETHERILL Raleigh, N.C. 27606 /-5700 7 - - SITE 6 REMOVED FROM 4B PLANS. SITE 7 REMOVED FROM 4B PLANS. EN INEERING License No. F-0377 r� DENOTES FILL IN ® DENOTES IMPACTS IN NOT IMPACTED BY PROPOSED WORK INCORPORATED INTO SITE 5C Bus: 9198518077 Fax: 9198518107 R•W SHEET NO. WETLAND SURFACE WATER ROADWAY DESIGN HYDRAULICS TMNSPORTATION_NNING/DESIGN - BRIDGE/STRUCTURE DESIGN ENGINEER ENGINEER Cn0L/SITE DESIGN - GIS/GPS- CONSTRUCTION OBSER 10N DENOTES MECHANIZED ® DENOTES TEMPORARY CLEARING IMPACTS IN SURFACE WATER s��. 14 Nmle >>morn + p0 00 SEEF �I/ _* TA• � . P.O. BOX 33068 • RALEIGH, N.C. 27636-3068 Y3- F MA�C�{LINE WELA�1D LAS ; �r B1 CP- CB L" \ OE P� GTIO °✓ o /� F F \ O I F 50 O SPECS CUT DITCH ( ��$ DOCUMENT NOT CONSIDERED FINAL SEE DETAIL 65HEET 2D-1 m „ g SEP D 15/SHEET 2 / UNLESS ALL SIGNATURES COMPLETED y F F / zD TE L DITCH J/ REMOVE SYSTEM 0 n w ' -''1 • • / ° /CLA S 1 P RAP vo z \ TOE PROTEC ON ?_ 1 - I EST 145 SY Po O / CLASS 'B' RI RAP ' - v 18 RCP I I < ° m ��- \ CANygS-`EST, 1 FS SEE DETAI F F TEI 8 ., S T DETAIL 1G DEET 2D-1 VANOPY EST'? 8 FD HEFT 2D-1 I SEE D HEET 2131 -- n CB CB 8 T 1 DEBORAH BAS a, v I 1 I 5 s l 15 sm 1 F F`- 1 � Lo -o I F REMOVE EXIST: - Q L �I o _ - o 1 PT to. .3 I SIDEWALK / In I I I� ' ) � 18" RCP- IV r^ q \ / / I I - '�' A 24" CSP W/E WS .SI 1 * �Nv �ti ��. ,,,.. �O// I _ _ n GRADE PAVEMENT pQ• REMOVAL AREA AND FF- 39' RT. _ -{dY CLASS I RIP RAP EXIST CURB LINE TO A / 0 jS y EST 7 TONG n * * 9� OPO 176 LF OF SY �^ B P S EXISTING 36" CMP W/SCOUR HOLE � sY' - * * 'i DRAIN TO DI'S I y_._ p pet ' � @ 12' X 10' RCBC �, I CLASS II RIP RAP ON BANK I o I 1 FT) CLASS II RIP RAP COUNTERSUNK IN STR '"e _ y 9� DEG SKE o. I II % SUPPLEMENT WITH CLASS I RIP RAP AS N-111 Yz Sr i s ,2 / �' � zTAHS-EMSS-�I-RfP�AFr--vzz ezz �1�61 � z „ ry X S� �/� 18" RCP III LASS II R RAP / -` CONVERT to D� �( 16 / EST 70 SY GFD U CB 1 I/ -- "' - SEE DET�BFIEFS-2_-.-'�hTi9°a".L BASE DITCH- _ - 5 0 TT0 SEE DFTAIL'3iSHEET CB - m _ T eziz W/CLASS I RIP RAP y 4§TlS TONS 8" RCP- IV I e SITE 5E s, \ I J EST 80 I 18" RCP- III _� JC gs� S v- .v— - - -'vim' •� J5�- GRADE EXIST CURB I I �RE30 9E J J'R CREEK vaz AI LINE TO DRAIN —�- —35 - I r r I=3.,r— `F''LIF=s1r�6--ETF' v_ BEG jR SBM G �c9,r a, - END - I I IA - - \ AT STA. 30+13- OP-3I�--:5" I 1' IMPROVEMENTS \F �- -"—F C'.P F \ _ -T( ��.�._. CHANNEL IMP - \ CB 15 RCP 1~V SEE DETAIL 3/SHEET 2D-1 _ T �G L _ _ - v _ -- 2GI --- — � CB CB 15" RCP -IV CB 15" RCP -IV CB ---- - , / q r . --- RETAIN D 8'E _ 0328- £$Y cp 8'1If _ 79` x aAo VF _- - IB`RCF- B`91tT-30 �QL-0CATION- - __�yy + 7 REMOVE - -_ —18 RCP TpP=306.44' _ Q a 15" RCP- IV m Z 03' 17.0" E - - -- 2GI RAMP - K---- Q SI E ST -- v _ m 30" RCP- / - 1 / - ,:�"__ F uA moo:, _ _ _ F 7 _ _ _-LA - z°o �- r _ Q (�/ ( \,� F _ L PDE—�� I�' S ,,,_ CLASS 'B' RIP (` JA �t I )�/- °�/-�-e_ r = I END $BG AT `� y p 3 @ 12' X 12' RCB , ENSTIO = _ -dam S SD ESi Z3Y j' ,.^ _-��� ao' �J STA. 17+48 M C ET D 1 1�b $ _ J e� NOT BURIED EE DETAIL 25HE - - ESTCLA'B' RIP RAP 2 EST TONS " - W\1 ` // c / n A �r _ .�. EST SY �as I (Z) -L - - P T +t l 00.00 - a \ F y p OFF. = 37' LT. SITE 7 �� — + SAG x �� Ln ~ •II�� ~- .. + STA. 59+OT.54 (� O T Sto. 58+25.5 <r o *A N ul 110 zo.aa� CT - �' SITE 5C NN CLASS IRIP RA ��L v. eti SS `I RIP RAP ON BANK EST IS TONS F\ / EST 25 SY GF 28 ' LASS I RIP RAP COUNTERSUNK 11 1 0U� • C ANNEL IMPROVEMENTS / IN STREAM BED( _G E' EST 40 TONS CLASS TRAP RAP 57'1 7. 03 d 287. 25 SS II RIP RAP �° p gr� EST 55 SY GFD ` E DETAIL 25HEET 20.1 1� C W1 557 6.6 289.9 : "P SEE DETAIL 13/SHEET 2D-1 DURF{',1M AI T AU4C)",T / ov° o CUl 2055 39- 17 tiULv r 2085642�- 4 2&Orl� V �V C 7 _ ✓S �� -- SIC SCALE 68808. 055635. 8 •Z� �' I W2 768808.7 2 5636.3 294.64 �� �c v ° - / 7 50 25 50 100 * PROPOSED TRAFFIC SIGNAL o SEE SHTS. 15 & 16 - PROFILE F R SEE SHTS. 18 & 19 F�3- PROFILE SEE SHT. 17 FOR - L-=P OFILE SFE 5C CULVERT EXTENS�ON DESIGN (50-YR) W TOP OF B RIP RAP RSUNK /' IN BED SUPPLEMENT .ASS B RIP RAP VOIDS PERMIT DRAWING SHEET 15 OF 27 SffE 2150 DE 200 0 100 PROPOSED CULVERT 50 50 100 1223 ]Ones Franklin Rd. PROJECT REFERENCE NO. SHEET NO. ETHERILL Raleigh, N.C. 27606 00 EN INEERING License No. F-0377 Bus: 9198518077 RM1V SHEET NO. Fax: 919 851 8107 ROADWAY DESIGN HYDRAULICS —NSPORTATION —NNING/DEIGN - BRIDGE/STRU—RE DESIGN ENGINEER ENGINEER CNI41S-DESIGN-GIS/GPS- CONSTRUCTION OEER 10N Kimley�/,>*Horn P.O. BOX 33068 RALEIGH, N.C. 27636-3068 DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED 1K 200 2150 3 0 J00 - QUANTITY EST- SCALE CLASS '-I' RIPRAP 60 TONS -" = 50' H /11 _ /0' V 2 F AV OAR .S.EL. - 289,7' A 29-f90 -YJ7 ADE POINT ELE EW = 90' /2' X /0' RCBC l _ ' 2 LL- DE - _ --- - -- ----- -- ------ -- ---- -- - ---- -- ....... ----- TOPOF _ — I LEGEND PERMIT DRAWING 1223 Jones Franklin Rd. PROJECT REFERENCE NO. SHEET NO. $HEFT 17 OF 27 / ETHERILL Raleigh, N.C.27606 /-5700 /0 — EN INEERING License No. F-0377 ® DENOTES TEMPORARY ® DENOTES IMPACTS IN Bus: 9198518077 RAW SHEET NO. IMPACTS IN SURFACE WATER SURFACE WATER \ Fax: 9198518107 ROADWAY DESIGN HYDRAULICS TRANSPORTATION PLANNING/DESIGN- BRIDGE/STRUCTURE DESIGN ENGINEER ENGINEER CIVIL/SnT DESIGN - GIS/GPS - CONSTRUCTION OBSERVATION KimleylMorn ©06 O 0 P.O. BOX 33068 RALEIGH, N.C. 27636-3068 is I ` SITE 9 -IMPACT ZOOM-IN (SCALE: 1" = 509 WETLAND I m I -- DOCUMENT NOT CONSIDERED FINAL TIE PROP 18" PIPES -N '\ C WC A� N UNLESS ALL SIGNATURES COMPLETED INTO EXIST BLIND CIA J CLASS 'B' RIP RAP r 1 m EST 3 TONS I I DO O EST 10 SY GFD *� ADJUST EXIST i GRAD REAM TO TIE INTO p 1 Im DITCH AS NEEDED Q' ¢ BOTH THE POSED AND p TO ENSURE 18" DRAINS so.00 EXISTING PIPE NCE Op \ EST 25 TONS CLASS P RAPLn EST 45 SY GFD N ti SEE DETAIL 21SHEET 2D-1 (� m I \ )= OAK RD 0BST ETF FOR INLET GRADING DETAIL SR 13/0 TRIP( E' SITE 9 1S TOE PROTECTION - CLASS 'B' RIP RAP I \ �^, nJ��J EST 11 TONS I q8' / 1=� / EST 25 SY GFD WOODS I R/M NON LIP a�21NCDOI SEE DETAIL1SSHEET 2D-1 174 STAL HEADWALL EIP 11' NO ACCE5S R/R NoN REMOVE EXIST CONC DITCHN 1i STD 838.01 EIP /ly NON ExISiMG R/ IN R/48' �/ ISBW R/ NON j' - - -AND m m z x----- -- - 8 C P W/EL WS WOODS / � 1 S BOUP TOSETA 52+00 Y {p __ _ _ __ __-----_---i1 FILL EXISTING TOCONCR TE DICH--_X -_- _ _ _ _ __ _ 1�_ >C CHLX - x LOW POINT\�\72' C C - - - - C 2DIB�a.OEPW 6?C ' E ETAIL 0 BG " 1--' \ Cep 1 �11., _12/U 7 -V VISOIOAOF S- - -i 5- ----_ REMOVE 1v SHET 20.1 '1 6 CONCF I='�°- ,-F W1 _ - =r�o= _ - -- :. _ - - - - - - _ � _ F � ro-� - - - ------ o - _ - _ - - z- z- T_ ----- 2 _ - _ i 2GI ---—————————————— -OOD- ---� -- - I `I 4I JS GRAPHIC SCALE 50 25 0 50 100 PLANS ------------- ------------- sTTL WOODS CCP CONCOURSE LLC RETAIN 0.625" WALL CAT-1 -CR� /_ I _ - - .. .. .. .. .. C C - C INV=295. __ C 9 .29' CLASS 'B' RIP RAP EST 3 TONS Ex¢IMc R/ EST 10 SY GFD END SBG AT STA. 53+00 -Y- CLEAN OUT EXIST 18" J I o — ADD CLASS 'B' RIP RAP O IP EST 3 TONS + y- EST 10 SY GFD (V LC � Z � 1-4 I �) I ILL. I I O INV=293.29' O CLEAN OUT PIPE OUTLET ADD CLASS II RIP RAP EST 20 TONS a o A EST 40 SY GFD / OUT PIPE OUTLET v ZZzzef -z�C ADD LA `Ri /za�ZEST 2 TONS zO ARTNERS, LuC FD INV=286.07' SEE SHTS. 20 THRU 23 FOR -Y- PROFILE SEE SHT.24 FOR -RPB- PROFILE ��T���„SEE SHT. 25 FOR -RPC- PROFILE„/SEE SHT. 25 FOR -RPC- PROFILE '��'AY C RB TO=317.43' - F - IS' 0 T=312.31' F / 6 INV=303.12' F P -F - BEGINN SB SBG AT STA. 48+45 -Y- TIE TO EXISTING nT0 R/ r LEGEND PERMIT DRAWING r SHEET 18 OF 27 r� ®DENOTES TEMPORARY ® DENOTES IMPACTS IN IMPACTS IN SURFACE WATER SURFACE WATER — \ 0 is SITE 9 -IMPACTT ZOOM -IN I I ` (SCALE: V = 501 I WETLAND I m n \— 7 1223 ]ones Franklin Rd. PROJECT REFERENCE NO. SHEET NO. ETHERILL Raleigh, N.C. 27606 EN INEER,NG License No. F-0377 /-5700 /0 RM1V SHEET NO. Bus: 9198518077 Fax: 919 851 8107 ROADWAY DESIGN HYDRAULICS TMNSPORTATION —NNING/DEIGN - BRIDGE/STRUCTURE DESIGN ENGINEER ENGINEER CIVI41SITE DESIGN - GIS/GPS- CONSTRUCTION OEER 10N Kimleyl)Horn P.O. BOX 33068 RALEIGH, N.C. 27636-3068 DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED y�1 y - "' FOR TAIL�GF.) HEET 2D 1 I SE SEE DE INLD G SITE9IN I - - E PROTECTION rJ E 2a TSb OY GFD�sa _ o J p[F N z _ 'I REMOVE XIS ` \ "/R / N / SEE,TAIL 155HET 2D-1 z Esc NO ICCE S yl oN e. / S �,S +INSTAL HE m I EiP i q / S DN / 0 Jv V T CONC DIT H 99 / m NC DO ST ,TF F ~ FTF FILL E%STNG� J`�.. C O ECONCR TE DUP T TA OTCHY 8" CSP W/EL�OS�_ 4-�ik / _ _ w 1B" _ - I LOW POINT - 7 HL L-I C _ _ - - r �- R JX �- r OEP 27p„ 18 2GI O10 EP - / 1-.: _ J - _ _ _ _ _ _ - - -/`� - _ . �_� \ \ _ t, o \' END SB J�a\X\IF\ _ _ _ ���--- - A•o e,r h r FS SEE DETAIL 12 SHEET 2D-1 REMOVE ice- �� LO F U?CI i `/— zis s �L_ _ _ -- _ - _ _ F G EED TL-3 _ - UJ _ -�" _ - _ - - - - _ :Tsa -sr� - �x�a=- _ f--_� - F �r ro- _ - LU-_ -- -___ Zi"-RCP-IV 2G -- ___ _ --_ 2GI �. --- � ----- — ---- z ---- NEED TOP, + / NEED T P, INVERTS, �/ --- - + N -_ _ _ sz° - - & FLO DIRCTIO - -_ -TL T- T-- °'T RETAIPI RETAIN -- -- ---- -- -- \ - 48" WELDED STEEL NOT BURIED —� -- — — ---- r B. WALL III` _ II ____ 2GI —�------� -- r�---- i _ �°= DI � _URB �p"l f� � ��° � C_E s - - l V 3D3,IR os� _ � os - __ .3�m.��_ AL�TA 4 �� J \ ��✓ , _� ��_ INV=2 _ 4� P o � TIE TO ,EX�5�1I�6,� �17 Q CLASS�'e' RIP RA sC D r Le 6 C __ r � _ _ � _ - EST 10 SYGFD END ABS �P a J T T --- CLEAN ASS Q g \ ADD CLOUT B' IR P 1RAP i r SC -- EST 3 TONS /\ O v z EST 10 SY GFD Lcl _ z is C I �) CCP CONCOURSE LLC ILL. I I I O INV=253'29' _ P, �o CLEAN OUT PIPE OUTLET ADD CLASS II RIP RAP ¢�v EST 20 TONS ¢¢o m EST 40 SY GFD OUT PIPE OUTLET v ZzzeJ _z�ADD LA `� zEST 2 TONS GRAPHIC SCALE ° J�FART/NERS, LL)jC FD 50 25 0 50 100 �� � /wv=z° e/ PLANS a/ s./ INV=286.07' SEE SHTS. 20 THRU 23 FOR -Y- PROFILE a ��a SEE SHT.24 FOR -RPB- PROFILE a� : SEE SHT. 25 FOR -RPC- PROFILE r LEGEND PERMIT DRAWING 1223 loves Franklin Rd. PROJECT REFERENCE NO. SHEET NO. r SHEET 19 OF 27 ETHERILL Raleigh, N.C.27606 /-5700 EN INEERING License No. F-0377 o DENOTES MECHANIZED DENOTES IMPACTS IN / Bus: 91985187 RAW SHEET NO. ® Fax: 9198518/0107 CLEARING SURFACE WATER ROADWAY DESIGN HYDRAULICS TRANSPORTATION PLANNING/DESIGN- BRIDGE/STRUCTURE DESIGN ENGINEER ENGINEER CnOL/SITE DESIGN - GIS/GPS - CONSTRUCTION OBSERVATION ®DENOTES TEMPORARY / IMPACTS IN SURFACE WATER Kim eylMorn O � P.O. BOX 33068 RALEIGH, N.C. 27636-3068 �P / DOCUMENT NOT CONSIDERED FINAL �j/ UNLESS ALL SIGNATURES COMPLETED EIF'\ I El J B WILKINSON El nRED BOYD WILKINSON '2 CO NT \ \ OF K � � 4\ - m RALEIGH-DURHAM ��� AIRPORT AUTHORITY DRAINAGE BY OTHERS %U Y �m RAINAGE BY ®TH#R% \m �oY DRAINAGE BY OTHERS DRAINAGE BY OTHERS EIISTING R/W SILL \\�� \ �✓ \. i� PST -------- _-- Tc--------- - - - - -rn �3_ - / BY OTHERS �--Tc- _--- --Tc-------- - - - - -------- - - - ---------_ N510 _ y3m-_-------__:c- -- - - - -_- z� ETr rE �F -€n j3m 6 LJJ .. .. .. ., 15" RCP -IV AQ,LLI 2GI_ MTL t-_. -- _2GI �LIMTL L MTL T_ LU __- N C- - - - - - - - - - - - - - - - - - - - - - - - - - - &---------------------- - - - - - - - - - - - - p p ------RETAIN - - - - - - - - - - - - - -------- RETAIN� --RETAIN - - - - - - - p O �02298 ig, -- ---------------------------- f_ }------- --- ----------------------- NEED T P, yERTS, p------------------ TOP=301.T4' --- "��A" �`` & FLO DI CTIO Y----------- TOP=305.79_ - - - - - ------ ---- DO -_- INV=293.19' ---_ DI DI01 -------------------------------------------- RETAhL_ INV=296.55' `�" " `INV=300.79' Q N 2 H _ N DANK 440ORE FREEWAY 73'BST r.. .. ,. } Z ESRCP-IVT 2GI -_ 2GI -- - ---- - - - - _- 15" RCP -IV_---- 2GI _ T T., ,T.. T - - T - T - T �G7 - 15" RCP IV 2GI W a -r T� T - - T T MTL _ .. Z EX `� - 3.3REMOVE 12 LF OF 15" CMP - F ` 18" OUTLET Errs �.-tF erF J8 W/MH AND INSTALL 20 LF U NV 28 Q lNV=284.65' - - - - - - - - - - - - - - - - - - - - - - - - - - / - - m� - - - _ - - _ - - - - - _ - 15" CS < F F F F F F F F F F F F- - - - - - - - - - - - - - - - - - C < CLASS 'B' RIP RAP F F F F < CLASS 'B' RIP P EST 3 TONS / \ - - -11�8- ,y S * CLASS O RIP RAP CLASS 'B' RIP RAP N * EST 3 TONS EST 3 TONS EST 10 SY GFD `-'.EST 2 TONS \_ ST 10 SY GF _ BAR-' x EST 10 SY GFD u \ e �. .. X- Y 6 Y / \ \ s .\+ X XX x- EST 7 SY GFD - X�\ Xrl'ONCRETE E%I nNc i \ - - Mo LIENr- E X�X �� 15 jOI�EFN �EIrEkSEIAE�B 5131 PG 214- v ONUMENT _ Ems- E \=T + �\m s 7 aI 1o.ra.5 11 i e SITE IOC Fw7N\ \� WETLAND SI� CLASS RIP RAP SITE 10A EST 3 TOO NS EST 10 SY GFD OF �AKE \a � ~ THREE BARR OF 3 @ 8' r FFII �I � `11C C EXTENSION a� 0 +o \O O \ 4 /ALKIAL CENTER REALTY I:ORP., A NORTH CAROLINA CORPORATION NORTH E4CTER AN ELEV. CUL1 767044.51 205601fSERIA88 RREL281.95 CUL2 767037.12 2056 sW 281.84 CUL3 767036.93 2056444.04 CHANIftIMP16VE CUL4 767029.98 2056451 .96 LAS'�91f 4p7W CUL5 767029.70 2056452.41 Loa CUL6 767022.98 2056460.44 281.49 CE1 767033.98 2056448.07 288.56 HW1 767037.33 2056443.94 290.60 CUL7 767276.77 2056476.84 280.43 CUL8 767270.06 2056484.74 280.57 CUL9 767269.75 2056485.22 283.09 CUL10 767263.06 2056493.12 280.45 ENTS / H / GRAPHIC SCALE 2°-1 50 45 0 T�0 100 ��� / PLANS / SEE SHTS. 20 THRU 23 FOR -Y- PROFILE SEE SHTS. 25 & 26 FOR -RPD- PROFILE r LEGEND DENOTES IMPACTS IN SURFACE WATER PERMIT DRAWING SHEET 20 OF 27 — — / 1223 ]Ones Franklin Rd. ETHERILL Raleigh, N.C. 27606 EN INEERING License No. F-0377 Bus: 919 851 8077 Fax: 9198518107 PROJECT REFERENCE NO. SHEET NO. /-5700 r o DENOTES MECHANIZED ® CLEARING RaN SHEET NO. ROADWAY DESIGN HYDRAULICS TMNSPOI ION PL4NNING/DESIGN- BRIDGE/STRUCTURE DESIGN ENGINEER ENGINEER ®DENOTES TEMPORARY IMPACTS IN SURFACE WATER / CI /SITE DESIGN - GIS/GPS- CONSTRUCTION OBSERVHTION Kimle)nmorn O � P.O. BOX 33068 RALEIGH, N.C. 27636-3068 �P / DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED EIP\ I �-�j El J B WILKINSON& e- w El DRED BOYD WILKINSON 0 CO NT \ OF K -� m-�� I �, �\ \ RALEIGH-DURHAM W 1 \ AIRPORT AUTHORITY 11 I DRAINAGE BY OTHERS i R � 1 e RAINAGE BY®TI#Rl \m DRAINAGE BY OTHERS m n ILL J seems . �� + — saz �'� iM— Jf21'E NSTPS _ �'\ \ _ / - - — — --BY OTHERS 11�550� — r Bz — — — — — �_ — _ --rc — — — -- — — ;3� — — — — — — — — r — — -- — — _ — 4 �_ ---- _ 2 a= w — - — — - --- —_ _ - --- — -----� 'sa—� -- — say_ � � — - w -- w-----z ---- - — --- _ -_ _ - - — _ — — _- _- O i N ----- - _� _ - --- ----- T O �'� RETAOd���:.-F TOF=3!ll.7a._ `:Zfl_`�. & D T P.I TRO S.--Y_ N ` --- TOP=305.79' --- N TAI Q O — -- ----- ------ ----- -- __--- ---- --- ------------ -- — 00 ----1NY=z�3.Pr•— °°t _— — ----- ----- - D N Z _ N -- — DAy K #09RE FREEWAY UBST _ :P-IV � 2GI15" --- RCPJiL_---- ti0 _ 1 1 — — — — - ` zv° CLAS RIP P EST 3 TONS __--- / ` —ice N 4. \ — — - .- ES 3 TONS ST 10 SY GF EST 10 SY GFD ------ _ •- 1es X_X �X­\ �.� X E/ T \ EDB 5131 PG 21< ' 5 SGW�EaN �T Z'EASE\ CONCRETE WNWENT \ y v SI IOC _ _ —aye— — — � \ WN ' SITE 10A CLASS 'B' RIP RAP EST 3 TONS T EST 10 SY GFD OF WAKE �4 y CULVERT tt2 y OF 3 @ 9'X 8' THREE BARREc EXTENSION o� 0 +o \O O �( O O / tKIAL 4 / ENTER REALTY LORP.. AANORTH CCAROLINA CORPORATION NORTH EPC�tITTER AN ELEV. CUL 1 767044. 51 2056W59ER1488 RREL 281 . 95 CUL2 767037.12 205694PTBMF 281, CUL3 767036.93 2056444.04 CHANNA IMPROVE CLASS II RIP RAP W EE Et AIN BEN CAll 45HEET CUL4 767029.98 2056451 .96 CUL5 767029. 70 2056452.41 CUL6 767022.98 2056460.44 281, CE1 767033.98 2056448.07 288.56 HW1 767037.33 2056443.94 290.60 CUL7 767276.77 2056476.84 280.43 CUL8 767270.06 2056484.74 280.57 CUL9 767269.75 2056485.22 283.09 CUL10 767263.06 2056493.12 280.45 ENTS H 2 D-1 2GFr= w _— Z 21 �0 MOVE 12 LF OF 15--CxO _D INST20 LF aes —_- JB W/MH.- - Err gas ' CSP - zas— i Q 'R CLASS 'B' RIP RAP * EST 3 TONS CLASS 'B' RIP RAP # * ** EST 10 SY GFD �. EST 2 TONS X_X _ EST7 SY GFD y� —X E 10.i4.5 \�\ �W ETLAN ar,\a 2\ &z\ z \ JS \ / GRAPHIC SCALE / 50 15 0 50 100 11111_1' / PLANS / SEE SHTS. 20 THRU 23 FOR -Y- PROFILE SEE SHTS. 25 & 26 FOR -RPD- PROFILE S�TE �OA CULVERT EXTENSON 2 0 20.0 510 ICO 50 QUANTITY ESTIMAT SCALE ASS '11' RIPRAP 90 TONS I" = 50' H CAVATION O l /O V CULVERT 16 CY NNEL 50 CY EXISTING EXISTING 3 @ 9'x8' RC C - 5 0 190 200 L STA 86f76 -Y- GRADE POINT ELEV = SKEW =k460' 10' 0p' PROPOSED 1-5506 EXTENSION BY OTHERS-- 300 100-Y 50-YR W.S. TOP OF Now LEGEND PERMIT DRAWING 1223 Jones Franklin Rd. PROJECT REFERENCE NO. SHEEP NO. SHEET 23 OF 27 — — ETHERILL Raleigh, N.C.27606 /-5700 EN INEERING License No. F-0377 /2 DENOTES TEMPORARY DENOTES IMPACTS IN ® ® Bus: 9198518077 RAW SHEET NO. Fax: 9198518107 IMPACTS IN SURFACE WATER SURFACE WATER ROADWAY DESIGN HYDRAULICS TRANSPORTATION PLANNING/DESIGN- BRIDGE/STRUCTURE DESIGN ENGINEER ENGINEER ® DENOTES EXCAVATION CINUSITE DEIGN - GIS/GPs- CONSTRUCTION OBSERVATION KimlepMorn P.O. BOX 33068 RALEIGH, N.C. 2763E-3068 O5�� ev � t DOCUMENT NOT CONSIDERED FINAL -DUNLESS ALL SIGNATURES COMPLETED M p0 11 m URHA AUTH^" / \ j HW I � � (' l SITE 11A and 12 - IMPACT ZOOM -IN (SCALE: 1" = 509 O (' SITE 12 Ul O O a VDNu4EN* _ _ _ _ _ _ . _ _ _ _ . • ...... gy `,o INSTALL HEADWALL BM2 ELEVATIOL. N 766801 E 20- D NCDOT STD 838.27 / AND TIE PROPOSED HW RALEIGH-DURHAM AIRPORT AUTHORITY T,�TP BL STATION 32.66.00 16 LEFT TO EXISTING HW BY OTHERS SITE IIA e=""6- �rpc. F� NAIL W/TRG SEE DETAIL 26/SHEET 2D-1 FOR INLET GRADING DETAIL pl �+ j c� r T6 1932 GRADE STREAM TO TIE INTO -r- BOTH THE PROPOSED AND m� DRAINAGE BY OTHERS 86�45.5� EXISTING PIPE ENTRANCE I-5506 SITES ITLTr p NU ENT � �5A AND SB � DRAINAGE BY OTHERS �� AIONUTAENT � 6 R/ DRAINAGE BY OTHERS DRAINAGE BY OTHERS DRAINAGE BY OTHERS ii W Co NC DITCH INV=307.84' :r) • � _ _ 3 11 P T 1 DITCH_ - - - ..�ONC /t(2) ELBOWS - - _ _ - - - -E � CONC DITCH I ..-®Tc- - - _ ---_3Q RCINV=30VE WH t-L°bIV=3a4frT CONC-DIi6H-TC- - - - - - - - - - - - - -To- - - - - - _2GI -®MTL r GOREFREEWAY 60'BST _ 2GI _ - _ L - - - - - - TB JB - - - MTL_LMTI-t P t r_ `''r- -- V 312�L/iDANK NOT BURIED0 P6.-E LU --------------- --------------------------(--) ---------------E0 ----------------- --'� 0 -------------� ----------/-40 WEST BOUND VAR. WIDTH BST N--------------- - --��— -------------------- — O O ----------------------- E—A--------------- � ---------------------------TOP=3-09.61— --- -- 3ETAIN OP M= — --— — — — — — — — — — —T � - .p 01 •---------------- RETAIN --- -- D DI IN ---------------------_ -- � Q INV=304.54' INV=31I.87' Z 2 (n ---- --------- I-40 EAST BWND VAR. WIDTH BST ----- / w —— — — — — — — — — — — — — — — — -- — ---------- —�--------------- — — — — — ---------------- ---= N --------m'' -------- ---- DM K MORE FREEWAY 6a BST -------------- — _------- ----------------- I Z -2 - - - - - - - - - - - - - yTi� 18" RCP -IV- - - - - - - - - - - --_ CONVERT TO T— CH GBOLTED INV=31 �= MOVE .. .. .. .. JBW/MH COVER gEI F ~ JB W/MH H Li � INV=F�WR _ � � F � � F 4 - ". ._.._2GI 1/22GGI-1 m F � C - � _ SEE DETAIL 12 "� U � Q _ _ _ _ _ _ _ _ _ _ _ COVER F _ � h _ _ _ _ _ _ _ _ _ _ _ _ F F _ _ F F F p ET bT _ C - _ SHEET 2D-1 18 FS SEE DETAIL 12 C - _ F F F28d2 CLASS 'B' RIP RAP F F , _ _ _ _ - _ - SHEEP 2D-1 C - - - - - - - C C C EST 3 TONS EST 10 SY GFD REMOVE FES AND 4' LF OF EXIST 15" RCP AND INSTALL 24' LF OF 15" RCP COLAR BEGIN SBG L& \ —Irv_ _�^ v v �' ND $TA.101+70! WK / \ �, , E CLASS O RIP RAP EST 2 TONS EXISTING R/W M BLIND JB W/SIAB LID E I �E5XT C CRE1L CSP SOUTHERN BELL EASEMENT IBN i994 PL 191i E E MO MENT - E 6 SJ ` EST 7 SY GFD / — — — — X / X / rD-r�X REMOVE 4' LF OF / EXIST 51" X 57" CMP / AND INSTALL 18' LF OF / Y X & 1 , SG I TOE PROTECTION �� J CLASS 'B' RIP RAP EST 35 TONS + �. �.J X 60" RCP -III / RIP RAP EST 75 SY GFD REMOVE 8' OF EXIST 18" RCP 'J' 'Y SITE 11 WG �}' ESTCLASS O EST 5 TONS EST 17 SY GFD SEE DETAIL 15/SHEET 2D-1 8• / a� AND INSTALL 24' LF OF 18' RCP THE C0 SITE 11 - IMPACT ZOOM -IN J >). LATERAL 'V' DITCH WAKE GATEWAY, LLC CLASS 'B' RIP RAP OF WA (SCALE: 1" = 5O') W/CLASS I RIP RAP EST 3 TONS EST 45 TONS EST 10 SY GFD . EST 60 SY GFD ' N SEE DETAIL 8/SHEET 20.1 \ E(E F%F 1, � IET REPAIR EXISTING OUTLET CLASS II RIP RAP ON BANK CLASS II RIP RAP COUNTERSUNK IN STREAM BED -27 1 SUPPLEMENT WITH CLASS IRIP RAP AS NECESSARY EST 80 TONS CLASS II RIP RAP EST 115 SY GFD N a SEE DETAIL 22,SHEET 2D-1 GRAPHIC SCALE \ 50 25 0 50 100 PLANS SEE SHTS. 20 THRU 23 FOR -Y- PROFILE LEGEND PERMIT DRAWING SHEET 24 OF 27 1223 ]Ones Franklin Rd. PROJECT REFERENCE NO. SHEET NO. ETHERILL Raleigh, N.C. 27606 /-5700 /2 DENOTES TEMPORARY DENOTES IMPACTS ® IMPACTS IN SURFACE WATER ® SURFACE WATER — — IN EN INEERI NG License No. F-0377 Bus: 9198518077 RAW SHEET NO. Fax: 9198518107 ROADWAY DESIGN HYDRAULICS TMNSPORTATION PLANNING/DESIGN- BRIDGE/STRUCTURE DESIGN ENGINEER Cn0L/SRE DESIGN - GIS/GPS- CONSTRUCTION OB.sER-10N ENGINEER ® DENOTES EXCAVATION Kimley�>)Horn X P.O. BOX 33068 RALEIGH, N.C. 27636-3068 \\ 1) DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED IJONuMENr SITE 11A and 12 - IMPACT ZOOM -IN (SCALE: 1" = 509 .... .. ... ....... ........ BM2 FI FV4T LCM 32 O I ` ' SITE LO _ � � INSTALL HEADWTYLL NCDOT STD 836.27 ' / RALEIGH-DURHAM AIRPORT AUTHORITY / pl PG _ N 766801 F NO I LT WITH \q ....„..i \ \ i / l / I �TE 7 T LL GRADE STREAM TO TIE INTO BOTH THE PROPOSED AND EXISTING PIPE ENTRANCE A AND TIE PROPOSED, HW \ A / TO EXISTING HW Y OT RS \ I I \ SEE DETAIL 2NSHEET 2D-1 / J FOR INLET GRADING DET L / r ✓ J DRA' AGE BY OTHE 6�95. m� I 06 SITEJ 8 R � m \3 J. I = � Nu N111k1111 DRAINA E BY OTHERS `s X0 DRAT GE BY OTHERS = � O GE B%OT � o w ITI DII W - z°�_ -- - ?' qV i3— _ °rc _ �— —_ Tc—� �_� _- �GF r==' — _—._ TB JB - - — — W W - ------ ------ �eiPry R OORE FREEµ'AY �� ------- �— / - -- _-AFL - 60" WELDE— (NOT BURIED_ ------ _------- -- — K E55 OTI(ENCFWESS O �_ —-------- ------ -- — 8'E4_ Q ---------- '\ --_-- l ST M 1 VAR. *IOTH BST ---- ///� �� -------'�"�_ —_TOP=309.61-- ----- ------ --- lKHI ------ ----- -- --- RETAIN _ _ _ -- \----- _--_ �_------ RETAIN TOP TOP= .34_-- 10 M "_----- ----- --� ---- '__----- ----y ----�_-- ----_ —_ - _ - — - - --_ DI — -IN Q _ INV=304,54' Z ' NI-40 EAST D VAR. WIDTH BST — -- ----- _ ------ _ _BAV K PbOf E FREE}y_Y W BST LU Z _ _- -- - - — —_ --- T — - -- -- - - ---- _ --- ---- _ -- -- _ RT EXIST GITO REMOVE F 1 BOWVEMLI COV 2 2GI _ i H a z = COVE -- - _--OOVER-2bd2 �_. F.__ — F F ��' II CLASS 'B' RIP RAP -----______ _- �NNV= FfE`-OVER ' _- �� _ _ _ _ _ _ F F F F _� '0 -_ � I '1 ..... __ �E 18 SH��T 2U=1 IL FS SE T 2 S 1 _ _ -----EST .3 TONS 10 SY GFD �-_ - 6 — _ _ _ _--_ \ REMOVE�FES AND 4' LF EXIST1/EST -_ AND INLL 24' LF OF 75" 'ea vas vY _ i'...�2 ¢s —� ' - - \ C� C C COLLAR & BEGIN S�- EXTEND STA. 101 1 70 -Y- (RT) 15" CSP OUTxERE HECC-ELSEAIENT IB,N 999 19 I/ ------- �- / ._ ------- _CLASS 'B' RIP RAP -_ _-_ I IS BLIND A W/SLAB LID o , EST 2 TONS ------ si EST 7 SY GFD / - - \ / T9 �\ \ REMOVE 4' LF OF / &, EXIST 51" X 57" CMP / \ \ �, AND INSTALL 18' LF OF / '1- A" SG E�' TOE PROTECTION CLASS 'B' RIP RAP EST 35 TONS 'B' ,y, 'J' 1'�.J \ 60" RCP -III / CLASS RIP RAP EST 75 SY GFD REMOVE 8' OF EXIST 18" RCP 'J' \ 8• '1 SITE 11 WG 'F / e� / EST 5 TONS EST 17 SY GFD SEE DETAIL 15rSHEET 2D-1 AND INSTALL 24' LF OF 18" RCP THE COUNTY SITE 11 -IMPACT ZOOM -IN J .>y N' LATERAL 'V' DITCH WAKE GATEWAY, LLC CLASS 'B' RIP RAP OF FAKE (SCALE: 1" = 50')W/CLASS I RIP RAP EST 45 To EST 3 TONS EST 10 SY GFD - 0 EST 60 SY GFD SEE DETAIL &SHEET 2D-1 r � \ yi cb E IET REPAIR EXISTING OUTLET CLASS 11 RIP RAP ON BANK CLASS II RIP RAP COUNTERSUNK IN STREAM BED SUPPLEMENT WITH CLASS I RIP RAP AS NECESSARY — — EST 80 TONS CLASS 11 RIP RAP _ a \ EST 115 SY GFD SEE DETAIL 221SHEET 2D-1 GRAPHIC SCALE 50 25 0 50 100 PLANS SEE SHTS. 20 THRU 23 FOR -Y- PROFILE r LEGEND PERMIT DRAWING 1223 Jones Franklin Rd. PROJECT REFERENCE NO. SHEEP NO. r SHEET 25 OF 27 ETHERILL Raleigh, N.C.27606 /-5700 /�{ — EN INEERING License No. F-0377 o DENOTES MECHANIZED DENOTES FILL IN Bus: 9198518077 RAW SHEET NO. CLEARING WETLAND Fax: 9198518107 ROADWAY DESIGN HYDRAULICS \ TRANSPORTATION PLANNING/DES[GN- BRIDGE/STRUCURE DESIGN ENGINEER ENGINEER \ C­/SITE DESIGN - GIS/GPS- CONSTRUCTION OBSERVATION p N\ Kimley�,*-Horn e APO WETLAND \� \ P.O. BOX 33068 RALEIGH, N.C. 27636-3068 a TOE PROTECTION �. \O �� CLASS 'B' RIP RAP \ \ W H �J RALEIGH DURHAM INTERNATIONAL EST 50 TONS m DOCUMENT NOT CONSIDERED FINAL Q p \ EST 200 SY GFD \ UNLESS ALL SIGNATURES COMPLETED SEE DETAIL 155HEET 20.1 \\ EDWARD S. JR. FINLEY & 1 VIRGINIA D. FINLEY SITE 8B + \ SS RA�PPS RAP �,.. s \ •�, g E TOTJ E E 30 GFD / E PDE =357F T F �5' UT=351.T0' FS SEE DETAIL 12 SHEET 2D-1 F 'WOODS �p0 _ _ _ Q F F F W \ \ \ \\ \\\ \ \ \ C F 18" RCP- IV CAT 7 F W \ \ \ FS SEE DETAIL 12 C SHEET 2D-1 E C GI O \c E _ _� ---c ---� ---� -- --E -- c E� -- - E� c C? \ \ O \ \ \rY<o CB fV \ \ �� Y2 rS•p� \ CB 36" RCP- III NOT BURIED \ 15" RCP- IV ( ) 18" RCP- III 24" CSP W/ELBOW yy CB C. WOODS \e-�--C PEDF BLIND _ W �M=Z ZOOM -IN (SCALE: 18"RCP- IV-- f C3611RCP-III �, CREST SPECIAL C DITCH \ \ \ .o \� .. \ \ 2GI TOE PROTECTI - PDE J 4 �sxa, SEE D L 65HEET 2D-1 \ \ \ \ \ IFS SEE DETAIL 1 C CLASS 'B' RIP RAP CLASS 'B' RIP P E s9oT 4\ <\ \ \ \\ \ \r <o EET 2D-1 EST 3 TONS EST 3 TO S \ < 1 CP- IV _ U EST 10 SY GFD EST 38 S GFD / F _ SPEC idV' DITCH \ l 1 18" RCP- IV SEE D IL 15/SHEET 20.1/ TOP=352.03' \ \ \ s \ SEE 6ETAI -2D-1 1 A / TOE PROTECTION SPECIAL LATE 'V' DITCH I2• IN=346.98' DISPECIAL LATERAL'V' U ,� 118" RCP- IV SEE DETAIL SHEET 2D-1 + EST 15 TONS 1CLASS 'B' RIP RA 2' OUT=346.9 \ 'yT \ \ \ \ r \ \�\ EST 18 TONSF 'B' RIP RA - / 13 a' 18" RCP- IV EST 30 SY GFD EST 40 SYi.GFD f \•HOpF \ \ \ \\� SEE DETAIL 15 aSEE DETAIL"27/SHEET 2D- SPECIAL LATERAL'V' \ I( SHEET \ \ / EE DETAIL 5'B' RIP RAP y� ti O RALEIGH DURHAM \ \ \ ra CLASS 'B' RIP RAC a,. ( -{-'S`� -I-� INSTALL HEADWALL O OP=3sz.o99' INTERNATIONAL S 3 TONS �F CB EDITH U. WILSON & NCDOT STD 838.0 DI INTOI-148'-NN \ 10 Y GFD '�-o� \ PCP , P E € U-AJffA%S'V'DITCH TOP-3355I ggI' CARP HOTELS LLB GRADE PAVEMEN \. zcy I 3 'F 12 IN=346`.37' �- W/CLASS I RIP RAP OUT=346.25 REMOVAL AREA 00 \ � \ U � C EST 30 TONS TO DRAIN. MAINTAIN \ \ F EST 40 SY GFD EXISTING DRAINAGE \ CB - SEE DETAIL 9/SHEET 2D-1 �,\ \ \ \ 15" RCP- IV PATTERNS E \\ +6/_� \ y CLASS O RIP RAP �E l TOP=350.94' \ \ \ A I I 7� �^ ` m h EST 3 TONS TOP=350.95' 12' OUT=346.94' / \ ry' EST 10 SY GFD 12'IN=345.46' (< \ T=342.641v,q� 12' OUUT=345.39' \\ D \�1 IB' OU 39.4I' 18" CSP O \ �� W/ELBOWS / \ 9 ^\2q.CQ0 \� p \•\\/ � � RETAIN DI S\ \ � Top. GRADE EXIST SWALE TOX11 CB D N / �• \ \y�Qta 3 r6 \��\ //0 < TOP= 4 76' o„ 3 g M / GODS \ G\ \ W ' 12'OUT=373.73'�1" x /} _P Q0 T�p 348 75' 18 RCP- IV 4I D� N ,+ ^C 12'iN43.50' pJ moo/ GATE'1AY© 30"RCP III\ S /CAROLI A HOTELS / r q' RESORTS LLC / l 8� .,hm �� HOSPITALITY LLC tiq `�\ � a /� � •HoeE � � �/�� \ W � Fey- / -- E� �p� \\ s\\�L<Q . �a a 4 46'\W�6• - � �� 30" RCP- III &o �/ \ \i\ \ ion / CB 5 \�S \ \\\ \\ \r �o INV=343.80 c,p Cy / - h o 4 4t L \ /S �,� / y ( % �n'4 Cy p2 / �\�\l, p {� aQ i/ C VERT CB s saq•1y� \ Sc,�P a — `v' ``ADJUST CB/ TO J /MH ,a •✓o kgvgy� \ /��g II ; Z {/, j G/ TO RtQTECiIOr \ \ e,CBPI-346.80' JqC "f'pdioy � v 11yOyP 8R3I53 I I 5j/P-N 334I.20' �� \1 /// / `v' �OQ� � ES $2 ON dy'f MUD/ ATER/ %% 6.1 333.50- f y, � II W DE I /15'OUT-341.18'//y j2jj/ �. ���� // `.�T25SYGFD \\ GRAPHIC SCALE 6' 333.51'- ,O 8' 0 7=332.7 ss GtF � m I L , I I J I POOL 1 _ . °$ • / DETAIL 155HEET DN 1 c\ \ M} e __� so zs o so 100 \ Iz• o 41.71'\\,, E) �2 TOP=342.70' I I p Q \ l��Qp 30 / �/ y / c, �s• 12'OIJT=gg9.45, .i j0 9 4.G� / 'n'ro OC 2•\ a g -I 12'Iry=339.6TI 129'C&Cj q4 ATE. p°/ P1 / / / / / �' GRADE PAVEMENT ''+ PANS CATER STORAGE I ( \ CONVERT to DI REMOVAL AREA AND '•� \\ \ I' -� 10 OUS` 3396•I'E'- / / / / / I EXIST CURB LINE TO TOp-344.-03' \\� \B• SOeg 06 \/� oeo \ IS• UT-33 pp6' '� / / / I DRAIN TO DI'S \ s> 15' OUT=339195' \ � 301 � \ IS/R P oR��r 4�4 C \\��1'` 15.�OP - /B �2A�J �� / 1 a e� / / � 7 \°\ \�`�E<' p Q III L_24'c&In�0.El<J1N} RETq/N�Cp / o ti / /// REMovE EwsT. SEE SHTS.18 & 19 FOR -Y3- PROFILE s a e I ,\ 'SIDEWALK \ \ SEE SHT. 19 FOR -Y8- PROFILE JSjHkCrUAF 4 - r _ ' :�^°• ' -\ LEGEND DENOTES MECHANIZED DENOTES FILL IN CLEARING WETLAND ss\\ r 5 -35TT-3351..1 \ \\ C 1VOOD5 �p0 \ k\ \ \tee C \� � C CyFy7 SPEC C DITCH ST4 g 3, SEE D &SHEET 2 -1 Sy DT Q W TOP 352.. \ 12''U'T=.98' 12'OUT=3469 13 \2 NOpF � DI TOPa352.0 TOP=35I r CARY HOTEIM9e8 12' IN 346`.37' OUT=346.25 / 'kg - v2- / E l\ IJII \ TOP=350.95' 12?• 3395 3T ROLINA 3O HO SO RERTS LL( C BIN 3325 f 6IIy 333.50- pEE A '� 6' IN-333.51' 6 B' 0 T=332.7 �9f QrM' \ 12' v. 'Opo P•\ p n 2 \ 5 S \ 33ii PERMIT DRAWING 1223 ]Ones Franklin Rd. PROJECT REFERENCE NO. SHEET NO. SHEET 26 OF 27 ETHERILL Raleigh, N.C. 27606 /-5700 /�{ EN INEERING License No. F-0377 Bus: 9198518077 RW SHEET NO. Fax: 919 851 8107 ROADWAY DESIGN HYDRAULICS \ TRMISPORTATION —NNING/DESIGN - BRIDGE/STRUCTURE DESIGN ENGINEER ENGINEER \ Cn0L,ISITE DESIGN - GIS/GPS- CONSTRUCTION OBSER 10N Kimley'-ft n P.O. BOX 33068 RALEIGH, N.C. 27636-3068 E PR CO CTI �\ Cr R �WH� LA S 'H' R \ \ EST 5 TONS V, DOCUMENT NOT CONSIDERED FINAL AL GH D H M A AL n�c EST .200 Y GF V A UNLESS ALL SIGNATURES COMPLETED 116EE 'DETA 15SH T 2 1� I, ( / •b'/ �, SS IR RAPv E TS \ E T 30 f-1, e � � � ��� F PDE F * 1► FS EE TA l2 � a $FEET 2D� F F F /\ W � �' F W V E - 18" RCP- IV CAT T o9e S SEE DETAIL O E \ , SHEET 20.1 - G 0 E _ i 36' RCP-/ B 1— - BURIED) � V 1H'RCP-III — CSP I ' re C W/@.HOW �a or SITE 88 -IMPACT ZOOM -IN W ALE: 7" - SC - 50' RCP- V � i ePT P 36' RCP"III TOE PROTECTPOE C CLASS '8' RI m RAb I Q S 'e' RI AP E 0 1 \ ("V D C EET , U I \ 1 18^ T 3 TONS ' I`:S 17 TO \ -SEE 6EAI 55HE 2 1 ES 1�1 CP- IV EST 10 9Y FD E T 38 5 GF � "• SPECIAL V RCP IV E DE IL 1 HEE T2D 1 +� E" SQ \ \� DI TOE 'PROTECTION ET 2D 1 SPECIA LATE 'V' DITC \ t4 CC 1 "RCP IV - CLASS 'B' RIP RA \ EST40LSLYP.T RA V' DITCH U `� SEED AIL HEE 2D - < o EST-'18, TONS 'B' RIP RAP I T 15 TONS v 18" RCP- IV ^'� �/ �' ` ESOP-30,/SY GFD DETAIL 2N3HEET 2L -' ; I o � zc SEEDETAIL _ s<e� v<E SPE ERAL�' FP � I _ y� SHE`E-T=P2�___ 12 EE Hi ET 1 RALEIGH DURHAM v Tp C S5 -B =4kIP �o O � I TALL HE WALL ONAL v s TONS v I Ca - ��EDI HT l)v ILSON'S�- Nc �a D s3'a:0 -GRA__ 'DE-PAVEWN 0 Y GFD . v, i I P E _ �R S V' DITCH� W` CLASS I R .RAP REMOVAL AREA \ �'' ESt�O TONS TO DRAIN. MAINTAIN \ UI - EST 40-S)� GFD \ '------EXISTI GNAGE \ - SSE(: SHEE 1 ��DRAI- - 15" RCP- IV CI3 DETAIL \\\ 9y. PATTERNS \ •� �.._. CLA 'B' RIP RAP \ A I I ` �� EST 3 TANS �� T 10 SY-GFD. y � M/ v4p LB 4Y \\\ �, / \ 0 DI RETAIN _ `•�•�,�`L8\ \ SWALE TO Y/^ y�S4;3- \ CB CY! ,TO 76' = 4 .H6' \ MOODS / / } // •�aL' \ \ \ OUT=373.73' AT 18" RCP- �Ipp��3348.75' Jy I IN'843.50' 0 / / UTyT43.55' GA E{YAY �" CB CB �/ O ,AAA%-� � '/ coNVERTce �coNv�RT\3e �' v \ �V�o C TO 1B W/M. C O • J U/ .i/ TOE PRfitECTION \� \ CLASS B I T. / !t EST TONS ' /15 o�T3sd 2e S FD v v GRAPHIC SCALE I' 1 /J �% •`p1 i /� /T IL 155HEET \ \ / r so zs o 50 100 6I24 q .i'OVP �' s•' q Cam"/ / �� '� GRADE PAVEMENT - V� PLANS q4. 5-( n 4 CONVERT to DI REMOVAI�AREA AND '�•a;., - �L �� 46'vEXIST -CURB UN@ TO N 344 v Z DRAM Ta -151' O l � 7 � \ _ �_2a'c I �� j Q / A REMove ExisT. ��, SEE SHTS. 18 & 19 FOR -Y3- PROFILE SEE SHT. 19 FOR -Y8- PROFILE WETLAND AND SURACE WATER IMPACTS SUMMARY WETLAND IMPACTS SURFACE WATER IMPACTS Site No. Station (Fromfro) Structure Size/Type Permanent Fill In Wetlands (ac) Temp. Fill In Wetlands (ac) Excavation in Wetlands (ac) Mechanized Clearing in Wetlands (ac) Hand Clearing in Wetlands (ac) Permanent SW impacts (ac) Temp. SW impacts (ac) Existing Channel Impacts Permanent (ft) Existing Channel Impacts Temp. (ft) Natural Stream Design (ft) 1 17+44/17+62 -L- (RT) Scour Hole Stabilization < 0.01 < 0.01 20 15 2A 29+10/29+46 -L- (LT) Channel Improvements < 0.01 < 0.01 26 12 2B 33+00/33+30 -L- (LT) Bank Stabilization < 0.01 < 0.01 40 10 3A 33+30/33+51 -L- (LT) 3 @ 10'X10' RCBC Extension 0.03 53 33+30/33+51 -L- (LT) Bank Stabilization 0.02 < 0.01 45 15 3B 33+61/33+85 -L- (RT) Excavation < 0.01 33+24/33+38 -L- (RT) Bank Stabilization < 0.01 < 0.01 15 33 4 14+02/14+36 -RPB- (RT) Fill Slope < 0.01 4A REMOVED AFTER 4B MEETING 4B 14+52/14+80 -RPD- (LT) Bank Stabilization < 0.01 < 0.01 23 20 5A 75+05/75+30 -Y- (LT) Bank Stabilization < 0.01 < 0.01 10 20 5B REMOVED DUE TO DESIGN CHANGE 5C 51+50/52+59 -L- (RT) 3 @ 12'X12' RCBC Extension 0.02 37 51+50/52+59 -L- (RT) Channel Improvements 0.02 32 51+50/52+59 -L- (RT) Bank Stabilization 0.04 0.03 86 1 53 5D 54+50/54+75 -Y- (LT) Scour Hole Stabilization < 0.01 < 0.01 14 38 5E 29+90 -Y3- (CL) Proposed 12'X10' RCBC 0.07 176 29+90 -Y3- (CL) Bank Stabilization 0.03 < 0.01 73 20 6 51+47/51+67 -L- (RT) Channel Improvements < 0.01 < 0.01 10 10 7 52+38/52+76 -L- (RT) Channel Improvements < 0.01 < 0.01 20 24 8A 29+75/28+90 -Y3- (CL) Channel Fill 0.01 121 8B 26+22/28+96 -Y3- (LT) Fill Slope 0.30 0.07 26+25 -Y3- (CL) Rip Rap Pad < 0.01 9 53+20/53+34 -Y- (LT) Bank Stabilization < 0.01 < 0.01 45 17 10A 87+20/88+15 -Y- (RT) 3 @ 9'X8' RCBC Extension < 0.01 7 87+20/88+15 -Y- (RT) Channel Improvements 0.03 0.01 50 17 10B 88+00/88+74 -Y- (RT) 3 @ 9'X8' RCBC Extension 0.03 10C 86+82/87+00 -Y- (RT) 3 @ 9'X8' RCBC Extension < 0.01 11 95+48/99+77 -Y- (RT) 60" RCP Extension < 0.01 17 95+48/99+77 -Y- (RT) Scour Hole Stabilization < 0.01 < 0.01 28 23 11A 101+00/101+15-Y-(LT) Bank Stabilization <0.01 <0.01 28 10 12 101+15/101+57 -Y- (LT) Diversion Channel < 0.01 40 TOTALS*: 0.30 1 0.00 1 0.01 f 0.11 1 0.00 1 0.33 1 0.10 1 976 1 377 0 *Rounded totals are sum of actual impacts NOTES: 1-5506 Permit Sites have already been permitted and do not contribute to the total wetland and stream impacts for 1-5700. 1-5506 Permit Site 5A (48" CMP) 1-5506 Permit Site 5B (Bank Stabilization) Permanent SW Impacts: <0.01 ac. Temporary SW Impacts: <0.01 ac. Channel Impacts Permanent: 25 FT Channel Impacts Temporary: 26 FT gim