HomeMy WebLinkAbout20191029 Ver 1_PCN Form Submission_20190802DWR
MOM— of Water Resources
Pre -Construction Notification (PCN) Form
September 29, 2018 Ver 3
21nitial Review
Has this project met the requirements for acceptance in to the review process?*
r Yes
r No
Is this project a public transportation project?*
G Yes r No
Change mly if needed.
BIMS # Assigned
20191029
Is a payment required for this project?*
r No payment required
r Fee received
r Fee needed - send electronic notification
Select Project Reviewer*
Rob Ridings:eads\rgridings
Information for Initial Review
Version# *
1
Reviewing Office*
Central Office - (919) 707-9000
1a. Name of project:
1-40 and SR 3015 (Airport Blvd.) Interchange, Add Lane on 1-40 WB from SR 3015 to 1-540 [I-5700 Central]
1a. Who is the Primary Contact?*
NCDOT
1b. Primary Contact Email:*
driffey@ncdot.gov
Date Submitted
8/2/2019
Nearest Body of Water
Stirrup Iron Creek / Brier Creek
Basin
Neuse
Water Classification
QNSW
Site Coordinates
Latitude: Longitude:
35.8624-78.8146
FA. Processina Information
County (or Counties) where the project is located:
Wake
Is this project a public transportation project?*
r Yes r' No
Is this a NCDOT Project?*
r Yes r No
(NCDOT only) T.I.P. or state project number:
1-5700
WBS # (?)
50118.1.FS1
1a. Type(s) of approval sought from the Corps:
1c. Primary Contact Phone:*
(919)707-6151
W Section 404 Permit (wetlands, streams and waters, Clean Water Act)
r Section 10 Permit (navigable waters, tidal waters, Rivers and Harbors Act)
1b. What types) of permit(s) do you wish to seek authorization?
r Nationwide Permit (NWP)
V Regional General Permit (RGP)
r' Standard (IP)
1c. Has the NWP or GP number been verified by the Corps?
r Yes r No
Regional General Permit (RGP) Number:
RGP Numbers (for multiple RGPS):
1d. Type(s) of approval sought from the DWR:
fJ 401 Water Quality Certification - Regular
F Non-404 Jurisdictional General Permit
F Individual Permit
198200031 - NCDOT Bridges, Widening Projects 2015
le. Is this notification solely for the record because written approval is not required?
For the record only for DWR 401 Certification:
For the record only for Corps Permit:
F 401 Water Quality Certification - Express
W Riparian Buffer Authorization
1f. Is this an after -the -fact permit application?*
r Yes r No
1g. Is payment into a mitigation bank or in -lieu fee program proposed for mitigation of impacts?
r Yes r No
1g. Is payment into a mitigation bank or in -lieu fee program proposed for mitigation of impacts?
r Yes r No
Acceptance Letter Attachment
1h. Is the project located in any of NC's twenty coastal counties?
r Yes r No
1j. Is the project located in a designated trout watershed?
C Yes r No
FB. Applicant Information
1d. Who is applying for the permit?
[7 Owner r Applicant (other than owner)
le. Is there an Agent/Consultant for this project?
r Yes r No
2. Owner Information
2a. Name(s) on recorded deed:
Mutiple Properties
2b. Deed book and page no.:
2c. Responsible party:
2d.Address
Street Address
1598 Mail Service Center
Address Line 2
city
Raleigh
Fbstal / Zip Code
27699-1598
2e. Telephone Number:
(919)707-6000
2g. Email Address:*
State / Frovinre / R�gion
NC
0�untry
USA
2f. Fax Number:
*
r Yes r No
r Yes r No
pharris@ncdot.gov
C. Project Information and Prior Project History U
1. Project Information
1b. Subdivision name:
(d appropriate)
1c. Nearest municipality/ town:
Morrisville
2. Project Identification
2a. Property Identification Number:
2c. Project Address
Street Address
Address line 2
City
Postal / Zip 03de
3. Surface Waters
3a. Name of the nearest body of water to proposed project:*
Stirrup Iron Creek / Brier Creek
3b. Water Resources Classification of nearest receiving water:*
C;NSW
3c. What river basin(s) is your project located in?*
Neuse
3d. Please provide the 12-digit HUC in which the project is located.
030202010801
4. Project Description and History
2b. Property size:
State / ftovince / Ibgion
O�untry
4a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application:*
Land use consists of forested habitat with commercial development.
4b. Have Corps permits or DWR certifications been obtained for this project (including all prior phases) in the past?*
f Yes r No r Unknown
4d. Attach an 8 1/2 X 11 excerpt from the most recent version of the USGS topographic map indicating the location of the project site. (for DWR)
4e. Attach an 8 1/2 X 11 excerpt from the most recent version of the published County NRCS Soil Survey map depicting the project site. (for DWR)
4f. List the total estimated acreage of all existing wetlands on the property:
6.2
4g. List the total estimated linear feet of all existing streams on the property:
5,968
4h. Explain the purpose of the proposed project:*
Purpose is to reduce eAsting and future congestion at the 1-40 interchange with Airport Boulevard.
4i. Describe the overall project in detail, including indirect impacts and the type of equipment to be used:*
Revise interchange and construct aubliary lane on 1-40 Westbound from SR 3015 (Airport Blvd) to 1-540. The proposed project involves the conversion of the eAsting interchange to a
diverging diamond interchange. Control of access will be adjusted and maintained to accommodated the proposed design. Standard road building equipment, such as trucks, dozers,
and cranes will be used.
4j. Please upload project drawings for the proposed project.
1-5700_Permit Drawings_(2019-05-02).pdf 57.3MB
1-5700_Permit Drawings _BUFFERS _(2019-05-02).pdf 9.83MB
1-5700_RDY_Plans.pdf 9.38MB
5. Jurisdictional Determinations
5a. Have the wetlands or streams been delineated on the propertyor proposed impact areas?*
r Yes r No O Unknown
Comments:
Most recent field forms dated 11/7/2017.
5b. If the Corps made a jurisdictional determination, what type of determination was made?*
F Preliminary r Approved r^ Not Verified r^ Unknown r N/A
Corps AID Number:
SAW-2015-01934
5c. If 5a is yes, who delineated the jurisdictional areas?
Name (if known): Greg Price
Agency/Consultant Company: Carolina Ecosystem Inc.
Other:
5d. List the dates of the Corp jurisdiction determination or State determination if a determination was made by the Corps or DWR
June 6, 2018
5d1. Jurisdictional determination upload
18-06-06_PJD_NCDOT_I-5700_I-40 at Airport Boulevard_Div5.pdf 117.6KB
6. Future Project Plans
6a. Is this a phased project?*
r Yes r No
Are any other NWP(s), regional general permit(s), or individual permits(s) used, or intended to be used, to authorize any part of the proposed project or related activity?
D. Proposed Impacts Inventory
1. Impacts Summary
la. Where are the impacts associated with your project? (check all that apply):
R Wetlands W Streams -tributaries W Buffers
r Open Waters r Pond Construction
2. Wetland Impacts
2a1 Reason(?)
2b. Impact type * (?)
2c. Type of W.
2d. W. name *
2e. Forested*
2f. Type of
Jurisdicition*(?)
2g. Impact
area*
Site 3B
Excavation
P
Bottomland Hardwood Forest
WI
Yes
Both
0.005
(acres)
Site 4
Mechanized
P
Headwater Forest
WD
Yes
Both
0.006
(acres)
Site 8B
Fill
P
Bottomland Hardwood Forest
WH
Yes
Both
0.300
(acres)
Site 8B
Mechanized
P
Bottomland Hardwood Forest
WH
Yes
Both
0.070
(acres)
Site 10B
Mechanized
P
Non -Tidal Freshwater Marsh
WK
Yes
Both
0.030
(acres)
Site 10A
Mechanized
P
Non -Tidal Freshwater t:]
WN
Yes
Both
0.006
(acres)
29. Total Temporary Wetland Impact
0.000
2g. Total Wetland Impact
0.417
2h. Comments:
Defined <0.01 Impacts in Column G instead of reporting <0.01.
3. Stream Impacts
2g. Total Permanent Wetland Impact
0.417
3a. Reason for impact (?) 3b.lmpact type * 3c. Type of impact* 3d. S. name * 3e. Stream Type * 3f. Type of 3g. S. width * 3h. Impact
(9) Jurisdiction* length*
1 - Fill Permanent Rip Rap Fill SL Perennial Both 5 20
Average(feet) (linearfeet)
gp
Site 1 - Fill
Temporary
Rip Rap Fill
SL
Perennial
Both
5Ave
1(linearfed)
aqe (fed)
S3
Site 2A-Fill
Permanent
Other IF
Intermittent
Both
2Average
2(6li
(fed)
ear fed)
Site 2A - Fill
Temporary
Other
SD
Intermittent
Both
12
Average (feet)
(linearfed)
SS
Site 2B -Fill
Permanent
Bank Stabilization
SD
Intermittent
DWR
2
40
Average (feet)
(linear fed)
S6
Site 2B - Fill
Tem ora
P ry
Bank Stabilization
SD
Intermittent
DWR
2
10
Average (feet)
(linear feet)
S7
Site 3A - Fill
Permanent
Culvert
Stirrup Iron Creek
P
Perennial
Both
15
53
Average (feet)
(linear fed)
S8
Site 3A - Fill
Permanent
Bank Stabilization
Stirrup Iron Creek
P
Perennial
DWR
15
45
Average (feet)
(linear feet)
S9
Site 3A - Fill
Tem ora
P rY
Bank Stabilization
Stirrup Iron Creek
P
Perennial
DWR
15
15
Average (feet)
(linear feet)
Fol
Site 3B - Fill
Temporary
Bank Stabilization J
Stirrup Iron Creek
Perennial
DWR
15
33
Average (feet)
(linear feet)
F11
Site 4B - Fill
Permanent
Bank Stabilization
SF
Perennial
DWR
5
23
Average (feet)
(linear fed)
F2]�S4B
lteP
- Fill
Tem ora rY
Bank Stabilization
SF
Perennial
DWR
5
20
Averge(fed)
(linear fed)
F3]�S5A
- Fill
iteAvenge
Permanent
Bank Stabilization
Brier Creek
Perennial
DWR
25
10
(feet)
(linear fed)
F4]�S5A
- Fill
iteP
Tem ora ry
Bank Stabilization
Brier Creek
Perennial
DWR
25
20
Average (feet)
(linearfed)
F
Site 5C - Fill
Permanent
Culvert
Brier Creek
Perennial
Both
25
37
Average (feet)
(linear fed)
F6�Site
5C - Fill
Permanent
Other
Brier Creek
Perennial
Both
25
32
Average (feet)
(linearfed)
F7��S5C
- Fill
iteAverage
Permanent
Bank Stabilization
Brier Creek
Perennial
DWR
25
86
(fed)
(linearfed)
S18
Site 5D - Fill
Permanent
Rip Rap Fill
Brier Creek
Perennial
Both
2Average
14inearfed)
(feet)
S19
Site 5D- Fill
Temporary
Rip Rap Fill
Brier Creek
Perennial
Both
25
38
Average (fed)
(linear fed)
S20
Site 5E - Fill
Permanent
Culvert
ffrCreek
Perennial
Both
2Average
1(nearfed)
(fee)
S21
Site 5E - Fill
Permanent
Bank Stabilization
Brier Creek
Perennial
DWR
25
73
Average (fed)
(linear fed)
S22
Site 5E - Fill
Tem ora
p rY
Bank Stabilization
Brier Creek
Perennial
DWR
25
20
Average (feet)
(linear feet)
S23
Site 6 - Fill
Permanent
Other ��SA
Intermittent
Both
2Ave
1(linearfeet)
age (Fee)
S24
Site 6 - Fill
Temporary
Other JSA
Intermittent
Both
2
10
Average (feet)
(linear feet)
�5]�S7
-Fill
iteAve
Permanent
Other
SB
Intermittent
Both
1
20
age (feet)
(linear fed)
�6]�S7
-Fill
iteP
Tem ora
Other
SB
Intermittent
Both
1
24
Ave age (feet)
(linear fee )
�7]�SSA
-Fill
iteAverage
Permanent
Fill
SH
Perennial
Both
3
121
(feet)
(linear fed)
�8]�S9
- Fill
iteAverage
Permanent
Bank Stabilization
SE
Intermittent
DWR
4
45
(feet)
(linear feet)
�91
Site 9 - Fill
Tem orar
P Y
Bank Stabilization
SE
Intermittent
DWR
4
17
Average (fee[)
(linear fed)
�01
Site
Permanent
Culvert
SJ
Perennial
Both
2
7
Average (feet)
(linearfed)
�11
Site
Permanent
Other
SJ
Perennial
Both
2
50
Average (fed)
(linear fed)
�Site`10A-Fill
Y
Other
SJ
Perennial
BothS32P
Ave age (feet)
(linearfed)
S33
Site 11 -Fill
Permanent
Culvert
SG
Perennial
Both
4Average
1(linearfee)
(fee)
S34
Site 11 - Fill
Permanent
Rip Rap Fill
SG
Perennial
Both
4Average(fee)
28i
earfe�)
S35
Site 11 -Fill
Temporary
Rip Rap Fill
SG
Perennial
Both
4
23
Average (feet)
(lir>earfeet)
S36
�Site 1 1A - Fill
Permanent
Bank Stabilization
f(7-5516)
Perennial
DWR
1Average(Feet)
2(linearfe�)
S37
Site 11A-Fill
Temporary
Bank Stabilization
SB(1-5506)
Perennial
DWR
1Ave
1(linearfee)
age (feet)
S38
Site 12 - Fill
Temporary
Bank Stabilization JSA
(1-5506)
Intermittent
DWR
2Ave
4(linear
age (feet)
feet)
�91
Site 3B - Fill
Permanent
Bank Stabilization
Stirrup Iron Creek
p
Perennial
DWR
15
15
Average (feet)
(linear feet)
H
Site 5C - Fill
Tem ora
p ry
Bank Stabilization
Brier Creek
Perennial
DWR
25
53
Average (feet)
(linear feet)
31. Total jurisdictional ditch impact in square feet:
31. Total permanent stream impacts:
976
31. Total stream and ditch impacts:
1353
3j. Comments:
Other in Column 3C = Channel Improvements and Rip Rap Fill = Scour hole stabilization.
6. Buffer Impacts (for DWR)
6a. Project is in which protect basin(s)?
Check all that apply.
V Neuse
r Catawba
r Goose Creek
G Other
3i. Total temporary stream impacts:
377
F Tar -Pamlico
r Randleman
r Jordan Lake
6b. Impact Type
6c. Per or Temp
6d. Stream name
6e. Buffer mitigation required?
6f. Zone f impact
6g. Zone 2 impact
Site 1AAllowable
P
SL
No
634
0
Site 1 B Allowable
P
SK
No
261
195
3ite2AAllowable
P
SD
No
2,889
0
Site 2B Mitigable
P
SD
Yes
1,108
50
Site 3A Allowable
P
Stirrup Iron Creek
No
4,098
919
Site 3B Allowable
P
Stirrup Iron Creek
No
1,357
367
Site 3C Mitigable
P
Stirrup Iron Creek
Yes
1,348 11
1,929
Site 4B Allowable
P
SF
No
605
414
Site 5 Mitigable
P
Brier Creek
Yes
2,867
1,390
Site 5AAllowable
P
Brier Creek
No
1,699
1,753
Site 5C Allowable
P
Brier Creek
No
9,315
1,967
Site 5D Allowable
P
Brier Creek
No
2,009
1,115
Site 5E Mitigable
P
Brier Creek
Yes
9,400
3,633
$ite8AAllowable
P
SH
No
4,932
4,741
Site 9 Allowable
P
SE
No
3,303
2,362
Site 10AAIlowable
P
SJ
No
4,014
2,654
Site 11 Allowable
P
SG
No
3,629
1,937
Site 11AAIlowable
P
SB (1-5506)
No
3,478
2,449
6h. Total buffer impacts:
Zone 1 Zone 2
Total Temporary impacts: 0.00 0.00
Zone 1 Zone 2
Total Permanent impacts: 56,946.00 27,875.00
Zone 1 Zone 2
Total combined buffer impacts: 56,946.00 27,875.00
6i. Comments:
Supporting Documentation
E. Impact Justification and Mitigation ��J ]
1. Avoidance and Minimization
la. Specifically describe measures taken to avoid or minimize the proposed impacts in designing the project:
NCDOT minimized construction footprint and the right -of way requirements by converting the eAsting Airport Boulevard interchange into a diverging
diamond as opposed to using a Flyover interchange.
1 b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques:
Proposed culvert at Sta. 29+90 -Y3- Will be buried 1' and has a 1' sill. Culvert barrel Will be back filled with native material to sill height. Alignment is
designed to minimize wetland and stream crossing impacts by using 2:1 slopes to reduce structure length and limit wetland impacts, by using grassed
swales to the mapmum extent practical, and by using open channel design with rip rap on banks only where practical in areas of parallel jurisdictional
stream impacts. Channel improvements and bank stabilization will be used at culvert inlets and outlets to help stabilize channels and minimize erosion.
Countersunk rip rap pads with armored slopes/banks will be used at pipe outlets to prevent scour holes, erosion, and to protect the eAsting channel. A
filtration basin Will provide water quality treatment for a broad spectrum of water quality parameters of concern. Design Standards in Sensitive
Watersheds will be implemented.
2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State
2a. Does the project require Compensatory Mitigation for impacts to Waters of the U.S. or Waters of the State?
r Yes r No
2c. If yes, mitigation is required by (check all that apply):
W DWR V Corps
2d. If yes, which mitigation option(s) will be used for this project?
r Mitigation bank i— Payment to in -lieu fee W Permittee Responsible
program Mitigation
5. Complete if Using a Permittee Responsible Mitigation Plan
5a. If using a permittee responsible mitigation plan, provide a description of the proposed mitigation plan including mitigation credits generated.
Wetland and stream mitigation Will come from sites on the NCDOT Debit Ledger.
5b. Mitigation Plan Upload
1-5700 Jeffreys Warehouse.pdf 204.72KB
6. Buffer mitigation (State Regulated Riparian Buffer Rules) - required by DWR
6a. Will the project result in an impact within a protected riparian buffer that requires buffer mitigation? If yes, you must fill out this entire form - please contact DWR for more
information.
r Yes r No
6b. If yes, then identify the square feet of impact.
6c. Reason for impact
6d. Total impact
(square feet)
Multiplier
6e. Required mitigation
(square feet)
Zone 1
Roadway Fill
14,723
3
44,169
Zone 2 Roadway Fill 7,002 1.5 10,503
6f. Total buffer mitigation required
54672
6g. If buffer mitigation is required, is payment to a mitigation bank or NC Division of Mitigation Services proposed?
r Yes r No
6i. If no, then discuss what type of mitigation is proposed.
Buffer mitigation will come from sites on the NCDOT Debit Ledger.
6j. Comments:
F. Stormwater Management and Diffuse Flow Plan (required by DWR)
1. Diffuse Flow Plan
la. Does the project include or is it adjacent to protected riparian buffers identified within one of the NC Riparian Buffer Protection Rules?
r Yes r No
What type of SCM are you providing?
r Level Spreader
P Vegetated Conveyance (lower SHWT)
r Wetland Swale (higher SHWT)
r Other SCM that removes minimum 30 % nitrogen
P Proposed project will not create concentrated stormwater flow through the buffer
Diffuse Flow Documentation
2. Stormwater Management Plan
2a. Is this a NCDOT project subject to compliance with NCDOT's Individual NPDES permit NCS000250?*
r Yes r No
Comments
G. Supplementary Information
1. Environmental Documentation
la. Does the project involve an expenditure of public (federal/state/local) funds or the use of public (federal/state) land?*
f• Yes r No
1b. If you answered "yes" to the above, does the project require preparation of an environmental document pursuant to the requirements of the National or State (North Carolina)
Environmental Policy Act (NEPA/SEPA)?*
r Yes r No
1c. If you answered "yes" to the above, has the document review been finalized by the State Clearing House?*
r Yes r No
NEPAor SEPAFinal Approval Letter
2. Violations (DWR Requirement)
2a. Is the site in violation of DWR Water Quality Certification Rules (15A NCAC 2H .0500), Isolated Wetland Rules (15A NCAC 2H .1300), or DWR Surface Water or Wetland Standards or
Riparian Buffer Rules (15ANCAC 2B .0200)? *
r Yes r No
3. Cumulative Impacts (DWR Requirement)
3a. Will this project result in additional development, which could impact nearby downstream water quality?*
r Yes r No
3b. If you answered "no," provide a short narrative description.
Due to the existing transportation facility located in an ebsting urban area, this project will neither influence nearby land uses nor stimulate growth.
4. Sewage Disposal (DWR Requirement)
4a. Is sewage disposal required by DWR for this project?*
r Yes r No r N/A
5. Endangered Species and Designated Critical Habitat (Corps Requirement)
5a. Will this project occur in or near an area with federally protected species or habitat?*
r Yes r No
5b. Have you checked with the USFWS concerning Endangered Species Act impacts?*
r Yes r No
5c. If yes, indicate the USFWS Field Office you have contacted.
Raleigh
5d. Is another Federal agency involved?*
r Yes r No r Unknown
Se. Is this a DOT project located within Division's 1-8?
r Yes r No
5j. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat?
USFWS Environmental Conservation Online System (ECOS) range by basin (IPAC) website and NCNHP database along with Feld surveys.
Consultation Documentation Upload
20190430_letter_Service to NCDOT_I-5700.pdf 41.22KB
6. Essential Fish Habitat (Corps Requirement)
6a. Will this project occur in or near an area designated as an Essential Fish Habitat?*
r Yes r No
6b. What data sources did you use to determine whether your site would impact an Essential Fish Habitat?*
NMFS County Index
7. Historic or Prehistoric Cultural Resources (Corps Requirement)
7a. Will this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural preservation status?*
r Yes r No
7b. What data sources did you use to determine whether your site would impact historic or archeological resources?*
NEPA documentation
7c. Historic or Prehistoric Information Upload
8. Flood Zone Designation (Corps Requirement)
8a. Will this project occur in a FEMA-designated 100-year floodplain?*
r Yes r No
8b. If yes, explain how project meets FEMA requirements:
NCDOT Hydraulics Unit coordination with FEMA
8c. What source(s) did you use to make the floodplain determination?*
FEMA Maps
Miscellaneous
Comments
Miscellaneous attachments not previously requested.
Signature u
*
W By checking the box and signing below, I certify that:
• I have given true, accurate, and complete information on this form;
• I agree that submission of this PCN form is a "transaction" subject to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act");
• I agree to conduct this transaction by electronic means pursuant to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act");
• I understand that an electronic signature has the same legal effect and can be enforced in the same way as a written signature; AND
• I intend to electronically sign and submit the PCN form.
Full Name:
Mack Christopher Rivenbark, III
Signature
hkq e. RiaWaq,111
Date
8/2/2019