Loading...
HomeMy WebLinkAbout20191029 Ver 1_PCN Form Submission_20190802DWR MOM— of Water Resources Pre -Construction Notification (PCN) Form September 29, 2018 Ver 3 21nitial Review Has this project met the requirements for acceptance in to the review process?* r Yes r No Is this project a public transportation project?* G Yes r No Change mly if needed. BIMS # Assigned 20191029 Is a payment required for this project?* r No payment required r Fee received r Fee needed - send electronic notification Select Project Reviewer* Rob Ridings:eads\rgridings Information for Initial Review Version# * 1 Reviewing Office* Central Office - (919) 707-9000 1a. Name of project: 1-40 and SR 3015 (Airport Blvd.) Interchange, Add Lane on 1-40 WB from SR 3015 to 1-540 [I-5700 Central] 1a. Who is the Primary Contact?* NCDOT 1b. Primary Contact Email:* driffey@ncdot.gov Date Submitted 8/2/2019 Nearest Body of Water Stirrup Iron Creek / Brier Creek Basin Neuse Water Classification QNSW Site Coordinates Latitude: Longitude: 35.8624-78.8146 FA. Processina Information County (or Counties) where the project is located: Wake Is this project a public transportation project?* r Yes r' No Is this a NCDOT Project?* r Yes r No (NCDOT only) T.I.P. or state project number: 1-5700 WBS # (?) 50118.1.FS1 1a. Type(s) of approval sought from the Corps: 1c. Primary Contact Phone:* (919)707-6151 W Section 404 Permit (wetlands, streams and waters, Clean Water Act) r Section 10 Permit (navigable waters, tidal waters, Rivers and Harbors Act) 1b. What types) of permit(s) do you wish to seek authorization? r Nationwide Permit (NWP) V Regional General Permit (RGP) r' Standard (IP) 1c. Has the NWP or GP number been verified by the Corps? r Yes r No Regional General Permit (RGP) Number: RGP Numbers (for multiple RGPS): 1d. Type(s) of approval sought from the DWR: fJ 401 Water Quality Certification - Regular F Non-404 Jurisdictional General Permit F Individual Permit 198200031 - NCDOT Bridges, Widening Projects 2015 le. Is this notification solely for the record because written approval is not required? For the record only for DWR 401 Certification: For the record only for Corps Permit: F 401 Water Quality Certification - Express W Riparian Buffer Authorization 1f. Is this an after -the -fact permit application?* r Yes r No 1g. Is payment into a mitigation bank or in -lieu fee program proposed for mitigation of impacts? r Yes r No 1g. Is payment into a mitigation bank or in -lieu fee program proposed for mitigation of impacts? r Yes r No Acceptance Letter Attachment 1h. Is the project located in any of NC's twenty coastal counties? r Yes r No 1j. Is the project located in a designated trout watershed? C Yes r No FB. Applicant Information 1d. Who is applying for the permit? [7 Owner r Applicant (other than owner) le. Is there an Agent/Consultant for this project? r Yes r No 2. Owner Information 2a. Name(s) on recorded deed: Mutiple Properties 2b. Deed book and page no.: 2c. Responsible party: 2d.Address Street Address 1598 Mail Service Center Address Line 2 city Raleigh Fbstal / Zip Code 27699-1598 2e. Telephone Number: (919)707-6000 2g. Email Address:* State / Frovinre / R�gion NC 0�untry USA 2f. Fax Number: * r Yes r No r Yes r No pharris@ncdot.gov C. Project Information and Prior Project History U 1. Project Information 1b. Subdivision name: (d appropriate) 1c. Nearest municipality/ town: Morrisville 2. Project Identification 2a. Property Identification Number: 2c. Project Address Street Address Address line 2 City Postal / Zip 03de 3. Surface Waters 3a. Name of the nearest body of water to proposed project:* Stirrup Iron Creek / Brier Creek 3b. Water Resources Classification of nearest receiving water:* C;NSW 3c. What river basin(s) is your project located in?* Neuse 3d. Please provide the 12-digit HUC in which the project is located. 030202010801 4. Project Description and History 2b. Property size: State / ftovince / Ibgion O�untry 4a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application:* Land use consists of forested habitat with commercial development. 4b. Have Corps permits or DWR certifications been obtained for this project (including all prior phases) in the past?* f Yes r No r Unknown 4d. Attach an 8 1/2 X 11 excerpt from the most recent version of the USGS topographic map indicating the location of the project site. (for DWR) 4e. Attach an 8 1/2 X 11 excerpt from the most recent version of the published County NRCS Soil Survey map depicting the project site. (for DWR) 4f. List the total estimated acreage of all existing wetlands on the property: 6.2 4g. List the total estimated linear feet of all existing streams on the property: 5,968 4h. Explain the purpose of the proposed project:* Purpose is to reduce eAsting and future congestion at the 1-40 interchange with Airport Boulevard. 4i. Describe the overall project in detail, including indirect impacts and the type of equipment to be used:* Revise interchange and construct aubliary lane on 1-40 Westbound from SR 3015 (Airport Blvd) to 1-540. The proposed project involves the conversion of the eAsting interchange to a diverging diamond interchange. Control of access will be adjusted and maintained to accommodated the proposed design. Standard road building equipment, such as trucks, dozers, and cranes will be used. 4j. Please upload project drawings for the proposed project. 1-5700_Permit Drawings_(2019-05-02).pdf 57.3MB 1-5700_Permit Drawings _BUFFERS _(2019-05-02).pdf 9.83MB 1-5700_RDY_Plans.pdf 9.38MB 5. Jurisdictional Determinations 5a. Have the wetlands or streams been delineated on the propertyor proposed impact areas?* r Yes r No O Unknown Comments: Most recent field forms dated 11/7/2017. 5b. If the Corps made a jurisdictional determination, what type of determination was made?* F Preliminary r Approved r^ Not Verified r^ Unknown r N/A Corps AID Number: SAW-2015-01934 5c. If 5a is yes, who delineated the jurisdictional areas? Name (if known): Greg Price Agency/Consultant Company: Carolina Ecosystem Inc. Other: 5d. List the dates of the Corp jurisdiction determination or State determination if a determination was made by the Corps or DWR June 6, 2018 5d1. Jurisdictional determination upload 18-06-06_PJD_NCDOT_I-5700_I-40 at Airport Boulevard_Div5.pdf 117.6KB 6. Future Project Plans 6a. Is this a phased project?* r Yes r No Are any other NWP(s), regional general permit(s), or individual permits(s) used, or intended to be used, to authorize any part of the proposed project or related activity? D. Proposed Impacts Inventory 1. Impacts Summary la. Where are the impacts associated with your project? (check all that apply): R Wetlands W Streams -tributaries W Buffers r Open Waters r Pond Construction 2. Wetland Impacts 2a1 Reason(?) 2b. Impact type * (?) 2c. Type of W. 2d. W. name * 2e. Forested* 2f. Type of Jurisdicition*(?) 2g. Impact area* Site 3B Excavation P Bottomland Hardwood Forest WI Yes Both 0.005 (acres) Site 4 Mechanized P Headwater Forest WD Yes Both 0.006 (acres) Site 8B Fill P Bottomland Hardwood Forest WH Yes Both 0.300 (acres) Site 8B Mechanized P Bottomland Hardwood Forest WH Yes Both 0.070 (acres) Site 10B Mechanized P Non -Tidal Freshwater Marsh WK Yes Both 0.030 (acres) Site 10A Mechanized P Non -Tidal Freshwater t:] WN Yes Both 0.006 (acres) 29. Total Temporary Wetland Impact 0.000 2g. Total Wetland Impact 0.417 2h. Comments: Defined <0.01 Impacts in Column G instead of reporting <0.01. 3. Stream Impacts 2g. Total Permanent Wetland Impact 0.417 3a. Reason for impact (?) 3b.lmpact type * 3c. Type of impact* 3d. S. name * 3e. Stream Type * 3f. Type of 3g. S. width * 3h. Impact (9) Jurisdiction* length* 1 - Fill Permanent Rip Rap Fill SL Perennial Both 5 20 Average(feet) (linearfeet) gp Site 1 - Fill Temporary Rip Rap Fill SL Perennial Both 5Ave 1(linearfed) aqe (fed) S3 Site 2A-Fill Permanent Other IF Intermittent Both 2Average 2(6li (fed) ear fed) Site 2A - Fill Temporary Other SD Intermittent Both 12 Average (feet) (linearfed) SS Site 2B -Fill Permanent Bank Stabilization SD Intermittent DWR 2 40 Average (feet) (linear fed) S6 Site 2B - Fill Tem ora P ry Bank Stabilization SD Intermittent DWR 2 10 Average (feet) (linear feet) S7 Site 3A - Fill Permanent Culvert Stirrup Iron Creek P Perennial Both 15 53 Average (feet) (linear fed) S8 Site 3A - Fill Permanent Bank Stabilization Stirrup Iron Creek P Perennial DWR 15 45 Average (feet) (linear feet) S9 Site 3A - Fill Tem ora P rY Bank Stabilization Stirrup Iron Creek P Perennial DWR 15 15 Average (feet) (linear feet) Fol Site 3B - Fill Temporary Bank Stabilization J Stirrup Iron Creek Perennial DWR 15 33 Average (feet) (linear feet) F11 Site 4B - Fill Permanent Bank Stabilization SF Perennial DWR 5 23 Average (feet) (linear fed) F2]�S4B lteP - Fill Tem ora rY Bank Stabilization SF Perennial DWR 5 20 Averge(fed) (linear fed) F3]�S5A - Fill iteAvenge Permanent Bank Stabilization Brier Creek Perennial DWR 25 10 (feet) (linear fed) F4]�S5A - Fill iteP Tem ora ry Bank Stabilization Brier Creek Perennial DWR 25 20 Average (feet) (linearfed) F Site 5C - Fill Permanent Culvert Brier Creek Perennial Both 25 37 Average (feet) (linear fed) F6�Site 5C - Fill Permanent Other Brier Creek Perennial Both 25 32 Average (feet) (linearfed) F7��S5C - Fill iteAverage Permanent Bank Stabilization Brier Creek Perennial DWR 25 86 (fed) (linearfed) S18 Site 5D - Fill Permanent Rip Rap Fill Brier Creek Perennial Both 2Average 14inearfed) (feet) S19 Site 5D- Fill Temporary Rip Rap Fill Brier Creek Perennial Both 25 38 Average (fed) (linear fed) S20 Site 5E - Fill Permanent Culvert ffrCreek Perennial Both 2Average 1(nearfed) (fee) S21 Site 5E - Fill Permanent Bank Stabilization Brier Creek Perennial DWR 25 73 Average (fed) (linear fed) S22 Site 5E - Fill Tem ora p rY Bank Stabilization Brier Creek Perennial DWR 25 20 Average (feet) (linear feet) S23 Site 6 - Fill Permanent Other ��SA Intermittent Both 2Ave 1(linearfeet) age (Fee) S24 Site 6 - Fill Temporary Other JSA Intermittent Both 2 10 Average (feet) (linear feet) �5]�S7 -Fill iteAve Permanent Other SB Intermittent Both 1 20 age (feet) (linear fed) �6]�S7 -Fill iteP Tem ora Other SB Intermittent Both 1 24 Ave age (feet) (linear fee ) �7]�SSA -Fill iteAverage Permanent Fill SH Perennial Both 3 121 (feet) (linear fed) �8]�S9 - Fill iteAverage Permanent Bank Stabilization SE Intermittent DWR 4 45 (feet) (linear feet) �91 Site 9 - Fill Tem orar P Y Bank Stabilization SE Intermittent DWR 4 17 Average (fee[) (linear fed) �01 Site Permanent Culvert SJ Perennial Both 2 7 Average (feet) (linearfed) �11 Site Permanent Other SJ Perennial Both 2 50 Average (fed) (linear fed) �Site`10A-Fill Y Other SJ Perennial BothS32P Ave age (feet) (linearfed) S33 Site 11 -Fill Permanent Culvert SG Perennial Both 4Average 1(linearfee) (fee) S34 Site 11 - Fill Permanent Rip Rap Fill SG Perennial Both 4Average(fee) 28i earfe�) S35 Site 11 -Fill Temporary Rip Rap Fill SG Perennial Both 4 23 Average (feet) (lir>earfeet) S36 �Site 1 1A - Fill Permanent Bank Stabilization f(7-5516) Perennial DWR 1Average(Feet) 2(linearfe�) S37 Site 11A-Fill Temporary Bank Stabilization SB(1-5506) Perennial DWR 1Ave 1(linearfee) age (feet) S38 Site 12 - Fill Temporary Bank Stabilization JSA (1-5506) Intermittent DWR 2Ave 4(linear age (feet) feet) �91 Site 3B - Fill Permanent Bank Stabilization Stirrup Iron Creek p Perennial DWR 15 15 Average (feet) (linear feet) H Site 5C - Fill Tem ora p ry Bank Stabilization Brier Creek Perennial DWR 25 53 Average (feet) (linear feet) 31. Total jurisdictional ditch impact in square feet: 31. Total permanent stream impacts: 976 31. Total stream and ditch impacts: 1353 3j. Comments: Other in Column 3C = Channel Improvements and Rip Rap Fill = Scour hole stabilization. 6. Buffer Impacts (for DWR) 6a. Project is in which protect basin(s)? Check all that apply. V Neuse r Catawba r Goose Creek G Other 3i. Total temporary stream impacts: 377 F Tar -Pamlico r Randleman r Jordan Lake 6b. Impact Type 6c. Per or Temp 6d. Stream name 6e. Buffer mitigation required? 6f. Zone f impact 6g. Zone 2 impact Site 1AAllowable P SL No 634 0 Site 1 B Allowable P SK No 261 195 3ite2AAllowable P SD No 2,889 0 Site 2B Mitigable P SD Yes 1,108 50 Site 3A Allowable P Stirrup Iron Creek No 4,098 919 Site 3B Allowable P Stirrup Iron Creek No 1,357 367 Site 3C Mitigable P Stirrup Iron Creek Yes 1,348 11 1,929 Site 4B Allowable P SF No 605 414 Site 5 Mitigable P Brier Creek Yes 2,867 1,390 Site 5AAllowable P Brier Creek No 1,699 1,753 Site 5C Allowable P Brier Creek No 9,315 1,967 Site 5D Allowable P Brier Creek No 2,009 1,115 Site 5E Mitigable P Brier Creek Yes 9,400 3,633 $ite8AAllowable P SH No 4,932 4,741 Site 9 Allowable P SE No 3,303 2,362 Site 10AAIlowable P SJ No 4,014 2,654 Site 11 Allowable P SG No 3,629 1,937 Site 11AAIlowable P SB (1-5506) No 3,478 2,449 6h. Total buffer impacts: Zone 1 Zone 2 Total Temporary impacts: 0.00 0.00 Zone 1 Zone 2 Total Permanent impacts: 56,946.00 27,875.00 Zone 1 Zone 2 Total combined buffer impacts: 56,946.00 27,875.00 6i. Comments: Supporting Documentation E. Impact Justification and Mitigation ��J ] 1. Avoidance and Minimization la. Specifically describe measures taken to avoid or minimize the proposed impacts in designing the project: NCDOT minimized construction footprint and the right -of way requirements by converting the eAsting Airport Boulevard interchange into a diverging diamond as opposed to using a Flyover interchange. 1 b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques: Proposed culvert at Sta. 29+90 -Y3- Will be buried 1' and has a 1' sill. Culvert barrel Will be back filled with native material to sill height. Alignment is designed to minimize wetland and stream crossing impacts by using 2:1 slopes to reduce structure length and limit wetland impacts, by using grassed swales to the mapmum extent practical, and by using open channel design with rip rap on banks only where practical in areas of parallel jurisdictional stream impacts. Channel improvements and bank stabilization will be used at culvert inlets and outlets to help stabilize channels and minimize erosion. Countersunk rip rap pads with armored slopes/banks will be used at pipe outlets to prevent scour holes, erosion, and to protect the eAsting channel. A filtration basin Will provide water quality treatment for a broad spectrum of water quality parameters of concern. Design Standards in Sensitive Watersheds will be implemented. 2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State 2a. Does the project require Compensatory Mitigation for impacts to Waters of the U.S. or Waters of the State? r Yes r No 2c. If yes, mitigation is required by (check all that apply): W DWR V Corps 2d. If yes, which mitigation option(s) will be used for this project? r Mitigation bank i— Payment to in -lieu fee W Permittee Responsible program Mitigation 5. Complete if Using a Permittee Responsible Mitigation Plan 5a. If using a permittee responsible mitigation plan, provide a description of the proposed mitigation plan including mitigation credits generated. Wetland and stream mitigation Will come from sites on the NCDOT Debit Ledger. 5b. Mitigation Plan Upload 1-5700 Jeffreys Warehouse.pdf 204.72KB 6. Buffer mitigation (State Regulated Riparian Buffer Rules) - required by DWR 6a. Will the project result in an impact within a protected riparian buffer that requires buffer mitigation? If yes, you must fill out this entire form - please contact DWR for more information. r Yes r No 6b. If yes, then identify the square feet of impact. 6c. Reason for impact 6d. Total impact (square feet) Multiplier 6e. Required mitigation (square feet) Zone 1 Roadway Fill 14,723 3 44,169 Zone 2 Roadway Fill 7,002 1.5 10,503 6f. Total buffer mitigation required 54672 6g. If buffer mitigation is required, is payment to a mitigation bank or NC Division of Mitigation Services proposed? r Yes r No 6i. If no, then discuss what type of mitigation is proposed. Buffer mitigation will come from sites on the NCDOT Debit Ledger. 6j. Comments: F. Stormwater Management and Diffuse Flow Plan (required by DWR) 1. Diffuse Flow Plan la. Does the project include or is it adjacent to protected riparian buffers identified within one of the NC Riparian Buffer Protection Rules? r Yes r No What type of SCM are you providing? r Level Spreader P Vegetated Conveyance (lower SHWT) r Wetland Swale (higher SHWT) r Other SCM that removes minimum 30 % nitrogen P Proposed project will not create concentrated stormwater flow through the buffer Diffuse Flow Documentation 2. Stormwater Management Plan 2a. Is this a NCDOT project subject to compliance with NCDOT's Individual NPDES permit NCS000250?* r Yes r No Comments G. Supplementary Information 1. Environmental Documentation la. Does the project involve an expenditure of public (federal/state/local) funds or the use of public (federal/state) land?* f• Yes r No 1b. If you answered "yes" to the above, does the project require preparation of an environmental document pursuant to the requirements of the National or State (North Carolina) Environmental Policy Act (NEPA/SEPA)?* r Yes r No 1c. If you answered "yes" to the above, has the document review been finalized by the State Clearing House?* r Yes r No NEPAor SEPAFinal Approval Letter 2. Violations (DWR Requirement) 2a. Is the site in violation of DWR Water Quality Certification Rules (15A NCAC 2H .0500), Isolated Wetland Rules (15A NCAC 2H .1300), or DWR Surface Water or Wetland Standards or Riparian Buffer Rules (15ANCAC 2B .0200)? * r Yes r No 3. Cumulative Impacts (DWR Requirement) 3a. Will this project result in additional development, which could impact nearby downstream water quality?* r Yes r No 3b. If you answered "no," provide a short narrative description. Due to the existing transportation facility located in an ebsting urban area, this project will neither influence nearby land uses nor stimulate growth. 4. Sewage Disposal (DWR Requirement) 4a. Is sewage disposal required by DWR for this project?* r Yes r No r N/A 5. Endangered Species and Designated Critical Habitat (Corps Requirement) 5a. Will this project occur in or near an area with federally protected species or habitat?* r Yes r No 5b. Have you checked with the USFWS concerning Endangered Species Act impacts?* r Yes r No 5c. If yes, indicate the USFWS Field Office you have contacted. Raleigh 5d. Is another Federal agency involved?* r Yes r No r Unknown Se. Is this a DOT project located within Division's 1-8? r Yes r No 5j. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat? USFWS Environmental Conservation Online System (ECOS) range by basin (IPAC) website and NCNHP database along with Feld surveys. Consultation Documentation Upload 20190430_letter_Service to NCDOT_I-5700.pdf 41.22KB 6. Essential Fish Habitat (Corps Requirement) 6a. Will this project occur in or near an area designated as an Essential Fish Habitat?* r Yes r No 6b. What data sources did you use to determine whether your site would impact an Essential Fish Habitat?* NMFS County Index 7. Historic or Prehistoric Cultural Resources (Corps Requirement) 7a. Will this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural preservation status?* r Yes r No 7b. What data sources did you use to determine whether your site would impact historic or archeological resources?* NEPA documentation 7c. Historic or Prehistoric Information Upload 8. Flood Zone Designation (Corps Requirement) 8a. Will this project occur in a FEMA-designated 100-year floodplain?* r Yes r No 8b. If yes, explain how project meets FEMA requirements: NCDOT Hydraulics Unit coordination with FEMA 8c. What source(s) did you use to make the floodplain determination?* FEMA Maps Miscellaneous Comments Miscellaneous attachments not previously requested. Signature u * W By checking the box and signing below, I certify that: • I have given true, accurate, and complete information on this form; • I agree that submission of this PCN form is a "transaction" subject to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act"); • I agree to conduct this transaction by electronic means pursuant to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act"); • I understand that an electronic signature has the same legal effect and can be enforced in the same way as a written signature; AND • I intend to electronically sign and submit the PCN form. Full Name: Mack Christopher Rivenbark, III Signature hkq e. RiaWaq,111 Date 8/2/2019