Loading...
HomeMy WebLinkAboutSW6190701_Calcs_(Pipe_System)_20190801NAME 7Th. Subdivision DATE )6-27-19 PROJECT NO 1360 DESIGN PHASE PRELIMCT CONSTR / Xarms REVISIONION County, North Carolina BY CEK RECORDerland OTHER CHECKED BY CS13 (SPECIFY) n= 0.013 9= 226 h= 26 STORM DRAINAGE SCHEDULE CONTINUED AREAS (INLETS) INLET AREA (AC) INLET Cc RUNOFF COEFF. INLET DISCHARGE (CFS) Q (+) UPSTREAM BYPASS (CFS) Q(-) INLET BYPASS (CFS) CAPTURED INLET DISCHARGE (CFS) TOTAL AREAS (AC) INLET TIME (MIN) PIPE TIME (MIN) Tc TIME OF CONC. (MIN) I INTENSITY (IN/HR) Cc RUNOFF COEFF. FROM TO PIPE 1 IN PIPE 1 OUT PIPE 1 IN PIPE 2 IN PIPE 2 OUT PIPE 2 IN TSB1 PIPE TSB1 OUT TSB1 PIPE Storm Drainage for Spread.xls 10-YEAR Date 811/2019 Time: 4:29 PM Page 1 of 4 • " " ' DATE DESIGN PHASE PROJECT NAME The Farms Subdivision 06-27-19 PRELIM CONSTR / X / REVISION PROJECT NO 1360 LOCATION Cumberland County, North Carolina BY CEK RECORD OTHER CHECKED BY CSB (SPECIFY) n= 0.013 9= 226 h= 26 STORM DRAINAGE SCHEDULE - CONTINUED Q DISCHARGE (CFS) Q SIDE- STREAM (CFS) SLOPE DIA. (IN) CAPACITY (FULL) (CFS) V FULL (FPS) LENGTH (FT) SEGMENT TIME (MIN) UPPER INV. (FT) LOWER INV. (FT) UPSTREAM TOP ELEV. (FT) FROM TO PIPE 1 IN PIPE 1 OUT 1920. 0.00 0.0102 24 22.9 7.3 44 0.10 130.00 129.55 132.47 PIPE 2 IN PIPE 2 OUT 8.90 0.00 0.0102 18 10.6 6.0 44 0.12 132.20 131.75 134.75 TSB1 PIPE TSB1 OUT 15.00 0.00 0.0050 24 16.0 5.1 90 0.29 126.00 125.55 130.00 Storm Drainage for Spread As 10-YEAR Date 811/2019 Time: 4:29 PM Page 2 of 4 " 0 " ' " ' DATE DESIGN PHASE CT NAME 7Th. arms Subdivision 06-27-19 PRELIM CONSTR / X / REVISIONION PROJECT NO 1360 County, North Carolina BY CEK RECORDerland OTHER CHECKED BY CSB (SPECIFY) n= g= h= 0.013 226 26 HYDRAULIC GRADE LINE PIPE HYDRAULIC SIDESTREAM REA RADIUS SUMMATION II(FT)(FT) (CFS) Hf He 90 DEG=0.7 60 DEG=0.55 HEAD LOSS I He BEND LOSS Hb K'S 30 DEG=0.28 15 DEG=0.10 I Ht BEND LOSS K CONTINUED FRICTION FRICTION SLOPE VELOCITY (FT/FT) (FPS) FROM TO PIPE 1 IN PIPE 1 OUT 3.1416 0.5000 0.00 0.31 0.14 0.20 0.09 0.74 0.15 0.0071 6.08 PIPE 2 IN PIPE 2 OUT 1.7671 0.3750 0.00 0.31 0.10 0.14 0.06 0.61 0.15 0.0071 5.02 TSB1 PIPE TSB1 OUT 3.1416 0.5000 0.00 0.39 0.09 0.12 0.05 0.66 0.15 0.0044 4.75 Storm Drainage for Spread.xls 10-YEAR Date 811/2019 Time: 4:29 PM Page 3 of 4 "1"' " DATE 06-27-19 DESIGN PHASE NAME 7Th. Subdivision PRELIMCT CONSTR / Xarms REVISIONION PROJECT NO 1360 County, North Carolina BY CEK RECORDerland OTHER CHECKED BY CSB (SPECIFY) n= 0.013 g= 226 h= 26 HYDRAULIC GRADE LINE - CONTINUED DESIGN CRITERIA: 1. DESIGN FORTHE 10YR STORM 2. ASSUME TIME OF CONCENTRATION TO AN INDIVIDUAL INLET = 5 MIN. (Unless otherwise noted) 3. INTENSITY = g/(h+T), FOR 10 YR STORM (g and h were derived from Raleigh -Durham Intensity - Duration -Frequency Charts, REF: NC Erosion and Sediment Control Planning and Design Manual) 4. MANNINGS "n" FACTOR= 0.013 5. RUNOFF COEFICIENT Cc=0.50 (PerCR-7107) OUTLET W.S. ELEV (FT) INLET W.S. ELEV. FLOW CONDITION CONTROL FREE- BOARD (FT) COMMENTS FROM TO OUTLET INLET USE CONTOL CONTROL (FT) (FT) (FT) PIPE 1 IN PIPE 1 OUT 131.15 131.89 132.61 132.61 INLET (0.14) OVERFLOW EXISTING GROUND 129.82 PIPE 2 IN PIPE 2 OUT 132.95 133.56 134.04 134.04 INLET 0.71 OK EXISTING GROUND 132.07 TSB1 PIPE TSB1 OUT 127.15 127.81 127.98 127.98 INLET 2.02 OK EXISTING GROUND 126.00 Storm Drainage for Spread.xls 10-YEAR Date 8/1/2019 Time: 4:29 PM Page 4 of 4