Loading...
HomeMy WebLinkAbout20180180 Ver 1_Additional Draft Mit Plan Comments_20190805Strickland, Bev From: Browning, Kimberly D CIV USARMY CESAW (US) <Kimberly.D.Browning@usace.army.mil> Sent: Monday, August 05, 2019 11:06 AM To: Dailey, Samantha J CIV USARMY CESAW (USA); Adam McIntyre; Catherine Manner; Cara Conder Cc: Tugwell, Todd J CIV USARMY CESAW (US); Kim Browning; Haupt, Mac; Davis, Erin B; Bowers, Todd; Wilson, Travis W.; Merritt, Katie Subject: [External] Additional Hollowell Draft Mit Plan Comments (UNCLASSIFIED) CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to report.spam@nc.gov<maiIto: report.spam@nc.gov> CLASSIFICATION: UNCLASSIFIED WLS Neuse 01 -Hollowell Draft Mitigation Plan (SAW -2017-00159) Comments: 1. Please provide a separate monitoring map. Please include fixed photo points referenced in section 9.4. 2. UT2-R3: Why is the ratio for Ell 2:1? Since only buffer planting on one side is proposed, a ratio of 3.5:1 is more appropriate here. 3. UT1-R2: Wasn't part of this trib in violation of Neuse Buffer Rules? If so, that portion should be treated with a reduced ratio of 2:1, rather than 1:1. Please provide an updated Determination of Credits. 4. The functional pyramid is cited to show existing conditions for each category, and was used to describe the functional uplift potential of the project, which is appreciated. Please note that the functional pyramid and SQT tool have not been approved for use by the IRT in determining success for mitigation projects. It would be interesting to see the correlation of the NCSAM assessment compared to the SQT throughout the project. 5. Table 12: Does this include both stream riparian buffer planting and the wetland re-establishment/enhancement areas? Or will there be a separate planting list for wetlands, perhaps to include more FACW species? 6. Please show proposed BMPs on Figure 10. Additionally, please address the maintenance of the BMPs if they are included within the easement. 7. 8.1: All four bankfull events must occur in separate years. 8. BHR should not exceed 1.2 Sorry for the delay. Thanks Kim Kim Browning Mitigation Project Manager, Regulatory Division I U.S. Army Corps of Engineers 3331 Heritage Trade Dr, Ste. 105 1 Wake Forest, NC 27587 1 919.554.4884 x60 BUILDING STRONG (r) CLASSIFICATION: UNCLASSIFIED