Loading...
HomeMy WebLinkAbout20160980 Ver 1_USACE Correspondence_20190805Strickland, Bev From: Dailey, Samantha J CIV USARMY CESAW (USA) <Samantha.J.Dailey@usace.army.mil> Sent: Monday, August 05, 2019 11:18 AM To: Tugwell, Todd J CIV USARMY CESAW (US); Kim Browning; Haupt, Mac; Davis, Erin B; Wilson, Travis W.; Bowers, Todd Subject: [External] SAW -2016-01989 / EBX-Neuse I, LLC / Neu -Con UMBI / Meadow Spring Mitigation Site Final As -Built Monitoring Report Follow Up Flag: Follow up Flag Status: Flagged CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to report.spam@nc.gov<maiIto: report.spam@nc.gov> Good morning, The below referenced FINAL As -Built Monitoring Report review has been requested by EBX-Neuse I, LLC. Per Section 332.8(0)(9) of the 2008 Mitigation Rule, this review follows the streamlined review process, which requires an IRT review period of 15 calendar days from this email notification. Please provide any comments by 5 PM on the 15 -day comment deadline shown below. When providing comments please indicate if your concerns are great enough that you intend to request an ADDITIONAL site visit prior to the initial credit release (please note the IRT visited the Meadow Spring Mitigation Site on July 9, 2019). Comments provided after the 15 -day comment deadline (shown below) may not be considered. At the conclusion of this comment period, a copy of all comments will be provided to EBX-Neuse I, LLC and the NCIRT along with District Engineer's intent to approve or disapprove this Final As -Built and as -built implementation credit release. Sponsor: EBX-Neuse I, LLC Name: Neu -Con UMBI / Meadow Spring Mitigation Site USACE ID: SAW -2016-01989 River Basin: Neuse H UC: 03020201 County: Johnston The As -Built Implementation Credit Release for the Meadow Spring Mitigation site would entail 15 -percent of the total stream and wetland restoration and enhancement credits: 899 stream mitigation units and 2.16 wetland mitigation units. 15 -Day Comment Start Date: August 5, 2019 15 -Day Comment Deadline: August 19, 2019 45 -Day Credit Release Approval Deadline: August 19, 2019 *NOTE: If a site visit is request by the IRT, comments are due 15 days after the site visit is complete. Mitigation Plan lengths may vary from the As-Builts. Link to Meadow Spring As -Built drawings are on RIBITs, under the Neu -Con Meadow Spring As -Built Monitoring Report: https://rib its. usace. a rmy. m i I/ri bits_a pex/f? p=107:278:13302420095071:: N O: R P, 278: P278_BAN K_I D:4414 Please select the arrow beside Neu -Con Meadow Spring As -Built Baseline Monitoring Report and select Meadow Spring Baseline Monitoring Report Final. Thank you, Sam Samantha Dailey Regulatory Project Manager U.S. Army Corps of Engineers Regulatory Division 3331 Heritage Trade Drive, Suite 105 Wake Forest, NC 27587 (919) 554-4884, Ext. 22 Samantha.j.dailey@usace.army.mil