Subject: [External] SAW -2016-01989 / EBX-Neuse I, LLC / Neu -Con UMBI / Meadow Spring
Mitigation Site Final As -Built Monitoring Report
Follow Up Flag: Follow up
Flag Status: Flagged
CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an
attachment to report.spam@nc.gov<maiIto: report.spam@nc.gov>
Good morning,
The below referenced FINAL As -Built Monitoring Report review has been requested by EBX-Neuse I, LLC. Per Section
332.8(0)(9) of the 2008 Mitigation Rule, this review follows the streamlined review process, which requires an IRT
review period of 15 calendar days from this email notification. Please provide any comments by 5 PM on the 15 -day
comment deadline shown below. When providing comments please indicate if your concerns are great enough that you
intend to request an ADDITIONAL site visit prior to the initial credit release (please note the IRT visited the Meadow
Spring Mitigation Site on July 9, 2019). Comments provided after the 15 -day comment deadline (shown below) may not
be considered.
At the conclusion of this comment period, a copy of all comments will be provided to EBX-Neuse I, LLC and the NCIRT
along with District Engineer's intent to approve or disapprove this Final As -Built and as -built implementation credit
release.
Sponsor: EBX-Neuse I, LLC
Name:
Neu -Con UMBI / Meadow Spring Mitigation Site
USACE ID:
SAW -2016-01989
River Basin:
Neuse
H UC:
03020201
County:
Johnston
The As -Built Implementation Credit Release for the Meadow Spring Mitigation site would entail 15 -percent of the total
stream and wetland restoration and enhancement credits: 899 stream mitigation units and 2.16 wetland mitigation
units.
15 -Day Comment Start Date: August 5, 2019 15 -Day Comment Deadline: August 19, 2019 45 -Day Credit Release
Approval Deadline: August 19, 2019
*NOTE: If a site visit is request by the IRT, comments are due 15 days after the site visit is complete.
Mitigation Plan lengths may vary from the As-Builts.
Link to Meadow Spring As -Built drawings are on RIBITs, under the Neu -Con Meadow Spring As -Built Monitoring Report:
https://rib its. usace. a rmy. m i I/ri bits_a pex/f? p=107:278:13302420095071:: N O: R P, 278: P278_BAN K_I D:4414
Please select the arrow beside Neu -Con Meadow Spring As -Built Baseline Monitoring Report and select Meadow Spring
Baseline Monitoring Report Final.
Thank you,
Sam
Samantha Dailey
Regulatory Project Manager
U.S. Army Corps of Engineers
Regulatory Division
3331 Heritage Trade Drive, Suite 105
Wake Forest, NC 27587
(919) 554-4884, Ext. 22
Samantha.j.dailey@usace.army.mil