HomeMy WebLinkAbout20160981 Ver 1_USACE Correspondence_20190805Strickland, Bev
From: Dailey, Samantha J CIV USARMY CESAW (USA) <Samantha.J.Dailey@usace.army.mil>
Sent: Monday, August 05, 2019 11:10 AM
To: Tugwell, Todd J CIV USARMY CESAW (US); Kim Browning; Haupt, Mac; Davis, Erin B;
Wilson, Travis W.; Bowers, Todd
Subject: [External] SAW -2016-01973 / EBX-Neuse I, LLC / Neu -Con UMBI / Uzzle Mitigation
Site Final As -Built Monitoring Report
Follow Up Flag: Follow up
Flag Status: Flagged
CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an
attachment to report.spam@nc.gov<maiIto: report.spam@nc.gov>
Good morning,
The below referenced FINAL As -Built Monitoring Report review has been requested by EBX-Neuse I, LLC. Per Section
332.8(0)(9) of the 2008 Mitigation Rule, this review follows the streamlined review process, which requires an IRT
review period of 15 calendar days from this email notification. Please provide any comments by 5 PM on the 15 -day
comment deadline shown below. When providing comments please indicate if your concerns are great enough that you
intend to request an ADDITIONAL site visit prior to the initial credit release (please note the IRT visited the Uzzle
Mitigation Site on July 9, 2019). Comments provided after the 15 -day comment deadline (shown below) may not be
considered.
At the conclusion of this comment period, a copy of all comments will be provided to EBX-Neuse I, LLC and the NCIRT
along with District Engineer's intent to approve or disapprove this Final As -Built and as -built implementation credit
release.
Sponsor: EBX-Neuse I, LLC
Name:
Neu -Con UMBI / Uzzle Mitigation Site
USACE ID:
SAW -2016-01973
River Basin:
Neuse
H UC:
03020201
County:
Johnston
The As -Built Implementation Credit Release for the Uzzle Mitigation site would entail 15 -percent of the total stream
restoration and enhancement credits: 431.4 stream mitigation units.
15 -Day Comment Start Date: August 5, 2019 15 -Day Comment Deadline: August 19, 2019 45 -Day Credit Release
Approval Deadline: August 19, 2019
*NOTE: If a site visit is request by the IRT, comments are due 15 days after the site visit is complete.
Mitigation Plan lengths may vary from the As-Builts.
Link to Hannah Bridge As -Built drawings are on RIBITs, under the Hannah Bridge As -Built Report:
https://rib its. usace. a rmy. m i I/ri bits_a pex/f? p=107:278:13302420095071:: N O: R P, 278: P278_BAN K_I D:4417
Please select the arrow beside Neu -Con Uzzle As -Built Baseline Monitoring Report and select Uzzle Baseline Monitoring
Report Final.
Thank you,
Sam
Samantha Dailey
Regulatory Project Manager
U.S. Army Corps of Engineers
Regulatory Division
3331 Heritage Trade Drive, Suite 105
Wake Forest, NC 27587
(919) 554-4884, Ext. 22
Samantha.j.dailey@usace.army.mil