HomeMy WebLinkAbout20120142 Ver 5_More Info Received_20190802Carpenter,Kristi
From: Rivenbark, Chris
Sent: Friday, August 02, 2019 1:40 PM
To: Norton, April R
Cc: Monte Matthews (Monte.K.Matthews@usace.army.mil)
(Monte.K.Matthews@usace.army.mil); Williams, Andrew E CIV USARMY CESAW (US);
Sullivan, Roscoe L III CIV (US); Patterson, Robert D; Carpenter,Kristi; Dilday, Jason L
Subject: RE: Request for Additional Information: R-3421AB , Richmond County
Attachments: R3421A_SMP(20190730).pdf, R3421 B_SMP(20190730).pdf, R-3421 B - STR - RW - YD
201.pdf
Good morning April,
See below for responses to your questions. Our permit modification request has also been revised to include
attachments provided with this email.
Please let us know if you need anything else and thank you for trying to keep this one on schedule.
Chris Rivenbark
NCDOT- Environmental Analysis Unit
(919) 707-6152
From: Norton, April R <april.norton@ncdenr.gov>
Sent: Monday, July 29, 2019 9:18 AM
To: Rivenbark, Chris <crivenbark@ncdot.gov>; Dilday, Jason L <jldilday@ncdot.gov>
Cc: Monte Matthews (Monte.K.Matthews@usace.army.mi1) (Monte.K.Matthews@usace.army.mil)
<Monte.K.Matthews@usace.army.miI>; Williams, Andrew E CIV USARMY CESAW (US)
<andrew.e.williams2@usace.army.mil>; Sullivan, Roscoe L III CIV (US) <Roscoe.L.Sullivan@usace.army.miI>; Patterson,
Robert D <robert.patterson@ncdenr.gov>; Carpenter,Kristi <kristilynn.carpenter@ncdenr.gov>
Subject: Request for Additional Information: R-3421AB , Richmond County
Chris,
The permit modification request for the subject project has been reviewed. For the review process to continue, please
provide the below additional information within 30-days. Your application is currently placed on hold until the following
information has been received:
Mitigation
1. NCDWR requires mitigation for losses greater than or equal to 300 linear feet of stream and one acre of
wetlands. Please provide a mitigation plan that conforms to the requirements of 15A NCAC 02H .500 for the
proposed project, specifically R-342113. The DMS Acceptance letter for the Section B is attached.
Stormwater
Section A: See attached revised SMP for Section A
1. The proposed impervious acreage is missing on the SMP.
2. The SMP narrative states that grass swales are proposed. The grass swale BMP sheet needs to be filled -out and
included in the SMP.
3. The SMP narrative states that there are not any direct discharges to JS streams, however numerous pipes
discharge directly to JS streams.
Section B: See attached revised SMP for Section B
1. The SMP narrative states that grass swales are proposed. The grass swale BMP sheet needs to be filled -out and
included in the SMP.
Permit dwg sht 43: The labels at the base of ramp B use the word "basin". Is this a SW treatment basin? We proposed
using the gore area as a basin, raising inverts of pipes, etc to get some infiltration and attenuate flow. However, we did
not do any routing/storage calcs and are not looking to get credit. Only proposed from practical design standpoint and
not for mitigation/credit.
2.
RAMP B- PT 14,10 92
- -rC.AA.PE �0.1,1JAMWW
N
S" {RC;SS %FC"fl0_
1P 8 Sc fr+T
GRIEF QUADR*Ni 9S7 7 SY 'G. 0TE1[fRF
SEE CROS 5EC'r;-Q5
4 _. 551?! L3]kl
Please let me know if you have any questions.
Thanks,
April
April R. Norton
Transportation Permitting Branch
NC Department of Environmental Quality
Division of Water Resources
919-707-9111 office
919-710-6516 mobile
april.norton@ncdenr.gov
512 North Salisbury Street, 121" Floor (physical)
1617 Mail Service Center (mailing)
Raleigh, NC 27699-1617
Email correspondence to and from this address is subject to the
North Carolina Public Records Law and may be disclosed to third parties.
Fil
irawevr rmu/ -_
Email correspondence to and from this sender is subject to the N.C. Public Records Law and may be disclosed to third parties.
r
C)
rl-
70
U)
rAd
North Carolina Department of Transportation
�li)1'l Highway Stormwater Program
STORMWATER MANAGEMENT PLAN
(Version 2.08; Released April 2018) IF FOR NCDOT PROJECTS Eft
WBS Element: 34542.1.FR4 TIP No.: R-3421A County(ies): Richmond Page 1 of 3
General Project Information
WBS Element:
34542.1.FR4 ITIP Number: R-3421A Project Type: New Location Date: 7/30/2019
NCDOT Contact:
Mr. Stephen R. Morgan, PE
Contractor / Desi ner:
Address:
1000 Birch Ridge Drive
Raleigh, NC
Address:
Phone:
919-707-6739
Phone:
Email:
smorgan@ncdot.gov
Email:
City/Town:
Count kes :
Richmond
River Basin(s):
Yadkin -Pee Dee
CAMA Count ?
I No
Wetlands within Project Limits?
Yes
Project Description
Project Length (lin. miles or feet):
1.78 Surrounding Land Use: JAgricultural, Rural, Residential
Proposed Project
Existing Site 1111
Project Built -Upon Area ac.
54.4 ac.
ac.
Typical Cross Section Description:
46' Grass median, 2@12' paved inside shoulers, 2@12' lanes each direction, 12' paved
outside shoulder, grass roadway ditches.
Annual Avg Daily Traffic (veh/hr/day):
Design/Future: Year:
I Existing: Year: 2019
General Project Narrative:
(Description of Minimization of Water
Quality Impacts)
CSR 1 & 2 on Loop B & 173; CSR 3 Loop C; CSR 4 Ramp C; CSR 5 on L2/L2Rev (extension).
R-3421A is an interchange and bypass project (US220 Bypass From US74 Bypass West Of Rockingham at SR1109 Interchange) which will include a 46' grass median with
2@12' travel lanes in each direction. The project also includes grass lined roadway ditches. The proposed project includes 4 major drainage structures (3Culverts & extension
of 2 culverts) located in the interchange, which will convey Un-named Tribs to the Pee Dee River. The culverts will include sills and utilize Low Flow Benches as well as a
stream relocation between 2 culverts to maintain the low flow in one barrel of the culvert. A Rip Rapped Energy Dissipator will be utilized at the outlet of 2 60" pipes to dissipate
the energy and prevent erosion to the receiving stream. There are some minor channel improvements at the inlet and outlet of a few of the culverts. Direct dischages into
jurisdictional features were avoided to the maximum extent practicable. Where possible, drainage systems were released away from jurisdictional features. However, in some
locations direct discahge was unavoidable due to extreme topographic constraints as well as proposed roadway profiles. In these locations no practical alternatives were
present.
Waterbody Information
Surface Water Body (1): Un-named Trib to Pee Dee River
NCDWR Stream Index No.:
UT to 13 - 34
NCDWR Surface Water Classification for Water Body
Primary Classification:
Class C
Supplemental Classification:
Other Stream Classification:
None
Impairments:
None
Aquatic T&E Species?
No Comments:
NRTR Stream ID:
Buffer Rules in Effect: N/A
Project Includes Bridge Spanning Water Body?
No
Deck Drains Discharge Over Buffer? N/A
Dissipator Pads Provided in Buffer? N/A
Deck Drains Discharge Over Water Body?
N/A
(If yes, provide justification in the General Project Narrative)
(If yes, describe in the General Project Narrative; if no, justify in the
General Project Narrative)
(If yes, provide justification in the General Project Narrative)
North Carolina Department of Transportation
SlCll'1 i ]`rVcli['C Highway Stormwater Program
STORMWATER MANAGEMENT PLAN
(Version 2.08; Released April 2018) FOR NCDOT PROJECTS
WBS Element: 34542.1.FR4 TIP No.: R-3421A Count ies : Richmond Page 2 of 3
Swales
Sheet
No.
Station & Coordinates
(Road and Non Road
Projects)
Surface
Water
Body
Base
Width
ft
Front
Slope
(H:1)
Back
Slope
(H:1)
Drainage
Area
(ac)
Recommended
Treatm't Length
(ft
Actual
Length
ft
Longitudinal
Slope
N
Q2
(cfs)
V2
((fps)
Q10
cfs)
V10
(f s
Rock
Checks
Used
BMP
Associated w/
Buffer Rules?
See Comments Below
Additional Comments
The design for R-3421A includes typical grassed cut ditches within the roadway footprint. These ditches are collecting runoff from the impervious roadway surfaces and transporting the runoff to inlets and pipes. The
geometry of the typical cut ditches contain side slopes ranging from 4:1 to 8:1 and having mostly mild longitudinal slopes. However, no grassed swale treatment was claimed nor regired for this portion of the project even
though many aspects of the grassed Swale criteria was incorporated into the design.
r
C)
rl-
70
U)
rrA
I II�;�iWc'1 ■ North Carolina Department of Transportation
Highway Stormwater Program
STORMWATER MANAGEMENT PLAN
(Version 2.08; Released April 2018) FOR NCDOT PROJECTS
WBS Element: 34542.1.FR4 TIP No.: R-3421A County(ies): Richmond Page 3 of 3
Preformed Scour Holes and Energy Dissipators
Sheet
No.
Station & Coordinates
(Road and Non Road
Projects)
Surface
Energy Dissipator
Type
Riprap Type
Drainage
Area
(ac)
Conveyance
Structure
Pipe/Structure
Dimensions
(in)
Q10
(cfs)
V10
(fps)
BMP
Associated w/
Buffer Rules?
10
RPD- 10+32.66 73.4' LT
(1)Un-named
Trib to Pee
Riprap Energy
Dissipator Basin
Class I
2 - 60" RCP and 1 - 36"
RCP
N/A
34.9524103,-79.8468202
Additional Comments
IL A
" Keter to the NUUU I tSest Management Practices 100IboX (ZU14), NUUU I Standards, the Federal HlgnWay Administration (t-HVVA) Hyaraulic tnglneenng circular No. 14 (Htc-14), I hlyd tdltlon, Hyaraulic Design oT tnergy
Dissipators for Culverts and Channels (July 2006), as applicable, for design guidance and criteria.
r
0
M
(1)
U)
Tid
E ll�;h\�'il4' North Carolina Department of Transportation
5ton11%,vater Highway Stormwater Program
STORMWATER MANAGEMENT PLAN
(Version 2.08; Released April 2018) FOR NCDOT PROJECTS
WBS Element: 34542.1.FR3 TIP No.: R-3421 B County(ies): Richmond Page 1 of 3
General Project Information
WBS Element:
34542.1.FR3 ITIP Number: R-3421 B Project Type: New Location Date: 7/30/2019
NCDOT Contact:
Mr. Galen Call, PE
Contractor / Desi ner:
Address:
1000 Birch Ridge Drive
Raleigh, NC
Address:
Phone:
919-707-6711
Phone:
Email:
tail ncdot. ov
Email:
City/Town:
I
Count ies :
Richmond
River Basin(s):
Yadkin -Pee Dee
CAMA Count ?
I No
Wetlands within Project Limits?
Yes
Project Descri lion
Project Length (lin. miles or feet):
4.30 Surrounding Land Use: JAgricultural, Rural, Residential
Proposed Project
Existing Site
Project Built -Upon Area ac.
52.1 ac.
N/A ac.
Typical Cross Section Description:
46' Grass median, 2@12' paved inside shoulers, 2@12' lanes each direction, 12' paved
outside shoulder, grass roadway ditches.
N/A
Annual Avg Daily Traffic (veh/hr/day):
Design/Future: 19,980 Year: 2036
Existing: N/A Year: N/A
General Project Narrative:
(Description of Minimization of Water
Quality Impacts)
R-3421 B is an interchange and bypass project (US220 Bypass, 1-73/1-74) which will include a 46' grass median with 2@12' travel lanes in each direction. The project also
includes grass lined roadway ditches. The proposed project includes 1 major drainage structure (3 barrel RCBC), which will convey an unnamed tributary to Cartledge Creek.
The culvert will include sills and utilize Low Flow Benches to maintain low flow in two barrels. Rip Rapped Energy Dissipators will be utilized at the outlets of a 30" pipe and a
36" pipe to prevent erosion at the outlets.
Waterbody Information
Surface Water Body (1): Un-named Trib to Cartledge Creek
NCDWR Stream Index No.:
UT to 13 - 35
NCDWR Surface Water Classification for Water Body
Primary Classification:
Class C
Supplemental Classification:
Other Stream Classification:
None
Impairments:
None
Aquatic T&E Species?
No Comments:
NRTR Stream ID:
Buffer Rules in Effect: N/A
Project Includes Bridge Spanning Water Body?
INo
Deck Drains Discharge Over Buffer? I N/A
Dissipator Pads Provided in Buffer? N/A
Deck Drains Discharge Over Water Body?
I N/A
(If yes, provide justification in the General Project Narrative)
(If yes, describe in the General Project Narrative; if no, justify in the
General Project Narrative)
(If yes, provide justification in the General Project Narrative)
C
r
C
W
(f
a;
North Carolina Department of Transportation
SlCll'1 i ]�Vcti['C Highway Stormwater Program
STORMWATER MANAGEMENT PLAN
(Version 2.08; Released April 2018) FOR NCDOT PROJECTS
WBS Element: 34542.1.FR3 TIP No.: R-3421B Count ies : Richmond Page 2 of 3
Swales
Sheet
No.
Station & Coordinates
(Road and Non Road
Projects)
Surface
Water
Body
Base
Width
ft
Front
Slope
(H:1)
Back
Slope
(H:1)
Drainage
Area
(ac)
Recommended
Treatm't Length
(ft
Actual
Length
ft
Longitudinal
Slope
N
Q2
(cfs)
V2
((fps)
Q10
cfs)
V10
(f s
Rock
Checks
Used
BMP
Associated w/
Buffer Rules?
Additional Comments
The design for R-3421 B includes typical grassed cut ditches within the roadway footprint. These ditches are collecting runoff from the impervious roadway surfaces and transporting to inlets and pipes. The geometry of the
typical cut ditches contain side slopes ranging from 2:1 to 8:1 and mild longitudinal slopes. Although no grassed Swale treatment credit is claimed for this project or required many reaches of the grassed ditches/swales will
meet the criteria for grassed swale treatment.
r
C)
rl-
70
U)
rAd
I II�;�iWc'1 ■ North Carolina Department of Transportation
Highway Stormwater Program
STORMWATER MANAGEMENT PLAN
(Version 2.08; Released April 2018) FOR NCDOT PROJECTS
WBS Element: 34542.1.FR3 TIP No.: R-3421B County(ies): Richmond Page 3 of 3
Preformed Scour Holes and Energy Dissipators
Sheet
No.
Station & Coordinates
(Road and Non Road
Projects)
Surface
Energy Dissipator
Type
Riprap Type
Drainage
Area
(ac)
Conveyance
Structure
Pipe/Structure
Dimensions
(in)
Q10
cfs
V10
(fps)
BMP
Associated w/
Buffer Rules?
17
-L- 322+50 RT
(1)Un-named
Trib to
Riprap Energy
Dissipator Basin
Class 1
9.7
Pipe
30" RCP
27.5
1.1
N/A
34.9854605,-79.7994557
19
-L- 347+26 LT
(1)Un-named
Trib to
Riprap Energy
Dissipator Basin
Class 1
13.2
Pipe
36" RCP
32.4
1.2
N/A
34.9897885,-79.7930204
Additional Comments
Keter to the NGUU I tSest Management Practices I oolboX (ZU14), NUUU 15tanaaras, the Feaeral HlgnWay Aaminlstratlon (FHVVA) Hyaraulic tnglneering circular No. 14 (Htc-14), I hlra tuition, Hyaraullc Uesign of tnergy
Dissipators for Culverts and Channels (July 2006), as applicable, for design guidance and criteria.
ROY COOPER
Governor
MICHAEL S. REGAN
secretary
TIM BAUMGARTNER
Director
Mr. Philip S. Harris, III, P.E.
Environmental Analysis Unit
North Carolina Department of Transportation
1598 Mail Service Center
Raleigh, North Carolina 27699-1598
Dear Mr. Harris:
NORTH CAROLINA
Environmental Quality
August 2, 2019
Subject: Mitigation Acceptance Letter:
R-3421B, US 220 Bypass, Richmond County
The purpose of this letter is to notify you that the Division of Mitigation Services (DMS) will provide the
compensatory stream and wetland mitigation for the subject project. Based on the information supplied by you on July 30,
2019, the impacts are located in CU 03040201 of the Yadkin River basin in the Southern Piedmont (SP) Eco-Region, and are
as follows:
Yadkin Stream Wetlands Buffer (Sq. Ft.)
03040201 Non- Coastal
Sp Cold Cool Warm Riparian Riparian Marsh Zone 1 Zone 2
Impacts (feet/acres) 0 0 3,611.0 3.80 0 0 0 0
*Some of the stream and/or wetland impacts may be proposed to be mitigated at a 1:1 mitigation ratio. See permit application
for details.
DMS commits to implementing sufficient compensatory stream and wetland mitigation credits to offset the impacts
associated with this project as determined by the regulatory agencies in accordance with the In -Lieu Fee Instrument dated July
28, 2010. If the above referenced impact amounts are revised, then this mitigation acceptance letter will no longer be valid and
a new mitigation acceptance letter will be required from DMS.
If you have any questions or need additional information, please contact Beth Harmon at 919-707-8420.
Sincerely,
B. Stanfill �J
Asset Management Supervisor
cc: Mr. Monte Matthews, USACE — Raleigh Regulatory Field Office
Ms. Amy Chapman, NCDWR
File: R-3421B
North Carolina Department of Environmental Quality I Division of Mitigation Services
217 W. Jones Street 1 1652 Mail Service Center I Raleigh, North Carolina 27699-1652
919.707.8976