Loading...
HomeMy WebLinkAboutNCG030075_Inspection Report_20190731ROY COOPER Governor MICHAEL S. REGAN Secretary S. DANIEL SMITH Director NORTH CAROLINA Environmental Quality July 31, 2019 Borg Warner Turbo Systems Attention: Jack Martindale, EHS Manager 1849 Brevard Road Arden, North Carolina 28704 Subject: Compliance Evaluation Inspection Permit: NCG030075 Buncombe County, North Carolina Dear Mr. Swanson: Enclosed please find a copy of the Compliance Evaluation Inspection Report for the inspection I conducted at the subject facility on October 30, 2018. The report should be self-explanatory, however, should you have any questions concerning this report, please do not hesitate to contact me at (828) 296-4500 or by email at Isaiah.reed@ncdenr.gov. Sincerely; � J, Isaiah Reed, CPSWQ, CEP I, MS4CECI Environmental Specialist Land Quality Section Enclosure: Inspection Report D_E00%FZ>� North Carolina Department of Environmental Quality I Division of Energy, Mineral and Land Resources Asheville Regional Office 12090 U.S. Highway 70 1 Swannanca, North Carolina 28778 xowmcuvourvn 828.296.4500 Compliance Inspection Report Permit: NCG030075 Effective: 11/16/17 Expiration: 10/31/18 Owner: Borg Warner Turbo System SOC: Effective: Expiration: Facility: Borgwarner County: Buncombe 1849 Brevard Rd Region: Asheville Arden NC 28704 Contact Person: Mike Doughtery Title: Phone: 282-684-4000 Directions to Facility: System Classifications: Primary ORC: Secondary ORC(s): On -Site Representative(s): Related Permits: Inspection Date: 10/30/2018 Primary Inspector: Isaiah L Reed Secondary Inspector(s): Certification: Phone: Entry Time: 02:OOPM Exit Time: 03:30PM Phone: 828-296-4614 Reason for Inspection: Routine Inspection Type: Compliance Evaluation Permit Inspection Type: Metal Fabrication Stormwater Discharge COG Facility Status: Compliant rl Not Compliant Question Areas: Storm Water (See attachment summary) Page 1 of 3 Permit: NCG030075 Owner -Facility: Borg Warner Turbo System Inspection Date: 10/30/2018 Inspection Type : Compliance Evaluation Reason for Visit: Routine Inspection Summary: On October 30, 2019 this facility was inspected for compliance. I met with Jack Martindale on site. No major issues were noted during the inspection. The following items were noted during the inspection: 1) Tier Relief was issued by Darlene Kucken in 2015. 2) The facility also has representative outfall status. 3) Metal chip/coolant storage area is under shelter. 4) Some equipment and industrial equipment is being stored outdoors. Please be advised that Tier Relief status does not continue into the current permit cycle. If continued Tier relief is requested, an inspection will be conducted to determine if benchmark exceedances are due to a source other than the industrial process on site. If you have any questions, please contact this office at (828) 296-4614 Page 2 of 3 Permit: NCG030075 Owner- Facility: Borg Warner Turbo System Inspection Date: 10/30/2018 Inspection Type : Compliance Evaluation Reason for Visit: Routine Stormwater Pollution Prevention Plan Yes No NA NE Does the site have a Stormwater Pollution Prevention Plan? 0 ❑ ❑ ❑ # Does the Plan include a General Location (USGS) map? 0 ❑ ❑ ❑ # Does the Plan include a "Narrative Description of Practices"? 0 ❑ ❑ ❑ # Does the Plan include a detailed site map including outfall locations and drainage areas? 0 ❑ ❑ ❑ # Does the Plan include a list of significant spills occurring during the past 3 years? 0 ❑ ❑ ❑ # Has the facility evaluated feasible alternatives to current practices? 0 ❑ ❑ ❑ # Does the facility provide all necessary secondary containment? 0 ❑ ❑ ❑ # Does the Plan include a BMP summary? 0 ❑ ❑ ❑ # Does the Plan include a Spill Prevention and Response Plan (SPRP)? 0 ❑ ❑ ❑ # Does the Plan include a Preventative Maintenance and Good Housekeeping Plan? 0 ❑ ❑ ❑ # Does the facility provide and document Employee Training? 0 ❑ ❑ ❑ # Does the Plan include a list of Responsible Party(s)? 0 ❑ ❑ ❑ # Is the Plan reviewed and updated annually? M ❑ ❑ ❑ # Does the Plan include a Stormwater Facility Inspection Program? 0 ❑ ❑ ❑ Has the Stormwater Pollution Prevention Plan been implemented? 0 ❑ ❑ ❑ C td7i 11 i I Qualitative Monitoring Yes No NA NE Has the facility conducted its Qualitative Monitoring semi-annually? 0 ❑ ❑ ❑ Comment: Analytical Monitoring Yes No NA NE Has the facility conducted its Analytical monitoring? 0 ❑ ❑ ❑ # Has the facility conducted its Analytical monitoring from Vehicle Maintenance areas? ❑ ❑ ❑ Comment: Permit and Outfalls Yes No NA NE # Is a copy of the Permit and the Certificate of Coverage available at the site? 0 ❑ ❑ ❑ # Were all outfalls observed during the inspection? 0 ❑ ❑ ❑ # If the facility has representative outfall status, is it properly documented by the Division? 0 ❑ ❑ ❑ # Has the facility evaluated all illicit (non stormwater) discharges? 0 ❑ ❑ ❑ Comment Page 3 of 3