HomeMy WebLinkAbout20140090 Ver 5_U-2579B Mitigation Site As Builts_Site 20_20190801 ST�7E�.
05
STATE OF NORTH CAROLINA
DEPARTMENT OF TRANSPORTATION
ROY COOPER JAMES H.TROGDON,III
GOVERNOR SECRETARY
July 24, 2019
Ms. Nicholle Braspennickx
U.S Army Corps of Engineers
151 Patton Avenue, Room 208
Asheville,NC 28801
Subject: As-Built Report for Stream Mitigation Project U-2579B Site 20, Forsyth
County, TIP Project No. U-257913, USACE Action ID: SAW-2008-
03183,NCDWR Project No. 2014-0090v2
Dear Ms. Braspennickx,
Please find enclosed the As-Built Report for the subject stream mitigation project.
The Division 9 Resident Engineer responsible for administering the contract has certified
that the site was constructed according to the construction plan sheets, with any
exceptions noted in this As-Built Report.
Initial estimates and permit requirements stated that 450 LF of stream restoration
would be available once the pond had been drained and planted with the appropriate
species. Measurements completed after construction show that there is approximately
490 LF of stream from the inlet of the pipe to the property line.
The following information has been included as part of the As-Built Report: 1)
As-Built Plan Sheets, 2) Photo Point Locations, and Vegetation Plot Maps, 3) Planting
Plan and Restoration Detail Sheets. The sites will be monitored as described in the
associated permit requirements.
If you should have any questions or require additional information, please contact
Mr. Randy Griffin at (919) 707-6121. Thank you once again for your continued support
and cooperation.
Mailing Address: Telephone:(919)707-6000 Location:
NC DEPARTMENT OF TRANSPORTATION Fax:(919)212-5785 1020 BIRCH RIDGE DRIVE
ENVIRONMENTAL ANALYSIS UNIT Customer Service: 1-877-368-4968 RALEIGH,NC 27610
1598 MAIL SERVICE CENTER
RALEIGH,NC 27699-1598 Website:www.ncdot.gov
Sincerely,
DocuSigned by:
G
B8BFC9470D9E461...
For Philip S. Harris, III, P.E., CPM, Unit Head
Environmental Analysis Unit
Enclosures
cc: Mr. Monte Matthews, USACE
Mr. Dave Wanucha,NCDWR
Ms. Amy Chapman,NCDWR
Ms. Marla Chambers,NCWRC
Ms. Claire Ellwanger,USFWS
Mr. Todd Bowers, USEPA
Mr. David Harris P.E.,NCDOT- REU
Mr. Marcus Kiser P.E.,NCDOT-Div. 9 Resident Engineer
Ms. Amy Euliss,NCDOT-Div. 9 Environmental Officer
Mr. Randy Griffin,NCDOT-EAU
STATEco
arwn nwn raaacr aarasn+a na axarr r°rw�
.C. U-2579B
OSM-1
DIVISION OF HIGHWAYS
34839.1.1 W PE
EG. J T[-
ORSY H , CO U
Ner�7,
LOCATION: WINSTON SALEM NORTHERN BELTWAY (EASTERN SECTION)
(FUTURE I-74) FROM US 158 TO I-40 BUS/US 421
VIX wo
, -- TYPE OF WORK: WIDENING, GRADING, PAVING,DRAINAGE, SIGNING, SIGNALS,
CULVERTS AND STRUCTURES.
., a= 810
O
/ � �-_g G� A�l!i�/ A\`J
h " �. END BRIDGE LL,5_+
-L-STA.385+81.69 W��O p o� �J� 7
P I I BEGIN BRIDGE z U I1 Z L O
« -L STA.583+ISM Y \
J 14e
'y END BRIDGE
-I-STA.559+21.65 } END BRIDGE \
Y4RPA-STA,1 .22
6 4 BEGIN BRIDGE__ \�
�i' � � _. 1 6�- �•> � � BEGIN BRIDG
r
-�ST�555+50.01 � ry�o r h�
° -Y4RAA-STA.16—+44.341
W.
r _ END BRIDGE
1 ND.PRO. ; , !" ��� T pEE WIN TON-SALEM ;` - 5+50,Y4-CD-SSTA,1 17
� BEGIN BRIDGE
/ S
U-25798- . ` Gfi ��A� 10 1] 2 IVORl/y-Y4CD-5TA.16+79.03 j
m � -Y2- OFF-SITE DETOUR ROUTE 4196 Vwp� 9 SRN 6
VICINITY MAP F771y
Lon �O�OF�FO�L t 8 I I qyY4CBEGID BRIDGE
45+76.53
t M��' 0.CRE K1YL �` nyy END BRIDGE
w f 1ur Rise �OS > I `I Gaye -}4CD STA.41+92.-Q
} 9 \ \�l �'� `�u 67 BEGIN BRIDGE__. Q\`'r h� BEGIN BRIDGE
j ' �_ /' -Y2-STA,18+99.25 �?�Q �p�4r j -Y5- STA.21+60.86
D END BRIDGE y m N SEND BRIDGE J O �FM S / END BRIDGE
o -Yl-STA.3�6334 u -Y2-STA.21+41.18 �O Q -YS=STA.2V-S-404
o BEGIN_BRIDGE_ A
N -Y1-STA.32+93.77\ a ��
BEGIN BRIDGE
t
` trF B D YSSTA.26+62.28
p ti BEGIN BRIDGE E\I7 BRIDGE
f' -Y4RPBD- STA. + B f5 j6 -YS- STA.30+97.13
END_BRIDGE
S 3�1 Y4RPRD- STA.27+12.63
BEGIN BRIDGE
10 /1 G1' -L-STA.627+95,72
} %t 5 END BRIDGE
-L-STA.629+34.65
BEGIN BRIDGE 6
--L--STA.-641+70-U 44
END__BRIDGE_._. \ / I �� END PRO . U-2579B
BEG. PRO,J_.__U-2579B s� A� -Ir STA,643+79,01 I ; —L- Sl A 692+32.98
7 '
t —L- STA 478+00.00 1 LEND 41BRRIDG
w `
o �O+ STA.SS+3. 8
AS BUILT PLANS FOR SITE 20 IIDENTITY
ta.45+00.00
STREAM MITIGATION SITE �� o , ` POT
POT Sta.45+00.00
N
ON PLANSHEET 19 5 ; L-BEGIN BRIDGE_._
-Y4RPBD-STA.43+04.11
m END BRIDGE ,, BEGIN BRIDGE
m ` -YS-STA.69+ 3.11 -YS- ..6--.58
Pnepo�ed in III Office of: HYDRAULICS DIVISION OF HIGHWAYS
v GRAPHIC SCALES DESIGN DATA PROJECT LENGTH DIVISION OF HIGHWAYS E`GINEER STATE OF NORTH CAROLINA
�~ ADT 2010 = 53,560 LENGTH OF ROADWAY PROJECT U-2579B = 3.87 Miles.
50 25 0 50 100 1000 Birch Ridga Dr.,Ralailh NC,27610 a ,ya
�01 ADT 2030 = 79,880 LENGTH OF STRUCTURE PROJECT U-2579B = 0.19 Miles. 2066 STANDARD SPECIFICATIONS
0 PLANS DHV = 10 % TOTAL LENGTH OF PROJECT U-2579B = 4.06 Miles. `
0WSIGNATURE: �
�LC) 5io 25 Q 50 too D = 60 % RIGHT OF WAY DATE ROADWAY
cc, T = 18 % " PROJECT E.\'GI,VEER DESIGN �4P
L PROFILE (HORIZONTAL) V = 70 MPH ENGINEER yak*
c°L 10 15 Q 10 20 LETTING DATE:
O -_J PROJECT DESIGN ENGINEER
-0 " TTST 12 % DUAL 6 % P.E.
v!o PROFILE (VERTICAL) SIGNATURE: STATE HIGHWAY DESIGN ENGINEER
Nina
PROJECT REFERENCE NO. SHEET NO.
— — \
a Na�r ELSON '�EAVIL U-2579B OSM-2
RC4C S.W v4 \ \ RAN SHEET NO.
\' \ ROADWAY DESIGN HYDRAULICS
ENGINEER ENGINEER
U-2579B SITE #20 `
B`-62 ROT 220+66.56 AS-BUILT PLANS(-L-STA.683+08.3 21.20 RT)
A % a30
'o0-L-
i
ROCK SILL
855.7' ELEVATIONDO
500.00,
CONSTRUCTED RIFFLE
x CONCRETE SILL IN 72" PIPE ,
E'4CD- STA85+65b7 0 ` "' 8�'5.6' ELEVATION �- • ,; ,.
END -Y4C0-PAVEMENT � (� �N�P,. O �
PAVEMENT
ti v
\ __SPECIAL DI'CH GRA /
SEE PROFILE FOR GM
I -45.46-Y4C0- I Oq
\ ---- 141.00' 0.00-Y4CD-
>H' E4 J.TA
741. �
\\\ 212 200.00' y'
2 \ I f 0
r
\ SPGN SUPPDR7 grpN 4
42'CSP__ \\\;'� _ CRIP 's' VEGETATION PLOT
�j WELBOW EST 2 TON I
\ \ C EST 7 SY PP -Y4CD- PT Sta.95+97.99
P� 201 AND ROD AND°uc PHOTO POINT
CONNECTORS
\ END SMOULDER DEWGUtiER
HW C �,STK 690 t30 Lj LT •26,46-�
o d FS� 9q�9q A308 201 IF \�- ---ronc
700.00'
BEGIN SHOULDER 8EI GUTTER FS
STA 687r90-L-Ly 2 1 _ \
Un g «�
d>� �
�J2'PSwj
F -4-
42014
\ — r
VS3D 4
r, / 302Z
G WPIAI'7 —
J2P5. IS 2GI ` krrrt-rTr--�p�—� -
97,: GPAU-35G / - 401WUT
DRAT!
\ 13`CSP W.�2 ELBOWS 18-CSP WyElE0W5
303
\� VO�DAND LUGS
AND ROD AND LUG
f
L G '--�-CONNECTORS / - CONNECTORS
iE�N"SH�OULDER EEAM OUTT __
STA 656+50-L-RT\
— — PS / CLASS'E'
RIP R.4P A� ��NO SHOULDER BERM GUTTER
i f` m. ice.. RIP 2 TONS
L STA'692+33-L-RT .3E.67-:
J --�RCCR PIL IN'Ong
i / 1 s�P oEteum EST S BY FF VA, 200.00'
CLASS'I'
_ :EST 31 TONS
I �-
EST 108-SY"FP
rF;L q,�., �i I\ REYiSE FILL SLOPE 3,75 11/ /. END TIP PROJECT U 2579B END ,\
L vD \ ETA 688+00 7. RT BEGIN TIP PROJECT U-2579AB WN.FENC� \
�c• a s�ae. A +52.9e L VA
—L— POT STA.692+32.98 cHaa_Es =F Hn3; roo0 \ '\
—t
\
� 240 \
219
---STA 687-90 TO 688-96-lr IT
_ STREAMBANK REFORESTATION � \
Lw. lip,
� � S•
--- --
III.
RAND E SON EAVIL of '-�" M-
r „
- RCI S.W AVIL - .• �. _is 'f;,,.p .
Co
U-2579B SIP
#20
-BL-62 POT 220+66.56 AS—BUILT f LANS
( L-STA.683+08.30 1.29 RT) }- -
WITH AERIAL , ti
ROCK SILL
855.7' ELEVATION
�1 CONSTRUCTED RIFFLE
r CON ETE SILL IN 72" PIPE - f r
E41�SrAj= 8 .6' ELEVATION r .
f. SPECIAL DITCH ORA '
SEE PROFILE FOR GRA -
at
SHELBA J.TALLEY
JONAH R.MOTSINGER
AD
f.
42 CSP CIA VEGETATIO
FLBOW RIP
LLI 1 EST 2 TOLLI
N FSS 2GI L EST 7 SY FF
298 RD 15"CSP W/2 ELBOWS
PHOTO POI
ROD AND LUG
`Y;ONNECTORS
3 i"R13 O END
+ .. GI-A FS L 69 J
FS
305 2GI f CONC -
Q 300 BEGIN SHOULDER B GUTTER S
`a.. a«1 -'` STA 687+90-L-L 2
F- ;.r.
�. r
_ cn 2GI W/FLAT
1 .� -r4CD- GRATE 8- _
w
F FS -
'I S •. "` 2GI I .. U 301 �' O °d•P"S'
' 2GI _. _. <D>304
! "' ?• :.
a
302 O
a 2GI W/FLA h S
GRATE y
FS` 2GI 2GI W/ T -
�- 297 DRAV'35D 2GI W/FLAT -. -- -_ - - _- - -_--308 GRATE
_ FLA
GRATE ___.—-.._. __ -
•y., 303 15"CSP-2 ELB WS 18"CSP W/ LBOWS �,P�.J '� .+...s �..^.r h "" '' t�„ a• ...i
AND ROD AND UG ND R A D LUG t.
�CONN TORS
t BE MOULDER BEJ GUTT ---- -�
STA 6R6s5(}--L.$T / ,j: -� ••" ;�. y''
CLASS'B' F . D SHOULDER BERM GUTTER•CHARL-ES JERRY HART
RIP RAP 'S 692 L33-L-RT
` ROCK FILL IN POND EST 2 TO
SEE oEr 1-3, NS
' EST 8 Sy FF
C SS
RIP RAP -
__.._ ES 1.TONS .
� F ,
x REV SE fii'SLOPE 2. 5. END
END TIP PROJECT U-2579B 4
Ec DETAIL 31 +F
. , S R K ILL STA U.SLOPE
OND O P Rr BEGIN TIP PROJECT U-2579AB *RFE r- '
(Not t0 SCa18)
:l ProGosed t l9■!
—L— POT STA.692+32.98 cHARLEs JERRv HART
NC1 Elev.=1150.0 Y -
� Ecrin Fill
z RocR Fill w N.W.S.L EI FRANCIS L.MANUEL >
To Berm e45.7 BILLIE MANUEL -
M STA.687+90TO 688+98—L—RT STREAMBANK REFORESTATION
ycr
�+
PRO1ECi 1E1E.4ENCE NG
U-25798 I
OSM-4
MATTING j RW SHEET NO.IN TRENCH - ANCHOR TRENCH ROADWAY DESIGN HYDRAULICS
ON 1' CENTERS ENGINEER ENGINEER
-- ANCHOR OVERLAP 2"
x 2 (nominal)
ON 1' CENTERS
WOODEN STAKE
v v a Fv v a v v ■ v e v v a a
a. 1
ANCHORS ON 1�2," - �
3 CENTERS
j DIRECTION I.a 12-24
OF FLOW �� - , �... •.� .
--ANCHORS ON
. I a t �� . 1' CENTERS
w ,
, T
To
. . . . .
f v." y ."v," ■ - "a a "■ a ,>ay. f".a. 'v .a... A m. a"'.a . a
#10 STEEL
REINFORCEMENT BAR
6" OVERLAY(MIN) „
4
ANCHORS ON-- IA METER BEND
1' CENTERS P LAN VIEW 4,!--_ ++
A
i
18" 1 FLOODPLAIN/ 241?
(TYP) �I
COIR FIBER-- EXISTING
MATTING BACKFILL GROUND y
ANCHORS ON r
3' CENTERS 1
1 " (nominal)
-- - STAPLE
EXTEND MATTING- 1
TO NWSEL - 6" MIN
ANCHORS ON
1' CENTERS
IN TRENCH 1211
I
- s -
— - - --MATTING SHALL BE �
PLACED IN TRENCH r
AND BACKFILLED
\\-----ANCHORS ON I I
STREAM BED /11 CENTERS ANCHOR OPTIONS
II
TYPICAL CROSS SECTION
STREAy SANK REFORESTATION
COIR FIBERMATTING DETAIL DETAIL SHEET 1 OF 2
NOT TO SCALE N.C.D.O.T.-ROADSIDE ENVIRON.14FNTAI, UNIT
-- ----- - --- PROJECT 0.!P N0. SHEET NO.
U-25798 79B OSM-5
PA'/ SHEET N0.
ROADWAY DESIGN HYDRAULICS
El TYPE 1 STREAM3ANK REFORESTATION SHALL 3E PLANTED 3 FT.TO 5 FT. ENGINEER ENGINEER
ON CENTER, RANDOM SPACING, AVERAGING 4 FT,ON CENTER,
PLANTING DETAILS APPROXIMATELY 2724 PLANTS PER ACRE.
❑ TYPE 2 STREAM1 SANK REFORESTATION SHALL 3E PLANTED 6 FT.TO 10 FT,
ON CENTER, RANDOM SPACING, AVERAGING 8 FT.ON CENTER,
I
LIVE STARS PLANTING DETAIL 3AREROOT PLANTING DETAIL APPROXIMATELY 680 PLANTS PER ACRE.
DI33LE PLANTING METHOD
USING THE K3C PLANTING 3AR ❑ NOTE:TYPE 1 AND TYPE 2 STREAM3ANK REFORESTATION SHALL 3E
PAID FOR AS "STREAM3ANK REFORESTATION"
LIVE STAKE
4wl
II 2 inch
u
SQUARE CUT STRFAM3ANK REFORESTATION TYPICAL
BUDS(FACING UPWARD) —� !
I
1.Insert planting bar 2.Remove planting bar 3.Insert planting bar
aA Shmvn and pull handle and place seedling at 2 inches toward planter I TYPE II
LIVE CUTTING
toward planter. correct depth. from seedling.
"/2'-2'DIAMETER) Vt]
I T11 E I
'.
2 i ;oer
i
6A
B FT. I Y ANGLE CUT 30'-45'
RTRFA)f
— r i
1.
_ I
I I
I I
4,Pull handle of bar 5,Push handle forward 6 Leave compaction
toward planter,firming firming soil at top, hole open.Water STREXM3AN'K REFORESTATION'
@oil at bottom, thoroughly.
NMURE,TYPE, SIZE,AND FURNISH SI-I<1LL CONFORM TO THE FOLLOR7NGt
CCIR FIBER.VAT TYPE 1
LIVE STAKES
PLANTING NOTES: 50% SALIX NIGRA 31ACK WILLOW 2 ft- 3 ft LIVE STAKES
I
PLANTING iaG t
50% CORNUS AMOMUM SILKY DOGWOOD 2 ft- 3 ft LIVE STAKES
During planting,Seedlings TYPE 2 !
Shall be kept In a moist
canvas bag or similar
container to prevent the 25% FRAXINUS PENNSYLVANICA GREEN ASH 12 in - 18 in 3R
root Systems from drying. A,
EXISTING/PROPOSEDAll GROUND 25% PLATANUS OCCIDENTALIS SYCAMORE 12 in - 18 in 311
K3C PLA\TM .3aR 25% QUERCUS PHELLOS WILLOW OAK 12 in -18 in 311
Planting bar Shall have a
blade with R triangular 25% QUERCUS NIGRA WATER OAK 12 in -18 in 311
7EXISTING/PROPOSED cross section,and shell
STREAMBED be 12 inches long,
4 inches wide and
1 inch thick at
center. j
BAN( STABILIZATION WITH LIVE STAKES
NOTE: —
LIVE STAKES SHALL BE SPACED APPROXIMATELY FEET STREA�VhANK MFOUSTATION
ON CENTER
LIVE STAKES SHALL BE DRIVEN UNTIL APPROXIMATELY
ELY �a ROOT PRUNING
OF LIVE STAKE IS WITHIN GROUND
All seedlings shall be root I
pruned,if necessary,so that
no mote extend more than DETAIL SHEET 2 OF 2
10 inches below the
root collar,
— — � N.C.D.O.T.-ROADSIDE ENVIRONMENTAL UNIT