HomeMy WebLinkAboutNCG070194_NOD Resolution_20190801ROY COOPER
Governor
MICHAEL S. REGAN
Secretary
S. DANIEL SMITH
Director
Quality Stone LLC
Attn: Shane Boyd
3314 US Highway 221 North
Marion, North Carolina 28752
NORTH CAROLINA
Environmental Quality
August 1, 2019
Subject: Compliance Evaluation Inspection
Permit: NCG070000
Certificate of Coverage: NCG070194
McDowell County, North Carolina
Dear Mr. Boyd:
Enclosed please find a copy of the Compliance Evaluation Inspection Report for the
inspection I conducted at the subject facility on July 23, 2019.
The report should be self-explanatory, however, should you have any questions
concerning this report, please do not hesitate to contact me at (828) 296-4500 or by email
at Isaiah.reed@ncdenr.gov.
Sincer *,
Isaiah Ree SWQ, CEPSCIrMS4CECI
Environmental Specialist
Land Quality Section
Enclosure: Inspection Report
D _EQZNorth Carolina Department of Environmental Quality I Division of Energy, Mineral and Land Resources
Asheville Regional Office 12090 U.S. Highway 70 1 Swannanoa, North Carolina 28778
'"off'°"°" "^'"m°^a'.i \� 828.296.4500
Compliance Inspection Report
Permit: NCG070194
SOC:
County: McDowell
Region: Asheville
Contact Person: Benji Boyd
Directions to Facility:
System Classifications:
Primary ORC:
Secondary ORC(s):
On -Site Representative(s):
Related Permits:
Effective: 06/01/18 Expiration: 05/31/23 Owner: Quality Stone LLC
Effective: Expiration: Facility: Quality Stone
3314 US Hwy 221 N
Inspection Date: 07/23/2019
Primary Inspector: Isaiah L Reed
Secondary Inspector(s):
Title:
Entry Time: 10:30AM
Certification:
Marion NC 28752
Phone: 828-652-4700
Phone:
Exit Time: 11:30AM
Phone: 828-296-4614
Reason for Inspection: Routine Inspection Type: Compliance Evaluation
Permit Inspection Type: Stone, Clay, Glass, and Concrete Products Stormwater Discharge COC
Facility Status: Compliant ❑ Not Compliant
Question Areas:
Storm Water
(See attachment summary)
Page 1 of 3
Permit: NCG070194 Owner- Facility: Quality Stone LLC
Inspection Date: 07/23/2019 Inspection Type : Compliance Evaluation Reason for Visit: Routine
Inspection Summary
On July 23, 2019 this facility was inspected for compliance and to determine if what progress has been made to reach a
resolution of the previously issued Notice of Deficiency. I met with Benji Boyd and Gene Harrell on site. The following items
were noted during the inspection.
1) A Stormwater Pollution Prevention Plan has been assembled on site which is not complete, but is a good starting point.
2) A discussion was had on site focusing on monitoring and SWPPP maintenance.
The permittee is directed to evaluate and discern all appropriate actions to take concerning compliance with the NCG070000
General Permit. Implementation of the General Permit will be evaluated during the next inspection.
Adequate progress has been made to resolve the notice of deficiency, and to serve as a starting point for meeting and
maintaining compliance in the coming months.
If you have any questions, please contact this office at (828) 296-4614
Page 2 of 3
Permit: NCG070194 Owner• Facility: Quality Stone LLC
Inspection Date: 07/23/2019 Inspection Type : Compliance Evaluation
Stormwater Pollution Prevention Plan
Does the site have a Stormwater Pollution Prevention Plan?
# Does the Plan include a General Location (USGS) map?
# Does the Plan include a "Narrative Description of Practices"?
# Does the Plan include a detailed site map including outfall locations and drainage areas?
# Does the Plan include a list of significant spills occurring during the past 3 years?
# Has the facility evaluated feasible alternatives to current practices?
# Does the facility provide all necessary secondary containment?
# Does the Plan include a BMP summary?
# Does the Plan include a Spill Prevention and Response Plan (SPRP)?
# Does the Plan include a Preventative Maintenance and Good Housekeeping Plan?
# Does the facility provide and document Employee Training?
# Does the Plan include a list of Responsible Party(s)?
# Is the Plan reviewed and updated annually?
# Does the Plan include a Stormwater Facility Inspection Program?
Has the Stormwater Pollution Prevention Plan been implemented?
Comment:
Permit and Outfalls
# Is a copy of the Permit and the Certificate of Coverage available at the site?
# Were all outfalls observed during the inspection?
# If the facility has representative outfall status, is it properly documented by the Division?
# Has the facility evaluated all illicit (non stormwater) discharges?
Comment:
Reason for Visit: Routine
Yes No NA NE
E ❑ ❑ ❑
❑ ❑ ❑
■❑❑❑
■❑❑❑
■❑❑❑
■❑❑❑
■❑❑❑
■❑❑❑
■❑❑❑
E ❑ ❑ ❑
■❑❑❑
■❑❑❑
■❑❑❑
■❑❑❑
Yes No NA NE
❑ ❑ ❑
❑ ❑ ❑ E
❑❑❑■
❑❑❑■
Page 3 of 3