HomeMy WebLinkAboutNCC191180_ESC Approval Submitted_20190731Wake County Environmental Services Department
Water Quality Division, Watershed Management Section
WAKE
336 Fayetteville St. • P.O. Box 550 • Raleigh, NC 27602
COUNTY TEL 919 856-7400 • FAX 919 743-4772
(.,3«)i_,-
SECPA - SEDIMENT AND EROSION CONTROL CONSTRUCTION PLAN APPROVAL
Project Name Hampton Place T/H Watershed Crabtree
Date Processing
Date Received 3/15/18 Initiated 3/15/18
Disturbed
Acreage 7.11
Plan Review Fee $1778 paid
Jurisdiction Morrisville
Project Number S6141
Permit Fee $1778 pending
Applicant: Engineer:
Name Capitol Properties of Raleigh II, LLC Don Curry, PE
------------------------------------------------------------------------------- -----------------------------------------------------
Address: 3724 National Dr, Ste 200 Raleigh, NC 27612 205 S. Fuquay Ave., Fuquay-Varina, NC 27526
--------------------------------------------------------------------------------- -
Phone: 984-200-5540 919-552-0849
--------------------------------------------------------------------- -----------------------------------------------------------------------------------------
Email: jpalmer@shenandoahhomes.us don@curryeng.com
--------------------------------------------------------------------------------------------------------------------------------------------------------------
Plan Date/Revision Date: 1/5/18-3/12/18
Approval Date: ® Construction Plan Approved with the following Conditions of Approval and Applicable Standards
4/30/18
Conditions of Approval
Items marked with an "X" were noted as conditions of the Sediment and Erosion Control Plan approval. Unless otherwise
noted, all references shown in brackets are for the Wake County Unified Development Ordinance (UDO), adopted 04/17/06.
®
1'
A mandatory preconstruction meeting is required between the owner, contractor, and Wake County prior to
issuance of the Land Disturbance Permit. The permit fee is due at that time. [10-30-7(C)]
®
2.
Grading, other than for installation of soil erosion and sedimentation control measures, is prohibited prior to
the issuance of a Certificate of Compliance. [10-30-7(D)]
Contractor shall follow plans strictly and maintain contact with Wake County prior to making any field
®
3.
modifications to erosion and sediment control devices. No devices shall be removed without prior approval
from Wake County.
Wake County's sedimentation pollution control program is performance oriented, requiring protection of the
natural resources and adjoining properties. If at any time during the project it is determined that the Erosion
®
4.
and Sedimentation Control Plan is inadequate to meet the requirements of the Erosion and Sedimentation
Control Ordinance of Wake County, this office may require revisions in the plan and its implementation to
ensure compliance with the Ordinance.
All projects that have approved plans for an E&SC permit on or after Aug. 3, 2011 are covered by the NPDES
Construction Stormwater General Permit, NCG 010000. In addition, effective October 1, 2010, persons
®
5'
conducting land -disturbing activities larger than one acre must inspect their project after each phase of the
project, and document the inspection in writing. A packet with information on the NPDES General Permit and
the Self -inspection Program will be provided at the preconstruction meeting. Permits and inspection reports
shall be maintained on site.
®
6.
SUBDIVISIONS ONLY Builders are required to obtain grading permits for cumulative disturbance over one acre
(including non-contiguous lots).
Applicable Regulations Unless otherwise noted, all references shown in brackets are for the Wake County Unified
Development Ordinance (UDO), adopted 04/17/06.
1
APPROVAL S&EConstructionPlanReviewChecklist-V.2 WM
0
WAKE
COUNTY
—(.,3«)i_,
—
Wake County Environmental Services Department
Water Quality Division, Watershed Management Section
336 Fayetteville St. • P.O. Box 550 • Raleigh, NC 27602
TEL 919 856-7400 • FAX 919 743-4772
SECPA - SEDIMENT AND EROSION CONTROL CONSTRUCTION PLAN APPROVAL
10-30-6 Validity of Plan, Lapse of Approval - An approved erosion and sedimentation control plan is valid for 2
®
7.
calendar years from the date of approval. If a land disturbance permit has not been obtained within the 2-year
period, the erosion and sedimentation control plan approval becomes null and void.
®
8.
10-30-8 Actions Required Prior to Land Disturbance
S&EC plan approval and land disturbance permit issued must be prominently displayed until all
❑
a.
construction is complete, all permanent sedimentation and erosion control measures are installed and the
site has been stabilized. A copy of the approved plan must be kept on file at the job site.
❑
b'
No person shall initiate a land -disturbing activity until notifying Wake County of the date that the land-
disturbing activity will begin.
®
9.
10-31-1 Authority
County officials may enter any property, public or private, at reasonable times for the purpose of
investigating and inspecting the sites of any land -disturbing activity. No person shall refuse entry or access
❑
a•
to any authorized representative or agent for the County who requests entry for purposes of inspections,
and presents appropriate credentials, nor shall any person obstruct, hamper, or interfere with any such
representatives while in the process of carrying out their official duties.
Agents and officials of the County will periodically inspect land -disturbing activities to ensure compliance
with the North Carolina Sedimentation Pollution Control Act, this article, or rules or orders adopted or
❑
b•
issued pursuant to this article, and to determine whether the measures required in the erosion and
sedimentation control plan are effective in controlling erosion and sedimentation resulting from land -
disturbing activity.
❑
c'
Any land -disturbing activity will be the responsibility of the person(s) conducting the land disturbing
activity, including the property owners. Failure to prevent off site sedimentation will be deemed a
violation of the erosion and sedimentation control regulations of this article.
Wake County Watershed Management Section is not responsible for subject approvals of other Local, State or Federal Agencies. The
subject approvals are (but not limited to) Federal Emergency Management Area Flood regulations/requirements, Division of Water
Quality under stormwater or other water quality regulations/requirements, U.S. Army Corps of Engineers under Article 404/401
(Wetlands/Streams) jurisdiction/requirements, and/or any Federal, State, County and Local municipal regulations or permit
requirements. The approval issued in this letter cannot supersede any other required permit or approval.
C Shawn.springer@wakegov.com
Wake County PE:14�
Contact Info:
919-369-6035
Shawn Springer PE,CFM
2
APPROVAL S&EConstructionPIanReviewChecklist-V.2 WM