ENVIRONMENTAL QUALITY
State of North Carolina
Department of Environment and Natural Resources
Division of Water Resources
15A NCAC 02H .050�74'7
ality Certification, Shoreline Stabilization
FORM: SSGP 02-2017
Shoreline Stabilization Applicati" t Form 2 U 1 9 1 0 U 9
Three copies of the application (including attachments) and the application fee should be sent to:
If sending via US Postal Service If sending via delivery service (UPS, FedEx, etc.)
Karen Higgins Karen Higgins
DWR — 401 & Buffer Permitting Branch DWR — 401 & Buffer Permitting Branch
1617 Mail Service Center 512 N. Salisbury Street
Raleigh, NC 27699-1617 Raleigh, NC 27604
A. Applicant Information [15A NCAC 02H .0502(a)]
1. Owner Information
Name: Duke Energy Carolinas, LLC
Mailing Address: 550 S Tryon St — DEC22, Charlotte, NC 28202
Telephone Number
E-mail Address:
980-373-2436 Fax Number:
eric.rouse@duke-energy.com
2. Agent/ Contact Person Information
A signed and dated copy of the Agent Authorization letter must be attached if the Agent has
signed this application form. (A form can be downloaded here:
http://www.saw.usace.armv.miI/Portals/59/docs/reRulatory/reizdocs/Permits/SAMPLE AGENT AUTHORIZ
ATION FORM.pdf)
Name: John Crutchfield
Company Affiliation: Duke Energy — Director Public Safety & Recreation Strategy
Mailing Address: 526 S Church St — EC12K Charlotte NC 28202
Telephone Number: 980-373-2288 Fax Number:
E-mail Address: iohn.crutchfield@duke-energy.com
B. Project Information [15A NCAC 02H .0502(a) & (b)]
1. Attach a vicinity map (i.e. street map) clearly showing the location of the property with
respect to local landmarks such as towns, rivers, and roads. (See Attachments 1-a and 1-b)
2. Provide a detailed site plan showing property boundaries and proposed locations of
vegetation clearing, buildings, retaining walls, docks, impervious surfaces, rip rap, excavation
or dredging below Full Pond/ Normal Water Level elevations, and construction access
corridors. You may use the diagram provided at the end of this application form.
FORM: SSGP 02-2017 Page 1 of 3
3. Attach a photograph of the shoreline/ buffer proposed to be stabilized. (Include a scale of
some sort- a yard stick, shovel handle, etc.)
4. Location of the property (where work is to be conducted)
County: Mecklenburg Nearest Town: Cornelius
Lake/ river/ ocean adjacent to property: Lake Norman
Property size (acres): 2.88 acres
Subdivision name or site address (include phase/lot number): The subject property is an
island located within the Federal Energy Regulatory Commission (FERC) proiect boundary for
Lake Norman. The island is referred to as Heron Island (N-18), and is located approximateiv
1,500 feet west of 20433 Staghorn Court in Cornelius (see Attachment 1-b). Island N-18 is
owned by Duke Energy.
Directions to site - please include road names and numbers, landmarks, etc.: The Heron Island
(N-18) proiect site is only accessible via boat. The property is located approximately. 1,500 feet
West of 20433 Staghorn Court in Cornelius.
Latitude (in decimal degrees) 35.49237 Longitude (decimal degrees) -80.92203
S. Describe the existing land use or condition of the site at the time of this application
(residential, undeveloped, etc.): The island is undeveloped and densely wooded.
6. Describe proposed work (include discussion as to how hardening of shoreline has been
avoided, or why it is necessary): The purpose of shoreline stabilization is for preservation
of the island, which is an active heron rookery (i.e., approximately 40 nests in 2018). The
stabilization will protect this important natural resource site from further degradation of the
shoreline and loss of the island. The proposed work will stabilize three sections of the main
channel -facing shoreline (western shoreline) with current eroded bank heights of 2 feet to 5
feet. Stabilization will be completed with matting and riprap. The three sections proposed for
stabilization total 310 linear feet of shoreline. Any down/damaged trees currently located at
the shoreline will be placed on or adiacent to the stabilized shoreline after work is completed.
7. Will work be conducted from land? ❑ From water?
8. Total amount of impacts below the normal pool lake level/ Normal Water Level
Permanent impacts (including all excavation, backfill, rip rap, retaining walls, etc.) in square feet:
1,550 square feet
Temporary impacts in square feet:
FORM: SSGP 02-2017 Page 2 of 5
9. Total amount of impacts above the normal pool lake level / Normal Water Level and 50 feet
land -ward
Permanent impacts (including back fill, excavation, rip rap, retaining walls, etc.) in square feet:
620 square feet
Temporary impacts (temporary clearing, construction corridor) in square feet:
10. Please describe the vegetation above the normal pool lake level/ Normal Water Level and 50
feet landward to be impacted (number of trees, for instance): Vegetation impacts will
be limited to what is necessary to stabilize the shoreline. Any vegetation required to be
removed will be placed on/around the stabilized shoreline at the completion of the project.
11. Signature
Owner/Agent's Signature* [15A NCAC 02H .0502(f)l
23 July 2019
Date
Agent's signature is valid only if an authorization letter from the owner is provided.
12. Please approximately sketch the following information on this plan and provide dimensions for
each item:
a. All proposed vegetation clearing
b. Location of rip rap or fill to be placed above the Full Pond/ Normal Water Level elevation
c. Location of rip rap or fill to be placed below the Full Pond/ Normal Water Level elevation
d. Location of any proposed structures such as buildings, retaining walls, docks, etc.
FORM: SSGP 02-2017 Page 3 of 5
e. Location of any excavation or dredging below the Full Pond/ Normal Water Level elevation
La ke
(At Full Pond/ Normal Water Level)
Full Pond/ Normal Water Level
Shoreline I
Plan View
Area 1: 145 ft x 5 ft
below full Pond (max)
Area 2: 55ftx5ft
Area 3:110ftx5ft
7 �
2 ft above full
pond (max)
FORM: SSGP 02-2017 Page 4 of 5
Existing bank
height of 1 to
5 feet
Lake
(At Full Pond/ Normal Water
Side
0
View
D
FORM: SSGP 02-2017 Page 5 of 5
Attachment 1-a
Heron Island Vicinity Map
Lat/Long: 35.49237,-80.92203
La<e e N
ANDER N )f Cati
A,W
11 kN
U Vil. IV
-41 G
'Wes
Project Location
Low Svil le
LOW cville
ley
Mont
Attachment 1-b
Heron Island Location Map
Lat/Long: 35.49237. -80.92203
Project Location
Like o, J1iii11
Lake Norinc
Attachment 2
Heron Island Project Overview Map
Stabilization Area 1: 145 linear feet
Stabilization Area 2: 55 linear feet
Stabilization Area 3: 110 linear feet
Attachment 3-a
Heron Island Existing Conditions
Site Photo
t
.1.
Attachment 3-b
Heron Island Existing Conditions
Site Photo