Loading...
HomeMy WebLinkAbout20161069 Ver 2_Supplement EZ ND-158-17_20190108SUPPLEMENT -EZ FORM COVER PAGE Please indicate the types, quantities and locations of SCMs that will be used on this project: _ Quantity Location(s) Infiltration System Bioretention Cell Wet Pond 1 Southern Property Line Stormwater Wetland Permeable Pavement Sand Filter Rainwater Harvesting _ Green Roof T Level Spreader -Filter Strip Disconnected Impervious Surface _ Treatment Swale. Dry Pond - Designer information for this project: and Title: address: (City, State, Zip: Phone number(s): jEmail: Designer - SEAL 030176 Alr�t Rusty Baksa, Principal Engineer Land Development Solutions 310 Simmons Rd. Suite K Knoxville, TN 37922 865-671-2281 rbaksa@ldstn.com i it Signature f DkVigner Date Applicant: Mailing Address: Email: Project Name: ND -158-17 Address Quality Drive, Southpoint Business Park City / Town Mocksville Hollingsworth General Partnership Joe Hollingsworth 2 Centre Plaza Clinton, TN 37716 sworthcos.com Certification Statement: I certify, under penalty of law: that this Supplement -EZ form and all supporting information were prepared under my direction or supervision; - that the information provided in the form is, to the best of my knowledge and belief, true, accurate, and complete; and - that the engineering plans, specifications, operation and maintenance agreements and other supporting information are consistent with the information provided here. I am aware that there are significant penalties for submitting false information including the possibility of fines and imprisonment for knowing violations as well as a report being made to my professional board. j f.: sir nnnN11 Cover Page 1 4:16 PM 12/21/2018 WET POND ND -158-17 THE DRAINAGE AREA 1 Drainage area number 1 Break down of BUA in the drainage area (both new and existing): Total coastal wetlands area (sq ft) sf Parking / driveway (sq ft) 56022 sf Total surface water area (sq ft) Sidewalk (sq ft) 825 sf Total drainage area (sq ft) 710028 sf Roof (sq ft) 152241 sf BUA associated with existing development (sq ft) sf Roadway (sq ft) Proposed new BUA (sq ft) 209088 sf Other, please specify in the comment box below (sq ft) Percent BUA of drainage area 1 29% ITotal BUA (sq ft) 209088 sf COMPLIANCE WITH THE APPLICABLE STORMWATER PROGRAM Stormwater program(s) that apply (please specify): Design rainfall depth (in) Minimum volume required (cu ft) 37300 cf Design volume of SCM (cu ft) 64650 cf GENERAL MDC FROM 02H.1050 #1 Is the SCM sized to treat the SW from all surfaces at build -out? Yes #7 If applicable, with the SCM be cleaned out after construction? Yes #2 Is the SCM located on or near contaminated soils? No #8 Does the mainetenance access comply with General MDC (8)? Yes #3 What are the side slopes of the SCM (H:V)? 3:1 #9 Does the drainage easement comply with General MDC (9)? Yes #3 Does the SCM have retaining walls, gabion walls or other engineered side slopes? No #10 If the SCM is on a single family lot, does the plat comply with General MDC (10)? #4 Are the inlets, outlets, and receiving stream protected from erosion (10 -year storm)? Yes #11 Is there an O&M Agreement that complies with General MDC (11)? Yes #5 Is there a a bypass for flows in excess of the design flow? Yes 1#12 Is there an O&M Plan that complies with General MDC (12)? Yes #6 What is the method for dewatering the SCM for maintenance? Pump (preferred) 1#13 Was the SCM designed by an NC licensed professional? Yes WET POND MDC FROM 02H.1053 #1 Method used SA/DA #6 Width of the vegetated shelf (feet) 6 ft #1 Surface area of the main permanent pool (square feet) 18335 sf #6 Location of vegetated shelf Submerged #1 Volume of the main permanent pool (cubic feet) 64650 cf #6 Elevation of top of shelf (fmsl) 804 ft #2 Average depth of the main pool (feet) 4 ft #6 Elevation of bottom of shelf (fmsl) 803 ft #2 Was the vegetated shelf included in the calculation of average depth? No #6 Slope of vegetated shelf (H:V) 6:1 #2 Elevation of the bottom of the permanent pool (fmsl) 798 ft #7 Diameter of drawdown orifice (inches) 3.0 in #2 Elevation of the top of the permanent pool (fmsl) 804 ft #7 Drawdown time for the temporary pool (hours) 88 hrs #2 Elevation of the top of the temporary pool (fmsl) 807 ft #7 Does the orifice drawdown from below the top surface of the permanent pool? Yes #3 Depth provided for sediment storage (inches) 6 in #8 Does the pond minimize impacts to the receiving channel from the 1 -yr, 24 -hr storm? Yes #4 Are the inlet(s) and outlet located in a manner that avoids short-circuiting? Yes #9 Are fountains proposed? No #4 Describe any measures, such as berms or baffles, that will be taken to improve the flow path: #9 If yes, is documentation provided per Wet Pond MDC (9)? #10 Is a trash rack or other device provided to protect the outlet system? Yes #5 Volume of the forebay (cubic feet) 13,320 #11 Are the dam and embankment planted in non -clumping turf grass? Yes #5 Is this 15-20% of the volume in the main pool? Yes #11 Species of turf that will be used on the dam and embankment Non -clumping Fescue #5 Depth of forebay at entrance (inches) 84 in #11 Describe the planting plan for the vegetated shelf: #5 Depth of forebay at exit (inches) #5 Does water flow out of the forebay in a non-erosive manner? #5 Clean-out depth for forebay (inches) #5 Will the forebay be cleaned out when the depth is reduced to less than the above? 48 in Yes 12 in Yes See Sheet C505 ADDITIONAL INFORMATION Please use this space to provide any additional information about this wet pond that you think is relevant to the review: Wet Pond 1 10:31 AM 1/8/2019