Loading...
HomeMy WebLinkAbout20161069 Ver 2_Supplement EZ ND-157-17_20190108SUPPLEMENT -EZ FORM COVER PAGE Please indicate the types, quantities and locations of SCMs that will be used on this project: Infiltration System Bioretention Cell Wet Pond 1 Stormwater Wetland Permeable Pavement Sand Filter Rainwater Harvesting Green Roof Level Spreader -Filter Strip Disconnected Impervious Surface Pond Designer information for this project: Name and Title: Rusty Baksa, Principal Engineer Organization: Land Development Solutions Street address: 310 Simmons Rd. Suite K City, State, Zip: Knoxville, TN 37922 (Phone number(s): 865-671-2281 Email- rbaksa@ldstn.com Designer ,, SEAT_ 03017E �,f t�' ��JGdppNE Sigr tur otAiesigner 1 12 2( bo Date Southern Property Line Project Name: ND -157-17 Address Quality Drive, Southpoint Business Park City / Town Mocksville Applicant: Company: Hollingsworth General Partnership Contact: Joe Hollingsworth Mailing Address: 2 Centre Plaza _ City, State, Zip: Clinton, TN 37716 Phone number(s): 865-457-3601 Email: jhollingsworth@hollingsworthcos.com Certification Statement: I certify, under penalty of law: that this Supplement -EZ form and all supporting information were prepared under my direction or supervision; - that the information provided in the form is, to the best of my knowledge and belief, true, accurate, and complete; and - that the engineering plans, specifications, operation and maintenance agreements and other supporting information are consistent with the information provided here. I am aware that there are significant penalties for submitting false information including the possibility of fines and imprisonment for knowing violations as well as a report being made to my professional board. L'r;rlr unnri r Qw,rry Cover Page 1 4:16 PM 12/21/2018 WET POND ND -157-17 THE DRAINAGE AREA 1 Drainage area number 1 Break down of BUA in the drainage area (both new and existing): Total coastal wetlands area (sq ft) sf Parking / driveway (sq ft) 50606 sf Total surface water area (sq ft) Sidewalk (sq ft) 1850 sf Total drainage area (sq ft) 731808 sf Roof (sq ft) 130496 sf BUA associated with existing development (sq ft) sf Roadway (sq ft) Proposed new BUA (sq ft) 182952 sf Other, please specify in the comment box below (sq ft) Percent BUA of drainage area 1 25% ITotal BUA (sq ft) 182952 sf COMPLIANCE WITH THE APPLICABLE STORMWATER PROGRAM Stormwater program(s) that apply (please specify): Design rainfall depth (in) Minimum volume required (cu ft) 45000 cf Design volume of SCM (cu ft) 65000 cf GENERAL MDC FROM 02H.1050 #1 Is the SCM sized to treat the SW from all surfaces at build -out? Yes #7 If applicable, with the SCM be cleaned out after construction? Yes #2 Is the SCM located on or near contaminated soils? No #8 Does the mainetenance access comply with General MDC (8)? Yes #3 What are the side slopes of the SCM (H:V)? 3:1 #9 Does the drainage easement comply with General MDC (9)? Yes #3 Does the SCM have retaining walls, gabion walls or other engineered side slopes? No #10 If the SCM is on a single family lot, does the plat comply with General MDC (10)? #4 Are the inlets, outlets, and receiving stream protected from erosion (10 -year storm)? Yes #11 Is there an O&M Agreement that complies with General MDC (11)? Yes #5 Is there a a bypass for flows in excess of the design flow? Yes 1#12 Is there an O&M Plan that complies with General MDC (12)? Yes #6 What is the method for dewatering the SCM for maintenance? Pump (preferred) 1#13 Was the SCM designed by an NC licensed professional? Yes WET POND MDC FROM 02H.1053 #1 Method used SA/DA #6 Width of the vegetated shelf (feet) 6 ft #1 Surface area of the main permanent pool (square feet) 18560 sf #6 Location of vegetated shelf Submerged #1 Volume of the main permanent pool (cubic feet) 65000 cf #6 Elevation of top of shelf (fmsl) 825 ft #2 Average depth of the main pool (feet) 4 ft #6 Elevation of bottom of shelf (fmsl) 824 ft #2 Was the vegetated shelf included in the calculation of average depth? No #6 Slope of vegetated shelf (H:V) 6:1 #2 Elevation of the bottom of the permanent pool (fmsl) 820 ft #7 Diameter of drawdown orifice (inches) 3.0 in #2 Elevation of the top of the permanent pool (fmsl) 825 ft #7 Drawdown time for the temporary pool (hours) 88 hrs #2 Elevation of the top of the temporary pool (fmsl) 829 ft #7 Does the orifice drawdown from below the top surface of the permanent pool? Yes #3 Depth provided for sediment storage (inches) 6 in #8 Does the pond minimize impacts to the receiving channel from the 1 -yr, 24 -hr storm? Yes #4 Are the inlet(s) and outlet located in a manner that avoids short-circuiting? Yes #9 Are fountains proposed? No #4 Describe any measures, such as berms or baffles, that will be taken to improve the flow path: #9 If yes, is documentation provided per Wet Pond MDC (9)? #10 Is a trash rack or other device provided to protect the outlet system? Yes #5 Volume of the forebay (cubic feet) 8,250 #11 Are the dam and embankment planted in non -clumping turf grass? Yes #5 Is this 15-20% of the volume in the main pool? Yes #11 Species of turf that will be used on the dam and embankment Non -clumping Fescue #5 Depth of forebay at entrance (inches) 84 in #11 Describe the planting plan for the vegetated shelf: #5 Depth of forebay at exit (inches) #5 Does water flow out of the forebay in a non-erosive manner? #5 Clean-out depth for forebay (inches) #5 Will the forebay be cleaned out when the depth is reduced to less than the above? 60 in Yes 12 in Yes See Sheet C505 ADDITIONAL INFORMATION Please use this space to provide any additional information about this wet pond that you think is relevant to the review: Wet Pond 1 10:01 AM 1/8/2019