Loading...
HomeMy WebLinkAbout20161069 Ver 2_ND-157-17 Drainage Report_20190108Drainage and Detention Calculations For ND -157-17 The Hollingsworth Companies Southpoint Industrial Park Davie County, North Carolina Prepared by: Land Development Solutions 310 Simmons Road, Suite K Knoxville, Tennessee 37922 November 2018 Revised: LAND DEVELOPMENT SOLUTIONS Davie County, ND -157-17 November 2018 Table of Contents Section Description Introduction 2 Wet Pond 3 Temporary Storage Analysis 4 Appendix - Support Data & Calculations Davie County, ND -157-17 November 2018 1 Introduction The ND -157-17 project consists of construction of a 130,000+/- sf building and a 57 car parking lot along with related access drives and loading docks. The entire site drains through various storm water ditches and storm drain systems surrounding the site and eventually into an unnamed tributary of Beer Creek. The total site acreage is approximately 16.8 acres. The total area disturbed for this project is 9.7+/- acres. The site is located on the northwestern side of Quality Drive in the Southpoint Industrial Park. The site is made up of Clifford, Cordorus and Fairview soil types. The soils information is included in Appendix I. The following procedure was used to design the basin: 1. Define the existing drainage areas and patterns and calculate the pre - development runoff for the site. 2. Define the post -developed drainage areas and patterns based on the site plan and calculate the post -developed runoff for the site. Determine the areas that will drain directly off-site. 3. Determine a suitable method of treatment and design the drainage facilities accordingly. 4. Compare the post -development peak discharge with the pre -developed (allowable) peak discharge and determine detention basin locations. 5. Provide enough storage volume in the basin and design outlet structure thal provide adequate draw down time. 6. Design the emergency spillway to safely discharge the 100 year design storm peak runoff (in case of outlet structure failure). Methodology The Runoff Treatment Method (taken from the NCDENR Stormwater BMP Manual) was used to manage the stormwater for this site. A Wet Pond was chosen as the Primary SCM to treat the sotrmwater runoff. This SCM treats runoff and releases it as surface discharge or infiltrates and evapo-trainspires stormwater. The Wet Pond is designed and shall be constructed and maintained in accordance with the Minimum Design Criteria (See Appendix for MDC chart). The Wet Pond is designed to capture the design storm (taken from the USMP design standard for non -coastal counties, 1" rain event) and release it slowly over a period of two to five days. Davie County, ND -157-17 November 2018 2 Wet Pond (Design per NCDEQ MDC) Total Site = 16.8 Ac Impervious Area = 4.2 Ac Percent Impervious = 25% Treatment Volume Required = 45,000 cf Wet Pond Storage Provided = 65,000 cf Main Pool Depth Davg = VPP/APP = Vol. Perm. Pool/Area Perm. Pool = 65,000/18,560 = 3.5' (max. 5') Forebay Volume Required: 15-20% of Wet Pond Storage Required = 8,100 cf (18%) Provided = 8,250 cf Draw Down Time = 86.4 hours (3.6 days) See appendix for support data See ND -157-17 Southpoint Business Park Sheets C201 and C502 for information on the grading of the basin and the outlet structure. 3 Temporary Storage Analysis The pre -developed site drains to the southwest to a drainage ditch that outlets into an unnamed tributary of Beer Creek. The pre -developed drainage area consists of grass and woods. Table 1 and 2 below show the Area Characteristics and Peak Runoffs. Table 1 — Pre -developed Area Characteristics Pre -Developed Area Area Time of Composite Name & Hydrograph (acres) Concentration Ground Cover Curve # minutes Number Pre -Developed Area 16.8 9.7 Grass/Woods 68 Hydrograph #1 Davie County, ND -157-17 November 2018 Table 2 — Pre -developed Peak Runoff Post -Developed 1 Year 2 Year 5 Year 10 Year 25 Year 100 Year Hydrograph Design Design Design Design Design Storm Design Storm Number Storm Peak Storm Peak Storm Peak Storm Peak Peak Runoff Peak Runoff 0.9 Runoff cfs Runoff cfs Runoff cfs Runoff cfs) (cfs) (cfs Pre -developed Post Developed Area 2 11.9 20.7 35.5 48.1 66.3 97.4 Hydrograph #1 The pre -developed site runoff hydrographs are included in the Appendix. The Post -developed drainage area is divided into two separate areas that both drain to the southwest. The first area will bypass the wet pond and drain directly offsite. This area is made up of the undisturbed portion of the property. The second area will drain to the wet basin and outlet through the designed outlet structure. Table 3 and 4 below show the Area Characteristics and Peak Runoffs. Table 3 — Post -developed Area Characteristics Post -Developed Area Time of 5 Year Composite Area Name & (acres) Concentration Ground Cover Curve Hydrograph # Design Storm minutes Design Storm Number Post Developed Peak Runoff Peak Runoff Peak Runoff Peak Runoff Area 1 0.9 6.0 Grass/Light Woods 70 Hydrograph #2 (cfs) (cfs Area 1 Post Developed Area 2 15.9 8.1 Grass/Impervious 74 Hydrograph #3 6.4 #2 Table 4 — Post -developed Peak Runoff 1 Year 2 Year 5 Year 10 Year 25 Year 100 Year Hydrograph Design Storm Design Storm Design Storm Design Storm Design Storm Design Storm Number Peak Runoff Peak Runoff Peak Runoff Peak Runoff Peak Runoff Peak Runoff cfs) (cfs) (cfs) (cfs) (cfs) (cfs Area 1 Hydrograph 0.9 1.5 2.5 3.3 4.4 6.4 #2 Area 2 Hydrograph 19.9 30.1 46.8 60.4 79.9 112.2 #3 The post -developed site runoff hydrographs are included in the Appendix. Davie County, ND -157-17 November 2018 Conclusion The runoff hydrographs for the area draining to the wet pond were routed through the wet pond to obtain discharge hydrographs for each of the storms. The peak discharge from the wet Pond + the discharges from the undetained area (Area 1) are the total post developed flow to the downstream system. The combined discharges are compared to the pre -developed discharges. The discharges are listed in the Table 5: Table 5 — Wet Pond Routing and Combined Peak Discharges Allowable Peak Flow inparentheses) 1 Year 2 Year 5 Year 10 Year 25 Year 100 Year Hydrograph Design Storm Design Storm Design Storm Design Storm Design Storm Design Storm Number Peak Peak Peak Peak Peak Peak Discharge Discharge Discharge Discharge Discharge Discharge f cfs) (cfs) (cfs) (cfs) (cfs) (cfs #4 Retention 0.3 0.9 3.7 8.6 16.8 25.1 Basin Discharge #5 17.6 27.8 Combined 1.0 (11.9) 1.7 (20.7) 3.9 (35.5) 9.0(48.1) (66.3) (97.4) Discharge The routed hydrographs for each of the storms are included in the Appendix. The wet pond includes a 20' wide broad crested earthen weir for emergency discharge. The weir will be reinforced with North American Green C350 Turf Reinforcement Matting. The wet portion of the pond has sufficient volume to handle the treatment volume required. Table 5 shows that the temporary storage and outlet structure successfully reduce the peak discharge from the entire site in all the design storms. Davie County, ND -157-17 November 2018 Appendix r � [ i I �+ t + r / f f / ` r 1 1+ 11 jll x 11 I\ �f 1 i'► 1 1 F. syr ^ ra Y "0.5�+ � I� i ! r ►1 1 �� If 01 F f / /rJ�� 10' , / /•{/ 1,} , `_ _J j+ it i 51 h i I I )� '/ f/ ,' f' `y 111 1/f� r+ r t �_��r r a i l t /// fr# I1� r /{ r lit fIt 0,01, �' }/// ISS f '�-, r l r r � r � `� \ � � \i i Ihlr I r+ { ` _ _ \ , ,1 I„IItlt"l � � � J � i / 1' / r r/ y� J' \ ��ti�1 '�� l 4 1 1 [ ! r h - �, r }♦ x� ����: f 1 / i� Of yy ;_, detti--3 } e dr r // } J f! r10 ! J + SIJ” f JY, rrr tr�f� rrri! r 1 1 I Ilii {ri�/rr/ tilt 1 ��\+ \/aihh}�r �r�1 �rr� ly k�i�.� q�I kkrl iL1hkr�tk�th�llIti\1ii�ir ` ll f/s 1+t skiihl5y1lt1\ 4',y { r I I y1y1 �sral r ills 1;� \ +� rrr i / I / i r ytiti 1kil�rtiilil�,�illiy;{!��- kM- 4 — �//Ilx{41iti i r r f i I I ti i 1 f x { / � �� �' / 1 / �i � 4 1 1 Illi Rl"\` �\\�`���=IL l\\ AGPP' Project: Drawn B ;' LAND ND -157-17 Chocked DE VEL OPMEN T roved Pre -developed Area Job No. SOL U TIONS Scale: Sheet No. ley 1"=200' 310 SIMMONS RD., SUITE K- KNOXVILLE, TENNESSEE 37922 Davie County, North Carolina Date: 1 OU. DOE 974 na04 A A A. 1. �xr F' fflp jr f� 1'orI I j j 5 Il If }! f 0 /f r I I IF { YOr 1 t jol r IP if / / 1 f I/ �! ff /} /r % dF 11 ku ; ►f .0 -' Post-Dev Area 2 ` . 0 �tp' ' /.f / orf 0 f "o fe 15.9 Acres %I� FFE=81&0 40 }/ 4F I /jr!r fff }/7 yy. fig} �I�IIIIIIIIIII 1 fi r }/ 1% f I �UI�IIII IIII _ f 1' � 1 1 f I Ill�lllllgll � I! 1 ff xr t }_f + P11 Oft 111 t P I�IIIIIIIIIIII� I f f r F,' 1 11 +Irfe. rt x I I Illl1 III'y _ I + #e f� 1fIIIIII���I 4� 1111 IIII 1111 ;s �I }/ ,�� �� �r f � � +fl +Ilett �ti�� ��► � I III�In�ull I r � � fplll��f �_—�� � ,,% / ,' � +��� � 1+1 �'�r I`' � � �� �� xnll�lul uqM � r--_� %1 •, II aj'�IIIJ �{ tkk 11 IIII �l1�1111 I % f/ + rr+ tlInlI 1111111 N � hl�Ip Iljll'llllllljl I I — } 10 / f W1/ f % I j1kaof i4} i% /fI/IfiI III111�I�1111i // / ! ff� LAND ND -157-17 checked DE VEL OPMEN T Approved Post -developed Area Job No. SOL U TIONS sheetry rr 310 SIMMONS RD., SUITE K- KNOXVILLE, TENNESSEE 37922 1"=200' 11 -PH. 865-671-2281 D rfie Caunty, Narth Carolina 1111-15-18 2 ND -157-17 Wet Pond Treatment Volume Required = 45,000 cf Wet Pond Volume Provided = 65,000 cf MDC1 SD/DA: Total Site 16.8 Ac Impervious Area 4.2 Ac Percent Impervious 25% MDC2 Davg. = Vpp/App (Vol. Perm. Pool/Area Perm. Pool) 65,000/18,560 = 3.5' (Max. Depth 5') MDC3 Done M DC4 Done MDC5 Forebay = 15-20% Volume = 45,000*.18 = 8,100 cf Forebay Provided = 8,250 cf M DC6 Done M DC7 Done M DC8 Done M DC9 N/A MDC10 Done MDC11 See Landscape Plans JOB NAME: Mocksville NC Basin 2 DATE: 8-24-17 ORIFICE EQUATION FOR DRAW DOWN Q = Co *A*sgrt(2gH) Q = allowable flow, cfs Co = coefficient, 0.6 g = gravity, 32.2 ft./sec^2 H = average head, ft A = Area, f A2 Draw Down: Acreage = 16.8 FF Volume, ft^3 = 45000 Convert to Ac -ft = 1.03306 Allowable Flow, cfs = 0.521 Minimum Flow, cfs = 0.174 Water Surface Elevation = 826.5 02 invert = 01 invert= FF invert = 825 Solve for flow: Q = Co *A*sgrt 2 H) FF orifice diam., in. = 3.00 H, ft. = 1.5 A, f A2 = 0.049 FF Q, cfs = 0.289 avg flow 0.1447 01 orifice diam., in. _ H, ft. = 826.5 A, ft^2 = 0.000 01 Q, cfs = 0.000 avg flow 0.0000 02 orifice diam., in. _ H, ft. = 826.5 A, ft^2 = 0.000 02 Q, cfs = 0.000 avg flow 0.0000 Total Q, cfs =1 1 1 0.145 FF held, hrs. = 86.36 Hydrograph Summary Report Hydraflow Hydrographs by Intelisolve v9.2 Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to peak (min) Hyd. volume (cuft) Inflow hyd(s) Maximum elevation (ft) Total strge used (cuft) Hydrograph description 1 SCS Runoff 11.89 1 720 31,211 ---- ------ ------ Predevloped area 2 SCS Runoff 0.918 1 718 1,989 ---- ------ ------ Post devleoped - Undeveloped 3 SCS Runoff 19.87 1 719 43,094 ---- ------ ------ Post Developed to Wet Basin 4 Reservoir 0.254 1 1442 28,719 3 826.35 32,594 Temp Storage Pond 5 Combine 1.029 1 718 30,707 2,4 ------ ------ Total Site runoff Wet Pond 2.gpw 1 Year 15, 2018 Return Period: Thursday, Nov Hydrograph Report Hydraflow Hydrographs by Intelisolve v9.2 Hyd. No. 1 Time to peak Predevloped area Hyd. volume Hydrograph type = SCS Runoff Storm frequency = 1 yrs Time interval = 1 min Drainage area = 16.800 ac Basin Slope = 0.0% Tc method = TR55 Total precip. = 2.77 in Storm duration = 24 hrs Composite (Area/CN) = [(13.000 x 70) + (3.800 x 61)] / 16.800 Q (cfs) 12.00 10.00 M. 10 .00 4.00 2.00 Predevioped area Hyd. No. 1 -- 1 Year 2 Thursday, Nov 15, 2018 Peak discharge = 11.89 cfs Time to peak = 720 min Hyd. volume = 31,211 cuft Curve number = 68* Hydraulic length = 0 ft Time of conc. (Tc) = 9.70 min Distribution = Type II Shape factor = 484 Q (cfs) 12.00 10.00 OR .UM 4.00 2.00 I I I . I I I I I I I\ 1 0.00 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 1 Time (min) 3 Hydrograph Report Hydraflow Hydrographs by Intelisolve v9.2 Thursday, Nov 15, 2018 Hyd. No. 2 Post devleoped - Undeveloped Hydrograph type = SCS Runoff Peak discharge = 0.918 cfs Storm frequency = 1 yrs Time to peak = 718 min Time interval = 1 min Hyd. volume = 1,989 cuft Drainage area = 0.900 ac Curve number = 70 Basin Slope = 0.0% Hydraulic length = 0 ft Tc method = USER Time of conc. (Tc) = 6.00 min Total precip. = 2.77 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Q (cfs) 1.00 0.90 0.80 0.70 0.60 0.50 0.40 0.30 0.20 0.10 0 00 Post devleoped - Undeveloped Hyd. No. 2 -- 1 Year Q (cfs) 1.00 0.90 0.80 0.70 0.60 0.50 0.40 0.30 0.20 0.10 0 00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 2 Time (min) Hydrograph Report Hydraflow Hydrographs by Intelisolve v9.2 Hyd. No. 3 Time to peak Post Developed to Wet Basin Hydrograph type = SCS Runoff Storm frequency = 1 yrs Time interval = 1 min Drainage area = 15.900 ac Basin Slope = 0.0% Tc method = TR55 Total precip. = 2.77 in Storm duration = 24 hrs Composite (Area/CN) = [(4.200 x 98) + (6.700 x 61) + (5.000 x 70)] / 15.900 Q (cfs) 21.00 18.00 15.00 12.00 M1111 .M 3.00 4 Thursday, Nov 15, 2018 Peak discharge = 19.87 cfs Time to peak = 719 min Hyd. volume = 43,094 cuft Curve number = 74* Hydraulic length = 0 ft Time of conc. (Tc) = 8.10 min Distribution = Type II Shape factor = 484 Post Developed to Wet Basin Hyd. No. 3 -- 1 Year Q (cfs) 21.00 18.00 15.00 12.00 M 3.00 0.00 ' ' ' ' ' ' ' ' ' ' ' ' 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 3 Time (min) Hydrograph Report Hydraflow Hydrographs by Intelisolve v9.2 Hyd. No. 4 Temp Storage Pond Hydrograph type = Reservoir Storm frequency = 1 yrs Time interval = 1 min Inflow hyd. No. = 3 - Post Developed to Wet Basin Reservoir name = Temp Storage Storage Indication method used Q (cfs) 21.00 18.00 15.00 12.00 IM111111 .M 3.00 0.00 ' ' 0 300 Hyd No. 4 Temp Storage Pond Hyd. No. 4 -- 1 Year 600 900 1200 Hyd No. 3 5 Thursday, Nov 15, 2018 Peak discharge = 0.254 cfs Time to peak = 1442 min Hyd. volume = 28,719 cuft Max. Elevation = 826.35 ft Max. Storage = 32,594 cuft 1500 1800 2100 2400 2700 1llI I LI IJ1II � Total storage used = 32,594 cuft Q (cfs) 21.00 18.00 15.00 12.00 3.00 1 0.00 3000 Time (min) Hydrograph Report Hydraflow Hydrographs by Intelisolve v9.2 Hyd. No. 5 Time to peak = Total Site runoff Hyd. volume = Hydrograph type = Combine Storm frequency = 1 yrs Time interval = 1 min Inflow hyds. = 2, 4 Q (cfs) 2.00 1.00 Thursday, Nov 15, 2018 Peak discharge = 1.029 cfs Time to peak = 718 min Hyd. volume = 30,707 cuft Contrib. drain. area = 0.900 ac Total Site runoff Hyd. No. 5 -- 1 Year 300 600 900 1200 1500 1800 2100 2400 2700 Hyd No. 5 Hyd No. 2 Hyd No. 4 Q (cfs) 2.00 1.00 0.00 3000 Time (min) Hydrograph Summary Report Hydraflow Hydrographs by Intelisolve v9.2 Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to peak (min) Hyd. volume (cuft) Inflow hyd(s) Maximum elevation (ft) Total strge used (cuft) Hydrograph description 1 SCS Runoff 20.66 1 720 49,736 ---- ------ ------ Predevloped area 2 SCS Runoff 1.497 1 718 3,089 ---- ------ ------ Post devleoped - Undeveloped 3 SCS Runoff 30.14 1 719 64,014 ---- ------ ------ Post Developed to Wet Basin 4 Reservoir 0.886 1 929 47,288 3 826.62 40,389 Temp Storage Pond 5 Combine 1.662 1 718 50,376 2,4 ------ ------ Total Site runoff Wet Pond 2.gpw 2 Year 15, 2018 Return Period: Thursday, Nov Hydrograph Report Hydraflow Hydrographs by Intelisolve v9.2 Hyd. No. 1 Hyd. volume Predevloped area Curve number Hydrograph type = SCS Runoff Storm frequency = 2 yrs Time interval = 1 min Drainage area = 16.800 ac Basin Slope = 0.0% Tc method = TR55 Total precip. = 3.35 in Storm duration = 24 hrs Composite (Area/CN) = [(13.000 x 70) + (3.800 x 61)] / 16.800 Q (cfs) 21.00 18.00 15.00 12.00 M1111 .M 3.00 Predevloped area Hyd. No. 1 -- 2 Year Thursday, Nov 15, 2018 Peak discharge = 20.66 cfs Time to peak = 720 min Hyd. volume = 49,736 cuft Curve number = 68* Hydraulic length = 0 ft Time of conc. (Tc) = 9.70 min Distribution = Type II Shape factor = 484 Q (cfs) 21.00 18.00 15.00 12.00 M 3.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 1 Time (min) Hydrograph Report Hydraflow Hydrographs by Intelisolve v9.2 Hyd. No. 2 Time to peak Post devleoped - Undeveloped Hydrograph type = SCS Runoff Storm frequency = 2 yrs Time interval = 1 min Drainage area = 0.900 ac Basin Slope = 0.0% Tc method = USER Total precip. = 3.35 in Storm duration = 24 hrs Q (cfs) 2.00 1.00 �67 Thursday, Nov 15, 2018 Peak discharge = 1.497 cfs Time to peak = 718 min Hyd. volume = 3,089 cuft Curve number = 70 Hydraulic length = 0 ft Time of conc. (Tc) = 6.00 min Distribution = Type II Shape factor = 484 Post devleoped - Undeveloped Hyd. No. 2 -- 2 Year 120 240 360 480 600 720 840 960 Hyd No. 2 Q (cfs) 2.00 1.00 0.00 1080 1200 1320 1440 1560 Time (min) Hydrograph Report Hydraflow Hydrographs by Intelisolve v9.2 Hyd. No. 3 Time to peak Post Developed to Wet Basin Hydrograph type = SCS Runoff Storm frequency = 2 yrs Time interval = 1 min Drainage area = 15.900 ac Basin Slope = 0.0% Tc method = TR55 Total precip. = 3.35 in Storm duration = 24 hrs Composite (Area/CN) = [(4.200 x 98) + (6.700 x 61) + (5.000 x 70)] / 15.900 Q (cfs) 35.00 RI 11 25.00 20.00 15.00 10.00 5.00 10 Thursday, Nov 15, 2018 Peak discharge = 30.14 cfs Time to peak = 719 min Hyd. volume = 64,014 cuft Curve number = 74* Hydraulic length = 0 ft Time of conc. (Tc) = 8.10 min Distribution = Type II Shape factor = 484 Post Developed to Wet Basin Hyd. No. 3 -- 2 Year Q (cfs) 35.00 it 11 25.00 20.00 15.00 10.00 5.00 0.00 ' 1 1 1 1 1 1 1 1 1 1 1 1� 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 3 Time (min) Hydrograph Report Hydraflow Hydrographs by Intelisolve v9.2 Hyd. No. 4 Temp Storage Pond Hydrograph type = Reservoir Storm frequency = 2 yrs Time interval = 1 min Inflow hyd. No. = 3 - Post Developed to Wet Basin Reservoir name = Temp Storage Storage Indication method used Q (cfs) 35.00 25.00 20.00 15.00 10.00 5.00 0.00 ' ' 0 300 Hyd No. 4 Temp Storage Pond Hyd. No. 4 -- 2 Year 11 Thursday, Nov 15, 2018 Peak discharge = 0.886 cfs Time to peak = 929 min Hyd. volume = 47,288 cuft Max. Elevation = 826.62 ft Max. Storage = 40,389 cuft Q (cfs) 35.00 30.00 25.00 20.00 15.00 10.00 5.00 0.00 900 1200 1500 1800 2100 2400 2700 3000 Time (min) - Hyd No. 3 I I ILJ�I Total storage used = 40,389 cult Hydrograph Report Hydraflow Hydrographs by Intelisolve v9.2 Hyd. No. 5 Total Site runoff Hydrograph type = Combine Storm frequency = 2 yrs Time interval = 1 min Inflow hyds. = 2, 4 Q (cfs) 2.00 1.00 M `m Thursday, Nov 15, 2018 Peak discharge = 1.662 cfs Time to peak = 718 min Hyd. volume = 50,376 tuft Contrib. drain. area = 0.900 ac Total Site runoff Hyd. No. 5 -- 2 Year Q (cfs) 2.00 1.00 0.00 300 600 900 1200 1500 1800 2100 2400 2700 3000 Time (min) Hyd No. 5 Hyd No. 2 Hyd No. 4 Hydrograph Summary Report 13 Hydraflow Hydrographs by Intelisolve v9.2 Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to peak (min) Hyd. volume (cuft) Inflow hyd(s) Maximum elevation (ft) Total strge used (cuft) Hydrograph description 1 SCS Runoff 35.47 1 720 81,712 ---- ------ ------ Predevloped area 2 SCS Runoff 2.459 1 718 4,958 ---- ------ ------ Post devleoped - Undeveloped 3 SCS Runoff 46.75 1 719 98,598 ---- ------ ------ Post Developed to Wet Basin 4 Reservoir 3.748 1 757 81,264 3 826.90 48,539 Temp Storage Pond 5 Combine 3.944 1 755 86,223 2,4 ------ ------ Total Site runoff Wet Pond 2.gpw 5 Year 15, 2018 Return Period: Thursday, Nov Hydrograph Report Hydraflow Hydrographs by Intelisolve v9.2 Hyd. No. 1 Hyd. volume Predevloped area Curve number Hydrograph type = SCS Runoff Storm frequency = 5 yrs Time interval = 1 min Drainage area = 16.800 ac Basin Slope = 0.0% Tc method = TR55 Total precip. = 4.21 in Storm duration = 24 hrs 14 Thursday, Nov 15, 2018 Peak discharge = 35.47 cfs Time to peak = 720 min Hyd. volume = 81,712 cuft Curve number = 68* Hydraulic length = 0 ft Time of conc. (Tc) = 9.70 min Distribution = Type II Shape factor = 484 Composite (Area/CN) = [(13.000 x 70) + (3.800 x 61)] / 16.800 Q (Cfs) 40.00 30.00 20.00 10.00 Predevioped area Hyd. No. 1 -- 5 Year 120 240 360 480 600 720 840 960 Hyd No. 1 Q (Cfs) 40.00 it 11 20.00 10.00 0.00 1080 1200 1320 1440 1560 Time (min) Hydrograph Report Hydraflow Hydrographs by Intelisolve v9.2 Hyd. No. 2 Time to peak Post devleoped - Undeveloped Hydrograph type = SCS Runoff Storm frequency = 5 yrs Time interval = 1 min Drainage area = 0.900 ac Basin Slope = 0.0% Tc method = USER Total precip. = 4.21 in Storm duration = 24 hrs Q (cfs) 3.00 2.00 1.00 15 Thursday, Nov 15, 2018 Peak discharge = 2.459 cfs Time to peak = 718 min Hyd. volume = 4,958 cuft Curve number = 70 Hydraulic length = 0 ft Time of conc. (Tc) = 6.00 min Distribution = Type II Shape factor = 484 Post devleoped - Undeveloped Hyd. No. 2 -- 5 Year 120 240 360 480 600 720 840 960 Hyd No. 2 Q (cfs) 3.00 2.00 1.00 0.00 1080 1200 1320 1440 1560 Time (min) Hydrograph Report Hydraflow Hydrographs by Intelisolve v9.2 Hyd. No. 3 Hyd. volume Post Developed to Wet Basin Hydrograph type = SCS Runoff Storm frequency = 5 yrs Time interval = 1 min Drainage area = 15.900 ac Basin Slope = 0.0% Tc method = TR55 Total precip. = 4.21 in Storm duration = 24 hrs Composite (Area/CN) = [(4.200 x 98) + (6.700 x 61) + (5.000 x 70)] / 15.900 Q (cfs) 50.00 40.00 30.00 20.00 10.00 0.00 0 120 240 Hyd No. 3 16 Thursday, Nov 15, 2018 Peak discharge = 46.75 cfs Time to peak = 719 min Hyd. volume = 98,598 cuft Curve number = 74* Hydraulic length = 0 ft Time of conc. (Tc) = 8.10 min Distribution = Type II Shape factor = 484 Post Developed to Wet Basin Hyd. No. 3 -- 5 Year 360 480 600 720 840 Q (cfs) 50.00 40.00 30.00 20.00 10.00 0.00 960 1080 1200 1320 1440 1560 Time (min) Hydrograph Report Hydraflow Hydrographs by Intelisolve v9.2 Hyd. No. 4 Temp Storage Pond Hydrograph type = Reservoir Storm frequency = 5 yrs Time interval = 1 min Inflow hyd. No. = 3 - Post Developed to Wet Basin Reservoir name = Temp Storage Storage Indication method used. Q (cfs) 50.00 40.00 30.00 20.00 10.00 0.00 ' ' 0 300 Hyd No. 4 Temp Storage Pond Hyd. No. 4 -- 5 Year Peak discharge Time to peak Hyd. volume Max. Elevation Max. Storage 17 Thursday, Nov 15, 2018 = 3.748 cfs = 757 min = 81,264 cuft = 826.90 ft = 48,539 cuft 600 900 1200 1500 1800 2100 2400 2700 Hyd No. 3I I ILJ�I Total storage used = 48,539 cuft Q (cfs) 50.00 40.00 30.00 20.00 10.00 1 0.00 3000 Time (min) Hydrograph Report Hydraflow Hydrographs by Intelisolve v9.2 Hyd. No. 5 Total Site runoff Hydrograph type = Combine Storm frequency = 5 yrs Time interval = 1 min Inflow hyds. = 2, 4 Q (cfs) 4.00 3.00 2.00 1.00 Total Site runoff Hyd. No. 5 -- 5 Year ii V Thursday, Nov 15, 2018 Peak discharge = 3.944 cfs Time to peak = 755 min Hyd. volume = 86,223 tuft Contrib. drain. area = 0.900 ac Q (cfs) 4.00 3.00 2.00 1.00 0.00 ' ' ' ' ' ' ' ' ' 0.00 0 300 600 900 1200 1500 1800 2100 2400 2700 3000 Time (min) Hyd No. 5 Hyd No. 2 Hyd No. 4 Hydrograph Summary Report 19 Hydraflow Hydrographs by Intelisolve v9.2 Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to peak (min) Hyd. volume (cuft) Inflow hyd(s) Maximum elevation (ft) Total strge used (cuft) Hydrograph description 1 SCS Runoff 48.10 1 720 109,446 ---- ------ ------ Predevloped area 2 SCS Runoff 3.267 1 718 6,562 ---- ------ ------ Post devleoped - Undeveloped 3 SCS Runoff 60.44 1 719 127,681 ---- ------ ------ Post Developed to Wet Basin 4 Reservoir 8.578 1 735 110,085 3 827.23 58,038 Temp Storage Pond 5 Combine 9.033 1 733 116,647 2,4 ------ ------ Total Site runoff Wet Pond 2.gpw 10 Year 15, 2018 Return Period: Thursday, Nov Hydrograph Report Hydraflow Hydrographs by Intelisolve v9.2 Hyd. No. 1 Hyd. volume Predevloped area Curve number Hydrograph type = SCS Runoff Storm frequency = 10 yrs Time interval = 1 min Drainage area = 16.800 ac Basin Slope = 0.0% Tc method = TR55 Total precip. = 4.88 in Storm duration = 24 hrs Composite (Area/CN) = [(13.000 x 70) + (3.800 x 61)] / 16.800 Q (cfs) 50.00 40.00 30.00 20.00 10.00 0.00 0 120 240 Hyd No. 1 Predevloped area Hyd. No. 1 -- 10 Year 360 480 600 720 840 20 Thursday, Nov 15, 2018 Peak discharge = 48.10 cfs Time to peak = 720 min Hyd. volume = 109,446 cuft Curve number = 68* Hydraulic length = 0 ft Time of conc. (Tc) = 9.70 min Distribution = Type II Shape factor = 484 Q (cfs) 50.00 40.00 30.00 20.00 10.00 0.00 960 1080 1200 1320 1440 1560 Time (min) Hydrograph Report Hydraflow Hydrographs by Intelisolve v9.2 Hyd. No. 2 Hyd. volume Post devleoped - Undeveloped Hydrograph type = SCS Runoff Storm frequency = 10 yrs Time interval = 1 min Drainage area = 0.900 ac Basin Slope = 0.0% Tc method = USER Total precip. = 4.88 in Storm duration = 24 hrs Q (cfs) 4.00 3.00 2.00 1.00 21 Thursday, Nov 15, 2018 Peak discharge = 3.267 cfs Time to peak = 718 min Hyd. volume = 6,562 cuft Curve number = 70 Hydraulic length = 0 ft Time of conc. (Tc) = 6.00 min Distribution = Type II Shape factor = 484 Post devleoped - Undeveloped Hyd. No. 2 -- 10 Year M 120 240 360 480 600 720 840 960 Hyd No. 2 Q (cfs) 4.00 3.00 2.00 1.00 0.00 1080 1200 1320 1440 1560 Time (min) Hydrograph Report Hydraflow Hydrographs by Intelisolve v9.2 Hyd. No. 3 Hyd. volume Post Developed to Wet Basin Hydrograph type = SCS Runoff Storm frequency = 10 yrs Time interval = 1 min Drainage area = 15.900 ac Basin Slope = 0.0% Tc method = TR55 Total precip. = 4.88 in Storm duration = 24 hrs Composite (Area/CN) = [(4.200 x 98) + (6.700 x 61) + (5.000 x 70)] / 15.900 Q (cfs) 70.00 50.00 40.00 30.00 20.00 10.00 22 Thursday, Nov 15, 2018 Peak discharge = 60.44 cfs Time to peak = 719 min Hyd. volume = 127,681 cuft Curve number = 74* Hydraulic length = 0 ft Time of conc. (Tc) = 8.10 min Distribution = Type II Shape factor = 484 Post Developed to Wet Basin Hyd. No. 3 -- 10 Year Q (cfs) 70.00 50.00 40.00 30.00 20.00 10.00 0.00 ' — ' 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 3 Time (min) Hydrograph Report Hydraflow Hydrographs by Intelisolve v9.2 Hyd. No. 4 Temp Storage Pond Hydrograph type = Reservoir Storm frequency = 10 yrs Time interval = 1 min Inflow hyd. No. = 3 - Post Developed to Wet Basin Reservoir name = Temp Storage Storage Indication method used Temp Storage Pond 23 Thursday, Nov 15, 2018 Peak discharge = 8.578 cfs Time to peak = 735 min Hyd. volume = 110,085 cuft Max. Elevation = 827.23 ft Max. Storage = 58,038 cuft Q (cfs) Hyd. No. 4 -- 10 Year Q (cfs) 70.00 70.00 60.00 60.00 50.00 50.00 40.00 40.00 30.00 30.00 20.00 20.00 10.00 10.00 0.00 0.00 0 300 600 900 1200 1500 1800 2100 2400 2700 3000 Time (min) Hyd No. 4 Hyd No. 3 I I ILJ�I Total storage used = 58,038 cult 24 Hydrograph Report Hydraflow Hydrographs by Intelisolve v9.2 Thursday, Nov 15, 2018 Hyd. No. 5 Total Site runoff Hydrograph type = Combine Peak discharge = 9.033 cfs Storm frequency = 10 yrs Time to peak = 733 min Time interval = 1 min Hyd. volume = 116,647 cuft Inflow hyds. = 2, 4 Contrib. drain. area = 0.900 ac Q (cfs) 10.00 RIM . 11 4.00 2.00 Total Site runoff Hyd. No. 5 -- 10 Year 300 600 900 1200 Hyd No. 5 Hyd No. 2 1500 1800 2100 Hyd No. 4 2400 2700 Q (cfs) 10.00 . 11 4.00 2.00 1 0.00 3000 Time (min) Hydrograph Summary Report 25 Hydraflow Hydrographs by Intelisolve v9.2 Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to peak (min) Hyd. volume (cuft) Inflow hyd(s) Maximum elevation (ft) Total strge used (cuft) Hydrograph description 1 SCS Runoff 66.30 1 720 150,062 ---- ------ ------ Predevloped area 2 SCS Runoff 4.421 1 718 8,893 ---- ------ ------ Post devleoped - Undeveloped 3 SCS Runoff 79.90 1 718 169,334 ---- ------ ------ Post Developed to Wet Basin 4 Reservoir 16.80 1 728 151,600 3 827.83 75,343 Temp Storage Pond 5 Combine 17.64 1 726 160,493 2,4 ------ ------ Total Site runoff Wet Pond 2.gpw 25 Year 15, 2018 Return Period: Thursday, Nov Hydrograph Report Hydraflow Hydrographs by Intelisolve v9.2 Hyd. No. 1 Time to peak Predevloped area Hyd. volume Hydrograph type = SCS Runoff Storm frequency = 25 yrs Time interval = 1 min Drainage area = 16.800 ac Basin Slope = 0.0% Tc method = TR55 Total precip. = 5.79 in Storm duration = 24 hrs * Composite (Area/CN) = [(13.000 x 70) + (3.800 x 61)] / 16.800 Q (cfs) 70.00 50.00 40.00 30.00 20.00 10.00 Predevloped area Hyd. No. 1 -- 25 Year 26 Thursday, Nov 15, 2018 Peak discharge = 66.30 cfs Time to peak = 720 min Hyd. volume = 150,062 cuft Curve number = 68* Hydraulic length = 0 ft Time of conc. (Tc) = 9.70 min Distribution = Type II Shape factor = 484 Q (cfs) 70.00 50.00 40.00 30.00 20.00 10.00 0.00 ' � ' 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 1 Time (min) Hydrograph Report Hydraflow Hydrographs by Intelisolve v9.2 Hyd. No. 2 Hyd. volume Post devleoped - Undeveloped Hydrograph type = SCS Runoff Storm frequency = 25 yrs Time interval = 1 min Drainage area = 0.900 ac Basin Slope = 0.0% Tc method = USER Total precip. = 5.79 in Storm duration = 24 hrs Q (cfs) 5.00 4.00 3.00 2.00 1.00 0.00 0 120 240 Hyd No. 2 27 Thursday, Nov 15, 2018 Peak discharge = 4.421 cfs Time to peak = 718 min Hyd. volume = 8,893 cuft Curve number = 70 Hydraulic length = 0 ft Time of conc. (Tc) = 6.00 min Distribution = Type II Shape factor = 484 Post devleoped - Undeveloped Hyd. No. 2 -- 25 Year 360 480 600 720 840 960 Q (cfs) 5.00 4.00 3.00 2.00 1.00 0.00 1080 1200 1320 1440 1560 Time (min) Hydrograph Report Hydraflow Hydrographs by Intelisolve v9.2 Hyd. No. 3 Hyd. volume Post Developed to Wet Basin Hydrograph type = SCS Runoff Storm frequency = 25 yrs Time interval = 1 min Drainage area = 15.900 ac Basin Slope = 0.0% Tc method = TR55 Total precip. = 5.79 in Storm duration = 24 hrs Composite (Area/CN) = [(4.200 x 98) + (6.700 x 61) + (5.000 x 70)] / 15.900 Q (cfs) 80.00 70.00 50.00 40.00 30.00 20.00 10.00 28 Thursday, Nov 15, 2018 Peak discharge = 79.90 cfs Time to peak = 718 min Hyd. volume = 169,334 cuft Curve number = 74* Hydraulic length = 0 ft Time of conc. (Tc) = 8.10 min Distribution = Type II Shape factor = 484 Post Developed to Wet Basin Hyd. No. 3 -- 25 Year Q (cfs) 80.00 70.00 •11t 50.00 40.00 30.00 20.00 10.00 I I I I I- I I I 1 0.00 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 3 Time (min) Hydrograph Report Hydraflow Hydrographs by Intelisolve v9.2 Hyd. No. 4 Temp Storage Pond Hydrograph type = Reservoir Storm frequency = 25 yrs Time interval = 1 min Inflow hyd. No. = 3 - Post Developed to Wet Basin Reservoir name = Temp Storage Storage Indication method used Q (cfs) 80.00 70.00 50.00 40.00 30.00 20.00 10.00 0.00 ' ' 0 300 Hyd No. 4 Temp Storage Pond Hyd. No. 4 -- 25 Year 29 Thursday, Nov 15, 2018 Peak discharge = 16.80 cfs Time to peak = 728 min Hyd. volume = 151,600 cuft Max. Elevation = 827.83 ft Max. Storage = 75,343 cuft Q (cfs) 80.00 70.00 50.00 40.00 30.00 20.00 10.00 0.00 900 1200 1500 1800 2100 2400 2700 3000 Time (min) - Hyd No. 3 II IILJ�I Total storage used = 75,343 cult 30 Hydrograph Report Hydraflow Hydrographs by Intelisolve v9.2 Thursday, Nov 15, 2018 Hyd. No. 5 Total Site runoff Hydrograph type = Combine Peak discharge = 17.64 cfs Storm frequency = 25 yrs Time to peak = 726 min Time interval = 1 min Hyd. volume = 160,493 cuft Inflow hyds. = 2, 4 Contrib. drain. area = 0.900 ac Q (cfs) 18.00 15.00 12.00 • it 3.00 0.00 ' ' 0 300 Hyd No. 5 Total Site runoff Hyd. No. 5 -- 25 Year 600 900 1200 Hyd No. 2 1500 1800 2100 2400 2700 Hyd No. 4 Q (cfs) 18.00 15.00 12.00 3.00 1 0.00 3000 Time (min) Hydrograph Summary Report 31 Hydraflow Hydrographs by Intelisolve v9.2 Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to peak (min) Hyd. volume (cuft) Inflow hyd(s) Maximum elevation (ft) Total strge used (cuft) Hydrograph description 1 SCS Runoff 97.39 1 719 220,364 ---- ------ ------ Predevloped area 2 SCS Runoff 6.357 1 718 12,894 ---- ------ ------ Post devleoped - Undeveloped 3 SCS Runoff 112.21 1 718 239,773 ---- ------ ------ Post Developed to Wet Basin 4 Reservoir 25.10 1 728 221,867 3 828.80 107,005 Temp Storage Pond 5 Combine 27.75 1 721 234,762 2,4 ------ ------ Total Site runoff Wet Pond 2.gpw 15, 2018 Return Period: 100 Year Thursday, Nov 32 Hydrograph Report Hydraflow Hydrographs by Intelisolve v9.2 Thursday, Nov 15, 2018 Hyd. No. 1 Predevloped area Hydrograph type = SCS Runoff Peak discharge = 97.39 cfs Storm frequency = 100 yrs Time to peak = 719 min Time interval = 1 min Hyd. volume = 220,364 cuft Drainage area = 16.800 ac Curve number = 68* Basin Slope = 0.0% Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 9.70 min Total precip. = 7.25 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Composite (Area/CN) = [(13.000 x 70) + (3.800 x 61)] / 16.800 Q (cfs) 100.00 90.00 80.00 70.00 60.00 50.00 40.00 30.00 20.00 10.00 0 00 Predevloped area Hyd. No. 1 -- 100 Year Q (cfs) 100.00 90.00 80.00 70.00 60.00 50.00 40.00 30.00 20.00 10.00 0 00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 1 Time (min) Hydrograph Report Hydraflow Hydrographs by Intelisolve v9.2 Hyd. No. 2 Hyd. volume Post devleoped - Undeveloped Hydrograph type = SCS Runoff Storm frequency = 100 yrs Time interval = 1 min Drainage area = 0.900 ac Basin Slope = 0.0% Tc method = USER Total precip. = 7.25 in Storm duration = 24 hrs Q (cfs) 7.00 5.00 4.00 0101011 2.00 1.00 33 Thursday, Nov 15, 2018 Peak discharge = 6.357 cfs Time to peak = 718 min Hyd. volume = 12,894 cuft Curve number = 70 Hydraulic length = 0 ft Time of conc. (Tc) = 6.00 min Distribution = Type II Shape factor = 484 Post devleoped - Undeveloped Hyd. No. 2 -- 100 Year Q (cfs) 7.00 5.00 4.00 2.00 1.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 Hyd No. 2 Time (min) Hydrograph Report Hydraflow Hydrographs by Intelisolve v9.2 Hyd. No. 3 Time to peak Post Developed to Wet Basin Hydrograph type = SCS Runoff Storm frequency = 100 yrs Time interval = 1 min Drainage area = 15.900 ac Basin Slope = 0.0% Tc method = TR55 Total precip. = 7.25 in Storm duration = 24 hrs Composite (Area/CN) = [(4.200 x 98) + (6.700 x 61) + (5.000 x 70)] / 15.900 Q (cfs) 120.00 100.00 -I t o *11 40.00 OR II 34 Thursday, Nov 15, 2018 Peak discharge = 112.21 cfs Time to peak = 718 min Hyd. volume = 239,773 cuft Curve number = 74* Hydraulic length = 0 ft Time of conc. (Tc) = 8.10 min Distribution = Type II Shape factor = 484 Post Developed to Wet Basin Hyd. No. 3 -- 100 Year 0.00 0 Q (cfs) 120.00 100.00 :IMU .1 111 40.00 20.00 r TiTIFIIIIIIII 120 240 360 480 600 720 840 960 1080 1200 1320 1440 Hyd No. 3 Time (min) Hydrograph Report Hydraflow Hydrographs by Intelisolve v9.2 Hyd. No. 4 Temp Storage Pond Hydrograph type = Reservoir Storm frequency = 100 yrs Time interval = 1 min Inflow hyd. No. = 3 - Post Developed to Wet Basin Reservoir name = Temp Storage Storage Indication method used Q (cfs 120.00 100.00 :1 1I .M II 40.00 20.00 Peak discharge Time to peak Hyd. volume Max. Elevation Max. Storage 35 Thursday, Nov 15, 2018 = 25.10 cfs = 728 min = 221,867 cuft = 828.80 ft = 107,005 cuft Q (cfs) 120.00 100.00 :1 OU .1 1I, 40.00 20.00 KiYATIFIIIIIIIIIIIIIIIIII 180 360 540 720 900 1080 1260 1440 1620 1800 1980 Time (min) Hyd No. 4 Hyd No. 3 ®1 Total storage used = 107,005 cuft 36 Hydrograph Report Hydraflow Hydrographs by Intelisolve v9.2 Thursday, Nov 15, 2018 Hyd. No. 5 Total Site runoff Hydrograph type = Combine Peak discharge = 27.75 cfs Storm frequency = 100 yrs Time to peak = 721 min Time interval = 1 min Hyd. volume = 234,762 cuft Inflow hyds. = 2, 4 Contrib. drain. area = 0.900 ac Total Site runoff Q (cfs) Hyd. No. 5 -- 100 Year Q (cfs) 28.00 28.00 24.00 24.00 20.00 20.00 16.00 16.00 12.00 12.00 8.00 8.00 4.00 4.00 0.00 0.00 0 180 360 540 720 900 1080 1260 1440 1620 1800 Time (min) Hyd No. 5 Hyd No. 2 Hyd No. 4 tjj_, _ 3 - Vii- P.,Q sL rl-j�__ #units=Elevation,ft,volume,ft3 #Stage -Storage Curve Data #Stage - ft volume - ft3 #------------ ------------- 825.00000000, 64993.90844010 824.00000000, 48179.00688860 822.00000000, 21118.41239270 820.00000000, 0.00000000 tmp#54.ssc Page 1 tmp#53.ssc #Units=Elevation,ft,volume,ft3 #stage-Storage Curve Data #Stage - ft volume - ft3 #------------------------- 830.00000000,151637.32086371 829.00000000,113877.13808402 828.00000000, 80291.55367791 826.00000000, 22348.76038307 825.00000000, 0.00000000 Page 1 #units=Elevation,ft,volume,ft3 #stage -storage Curve Data #stage - ft volume - ft3 #------------ ------------- 825.00000000, 8249.02699357 824.00000000, 4945.39286630 822.00000000, 1276.72391785 820.00000000, 0.00000000 tmp#50.ssc Page 1 W 211 N P v41'N a Hydrologic Soil Group—Davie County, North Carolina 3 S`3J00 Sa"SH10 5Ta200 Ski 5� 5�0 5�6 3 Map Sole: 1:5,950 if pasted on A PxtZk (8.5" x III She Mfrs N N 0 50 100 200 300 A0 25D SOD to00 1500 Map prcjeC6on: Web Meratx Cam : WGS84 Edge b6: UTM Zine I 77 VK5 y Natural Resources Web Soil Survey Conservation Service National Cooperative Soil Survey ,drologic Soil Group—Davie County, North Carolina Hydrologic Soil Group Hydrologio Soil Group— Summary by Map Unit— Davie County, North Carolina (NC059) Map unit symbol Map unit name Rating Acres in AOl Percent of AOi CfB2 Clifford sandy clay loam, 2 to 8 percent slopes, moderately eroded B 31.6 40.1% CoA Codorus loam, 0 to 2 BID 0.2 0.3% percent slopes, frequently Flooded FaD Fairview sandy loam, 15 B 16.7 21.2% to 45 percent slopes -- - --- ~- — FcC2 Fairview sandy clay C ------ 30.3— 38.4% loam, 8 to 15 percent slopes, moderately eroded Totals for Area of interest _ 78.7 100.0% Da Natural Resources Web Soil Survey 5/25/2017 W Conservation Service National Cooperative Soil Survey Page 3 of 4 O 0 'o U) cm O 0 -0 S O Q 0 Z a in Z W W a v O O @ � I) r N fOS N Q a w .a N c cTj N 0 2 y. N 3 E O y O C O E R c co 3 L m Q f0 'as U cp C U_ co O C O n O` ._ 0 9 O O O E 7 O@ E 0.0 O O Q (6 @ Q co .L.. p m 3 Q co C L O O N 9 y O y C L Z p E O O` O O LL. 3 O 3 y E O) O O 07 C N Cdn O T7 -cc NC Z V O 3 U EO t 7 p Loi ° O O Q � � 0 C Ti W U N 00 I t N O C r' - z C 2 0 0 Q 00 � � N E N- I m m (D q O L t O O 'S (� '0 C6 m O- �p tD O T > LID 0 0 0 ! Q ` U G O - >+ Q O m C E cameos n o 2� Q m o° ' o� U O R n Q E a `y O O = CLO 6 -0 'a O .Nav o cm,0a 0 �� co w no o E N o> Q �v N to o, m L-. E Q Qo v@ f5 L L O 0� Z E mQ o c O O- f6 o� C ca o 1,71 o o� ' N @ E F' N T ca .� c3 @ <0 c6 O Q O O .2)0 7 T Q O p 'O C N 4 { C N C O j, cC Z ^ V O la � L U N C D O �� c6 o �O a ca Q O -O O Q m¢ cn O o ° E j O C ? �_in 3 m ='j = Q m = `o .a Q 0.cas N E N O E Q m fl O '� 0 0 0 Chi CJ Q O Z Q Q O c30-0`3 N O .0 07 C Q .6 O R 3 — N N CD =VJ ca T7. a U U C �` 0; O O C O C7 O E Q N O O C O C O.` L N ' C C O U fa O O p O p C ca O v� .Q U .0 E _ O 7 O� : fa O E O ._ t -r LU N; RE co u �aadca ro c�CO cue- o� tLcoi y v a w N R c co 3 L m o c 'as c m v H 9 O O O O c3 L o 13 ® ® ® � � 0 C Ti W 3 V � � o m m R O ca ca 6 W `y O O = O C O O m d a° O O o c J D 0 O o G 0 0 Q m¢ ¢ u* in U U O Z 0 Z M Q o W m c c C N 4 !A ti c 0 0 N N N � � a W Z In rdrdogic Soil Group—Davie County, North Carolina Description Hydrologic soil groups are based on estimates of runoff potential. Soils are assigned to one of four groups according to the rate of water infiltration when the soils are not protected by vegetation, are thoroughly wet, and receive precipitation from long -duration storms. The soils in the United States are assigned to four groups (A, B, C, and D) and three dual classes (A/D, B/D, and C/D). The groups are defined as follows: Group A. Soils having a high infiltration rate (low runoff potential) when thoroughly wet. These consist mainly of deep, well drained to excessively drained sands or gravelly sands. These soils have a high rate of water transmission. Group B. Soils having a moderate infiltration rate when thoroughly wet. These consist chiefly of moderately deep or deep, moderately well drained or well drained soils that have moderately fine texture to moderately coarse texture. These soils have a moderate rate of water transmission. Group C. Soils having a slow infiltration rate when thoroughly wet. These consist chiefly of soils having a layer that impedes the downward movement of water or soils of moderately fine texture or fine texture. These soils have a slow rate of water transmission. Group D. Soils having a very slow infiltration rate (high runoff potential) when thoroughly wet. These consist chiefly of clays that have a high shrink -swell potential, soils that have a high water table, soils that have a claypan or clay layer at or near the surface, and soils that are shallow over nearly impervious material. These soils have a very slow rate of water transmission. If a soil is assigned to a dual hydrologic group (A/D, B/D, or CID), the first letter is for drained areas and the second is for undrained areas. Only the soils that in their natural condition are in group D are assigned to dual classes. Rating Options Aggregation Method: Dominant Condition Component Percent Cutoff., None Specified Tie-break Rule: Higher 5pq Natural Resources Web Soil Survey 5/25/2017 Conservation Service National Cooperative Soil Survey Page 4 of 4 5/10!2017 Latitude and Longitude of a Point ifouchMap.CotT1 Maps Country -State I Places I Cities I Lat , kC M.baod N xi �a 5 �p aps Horne :> La:;tude a .d Lo-nc-.:ude o a Po;n To find the latitude and longitude of a point Click on the map, Drag the marker, or enter the... Address: Quality Drive Mocksville NC GO Mobile Version Nearbv Places of Interest Mame coinis to check? Try i atLona Trace Latitude and Longitude of a Point Clear/ Reset Remove Last Blue_ Marker Center Red Marker Get the Latitude and Longitude of a Point When you click on the map, move the marker or enter an address the latitude and longitude coordinates of the point are inserted in the boxes below. Latitude: 35.933596 Longitude: -80.605173 Degrees Minutes Seconds Latitude: 35 56 0.9456 Longitude: -80 36 18.6222 Show Point from Latitude and Longitude Use this if you know the latitude and longitude coordinates of a point and want to see where on the map the point is. Use: + for N Lat or E Long - for S Lat or W Long. Example: X40.689060 -74.044636 Note: Your entry should not have any embedded spaces. Decimal Deg. Latitude: Decimal Deg. Longitude: Show Pant Example: +34 40 50.12 for 34N 40' 50.12" Degrees Minutes Seconds Latitude: Longitude: Show Point --•----------•---- ------------------------------------ iTouchMap.com 2007-2016 — hu :/fitouchmap.comRattong.html Precipitation Frequency Data Server y � ✓ld�M POINT PRECIPITATION FREQUENCY ESTIMATES 1 ;. FROM NOAA ATLAS 14 �,RF/ 'VIOCKSVILLE, NORTH CAROLINA (31-5743) 35.8439 N80.4972 W 718 feet from "Precipitation -Frequence ?alas of the United Scare,•' NOAA Alas I,. %Vume 2. Version 3 G.\1. Bonnin. D. Martin. B. Lin. T. Pamoo'.:. Ni.Ye4ia. and D. Rile} NOAA. National I-VeatnerService. Si!cerSorn2. Ma,�!and.'_0,04 EwRacied: 7iu Seo : K09 Confidence Limits Seasonality IF Location Maps [ Other Info. j GIS data f Maps Ij Docs I� Precipitation Frequency Estimates (inches) 10 1. 36 60 120 12 M24 1 030 4a60ARI � ! Waoa[4�8�hEd.,oo�oZ(years) min min mtn min min mtn 6 hr hr 4 day 1 day day day day 0.38 0.607 [0.7E 170 37 FI -2 97 173 07 1.60 1.95 2.31 2.7 7 ;I 22 'i3.63 14..4.77 16.-'.2 7.93 19.98 11.91 0.45 0.72 0.90 1.2 1.56 1.82 1.94 2.35 2.78 3.35 13._8 4.36 4.98 5.6 i 57 19.33 t 1.68 13.88 5 0.52 0.84 1.06 1.51 1.93 i 2.27 2.43 1;2.94 31 ?9 !{4.21 -.83 5.3 fli6.06 6.81 8.94 10.82 13.32 15.65 10 0.58 70972=1.69 2.20 2.60 2.79 3.39 4.05 4.88 5.57 6_116.91 7.70 10.02 11.96 14.58 17.00 25 0.64 1.02 FI -297 1.91 2.54 3.04 3.29 4.00 47807 5.79 6.57 7.25 ,8.06 87897EE 13.47 16.21 18.73 i 0 0.65 1.108 1.44 2.20 3.09 3.7$ 4.04 4.9s 6.02 7.21 8.16 18.98 9.89 90;6 13.74 115.5 18.65 20.209 OCIC��O I�CDI���OC 200 0.75 1.18 1.49 2.32 3.26 4.03 4.42 5.46 6.66 8.02 8.97 9.88 ,10.84 11.70 14.90 16.88 19.82 22.50 X007 [YT 172 47 1.56 2.483.56 4.45 14.92 6.12 !7 9.06 10.08 1 1.10 12.12 12.98 16.46 18.36 21.35 24.05 1=5-81 1 17277 1.59 2.58 3.77 4.77 5.31 6.63 8.20 97887 10.96 12.06 13.13 13.98117.67 19.50 22.50 25.22 i nese c,^eoi`iatcn `requency esE:r.a!es are based on a poral rz n.s@ri�c ARi s [he Aver-je Rex a e in,avai. baser _inti _ -_2< 14 Doc;^e.t f_r more mfa ne ,n. NOTE: Fomatnig forces estnms rear zero to appear as zero Pac,e 1 o'4 Return to State Map (yR1F) n 0 IS 30 _ 1 0.41 0.66 0.82 1.12 x Upper bound Precipitation 60 120 TTi mtn mtn 1.40 1.63 1.74 of Frequency hr 2.12' the 90% confidence inten al Estimates (inches) 12 24 48 10 20 hr hr hr day L��Fda da 2.52 f 2.98 3.46 3.88 4.4b 5.07 6.76 304 day 8.31 y 60min da da 10.43 12.41 'I 0.49 0.78 079 87 1.35 1.70 179 87 2.12 EE 3.05 3.60 4.17 C6J 732 6.03 7.98 9.77 12.19 �14.44 0.57 0.9i 1.15 1.64 10 0.63 1.00 1.27 1.83 2.10 2.47 2.64 2.39 2.83 3.04 3.21 3.69 3.81 4.52 5.18 5.75 6.47 7.23 9.42 4.41 5.24 5.97 6.60 7.37 8.17 10,56 11.32 12.51 13.90 16.28 15.21 17.68 25 0.69 1.10 1.10 2.07 2.75 3.30 3.57 4.35 5.22 6.21 7.04 7.76 18.6079.?3 12.09 14.09 16.91 19.49 50 0.74 1.17 IFI -97277473703 3.67 3.98 4.87 5.86 7.00 7.88 8.68 9.57 10.43 13.29 15.30 18.22 20.87 100 0.78 1.24 1.56 273 97 3.29 4.03 4.40 5.40 6.52 7.79 8.73 9.63 10.57 11.44 ]4.51 16.51 19.49 22.20 200 10.81 1.29 1.63 2.54 3.56 4.40 4.82 15.94 7.21 8.62 9.62 10.60 11.60 12.45 15.76 17.72 20.75 23.49 0.86 1.36 1.71 2.72 1000 0.89 1.40 1.75 2.84 3.90 4.89 5.40 6.69 8.15 9.75 10.83 11.92 13.021 13.84 17.44 8.89 10.b5 11.78 12.9i 14.12 14.92 18.75 19.31 20.56 22.39 23.63 25. t 6 26.42 4.15 5.26 5.85 7.27 i ne upper mura or the connaence tntervat at wy, con:toence levet is me value wnw ow of cue s!nmaiea quarve va?ues ;c a given trequency are greater loan. '. hese p redp afion `eql: y estina!es c' c Cased o:,. a parJZl duranion series. ARI is the Average RecuaerKe !^.ieN'a! ...ase refe, :c 1,& - =4'2s'4 IOr more in;orriv o n. NOT E: Formatting prevents esfmaies nea" zer-c is appear as zer,-. x Lower bound of the 90% confidence interval Precipitation Frequency Estimates (inches) ARI" 10 1� 30 60 120 3 6 1Z 24 48 4 7 10 0 30 45 60 (years) min min min min min ' min hr hr hr �i hr hr qty Lday day I day day day day LL 0767 0.700797 17197 17387 1.48 ,177 97 2.13 2IE = 3.41 13.93 4.5 i 6.09 7.58 9.57 11.46 1= 0.41 0.66 0.83 1.15 1.44 1.68 1.79 2.17 2.57 El 7,67334.09 476 97 5.37 7.19 8.90 11.20 13.35 0.48 10.77 10.98 1.39 1.78 , 2.09 12.24 2.71 3.21 3.92 4.51 5.04 5.69 6.44 874 87 10.32 12.77 15.04 10 07D 37 Ej]170 77 1.55 2.02 + 2.39 2.56 ,3r1 1 3.71 ;4.54 >.19 5.77 jF6 487 7.27 19.44 11.40 13.96 16.34 r-- r --1r- - ittp: lhdse.n-,,,-s.noaa.gov/cai-binlhdsc/buildout-perl?type=pf&units=us&series=pd&statename=NORTH+C... 9/3/2009