Loading...
HomeMy WebLinkAbout20161069 Ver 2_ND-156-17 Drainage Report_20190108Drainage and Detention Calculations For ND -156-17 The Hollingsworth Companies Southpoint Industrial Park Davie County, North Carolina Prepared by: Land Development Solutions 310 Simmons Road, Suite K Knoxville, Tennessee 37922 s August 2017 Revised: � N1 tttfil/f� CARO Slp WA76 elt 'e CAI BAKS MONEMIOn', VOL U TONS Davie County, ND -156-17 August 2017 Table of Contents Section Description Introduction 2 Wet Pond 3 Temporary Storage Analysis 4 Appendix - Support Data & Calculations Davie County, ND -156-17 August 2017 1 Introduction The ND -156-17 project consists of construction of a 109,000+/- sf building and a 32 car parking lot along with related access drives and loading docks. The entire site drains through various storm water ditches and storm drain systems surrounding the site and eventually into an unnamed tributary of Beer Creek. The total site acreage is approximately 14.5 acres. The total area disturbed for this project is 9.2+/- acres. The site is located on the northern side of Quality Drive in the Southpoint Industrial Park. The site is made up of Clifford, Cordorus and Fairview soil types. The soils information is included in Appendix I. The following procedure was used to design the basins: 1. Define the existing drainage areas and patterns and calculate the pre - development runoff for the site. 2. Define the post -developed drainage areas and patterns based on the site plan and calculate the post -developed runoff for the site. Determine the areas that will drain directly off-site. 3. Determine a suitable method of treatment and design the drainage facilities accordingly. 4. Compare the post -development peak discharge with the pre -developed (allowable) peak discharge and determine detention basins locations. 5. Provide enough storage volume in the basin and design outlet structure that provide adequate draw down time. 6. Design the emergency spillway to safely discharge the 100 year design storm peak runoff (in case of outlet structure failure). Methodology The Runoff Treatment Method (taken from the NCDEQ Stormwater BMP Manual) was used to manage the stormwater for this site. A Wet Pond was chosen as the Primary SCM to treat the sotrmwater runoff. This SCM treats runoff and releases it as surface discharge or infiltrates and evapo-trainspires stormwater. The Wet Pond is designed and shall be constructed and maintained in accordance with the Minimum Design Criteria (See Appendix for MDC chart). The Wet Pond is designed to capture the design storm (taken from the USMP design standard for non -coastal counties, 1" rain event) and release it slowly over a period of two to five days. Davie County, ND -156-17 August 2017 2 Wet Pond (Design per NCDEQ MDC) Total Site = 14.5 Ac Impervious Area = 3.4 Ac Percent Impervious = 23.4% Treatment Volume Required = 27,175 cf Wet Pond Storage Provided = 35,600 cf Main Pool Depth Davg = VPP/APP = Vol. Perm. Pool/Area Perm. Pool = 35,600/10,360 = 3.5' (max. 5') Forebay Volume Required: 15-20% of Wet Pond Storage Required = 7,120 cf (20%) Provided Forebay 1 = 3,120 cf Forebay 2 = 10,200 cf Draw Down Time = 92 hours (3.8 days) See appendix for support data See ND -156-17 Southpoint Business Park Sheets C201 and C502 for information on the grading of the basin and the outlet structure. 3 Temporary Storage Analysis The pre -developed site drains to the southwest to a drainage ditch that outlets into an unnamed tributary of Beer Creek. The pre -developed drainage area consists of grass and woods. Table 1 and 2 below show the Area Characteristics and Peak Runoffs. Table 1 — Pre -developed Area Characteristics Pre -Developed Area Area Time of Composite Name & Hydrograph (acres) Concentration Ground Cover Curve # minutes Number Pre -Developed Area 14.5 11.1 Grass/Woods 64 Hydrograph #1 Davie County, ND -156-17 August 2017 Table 2 — Pre -developed Peak Runoff Post -Developed 1 Year 2 Year 5 Year 10 Year 25 Year 100 Year Hydrograph Design Design Design Design Design Storm Design Storm Number Storm Peak Storm Peak Storm Peak Storm Peak Peak Runoff Peak Runoff 5.3 Runoff cfs Runoff cfs Runoff cfs Runoff cfs (Cf S) cfs Pre -developed Post Developed Area 2 5.8 11.9 22.8 32.3 46.3 70.5 Hydrograph #1 The pre -developed site runoff hydrographs are included in the Appendix. The Post -developed drainage area is divided into two separate areas that both drain to the southwest. The first area will bypass the wet pond and drain directly offsite. This area is made up of the undisturbed portion of the property. The second area will drain to the wet basin and outlet through the designed outlet structure. Table 3 and 4 below show the Area Characteristics and Peak Runoffs. Table 3 — Post -developed Area Characteristics Post -Developed Area Time of 5 Year Composite Area Name & (acres) Concentration Ground Cover Curve Hydrograph # Design Storm minutes Design Storm Number Post Developed Peak Runoff Peak Runoff Peak Runoff Peak Runoff Area 1 5.3 8.7 Grass/Light Woods 70 Hydrograph #2 (cfs) (cfs Area 1 Post Developed Area 2 9.2 8.7 Grass/Impervious 75 Hydrograph #3 32.5 #2 Table 4 — Post -developed Peak Runoff 1 Year 2 Year 5 Year 10 Year 25 Year 100 Year Hydrograph Design Storm Design Storm Design Storm Design Storm Design Storm Design Storm Number Peak Runoff Peak Runoff Peak Runoff Peak Runoff Peak Runoff Peak Runoff cfs) (cfs) (cfs) (cfs) (cfs) (cfs Area 1 Hydrograph 4.5 7.5 12.4 16.5 22.4 32.5 #2 Area 2 Hydrograph 11.7 17.5 27.0 34.7 45.7 63.9 #3 The post -developed site runoff hydrographs are included in the Appendix. Davie County, ND -156-17 August 2017 Conclusion The runoff hydrographs for the area draining to the wet pond were routed through the wet pond to obtain discharge hydrographs for each of the storms. The peak discharge from the wet Pond + the discharges from the undetained area (Area 1) are the total post developed flow to the downstream system. The combined discharges are compared to the pre -developed discharges. The discharges are listed in the Table 5: Table 5 — Wet Pond Routing and Combined Peak Discharges Allowable Peak Flow inparentheses) 1 Year 2 Year 5 Year 10 Year 25 Year 100 Year Hydrograph Design Storm Design Storm Design Storm Design Storm Design Storm Design Storm Number Peak Peak Peak Peak Peak Peak Discharge Discharge Discharge Discharge Discharge Discharge f cfs) (cfs) (cfs) (cfs) (cfs) (cfs #4 Retention Basin 0.1 0.3 1.0 2.3 5.1 11.6 Discharge #5 12.5 16.7 23.3 37.8 Combined 4.6 (5.8) 7.6 (11.9) (22.8 ) (32.3) (46.3) (70.5) Discharge The routed hydrographs for each of the storms are included in the Appendix. The wet pond includes a 20' wide broad crested earthen weir for emergency discharge. The weir will be reinforced with North American Green C350 Turf Reinforcement Matting. The wet portion of the pond has sufficient volume to handle the treatment volume required. Table 5 shows that the temporary storage and outlet structure successfully reduce the peak discharge from the entire site in all the design storms. Davie County, ND -156-17 August 2017 Appendix m Project: Drawn B LAND ND -156-17 Checked Df- VEL OPM'EN T Approved Pre -developed Area Job No. SOL U TIONS Scale: Sheet No. 1 "=200' 310 SIMMONS ZD-, SUITE K KNOXVILLE. TENNESSEE 37922 Davie County, North Carolina Date: L PH: 865-671-2281 8-15-17 / r>; , •Pdst- Area'co r 5 CL CD o _ s O s r Post-Dev Area 2 g \ :- 9.2 Acres : (V o IV, r� #� f Cn ? Ix ca m '!/ ! t4 �-W '�"•" .._.... '=-Wim..-- —, t \� ... _ 1 G X dapp—Project: ocaWn e u LAND ND-15�-17 Checked D_ VEL OPM _N T Approved Post -developed Area '°b N. 771-6'.771-6'. SOLUTIONS ssneer No. 310 SIMMONS Rt., SUITE K -KNOXVILLE, TENNESSEE 37922 "=aoo' Davie County, Ncrth Carolina Oate: 2 PN: 865-671-2261 8-15-17 ND -156-17 (Minimum Design Criteria) Wet Pond Treatment Volume Required = 27,175 cf Wet Pond Volume Provided = 35,600 cf MDC1 SD/DA: Total Site 14.5 Ac Impervious Area 3.4 Ac Percent Impervious 23.4% fulitIN Davg. = Vpp/App (Vol. Perm. Pool/Area Perm. Pool) 35,600/10,360 = 3.5' (Max. Depth 5') MDC3 Done MDC4 Done MDC5 Forebay = 15-20% Volume = 27,175*.2 =5,435 cf Forebay 1 Provided = 3,120 cf Forebat 2 Provided = 10,200 cf MDC6 Done MDC7 Done MDC8 Done MDC9 N/A MDC10 Done M DC11 See Landscape Plans JOB NAME: Mocksville NC Basin 1 DATE: 8-9-17 ORIFICE EQUATION FOR DRAW DOWN Q = Co *A*sgrt(2gH) Q = allowable flow, cfs Co = coefficient, 0.6 g = gravity, 32.2 ft.lsecA2 H = average head, ft A = Area, ftA2 Draw Down: Acreage = 14.5 FF Volume, ftA3 = 27175 Convert to Ac -ft = 0.62385 Allowable Flow, cfs = 0.315 Minimum Flow, cfs = 0.105 Water Surface Elevation = 817 02 invert = 01 invert = FF invert = 816 Solve for flow: Q = Co *A*sgrt(2 H) FF orifice diam., in. = 2.50 H , ft. = 1 A, ftA2 = 0.034 FF Q, cfs = 0.164 avg flow 0.0821 01 orifice diam., in. = H, ft. = 817 A, ftA2 = 0.000 01 Q, cfs = 0.000 avg flow 0.0000 02 orifice diam., in. = H,ft. = 817 A, ftA2 = 0.000 02 Q, cfs = 0.000 avg flow 0.0000 Total Q, cfs = 0.082 FF held, hrs. = 91.98 Pond Report Hydraflow Hydrograp hs Extension for AutoCADO Civil 3 D 2009 by Autodesk, Inc. v6.066 Thursday, Aug 10, 2017 Pond No. 1 - Temp Storage Pond Data Pond storage is based on user -defined values. Stage 1 Storage Table Stage (ft) Elevation (ft) Contour area (sgft) Incr. Storage (cuft) Total storage (cult) 0.00 816.00 nla 0 0 2.00 818.00 nla 44,341 44,341 4.00 820.00 n/a 52,571 96,912 Culvert/ Orifice Structures Weir Structures [A] [B] [C] [PrfRsr] [A] [B] [C] [D] Rise (in) = 18.00 2.50 0.00 0.00 Crest Len (ft) = 16 00 20.00 0.00 0.00 Span (in) = 18.00 2.50 0.00 0.00 Crest EI. (ft) = 819.00 819.00 817.00 0.00 No. Barrels = 1 1 0 0 Weir Coeff. = 3.33 3.33 2.54 3.33 Invert EI. (ft) = 816.00 816.00 Q00 0.00 Weir Type = Riser Ciplti 90 degV -- Length (ft) = 55.00 0.00 0.00 0.00 Multi -Stage = Yes No Yes No Slope (%) = 12.70 0.00 0.00 n)a N -Value = .013 .013 .013 ni Orifice Coeff. = 0.60 0.60 0.60 0.60 Exfii.(inlhr) = 0.000 (by Wet area) Multi -Stage = ii Yes No No TW EIev. (ft) = 0.00 Stage (ft) 4.00 3.00 2.00 IKIIII 0 00 Note'. Culverllo rifice outflows are analyzed under inlet (ic) and outlet (oc) control Weir risers checked for orifice conditions (to) and submergence (a). Stage I Discharge Elev (ft) 820.00 819.00 818.00 817.00 mWzl 0.00 8.00 16.00 24.00 32.00 40.00 48.00 56,00 64.00 72.00 80.00 88.00 Total Q Discharge (cfs) Pond Report Hydraflow Hydrographs Extension for AutoCADO Civil 31D© 2009 by Autodesk, Inc. v6.066 Thursday, Aug 10, 2017 Pond No. 1 - Temp Storage Pond Data Pond storage is based on user -defined values. Stage 1 Storage Table Stage (ft) Elevation (ft) Contour area (sgft) Incr. Storage (cuff) Total storage (cult) 0.00 816.00 n/a 0 0 2.00 818.00 n/a 44,341 44,341 4.00 820.00 n/a 52,571 96,912 Culvert 1 Orifice Structures Weir Structures [A] [B] [C] [PrfRsr] [A] [B] [C] [D] Rise (in) = 18.00 2.50 0.00 0.00 Crest Len (ft) = 16.00 20.00 0.00 0.00 Span (in) = 18.00 2.50 0.00 0.00 Crest EI. (ft) = 819.00 819.00 817.00 0.00 No. Barrels = 1 1 0 0 Weir Coeff. = 3.33 3.33 2.54 3.33 Invert EI. (ft) = 816.00 816.00 0.00 0.00 Weir Type = Riser Ciplti 90 degV --- Length(ft) = 55.00 0.00 0.00 0.00 Multi -Stage = Yes No Yes No Slope (%) = 12.70 0.00 0.00 n/a N -Value = .013 .013 .013 n/a Orifice Coeff. = 0.60 0.60 0.60 0.60 Exfil.(in/hr) = 0.000 (by Wet area) Stage (ft) 4.00 3.00 2.00 1.00 000 Note: Culvert/Office outflows are analyzed under inlet (ic) and outlet (oc) control Weir risers checked for orifice conditions (ic) and submergence (s). Stage 1 Storage Elev (ft) 820,00 819.00 818.00 817.00 81600 0 10,000 20,000 30,000 40,000 50,000 60,000 70,000 80,000 90,000 100,000 Storage (cuff) Storage Hydrograph Return Period Rc�ad� ydra ow y graphs Extension forAutoCADO Civil 3DO 2009 by Autodesk, Inc. v6.066 Hyd. Hydrograph Inflow Peak Outflow (cfs) Hydrograph No. type Hyd(s) description (origin) 1 -Yr 2 -Yr 3 -Yr 5 -Yr 10 -Yr 25 -Yr 50 -Yr 100 -Yr 1 SCS Runoff ---- 5.812 11.85 ------- 22.75 32.28 46.28 ---- 70.52 Predevloped area 2 SCS Runoff 4.553 7.497 ---- 12.40 16.53 22.44 -- 32,50 Post devleoped - Undeveloped 3 SCS Runoff --- 11.68 17.53 ---- 26.95 34.72 45.73 ------- 63.88 Post Developed to Wet Basin 4 Reservoir 3 0.146 0.325 ------- 1.043 2.251 5A56 --- 11.55 Temp Storage Pond 5 Combine 2,4 4.616 7.591 ----- 12.53 16.72 23.34 -- 37.78 Total Site runoff Proj. file: Wet Pond 1.gpw Thursday, Aug 10, 2017 Hydrograph Summary Re ,y It Hydrograph$ Extension for AutoCADO Civil 3D® 2009 by Autodesk, lnc. v6.066 Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to peak (min) Hyd. volume (tuft) Inflow hyd(s) Maximum elevation (ft) Total strge used (tuft) Hydrograph description 1 SCS Runoff 5.812 1 722 19,939 ------ ------ ------ Predevloped area 2 SCS Runoff 4 553 1 720 11,357 ------ ------ ----- Post devleoped - Undeveloped 3 SCS Runoff 11.68 1 720 27,175 ------ ------ ---- Post Developed to Wet Basin 4 Reservoir 0.146 1 1444 16,389 3 816.96 21,223 Temp Storage Pond 5 Combine 4.616 1 720 27,746 2,4 ----- ------ Total Site runoff Wet Pond 1.gpw Return Period: 1 Year Thursday, Aug 10, 2017 3 Hydrograph Report Hydraflow Hydrographs Extension for AutoCADe Civil 3DB 2009 by Autodesk, Inc. v6.066 Thursday, Aug 10, 2017 Hyd. No. 1 Predevloped area Hydrograph type = SCS Runoff Peak discharge = 5.812 cfs Storm frequency = 1 yrs Time to peak = 722 min Time interval = 1 min Hyd. volume = 19,939 cuft Drainage area = 14.500 ac Curve number = 64* Basin Slope = 0.0% Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 11.10 min Total precip. = 2.77 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 * Composite (Area/CN) = [(5.300 x 70) + (9200 x 61)11 14.500 Q (cfs) 6.00 5.00 M -911 2.00 1.00 Predevloped area Hyd. No. 1 -- 1 Year Q (cfs) 6.00 5.00 4.00 3.00 2.00 1.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 1 Time (min) Hydrograph Report Hydraflow Hydrographs Extension for AutoCADO Civif 3DO 2009 by Autodesk, Inc. v6.066 Thursday, Aug 10, 2017 Hyd. No. 2 Post devleoped - Undeveloped Hydrograph type = SCS Runoff Peak discharge = 4.553 cfs Storm frequency = 1 yrs Time to peak = 720 min Time interval = 1 min Hyd. volume = 11,357 cuft Drainage area = 5.300 ac Curve number = 70 Basin Slope = 0.0% Hydraulic length = 0 ft Tc method = TR55 Time of cone. (Tc) = 8.70 min Total precip. = 2.77 in Distribution = Type 11 Storm duration = 24 hrs Shape factor = 484 Q (cfs) 5.00 4.00 71 1 2.00 1.00 Post devleoped - Undeveloped Hyd. No. 2 -- 1 Year Q (cfs) 5.00 4.00 3.00 2.00 1.00 0.00 - 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 2 Time (min) 4 �I -__ ....... - ..... ,t Q (cfs) 5.00 4.00 3.00 2.00 1.00 0.00 - 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 2 Time (min) 5 Hydrograph Report Hydraf low Hydrographs Extension for AutoCAD® Civil 31DO 2009 by Autodesk, Inc, v6.066 Thursday, Aug 10, 2017 Hyd. No. 3 Post Developed to Wet Basin Hydrograph type = SCS Runoff Peak discharge = 11.68 cfs Storm frequency = 1 yrs Time to peak = 720 min Time interval = 1 min Hyd. volume = 27,175 cult Drainage area = 9.200 ac Curve number = 75* Basin Slope = 0.0% Hydraulic length = 0 ft Tc method = TR55 Time of cone. (Tc) = 8.70 min Total precip. = 2.77 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 * Composite (Area/CN) = [(3.400 x 98) + (5.800 x 61)119.200 Post Developed to Wet Basin Q (cfs) Hyd. No. 3 -- 1 Year Q (cfs) 12.00 10.00 8.00 6.00 4.00 2.00 000 12.00 10.00 8.00 6.00 4.00 2.00 000 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 3 Time (min) Storage Indication method used Temp Storage Pond Q (cfs) Hyd. No. 4 -- 1 Year 12.00 10.00 8.00 6.00 4.00 2.00 0.00 _I 1 0.00 0 300 600 900 1200 1500 1800 2100 2400 2700 3000 Time (min) Hyd No. 4 Hyd No. 3 Total storage used = 21,223 cuft 6 Hydrograph Report Hydrafiow Hydrograp hs Extension for AutoCAD® Civil 3D@2009 by Autodesk, Inc. v6.066 Thursday, Aug 10, 2017 Hyd. No. 4 Temp Storage Pond Hydrograph type = Reservoir Peak discharge = 0.146 cfs Storm frequency = 1 yrs Time to peak = 1444 min Time interval = 1 min Hyd. volume = 16,389 cuft Inflow hyd. No. = 3 - Post Developed to Wet Basin Max. Elevation = 816.96 ft Reservoir name = Temp Storage Max. Storage = 21,223 cuft Storage Indication method used Temp Storage Pond Q (cfs) Hyd. No. 4 -- 1 Year 12.00 10.00 8.00 6.00 4.00 2.00 0.00 _I 1 0.00 0 300 600 900 1200 1500 1800 2100 2400 2700 3000 Time (min) Hyd No. 4 Hyd No. 3 Total storage used = 21,223 cuft 7 Hydrograph Report Hydraflow Hydrographs Extension for AutoCADO Civil 3DO 2009 by Autodesk, Inc. v6.066 Thursday, Aug 10, 2017 Hyd. No. 5 Total Site runoff Hydrograph type = Combine Peak discharge = 4.616 cfs Storm frequency = 1 yrs Time to peak = 720 min Time interval = 1 min Hyd. volume = 27,746 cuft Inflow hyds. = 2, 4 Contrib. drain. area= 5.300 ac Q (cfs) 5.00 1591I6I am 2.00 1.00 Total Site runoff Hyd. No. 5 -- 1 Year Q (Cfs) 5.00 3.00 2.00 1.00 000 0 300 600 900 1200 1500 1800 2100 2400 2700 3000 Time {min) Hyd No. 5 Hyd No. 2 Hyd No. 4 Hydrograph Summary Re y rafow Hydrographs Extension forAutoCADD Civil 3D02009 by Autodesk, Inc. v6.066 Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to peak (min) Hyd. volume (cuft) Inflow hyd(s) Maximum elevation (ft) Total strge used (cuft) Hydrograph description 1 SCS Runoff 91.65 1 721 33,787 ------ ------ Predevloped area 2 SCS Runoff 7.497 1 720 17,638 ---- ------ Post devleoped - Undeveloped 3 SCS Runoff 17.53 1 720 39,966 --- ------ Post Developed to Wet Basin 4 Reservoir 0.325 1 1144 25,155 3 817.30 28,917 Temp Storage Pond 5 Combine 7.591 1 720 42,793 2,4 ---- ------ Total Site runoff Wet Pond 1.gpw Return Period: 2 Year Thursday, Aug 10, 2017 Hydrograph Report Hydraflow Hydrographs Extension for AutoCADO Civil 3D® 2009 by Autodesk, Inc. v6.066 Hyd. No. 1 Hyd. volume Predevloped area Curve number Hydrograph type = SCS Runoff Storm frequency = 2 yrs Time interval = 1 min Drainage area = 14.500 ac Basin Slope = 0.0% Tc method = TR55 Total precip. = 3.35 in Storm duration = 24 hrs w Composite (Area/CN) = [(5.300 x 70) + (9.200 x 61)] 1 14.500 Predev[oped area Hyd. No. 1 -- 2 Year (j Thursday, Aug 10, 2017 Peak discharge = 11.85 cfs Time to peak = 721 min Hyd. volume = 33,787 tuft Curve number = 64* Hydraulic length = 0 ft Time of conc. (Tc) = 11.10 min Distribution = Type II Shape factor = 484 10.00 M18 . �M 4.00 2.00 Q (cfs) 12.00 10.00 M .W W 2.00 0.00 � 1 L- - FIYna.il l ir.l- 1.. -J I I I I_ I I 1- 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) --_ Hyd No. 1 Hydrograph Report Hydraflow Hydrographs Extension for Auto CAD ) Civil 3D02009 by Autodesk, Inc. v6.066 Hyd. No. 2 Post devleoped - Undeveloped Hydrograph type = SCS Runoff Storm frequency = 2 yrs Time interval = 1 min Drainage area = 5.300 ac Basin Slope = 0.0% Tc method = TR55 Total precip. = 3.35 in Storm duration = 24 hrs Q (cfs) 8.00 no 4.00 2.00 o.00 0 10 Thursday, Aug 10, 2017 Peak discharge = 7.497 cfs Time to peak = 720 min Hyd. volume = 17,638 cuft Curve number = 70 Hydraulic length = 0 ft Time of cont. (Tc) = 8.70 min Distribution = Type II Shape factor = 484 Post derrleoped - Undeveloped Hyd. No. 2 -- 2 Year 120 240 360 480 600 720 840 960 — Hyd No. 2 Q (cfs) 8.00 . 11 4.00 2.00 O.00 1080 1200 1320 1440 1560 Time (min) Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D@2009 by Autodesk, Inc. v6.066 Thursday, Aug 10, 2017 Hyd. No. 3 Post Developed to Wet Basin Hydrograph type = SCS Runoff Peak discharge = 17.53 cfs Storm frequency = 2 yrs Time to peak = 720 min Time interval = 1 min Hyd. volume = 39,966 tuft Drainage area = 9.200 ac Curve number = 75* Basin Slope = 0.0% Hydraulic length = 0 ft Tc method = TR55 Time of cont. (Tc) = 8.70 min Total precip. = 3.35 in Distribution = Type Il Storm duration = 24 hrs Shape factor = 484 * Composite (Area/CN) _ [(3.400 x 98) + (5.800 x 61)] 19.200 Post Developed to Wet Basin Q (cfs) Hyd. No. 3 -- 2 Year Q (cfs) 18.00 18.00 15.00 15.00 f 12.00 12.00 9.00 9.00 6.00 6.00 3.00 3.00 0.00 - 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (mitt) Hyd No. 3 12 Hydrograph Report Hydraflow Hydrographs Extension forAutoCADG� Civil 31® 2009 by Autodesk, Inc. v6.066 Thursday, Aug 10, 2017 Hyd. No. 4 Temp Storage Pond Hydrograph type = Reservoir Peak discharge = 0.325 cfs Storm frequency = 2 yrs Time to peak = 1144 min Time interval = 1 min Hyd. volume = 25,155 cuft Inflow hyd. No. = 3 - Past Developed to Wet Basin Max. Elevation = 817.30 ft Reservoir name = Temp Storage Max. Storage = 28,917 cult Storage Indication method used. Temp Storage Pond Hyd. No. 4 -- 2 Year 15.00 12.00 • 11 • t1 3.00 0.00 0 300 600 900 1200 1500 1800 2100 2400 2700 Hyd No. 4 Hyd No. 3 Total storage used = 28,917 cult Q (cfs) 18.00 15.00 12.00 • 11 we] 3.00 0.00 3000 Time (min) Q (cfs) 8.00 . rr 2.00 awe Total Site runoff Hyd. No. 5 -- 2 Year Q (cfs) 8.00 . rr 4.00 2.00 000 0 300 600 900 1200 1500 1800 2100 2400 2700 3000 Time (rain} Hyd No. 5 Hyd No. 2 Hyd No. 4 13 Hydrograph Report Hydraflow Hydrographs Extension for AutoCADO Civil 3D0 2009 by Autodesk, Inc. v6.066 Thursday, Aug 10, 2017 Hyd. No. 5 Total Site runoff Hydrograph type = Combine Peak discharge = 7.591 cfs Storm frequency = 2 yrs Time to peak = 720 min Time interval = 1 min Hyd. volume = 42,793 cult Inflow hyds. T 2, 4 Contrib. drain. area= 5.300 ac Q (cfs) 8.00 . rr 2.00 awe Total Site runoff Hyd. No. 5 -- 2 Year Q (cfs) 8.00 . rr 4.00 2.00 000 0 300 600 900 1200 1500 1800 2100 2400 2700 3000 Time (rain} Hyd No. 5 Hyd No. 2 Hyd No. 4 14 Hydrograph Summary Rei,braa owHydrographsExtensionforAutoCAD®Civil3D@2009byAutodesk,Inc.v6.066 Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to peak (min) Hyd. volume (cuft) Inflow hyd(s) Maximum elevation (ft) Total strge used (cult) Hydrograph description 1 SCS Runoff 22.75 1 721 58,540 ---- ---- --- Predevloped area 2 SCS Runoff 12.40 1 720 28,314 ---- ---- Post devleoped - Undeveloped 3 SCS Runoff 26.95 1 720 60,973 -- -- ---- Post Developed to Wet Basin 4 Reservoir 1.043 1 844 45,267 3 817.64 36,396 Temp Storage Pond 5 Combine 12.53 1 720 73,581 2,4 ------ ------ Total Site runoff Wet Pond 1.gpw Return Period: 5 Year Thursday, Aug 10, 2017 15 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2009 by Autodesk, Inc. v6.066 Thursday, Aug 10, 2017 Hyd. No. 1 Predevloped area Hydrograph type = SCS Runoff Peak discharge = 22.75 cfs Storm frequency = 5 yrs Time to peak = 721 min Time interval = 1 min Hyd. volume = 58,540 cult Drainage area = 14.500 ac Curve number = 64* Basin Slope = 0.0% Hydraulic length = Oft Tc method = TR55 Time of conc. (Tc) = 11.10 min Total precip. = 4.21 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 * Composite (Area/CN) � ((5.300 x 70) + (9.200 x 61)] / 14.500 Q (cfs) 24,00 20.00 16.00 12.00 4.00 Predevioped area Hyd. No. 1 -- 5 Year Q (cfs) 24.00 20.00 16.00 12.00 0.00 - 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 1 Time (min) !i i' Q (cfs) 24.00 20.00 16.00 12.00 0.00 - 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 1 Time (min) Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® CMI 3DO 2009 by Autodesk, Inc. v6.066 Hyd. No. 2 Hyd. volume Post devleoped - Undeveloped Curve number Hydrograph type = SCS Runoff Storm frequency = 5 yrs Time interval = 1 min Drainage area = 5.300 ac Basin Slope = 0.0% Tc method = TR55 Total precip. = 4.21 in Storm duration = 24 hrs Q (cfs) 14.00 12.00 10.00 MMI IP Thursday, Aug 1D, 2017 Peak discharge = 12.40 cfs Time to peak = 720 min Hyd. volume = 28,314 cuft Curve number = 70 Hydraulic length = 0 ft Time of cone. (Tc) = 8.70 min Distribution = Type II Shape factor = 484 Q (cfs) 14.00 12.00 10.00 : 11 . !! 4.00 2.00 0.00 1 1 1 1 1 1 4 — 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 — Hyd No. 2 Time (min) Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3DO2009 by Autodesk, Inc. v6.066 Hyd. No. 3 Hyd. volume Post Developed to Wet Basin Hydrograph type = SCS Runoff Storm frequency = 5 yrs Time interval = 1 min Drainage area = 9.200 ac Basin Slope = 0.0% Tc method = TR55 Total precip. = 4.21 in Storm duration = 24 hrs " Composite (ATealCN) = [(3.400 x 98) + (5.800 x 61)] 19.200 Q (cfs) 28.00 M10I411 20.00 16.00 12.00 S11 17 Thursday, Aug 10, 2017 Peak discharge = 26.95 cfs Time to peak = 720 min Hyd. volume = 60,973 cuft Curve number = 75* Hydraulic length = 0 ft Time of conc. (Tc) = 8.70 min Distribution = Type II Shape factor = 484 Q (cfs) 28.00 24.00 20.00 16.00 12.00 MIN 4.00 0.00 1 1 - 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) Hyd Na. 3 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2009 by Autodesk, Inc. v6.066 Thursday, Aug 10, 2017 Hyd. No. 4 Temp Storage Pond Hydrograph type = Reservoir Peak discharge = 1.043 cfs Storm frequency = 5 yrs Time to peak = 844 min Time interval = 1 min Hyd. volume = 45,267 tuft Inflow hyd. No. = 3 - Post Developed to Wet Basin Max. Elevation = 817.64 ft Reservoir name = Temp Storage Max. Storage = 36,396 cult Storage Indication method used. Temp Storage Pond Q (cfs) Hyd. No. 4 -- 5 Year Q (cfs) 28.00 28.00 24.00 24.00 20.00 20.00 16.00 — 16.00 12.00 12.00 8.00 MCI 4.00 4.00 o-oo 0.00 0 300 600 900 1200 1500 1800 2100 2400 2700 3000 Time (min) Hyd No, 4 Hyd No. 3 Total storage used = 36,396 cuft Total Site runoff Q (cfs) Hyd. No. 5 -- 5 Year Q (cfs) 14.00 14.00 12.00 12.00 10.00 10.00 8.00 8.00 6.00 6.00 4.00 4.00 2.00 2.00 0 00 — 000 0 300 600 900 1200 1500 1800 2100 2400 2700 3000 Time (min) Hyd No. 5 Hyd No. 2 Hyd No. 4 19 Hydrograph Report Hydraflow Hydrographs Extension forAutoCADO Civil 31DO 2009 by Autodesk, Inc. v6.066 Thursday, Aug 10, 2017 Hyd. No. 5 Total Site runoff Hydrograph type = Combine Peak discharge = 12.53 cfs Storm frequency = 5 yrs Time to peak = 720 min Time interval = 1 min Hyd. volume = 73,581 cult Inflow hyds. = 2, 4 Contrib. drain. area= 5.300 ac Total Site runoff Q (cfs) Hyd. No. 5 -- 5 Year Q (cfs) 14.00 14.00 12.00 12.00 10.00 10.00 8.00 8.00 6.00 6.00 4.00 4.00 2.00 2.00 0 00 — 000 0 300 600 900 1200 1500 1800 2100 2400 2700 3000 Time (min) Hyd No. 5 Hyd No. 2 Hyd No. 4 20 Hydrograph Summary ReRQr y raf ow Hydrographs Extension forAutoGAD®Civil 3D® 2049 by Autodesk, Inc. v6.066 Hyd. No. Hydrograph type (origin) Peak flow (Cfs) Time interval (min) Time to peak (min) Hyd. volume (cuft) Inflow hyd(s) Maximum elevation (ft) Total strge used (Cult) Hydrograph description 1 SCS Runoff 32.28 1 721 80,534 ---- ------ ------ Predevloped area 2 SCS Runoff 16.53 1 720 37,474 --- --- ------ Post devleoped - Undeveloped 3 SCS Runoff 34.72 1 719 78,558 -- -- ------ Post Developed to Wet Basin 4 Reservoir 2.251 1 778 62,610 3 817,91 42,417 Temp Storage Pond 5 Combine 16.72 1 720 100,083 2,4 ------ --- Total Site runoff Wet Ponca 1.gpvv Return Period: 10 Year Thursday, Aug 10, 2017 Hydrograph Report Hydraflow Hydrographs Extension forAutoCADO Civil 3DO 2009 by Autodesk, Inc. v6.066 Hyd. No. 1 Predevloped area Hydrograph type = SCS Runoff Storm frequency = 10 yrs Time interval = 1 min Drainage area = 14.500 ac Basin Slope = 0,0% Tc method = TR55 Total precip. = 4.88 in Storm duration = 24 hrs * Composite (Area/CN) = [(5.300 x 70) + (9.200 x 61)] / 14.500 Q (cfs; 35.00 30.00 25.00 20.00 15.00 5.00 21 Thursday, Aug 10, 2017 Peak discharge = 32.28 cfs Time to peak = 721 min Hyd. volume = 80,534 cuft Curve number = 64* Hydraulic length = 0 ft Time of conc. (Tc) = 11.10 min Distribution = Type II Shape factor = 484 Q (cfs) 35.00 25.00 20.00 15.00 10.00 5.00 0.00 - — ��. , 1 , 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 1 Time (min) 22 Hydrograph Report Hydrafiow Hydrographs Extension for AutoCAD AO Civil 3DO 2009 by Autodesk, Inc. v6.066 Hyd. No. 2 Hyd. volume Post devleoped - Undeveloped Curve number Hydrograph type = SCS Runoff Storm frequency = 10 yrs Time interval = 1 rein Drainage area = 5.300 ac Basin Slope = 0.0% Tc method = TR55 Total precip. = 4.88 in Storm duration = 24 hrs Thursday, Aug 10, 2017 Peak discharge = 16.53 cfs Time to peak = 720 min Hyd. volume = 37,474 cult Curve number = 70 Hydraulic length = 0 ft Time of cont. (Tc) = 8.70 min Distribution = Type 11 Shape factor = 484 Post devleoped - Undeveloped Q (cfs) Hyd. No. 2 -- 10 Year Q (cfs) 18.00 15.00 12.00 9.00 6.00 3.00 000 18.00 15.00 12.00 9.00 6.00 3.00 000 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 2 Time (min) * Composite (Area/CN) = [(3.400 x 98) + (5.800 x 61)j / 9.200 Q (cfs) 35.00 30.00 25.00 20.00 15.00 KNOW milli Post Developed to Wet Basin Hyd. No. 3 -- 10 Year Q (cfs) 35.00 30.00 25.00 20.00 15.00 10.00 5.00 0.O0 ..... 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 3 Time (min) 23 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D8 2009 hyAutodesk, Inc. v6.066 Thursday, Aug 10, 2017 Hyd, No. 3 Post Developed to Wet Basin Hydrograph type = SCS Runoff Peak discharge = 34.72 cfs Storm frequency = 10 yrs Time to peak = 719 min Time interval = 1 min Hyd. volume = 78,558 cult Drainage area = 9.200 ac Curve number = 75* Basin Slope = 0.0% Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 8.70 min Total precip. = 4.88 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 * Composite (Area/CN) = [(3.400 x 98) + (5.800 x 61)j / 9.200 Q (cfs) 35.00 30.00 25.00 20.00 15.00 KNOW milli Post Developed to Wet Basin Hyd. No. 3 -- 10 Year Q (cfs) 35.00 30.00 25.00 20.00 15.00 10.00 5.00 0.O0 ..... 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 3 Time (min) Storage Indication method used. Q (cfs) 35.00 30.00 25.00 20.00 15.00 10.00 5.00 Temp Storage Pond Hyd. No. 4 -- 10 Year Q (cfs) 35.00 30.00 25.00 20.00 15.00 10.00 5.00 0.00 ::` --.1 0.00 0 300 600 900 1200 1500 1800 2100 2400 2700 3000 Time (min) Hyd No. a Hyd No. 3 i .., Total storage used = 42,417 cuff 24 Hydrograph Report Hydraflow Hydrographs Extension forAutoCAQO CMI 31DO 2005 by Autodesk, Inc. v6.066 Thursday, Aug 10, 2017 Hyd. No, 4 Temp Storage Pond Hydrograph type = Reservoir Peak discharge = 2.251 cfs Storm frequency = 10 yrs Time to peak = 778 min Time interval = 1 min Hyd. volume = 62,610 cuft Inflow hyd. No. = 3 - Post Developed to Wet Basin Max. Elevation = 817.91 ft Reservoir name = Temp Storage Max. Storage = 42,417 cult Storage Indication method used. Q (cfs) 35.00 30.00 25.00 20.00 15.00 10.00 5.00 Temp Storage Pond Hyd. No. 4 -- 10 Year Q (cfs) 35.00 30.00 25.00 20.00 15.00 10.00 5.00 0.00 ::` --.1 0.00 0 300 600 900 1200 1500 1800 2100 2400 2700 3000 Time (min) Hyd No. a Hyd No. 3 i .., Total storage used = 42,417 cuff 25 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD@ Civil 3D® 2009 by Autodesk, Inc. v6.066 Thursday, Aug 10, 2017 Hyd. No. 5 Total Site runoff Hydrograph type = Combine Peak discharge = 16.72 cfs Storm frequency = 10 yrs Time to peak = 720 min Time interval = 1 min Hyd. volume = 100,083 cult Inflow hyds. = 2, 4 Contrib. drain. area= 5.300 ac Total Site runoff Q (cfs) Hyd. No. 5 -- 10 Year Q (cfs) 18.00 15.00 12.00 9.00 6.00 3.00 000 1 s.0o 15.00 12.00 9.00 6.00 3.00 0 00 0 180 360 540 720 900 1080 1260 1440 1620 1800 1980 2160 Time (min) Hyd No. 5 Hyd No. 2 Hyd No. 4 26 Hydrograph Summary ReRy9ralflowHydrographsExtension for AutoCAD®Civil 3D®2009 by Autodesk, Inc. v6.066 Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to peak (min) Hyd. volume (cuff) Inflow hyd(s) Maximum elevation (ft) Total strge used (cult) Hydrograph description 1 SCS Runoff 46.28 1 721 113,305 --- ------ — Predevloped area 2 SCS Runoff 22.44 1 720 50,783 ------ — ------ Post devleoped - Undeveloped 3 SCS Runoff 45.73 1 719 103,657 ------ ------ ------ Post Developed to Wet Basin 4 Reservoir 5.056 1 747 87,465 3 818.30 52,255 Temp Storage Pond 5 Combine 23.34 1 720 138,248 2,4 ---- ------ Total Site runoff Wet Pond 1.gpw Return Period: 25 Year Thursday, Aug 10, 2017 27 Hydrograph Report Hydraf low Hydrographs Extension forAUtoCAI]® Civil 3NC 2009 by Autodesk, Inc. v6.066 Thursday, Aug 10, 2017 Hyd. No. 1 Predevloped area Hydrograph type = SCS Runoff Peak discharge = 46.28 cfs Storm frequency = 25 yrs Time to peak = 721 min Time interval = 1 min Hyd. volume = 113,305 cult Drainage area = 14.500 ac Curve number = 64* Basin Slope = 0.0% Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 11.10 min Total precip. = 5.79 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 " Composite (Area/CN) _ [(5.300 x 70) + (9.200 x 61)] 1 14.500 Predevloped area Q (cfs) Hyd. No. 1 -- 25 Year Q (cfs) 50.00 50.00 40.00 — 40.00 — 30.00 30.00 - 20.00 20.00 10.00 10.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 1 Time (min) 28 Hydrograph Report Hydratlow Hydrographs Extension for AutoCAD® Civil 3D& 2009 by Autodesk, Inc. v6.066 Thursday, Aug 10, 2017 Hyd, No. 2 Post devleoped - Undeveloped Hydrograph type = SCS Runoff Peak discharge = 22.44 cfs Storm frequency = 25 yrs Time to peak = 720 min Time interval = 1 min Hyd. volume = 50,783 cuft Drainage area = 5.300 ac Curve number = 70 Basin Slope = 0,0% Hydraulic length = 0 ft Tc method = TR55 Time of cone. (Tc) = 8.70 min Total precip. = 5.79 in Distribution = Type ll Storm duration = 24 hrs Shape factor = 484 Post devleoped - Undeveloped Q (cfs) Hyd. No. 2 -- 25 Year Q (cfs) 24.00 24.00 20.00 20.00 I 16.00 16.00 12.00 12.00 8.00 8.00 4.00 4.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 2 Time (min) Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3 D 2009 by Autodesk, Inc. v6.066 Hyd. No. 3 Hyd. volume Post Developed to Wet Basin Hydrograph type = SCS Runoff Storm frequency = 25 yrs Time interval = 1 min Drainage area = 9.200 ac Basin Slope = 0.0% Tc method = TR55 Total precip. = 5.79 in Storm duration = 24 hrs * Composite (Area/CN) = [(3.400 x 98) + (5.800 x 61)] 1 9.200 29 Thursday, Aug 10, 2017 Peak discharge = 45.73 cfs Time to peak = 719 min Hyd. volume = 103,657 cuft Curve number = 75* Hydraulic length = 0 ft Time of conc. (Tc) = 8.70 min Distribution = Type II Shape factor = 484 Post Developed to Wet Basin Hyd. No. 3 -- 25 Year 40.00 20.00 10.00 0.00 0 120 240 360 480 Hyd No. 3 600 720 840 Q (cfs) 50.00 40.00 ON M 10.00 0.00 960 1080 1200 1320 1440 1560 Time (miry) Hydrograph Report Hydraflow Hydrographs Extension for AutoCADO Civil 3D@ 2009 by Autodesk, Inc. v6.066 Hyd. No. 4 Temp Storage Pond Hydrograph type = Reservoir Storm frequency = 25 yrs Time interval = 1 min Inflow hyd. No. = 3 - Post Developed to Wet Basin Reservoir name = Temp Storage Storage Indication method used. Q (cfs) 5Q.00 40.00 20.00 10.00 0.00 0 300 Hyd No. 4 Temp Storage Pond Hyd. No. 4 -- 25 Year Peak discharge Time to peak Hyd. volume Max. Elevation Max. Storage 30 Thursday, Aug 10, 2017 = 5.056 cfs = 747 min = 87,465 cult = 818.30 ft = 52,255 cuft 600 900 1200 1500 1800 2100 2400 2700 Hyd No. 3 _._i.l Total storage used = 52,255 cuft Q (cfs) 50.00 40.00 30.00 20.00 10.00 0.00 3000 Time (min) Hydrograph Report HydraflowHydrographs Extension for AutoCAD®Civil 3D®2009 by Autodesk, Inc. v6.066 Hyd. No. 5 Time to peak = Total Site runoff Hyd. volume = Hydrograph type = Combine Storm frequency = 25 yrs Time interval = 1 min Inflow hyds. = 2, 4 Q (cfs) 24.00 20.00 16.00 12.00 M .WI Total Site runoff Hyd. No. 5 -- 25 Year 31 Thursday, Aug 10, 2017 Peak discharge = 23.34 cfs Time to peak = 720 min Hyd. volume = 138,248 cuft Contrib_ drain. area= 5.300 ac Q (cfs) 24.00 20.00 16.00 12.00 4.00 !� 0 180 360 540 720 900 1080 1260 1440 1620 1800 Time (min) Hyd No. 5 Hyd No. 2 Hyd No. 4 32 Hydrograph Summary Re y�raf Flow Hydrographs Extension for AutoCAD® Civil 300 2009 by Autodesk, Inc. v6.066 Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to peak (min) Hyd. volume (cult) Inflow hyd(s) Maximum elevation (ft) Total strge used (cuft) Hydrograph description 1 SCS Runoff 70.52 1 720 171,055 ------ ------ — Predevloped area 2 SCS Runoff 32.50 1 719 73,631 — — — — Post devleoped - Undeveloped 3 SCS Runoff 63.88 1 719 145,956 ---- ---- — - Post Developed to Wet Basin 4 Reservoir 11.55 1 732 129,472 3 819.02 71,164 Temp Storage Pond 5 Combine 37.78 1 720 203,103 2,4 ------ ---- Total Site runoff Wet Pond 1.9pw Return Period: 100 Year Thursday, Aug 10, 2017 Hydrograph Report Hydraf low Hydrographs Extension for AutoCAD@ Civil 317 2009 by Autodesk, Inc. v6.066 Hyd. No. 1 Predevloped area Hydrograph type = SCS Runoff Storm frequency = 100 yrs Time interval = 1 min Drainage area = 14.500 ac Basin Slope = 0.0% Tc method = TR55 Total precip. = 7.25 in Storm duration = 24 hrs Composite (ATeafCN) = [(5.300 x 70) + (9.200 x 61)] 114.500 Predevloped area Hyd. No. 1 -- 100 Year 33 Thursday, Aug 10, 2017 Peak discharge = 70.52 cfs Time to peak = 720 min Hyd. volume = 171,055 tuft Curve number = 64* Hydraulic length = 0 ft Time of conc. (Tc) = 11.10 min Distribution = Type fl Shape factor = 484 70.00 50.00 40.00 i 1/ 10.00 Q (cfs) 80.00 70.00 50.00 40.00 30.00 20.00 10.00 0.00 a »....��.. . , _ -- 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 1 Time (min) Hydrograph Report Hydraflow Hydrographs Extension forAUtOCAQ® Civil 3D® 2009 by Autodesk, Inc. v6.066 Hyd. No. 2 Post devleoped - Undeveloped Hydrograph type = SCS Runoff Storm frequency = 100 yrs Time interval = 1 min Drainage area = 5.300 ac Basin Slope = 0.0% Tc method = TR55 Total precip. = 7.25 in Storm duration = 24 hrs Q (cfs) 35.00 30.00 25.00 20.00 15.00 10.00 "I WIM 34 Thursday, Aug 10, 2017 Peak discharge = 32.50 cfs Time to peak = 719 min Hyd. volume = 73,631 tuft Curve number = 70 Hydraulic length = 0 ft Time of cont. (Tc) = 8.70 min Distribution = Type II Shape factor = 484 Post devleoped - Undeveloped Hyd. No. 2 -- 100 Year Q (cfs) 35.00 30.00 25.00 20.00 15.00 10.00 5.00 �aur� 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 2 Time (min) Hydrograph Report Hydraftow Hydrographs Extension for AutoCAD® Civil 3DO 2009 by Autodesk, Inc. v6.066 Hyd. No. 3 Post Developed to Wet Basin Hydrograph type = SCS Runoff Storm frequency = 100 yrs Time interval = 1 min Drainage area = 9.200 ac Basin Slope = 0.0% Tc method = TR55 Total precip. = 7.25 in Storm duration = 24 hrs Composite (Area/CN) = [(3.400 x 98) + (5.800 x 61)] 19.200 Q (Cfs) 70.00 50.00 40.00 30.00 20.00 10.00 35 Thursday, Aug 10, 2017 Peak discharge = 63.88 cfs Time to peak = 719 min Hyd. volume = 145,956 cuft Curve number = 75* Hydraulic length = 0 ft Time of conc. (Tc) = 8.70 min Distribution = Type fl Shape factor = 484 Q (cfs) 70.00 .1 i1 50.00 J, •• 30.00 20.00 10.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 3 Time (min) 36 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD@ Civil 3D® 2009 by Autodesk, Inc. v6.066 Thursday, Aug 10, 2017 Hyd. No. 4 Temp Storage Pond Hydrograph type = Reservoir Peak discharge = 11.55 cfs Storm frequency = 100 yrs Time to peak = 732 min Time interval = 1 min Hyd. volume = 129,472 cuft Inflow hyd. No. = 3 - Post Developed to Wet Basin Max. Elevation = 819.02 ft Reservoir name = Temp Storage Max. Storage = 71,164 cuft Storage Indication method used Temp Storage Pond Q (cfs) Hyd. No. 4 -- 100 Year Q (cfs) 70.00 70.00 .1 77, 60.00 60.00 50.00 50.00 40.00 40.00 3Q00 30.00 20.00 20.00 10.00 10.00 0-00 0.00 0 300 600 900 1200 1500 1800 2100 2400 2700 3000 Time (min) Hyd No. 4 Hyd No. 3 Total storage used = 71,164 cuff Hydrograph Report Hydraflow Hydrographs Extension for AutoCADO Civil 3D02009 by Autodesk, Inc. v6.066 Hyd. No. 5 Total Site runoff Hydrograph type = Combine Storm frequency = 100 yrs Time interval = 1 min Inflow hyds. = 2, 4 Q (cfs) 40.00 30.00 20.00 10.00 0.00 0 180 360 540 720 900 1080 Hyd No. 5 Hyd No. 2 Hyd No. 4 Total Site runoff Hyd. No. 5 -- 100 Year 37 Thursday, Aug 10, 2017 Peak discharge = 37.78 cfs Time to peak = 720 min Hyd. volume = 203,103 cuft Contrib. drain. area= 5.300 ac 1260 1440 Q (cfs) 40.00 30.00 Ii 041 10.00 0.00 1620 Time (min) VIA #Units—Elevation,ft,volume,ft3 #Stage -Storage Curve Data #Stage - ft Volume - ft3 #------------ ------------- 815.00000000, 35608.47615325 814.00000000, 26029.99571547 812.00000000, 11477.74493226 810.00000000, 1907.29801786 809.00000000, 0.00000000 tmp#47.ssc Page 1 5" e_ #Units=Elevation,ft,volume,ft3 #Stage -Storage Curve Data #stage - ft volume - ft3 #------------------------- 820.00000000, 96912.25624650 818.00000000, 44341.08850829 816.00000000, 0.00000000 tmp#14.ssc Page 1 #units=Elevation,ft,volume,ft3 #stage -Storage Curve Data #Stage - ft volume - ft3 #------------ ----- 816.00000000, 3280.14703526 814.00000000, 1085.83095076 812.00000000, 232.65322122 810.00000000, 0.00000000 tmp#48.ssc Page 1 #units=Elevation,ft,volume,ft3 #Stage -Storage curve Data #Stage - ft volume - ft3 #------------ ------------- 816.00000000, 10262.33758979 814.00000000, 4234.16280545 812.00000000, 1142.39611284 810.00000000, 0.00000000 tmp#49.ssc Page 1 35° 5021'N 35° SS 45' N 3: Hydrologic Soil Group --Davie County, North Carolina Mm 535100 5E20 53M 55400 53x96 a"l-ceco 3 M Map Scale: 1:5,950 if pnrttd on A portray (8.5" x 11'� NMetes fl w 107 200 300 0 250 5m 1000 1507 Map projection: Web Mffcgu Career coct mtm WGS84 E* tics: UTM Zxe 17N WGSM wDA Natural Resources Well Soil Survey Conservation Service National Cooperative Sola Survey Hydrologic Soil Group—Davie County, North Carolina Hydrologic Soil Group Hydrologic Soil Group— Summary by Map l nl.i --- Davie County,., North Carolina (NC059) t17ag unit symbol Map unit name RatingAcres in AO! Percent of AOI f CfB2 Clifford sandy clay loam, B 31.6 , 40.1% 2 to 8 percent slopes, moderately eroded CoA Codcrus Loam, 0 to 2 $/D 0.2. 0.3% percent slopes, frequently flooded FaD Fairview sandy loam, 15 B 16.7 21.2% to 45 percent slopes FcC2 rairview sandy clay C 30.3 38.4% loam, 8 to 15 percent slopes, moderately eroded Totals for Area of Interest 78.7 i 900.0%'• LiSD_� Natural Resources Web 5011 Survey 51Z5/2017 Conservation Service National Cooperative Soil Survey Page 3 of 4 Z 0 Q 0 Z CL 0 Z LU V W —i IL n Q E O r ti�T Q O 3 m c3 D C cn Q m o 77 V 0 0 Z ol R N ro o m m > ro m o c m @ 9 N U m cro7 N D E m� E -o � Q Ns'm O o0E v 0lf7 L L N 6 G7 @ E E o m - nm ye�� 2 c m v V nT o m � m s�" m Q m N,-0 m Z U o 3 a U E m o Lu ro 0 a o 0 r°' 2m L m m m U m D .P L- @ p N c3 p V) 0 Z U Q c in D Q T m U _ @ U O 47 m w$ U) @�._ Q O m @ tl E C m �% Q7 L�1 m C V C 'U Q1 O r V' O p E �' c6 h "� E.G% m a.� ro y 0- -0 O C U O 0 y m @ U i Q Q±5 a m m` m N cc 4 p N my �' Z Z E �m¢o� Q 7 av4� y Q� ni & Lis �6 N N @ O 67 j N cn v f0 N _0 .0 `1 coC1 }` O 'D CL O T fn C CO m L a � m (n p— @ CL m O U O o m m� 3 L a s m T < 3 0 Q O m i3 Q ro' s _0 0 m 03 o U 0> 7 h @ 4 O d7 W LN4 j c m Q E Cn U ^2 a 'a Q N N P (n Cn (n r CaN n C4 F- OU - 0 ti�T Q O 3 m c3 D C cn Q m o 77 V 0 0 Z ol R � m m > m o c m m �- � � m m o cc o a N m o W m 0^ 2m � Y' tr o m ❑ Q U o Q Z » m a cR _ � 'crs o °' � m g ❑ c � <£ 7 F 6] m 9 co m L a ca O d7 c © ^ C O N � pl o o m 0 m 2 C m w 0. a ❑ ❑ p J O O O o A ❑ O m �, ammu ❑ Qam nZ cp<a m �' ElLo ❑ L 1 i m N 0 LTJ LJ 0 i 8 O d s N US N ti�T Q O 3 m c3 D C cn Q m o 77 V 0 0 Z Hydrologic Soil Group—Davie County, North Carolina Description Hydrologic soil groups are based on estimates of runoff potential. Soils are assigned to one of four groups according to the rate of water infiltration when the soils are not protected by vegetation, are thoroughly wet, and receive precipitation from long -duration storms. The soils in the United States are assigned to four groups (A, B, C, and D) and three dual classes (A/D, B/D, and C/D). The groups are defined as follows: Group A. Soils having a high infiltration rate (low runoff potential) when thoroughly wet. These consist mainly of deep, well drained to excessively drained sands or gravelly sands. These soils have a high rate of water transmission. Group B. Soils having a moderate infiltration rate when thoroughly wet. These consist chiefly of moderately deep or deep, moderately well drained or well drained soils that have moderately fine texture to moderately coarse texture. These soils have a moderate rate of water transmission. Group C. Soils having a slow infiltration rate when thoroughly wet. These consist chiefly of soils having a layer that impedes the downward movement of water or soils of moderately fine texture or fine texture. These soils have a slow rate of water transmission. Group D. Soils having a very slow infiltration rate (high runoff potential) when thoroughly wet. These consist chiefly of clays that have a high shrink -swell potential, soils that have a high water table, soils that have a claypan or clay layer at or near the surface, and soils that are shallow over nearly impervious material. These soils have a very slow rate of water transmission. If a soil is assigned to a dual hydrologic group (A/D, B/D, or C/D), the first letter is for drained areas and the second is for undrained areas. Only the soils that in their natural condition are in group D are assigned to dual classes. Rating Options Aggregation Method: Dominant Condition Component Percent Cutoff. None Specified Tie-break Rule: Higher USDA Natural Resources Web Soil Survey wzotzui t iia Conservation Service National Cooperative Soil Survey Page 4 of 4 5/10/2017 JiTouchMap.com "Io a and Deskiop Maps Home a Latitude and Longitude of a Point Latitude and Longitude of a Point Maps I Country . State I Places I Cities j Lat - Long Y. To find the latitude and longitude of a point Click on the map, Drag the marker, or enter the... Address: Quality Drive Mocksville QVC GO Mobile Version Nearbv Places of Interest Many ooints to check? Try Latt-ona Trace Latitude and Longitude of a Point Clean Reset Remove Last Slue Marker Show Point from Latitude and Longitude enter Red Marker ,_C --- -- — Use this if you know the latitude and longitude coordinates of a point and want to see where on the map the point is. Get the Latitude and Longitude of a Point Use: + for N Lai or E Long - for S Lat or W Long. Example: +40.689060 -74.044636 When you click on the map, move the marker or enter an Note: Your entry should not have any embedded spaces. address the latitude and longitude coordinates of the point are inserted in the boxes below. Decimal Deg. Latitude: Latitude: 35.933596 Decimal Deg. Longitude: Longitude: -80.605173 Show Point_u Example: +34 40 50.12 for 34N 40'50.12" Degrees Minutes Seconds Degrees Minutes Seconds Latitude: 35 56 0.9456 Latitude: Longitude: -80 36 18.6222 Longitude: Show Point p i-rouchlvlap.com 2007-2016 https:/btouohm ap.comA aU ong.htm I VI Precipitation Fl;equency Data Server POINT PREGIPITATION z FREQUENCY ESTIMATES FROM NOAA ATLAS 14 MOCKSVILLE, NORTH CAROLINA (31-5743) 35.84391\ 80.4972 W 718 feet from "Precipitation -Frequence Atlas or the United Scares" NOAA Atlas 14, Volume 2, Version 3 G.M. Bonin, D. Martin. B. Lin, T. Parzybok, .uf.Yeksa, and D. Riley NOAH. NaOonal breather Service. Silver Spring. Maryland. 2004 Extracted: Tim Sep 3 2609 Confidence Limits ( Seasonality Location Maps j Other Info. GIS data j Maps Docs Page 1 of 4 Return to State Ma Precipitation Frequency Estimates (inches) ` ARI s ]0 1� 30 ]1?1120 M14 ID 20 30 These precipitation freQuency estimates are based on a psrtiaf auratnn_ser_ies. ARI is the Average Recurrence interval. Please refer to NOR.4 N!a.* ,4 D3 cLrnent for more information- NOTE: Formattng forces estimates near zero to appear as zero. X Upper bound of the 90% confidence interval Precipitation Frequency Estimates (inches) AR1'x 5 jl� I5 30 60 120 3 6 12 24 48 4 7 ID 20 30 4�6D(years) min min min min min hr hr hr hr hr day day day day day day day 0 EE 0.66 0.82 1.12 1.40 1.63 177 47 2.12 2.52 2.98 3.46 3.88 4.46 5.07 b.76 KEI 10.43 12.41 0.49 0.78 0.98 FDT 1.70 1.98 F1 27 2.56 3.05 3.b0 F41-774.66 5.32 6.03 ?.98 9.77 12.19 14.44 0 0.57 0.93 1.15 1.64 2.10 2.47 2.64 3.21 3.8] 4.52 5.18 5.75 6.47 7.23 9.42 11.32 13.90 16.28 IO K6fl 1.00 1.27 1.83 2E EE 3.04 3.69 4.41 5.24 5.97 6.60 7.37 $.17 10.56 12.51 15.21 17.68 2S 0.69 1.10 1.40 2.07 2.75 3.30 3.57 4.35 5.22 6.21 7.04 7.76 8.60 9.43 1 12.09 14.09 16.9 t 19.49 5D 0.74 L 17 1.49 2.24 3.03 3.67 3.98 4.87 5.86 7.00 7.88 8.68 9.57 10.431 13.29 15.30 18.22120.87 100 0.78 1.24 1.55 2.34 3. 29 4.03 4.40 5.40 1 6.52 7.79 1 18.73 9.63 ]0.571 11.44 1451 16.511 19.49122.20 200 0.81 1 1.29 I l .63 2.54 1 3.56 EO] 4.82 15.94 7.21 1 8.62 1 9.62 ] 0.601 1 1.60 12.45 i 5.76 17.72 1 20.75 23.49 500 0.8611.3611.71 2.7213.9014.89 5.4016.6918.1519.75 110.83 11.92113.02113.84 17.44 19.31122.39125.16 1000 1 0.89 11.40 11.75 12.84 1 4.15 5.26 5.85 1 7.27 8.89 10.65 1 I L78 12.97 14.121 34.92 1$,75 20.561 23.63 126.42 'The uooer hound of the confidence inlprval at 96%rmnfidance level is the value which 5% of the simulated ouan0e values for a eiven freouencv are oreater than. - These precipitation frequency estimates are based on a partial duration series ARI is the Average Recurrence Interval_ Please refer 10 NOAH A!:as 14 Dorumer; for more information_ NOTE: Formatting prevents estimates near zero to appear as zero. x Lower bound of the 90% confidence interval Precipitation Frequency Estimates (inches) ART' 10 I� 30 60 120 3 6 I2 24 48 4 7 10 20 30 45 60 (years) min min min mi❑ mint min hr hr hr hr hr dfl� day day day day day day 0.35 0.56 0.70 0.95 i.19 ].38 1.48 1.79 12.13 12.59 3.01 13.4] 3.93 4.53 6.09 7.58 19.57 11.46 0 0.41 0.66 0.83 1.15 1.44 1.68 1.79 2.17 2.57 3.13 3.63 1 4.09 4.69 3.37 7.19 8.90 11.20 13.35 510 .77 0. .48 1 D98 1 1.39 1 2.09 2.24 2.71 3.92 .78 1 3.21 14.51 5.04 1 5.69 6.44 1 8.48 10.32112.771 35.04 10 Q.53 0.85 t.Q7 E.>j 2.0212.392.56 3.1113.71 4.54 VP97 5.77 16.48 1F72_719_497=401 13.961 1b.34 http:llhd sc.nws.noxa.govlcgi-binlhdsclbuildout.perl?type=pf&units=us&series=pd&statename=NORTH+C... 9/312009 [EFT11] 48e day 7 day MF60 min min min m 010.3810.60 0.76 11.03 t.29 min 1.50 1.60 1.95 2.31 2.77 day day day day 3.22 3.63 4.18 4.77 6.42 7.93 9.98 11.91 0 0.45 0.72 0.40 1.24 1,56 1.82 1.94 2.35 2.78 3.35 3.58 4.3� 4.98 5.67 7.57 9.33 11.68 13.88 0.52 0.84 1.06 1.31 1.93 2.27 2.432.94 3.49 4.21 4.83 5.3fj:] 6.06 6.81 8.94 10.82 13.32 15.65 10 O.SS 0.92 1.17 ].b9 2.20 2.60 2.79 3.39 4.05 4.88 5.57 6.]] b.9t 7.70 10.02 11.95 14.58 17.00 2S 0.64 1.02 1.29 1.91 2.54 3.04 3.29 4.00 4.80 5.79 6.57 7.25 8.06 8-89 11.47 13.47 16.21 18.73 50 0.68 1.08 1.37 2.06 2.79 3.38 3.66 4.48 5.41 b.51 7.36 8.11 E6:]9.82 12.60 14.b2 17.45 20.04 100 0.71 1.14 1.44 2.20 3.03 3.71 4,04 4.97 6.02 7.25 8.15 8.98 9.89 10.76 13.74 1.5.75 18.65 21.29 200 0.75 1.18 1.49 2.32 3.26 4.03 4.42 5.46 6.66 8.02 8.47 4.88 10.84 11.70 14.90 16.88119.82122.50 500 0.78 1.24 1.56 2.4$ 3.56 4.45 4.92 6.12 7.53 9.06 10.08 11.10 12.12 12.98 16.46 18.36121.35 24.05 1000 0.81 1 1.27 1.59 12.58 1 3.77 4.77 5.31 6.63 8.20 9.88 10.96 12.06 13.13 i 3.98 17.67 19.50122.50 25.22 These precipitation freQuency estimates are based on a psrtiaf auratnn_ser_ies. ARI is the Average Recurrence interval. Please refer to NOR.4 N!a.* ,4 D3 cLrnent for more information- NOTE: Formattng forces estimates near zero to appear as zero. X Upper bound of the 90% confidence interval Precipitation Frequency Estimates (inches) AR1'x 5 jl� I5 30 60 120 3 6 12 24 48 4 7 ID 20 30 4�6D(years) min min min min min hr hr hr hr hr day day day day day day day 0 EE 0.66 0.82 1.12 1.40 1.63 177 47 2.12 2.52 2.98 3.46 3.88 4.46 5.07 b.76 KEI 10.43 12.41 0.49 0.78 0.98 FDT 1.70 1.98 F1 27 2.56 3.05 3.b0 F41-774.66 5.32 6.03 ?.98 9.77 12.19 14.44 0 0.57 0.93 1.15 1.64 2.10 2.47 2.64 3.21 3.8] 4.52 5.18 5.75 6.47 7.23 9.42 11.32 13.90 16.28 IO K6fl 1.00 1.27 1.83 2E EE 3.04 3.69 4.41 5.24 5.97 6.60 7.37 $.17 10.56 12.51 15.21 17.68 2S 0.69 1.10 1.40 2.07 2.75 3.30 3.57 4.35 5.22 6.21 7.04 7.76 8.60 9.43 1 12.09 14.09 16.9 t 19.49 5D 0.74 L 17 1.49 2.24 3.03 3.67 3.98 4.87 5.86 7.00 7.88 8.68 9.57 10.431 13.29 15.30 18.22120.87 100 0.78 1.24 1.55 2.34 3. 29 4.03 4.40 5.40 1 6.52 7.79 1 18.73 9.63 ]0.571 11.44 1451 16.511 19.49122.20 200 0.81 1 1.29 I l .63 2.54 1 3.56 EO] 4.82 15.94 7.21 1 8.62 1 9.62 ] 0.601 1 1.60 12.45 i 5.76 17.72 1 20.75 23.49 500 0.8611.3611.71 2.7213.9014.89 5.4016.6918.1519.75 110.83 11.92113.02113.84 17.44 19.31122.39125.16 1000 1 0.89 11.40 11.75 12.84 1 4.15 5.26 5.85 1 7.27 8.89 10.65 1 I L78 12.97 14.121 34.92 1$,75 20.561 23.63 126.42 'The uooer hound of the confidence inlprval at 96%rmnfidance level is the value which 5% of the simulated ouan0e values for a eiven freouencv are oreater than. - These precipitation frequency estimates are based on a partial duration series ARI is the Average Recurrence Interval_ Please refer 10 NOAH A!:as 14 Dorumer; for more information_ NOTE: Formatting prevents estimates near zero to appear as zero. x Lower bound of the 90% confidence interval Precipitation Frequency Estimates (inches) ART' 10 I� 30 60 120 3 6 I2 24 48 4 7 10 20 30 45 60 (years) min min min mi❑ mint min hr hr hr hr hr dfl� day day day day day day 0.35 0.56 0.70 0.95 i.19 ].38 1.48 1.79 12.13 12.59 3.01 13.4] 3.93 4.53 6.09 7.58 19.57 11.46 0 0.41 0.66 0.83 1.15 1.44 1.68 1.79 2.17 2.57 3.13 3.63 1 4.09 4.69 3.37 7.19 8.90 11.20 13.35 510 .77 0. .48 1 D98 1 1.39 1 2.09 2.24 2.71 3.92 .78 1 3.21 14.51 5.04 1 5.69 6.44 1 8.48 10.32112.771 35.04 10 Q.53 0.85 t.Q7 E.>j 2.0212.392.56 3.1113.71 4.54 VP97 5.77 16.48 1F72_719_497=401 13.961 1b.34 http:llhd sc.nws.noxa.govlcgi-binlhdsclbuildout.perl?type=pf&units=us&series=pd&statename=NORTH+C... 9/312009