HomeMy WebLinkAbout20161069 Ver 2_C505 12-21-18_20190108M
0
N
Q
O
U
0
J
O
U
E
C6
M
o�
rn
0
N
C
0
c
Lo
0
U
m
z
W
U
0
O
Cn
0
0
c�
U
1
N.T.S.
822
•
812
•
iii
2
N.T.S.
ids
Wet Pond Easement 1000
1 - N01006'114 E 224.96
2 - N21 26 52 E 97.23'_
°Wet Pond Easement 5 '
3 - N 14 10 54 W 165.65 r� - \
Q)
-
2 7 F \
6 98 S \
4 N80 43 02 E 104.44 \
\
5 - S090
17 04n E 485.38' �
\
6 - S800
42 58n W 129.40'
1 \
7 N88 53 46 W 51.46 � \ �
Emergency Spillway 7Q \ (P\ \
o
Access Easement / �� $1$- +++++++++++++ + \ \ \
+ + + �+ �+ �+ +y + +
+ + \
moi' +
1 - S56054'52"E 10.00' - �� - + ++++'++�
2 - N35053'00"W 111.85' t r—� . T + +'++++yam \ \
3 - N01 006'46"E 52.76' 20 +++++++++++ -�+ + + + + + + +
4S885355E55.22 +++++ +\ \ \
14 ++ N \ \
5 - SO °06'14"W 10.00' �1 $ // + + + ,� Cr (o N \
6 N88 53 46 W 42.76 14 - a + 00
+ +� CO CO \ \
7 S01006'114 W 50.23 ( / // \ + + � Z� g 8
8 - S35053'00"E 109.00' \ �/ / \ \ ` +++++ �+
Oe
6' wide Vegetated _ 5 \
--Shelf (3,200 SF) � 0£g O
N\
B44_ 7
c9., 3
10 Access Easement
I
(Approx. 2,150 SF)
1 �
Wet Pond Landscape & Easement Plan
Forebay
Wet Pond Schematic Cross Section
Top Temporary Pool Elev. 819.0
Emergency Spillway Elev. 819.0
6' Aquatic Bench 6:1 Top Permanent Pool Elev. 816.0
1'
Bottom Permanent Pool Elev. 810.0
* See C201 and C502 for Outlet Structure
and Outlet Pipe information
�8_1___� 8
� ,2
$3(o
Top of berm
elev. = 820.0
3
1
NOTE:
1. La IS THE LENGTH OF THE RIPRAP
APRON.
2. D = 1.5 TIMES THE MAXIMUM
STONE DIAMETER BUT NOT LESS
THAN 6".
3. IN A WELL—DEFINED CHANNEL
EXTEND THE APRON UP THE
CHANNEL BANKS TO AN
ELEVATION OF 6" ABOVE THE
MAXIMUM TAILWATER DEPTH OR TO
THE TOP OF THE BANK,
WHICHEVER IS LESS.
4. A FILTER BLANKET OR FILTER
FABRIC SHOULD BE INSTALLED
BETWEEN THE RIPRAP AND SOIL
FOUNDATION.
Weir crest
Elev. = 819.0
20'
Landscape Notes
1 - The dam structure, including front and back of
embankment slopes, of the pond shall be
vegetated with non -clumping fescue. Trees and
woody shrubs shall not be allowed.
2 - The Vegetated shelf shall be planted with a
minimum of three diverse species of herbaceous,
native vegetation at a minimum density of 50
plants per 200 SF of shelf area (3,200/200 =
16*50 = 800 plants). Use equal parts Joe-Pye
Weed, Swamp Milkweed and White Turtlehead.
3 - Trees and Shrubs may be planted outside of
the embankment slopes and can serve to shade
the wet pond, along the south, east and west
sides.
Install North American Green C-350
erosion control blanket from edge of basin
spillway to rip -rap at outlet headwall for
entire width of spillway as indicated.
Follow manufacturers installation _ 2'
instructions.
Emergency Spillway
Topsoil & seed prior to
installing erosion control
blanket
Bury end
1' deep
f
PIPE
D0
3Do
L
La
W
D
RIPRAP
dao SIZE
RIPRAP
MAX. SIZE
OS1 to HW1
18"
4.5'
18'
23'
1.5'
9"
11.5"
Plan
Section A -A
Rip -Rap Outlet Protection
APPROVED BY PURCHASER / TENANT
APPROVED BY DEVELOPER / SELLER
C
0
.Ln
0
a>
0
0
z
co
4_0
>
U
0
Q0 CNI
Q0 M
M co
U
LU
U)U)
oLu
U_ z
J z
U H
zw
U J 0c)
> N
x�
0 1,-
Z
(Y
o 00
o � a
Cnco
0
QU)
oz
-50
>�
0
C: C)
J M
CARS �
SEAL �.
03017
1
9AK5;
Drawn By
CDB
Checked
EJB
Approved
EJB
.lob No.
217045
N.T.S.
Scale
12-21-18
Date
O
U)
U
U
O
m
0)
z
.Q
�
0
=
O
VJ
N
o_
0
.Ln
0
a>
0
0
z
co
4_0
>
U
0
Q0 CNI
Q0 M
M co
U
LU
U)U)
oLu
U_ z
J z
U H
zw
U J 0c)
> N
x�
0 1,-
Z
(Y
o 00
o � a
Cnco
0
QU)
oz
-50
>�
0
C: C)
J M
CARS �
SEAL �.
03017
1
9AK5;
Drawn By
CDB
Checked
EJB
Approved
EJB
.lob No.
217045
N.T.S.
Scale
12-21-18
Date
DATE
DATE C505
Sheet No.