Loading...
HomeMy WebLinkAbout20161069 Ver 2_C501 6-19-17_20190108ti C) N �L 0_ O U 0 J C 0 U E Q O M ti r O N cr r C 0) O LO U C m 0) Z a� U O WE O Backfill proposed curb seed & mulch all 1 3/8" WASHER disturbed soil areas 3» W/ 1/2" STD. NUT .� 4" CRUSHER RUN STONE 64 WELDED TO PIN C: i 5" CONC. WALK �" M CIO Expansion joints are to be placed 25'(max) apart 18 `� 1 /2" MILD STEEL Q W/ 6X6 REINF. W.W.F I Face of curb 2 � � depending on transverse joint markings and the . ° PIN 1 /2" EXPANSION JOINT - I I—III— ° 1-1/2" asphaltic concrete surface need to match curb expansion joint where � 20' O.C. MAXIMUM �(SM) � � sidewalk is built directly against curb. =III=III / EXP. JT. FILLER —I I I=I 7.5° 1° o U ti z fv"=III=III I ° %� � CONC. WHEEL 3" Wide Smooth Trowel _ STOP AS MANUF. +-+ ° ° o —IIIIII—III ° � Finish (Typ.) 5'-0" ° °^ ° =III Tack coat 3 L — ° ° ° ° ° ° BY SOUTHERN Ln (TYp.) - I T I—I I �1If I I=I 6„ 6 ° ° ° ° C8'S 0"S LONG TONE U)� Control Joint _ _ _ =III Q +� V 1-1/2" base mix (Asphalt W z O —I ° 1 Concrete BM) _�/ � I i it ili iIiII =1 1111 I I1 11 111 11 I I1 11 I I o =11 11=11 11=1 1=1 I I=1—I 11=1 I 'il_i—IIII -III II 6" mineral aggregate base per 3/4" HOLE 1'-0" Curb Expansion Joint NCDOTStandards FROM EA. END = � Curb Expansion Joint/ Expansion Joint Medium Broom Compacted subgrade O Finish (Typ.) O PLAN L 2 Medium Duty Paving With Curb Wheel Stop N.T.S. N.T.S. Backfill proposed curb Q0 rn seed & mulch all 1/2" PREFORMED 6 CO 4" CRUSHER RUN disturbed soil areas EXP. JOINT FILLER 6" 6" I i , U W STONE BASE -V *k LU 5" CONC. WALK 4" CRUSHER RUN STONE SIDEWALK MACHINE FORMED > U) � 5" CONC. WALK CONCRETE CURB \ W 6x6 W1.4xW1.4 WWF Z W/ 6x6 REINF. W.W.F ° Face of curb ASPHALT BINDER _ 1-1/2" asphaltic concrete surface °. ° COURSE O J LU 1/2" -TOOLED JOINT.(SM) I III=III o ° ° P 11 1 \\ „ — = 7.5" °° ° ° ° COURSE FINISH Q W V Z w I I ° ° ° o Z� J J �, I=1 I=1 ° ° ` ° ° ° ° sub -BA E Q W O " J °° a ° ° =IIIIII—III ° ° ° > N Tack coat , ° a I J Q Q >< 6'� 6 LO =) Z ° 2-1/2" base mix (Asphalt =III= ° ° ° ° ° ° ° ° Y 4 ° Cri Concrete BM) I—I 14 _ ° — — �_: —� O W 11 11 11 11 1=111 11 111 11 11= iIIIIII=iii= =1 111 11 111 1III1 I1 I 1-111-1 =1 I I ==1 I ==1 11= =1 I I ==1 I I = AN p � a III I 1-- I=1 I I III I �I I—II 1:= I I I—II ;III—III—I I I—III I I I—III—III —III—I I I =1 I I—I I I=1 I I—I I I=1 I I—I I I=1 I I—I I I=1 I I—I _T_ —III=I �=III- 8 mineral aggregate base per —� �_�—�=1 I I—III=�-III-1—I l cn Control Joint NCDOT Standards p Compacted subgrade 0- (n O Z > Sidewalk Detail 3 Heav Dut Pavin with Curb 5 Machine Formed Concrete Curb o N.T.S. N.T.S. y y g N.T.S. Cl) ca o J M CONTROL JOINT 8" Concrete section see joint SEE DETAIL pattern detail 8" Concrete paving MATCH TOP ° ASPHALT FINISH 5" CONC. WALK OF EXIST PAVING m 4 4 ° ° ° W CURB ° ° •. 4 a 6x6 W1.4xW1.4 WWF 6"t BINDER LAYER ° 0 c) ° 0 C)o O.D. 0 O0 � O 6 Mineral aggregate base per ° ° 40 STONE BASE NCDOTStandards ° ° Contraction X11=1 1=11� FF M 6 CRUSHER RUN 0 O o o O O X 16' Max. ° 4 4 °°4 ° joint (Typ.) * SELECT MATERIAL IIII IIII * ALL UTILITY AND STORM DRAIN -- a� COMPACTED TO 95% TRENCHES LOCATED UNDER AREAS ° SECTION ° ° ° STD. PROCTOR IIII IIII IT TO RECEIVE PAVING SHALL BE 4-1 (o4. 8" MIN. COMPLETELY BACKFILLED WITH ° Concrete 3'-0" V-0" Asphalt ° 9 CRUSHED STONE BASE MATERIALS Q AS SPECIFIED UNDER PAVING, 4 ° ° Notes: O' PLACED IN 8" LIFTS COMPACTED ° - 4 d - ° All contraction joints shall be sawed to 1/3 slab thickness. Joints at building and retaining \ TO 95% STANDARD PROCTOR O �r/^� bo ° ° 0 oo 0 0 0 0o O 1 g g 0.5 O.D. 4— C) VJ ° © 00 0 00 0 DENSITY. .2- 00,01,1 I IIIIIII=III I I 4 ° ° ° 4°. 0 0 0U_ 0 00o o0 0 00 walls shall be expansion joints. Construction joints shall be thickened edge joints or shall be ill o U =III=III= 1=III=III= ° ° -O o 0 00 00 00 0 00 Oo doweled with 1"0 plain smooth dowel bars 18" long each placed at 12" O.C. The exposed 1—I 6 MIN. v, =III=III=III=III III ° ° ° co 0 61(�100 O�O000 0 0 0 �O o O .o 0 0 0 0 00 00 end of the dowel bar shall be greased prior to placement of new concrete. it I 1=I I I=I I I=111=1'' 0 O O Q CRUSHED—/0' X00 0 0000 �0 00 00 Unless otherwise shown on joint layout plan. IIIIIIIIIII—III III III—III —III=IIIIII—III STONE =:d Ed I —III—I I —I I—III—I I—III— I—III—III—I I I— Construct thickened edge at cc I I—III—III—III—III III III—III III III—III—III—III transition 3" 6" 1 - #5 REBAR CONCRETE/ASPHALT TRANSITION JOINT PATTERN DETAIL 6 Integral Curb/Sidewalk 7 g Concrete Paving Detail 8 Storm Sewer Bedding N.T.S. N.T.S. N.T.S. o N a� M 0 Z ViCAR a � �EAL4 Drawn By CDB Checked EJB Approved EJB Job No. 217045 N.T.S. 5-19-17 Scale Date APPROVED BY PURCHASER / TENANT DATE APPROVED BY DEVELOPER / SELLER DATE C501 Sheet No.