Loading...
HomeMy WebLinkAbout310229_Inspection_20190218-lu Division of Water Resources ' Facility 'N' Amber � -� O Division of Soil and Water Conservation, O Other Agency Type of Visit: Compli Inspection Operation Review O Structure Evaluation O Technical Assistance Reason for Visit: O outine O Complaint O Follow-up O Referral O Emergency O Other O Denied Access Date of Visit: %� r Arrival Time: 3 o Departure Time: (p County: Region: Farm Name: Owner Email: Owner Name: Phone: Mailing Address: Physical Address: Facility Contact: Title: Phone: Onsite Representative: - e �e G ( o Integrator: Certified Operator: Certification Number: 9 / r, Z Back-up Operator: Certification Number: Location of Farm: Latitude: Longitude: Design Current Swine -Capacity Pop. Wea to Finish can to Feeder Feeder to Finish Farrow to Wean Farrow to Feeder Farrow to Finish Gilts Boars Other Other Design Current Wet Poultry Capacity Pop. La er Non -La er Design Current Dry Poultry Canacitv Pon. Layers Non -Layers Pullets Turkeys Turkey Poults Other Discharges and Stream Impacts 1. Is any discharge observed from any part of the operation? Discharge originated at: ❑ Structure ❑ Application Field ❑ Other: a. Was the conveyance man-made? b. Did the discharge reach waters of the State? (If yes, notify DWR) c. What is the estimated volume that reached waters of the State (gallons)? d. Does the discharge bypass the waste management system? (If yes, notify DWR) 2. Is there evidence of a past discharge from any part of the operation? 3. Were there any observable adverse impacts or potential adverse impacts to the waters of the State other than from a discharge? Design 'Current Cattle Capacity Pop. Dairy Cow Dairy Calf Dairy Heifer Dry Cow .Non -Dairy Beef Stocker Beef Feeder Beef Brood Cow e ❑ Yes [�o ❑ NA ❑ NE ❑ Yes ❑ No ❑ NA ❑ NE ❑ Yes ❑ No ❑ NA ❑ NE ❑ Yes []No ❑ NA ❑ NE ❑ Yes A�o[F:_] ❑ NE ❑Yes NA ❑ NE Page I of 3 21412015 Continued Facili Number: jDate of inspection: Waste Collection & Treatment 4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? ❑ Yes 0 No ❑ NA ❑ NE a. If yes, is waste level into the structural freeboard? Structure 1 Identifier: Spillway?: Designed Freeboard (in): Observed Freeboard (in):� Structure 2 Structure 3 Structure 4 5. Are there any immediate threats to the integrity of any of the structures observed? (i.e., large trees, severe erosion, seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed through a waste management or closure plan? ❑ Yes ❑ No ❑ NA ❑ NE Structure 5 Structure 6 ❑ Yes EP K6 ❑ NA ❑ NE ❑ Yes ff No ❑ NA ❑ NE If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmental threat, notify DWR 7. Do any of the structures need maintenance or improvement? ❑ Yes io NA ❑ NE 8. Do any of the structures lack adequate markers as required by the permit? ❑ Yes o ❑ NA ❑ NE (not applicable to roofed pits, dry stacks, and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require [:]Yes F_1,1F;0 NA ❑ NE maintenance or improvement? Waste Application 10. Are there any required buffers, setbacks, or compliance alternatives that need ❑ Yes o ❑ NA ❑ NE maintenance or improvement? 11. Is there evidence of incorrect land application? If yes, check the appropriate box below. ❑ Yes �No[] NA ❑ NE ❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.) ❑ PAN ❑ PAN > 10% or 10 lbs. ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑ Application Outside of Approved Area 12. Crop Type(s): 13. Soil Type(s): 14. Do the receiving crops differ from those designated in the CAWMP? ❑ Yes ❑,Pd� ❑ NA ❑ NE 15. Does the receiving crop and/or land application site need improvement? ❑ Yes N NA ❑ NE 16. Did the facili fail to secure and/or o erate per the irrigation design or wettable facility P ❑ Yes �No❑ NA ❑ NE acres determination? 17. Does the facility lack adequate acreage for land application? ❑ Yes ❑ NA ❑ NE 18. Is there a lack of properly operating waste application equipment? ❑ Yes EfNo ❑ NA ❑ NE Required Records & Documents 19. Did the facility fail to have the Certificate of Coverage & Permit readily available? ❑ Yes ❑ No ❑ NA ❑ NE 20. Does the facility fail to have all components of the CAWMP readily available? If yes, check ❑ Yes rNo❑ NA ❑ NE the appropriate box. ❑ WUP ❑ Checklists ❑ Design ❑ Maps ❑ Lease Agreements ❑ Other: 21. Does record keeping need improvement? If yes, check the appropriate box below. ❑ Yes No, ❑ NA ❑ NE ❑ Waste Application ❑ Weekly Freeboard ❑ Waste Analysis ❑ Soil Analysis ❑ Waste Transfers ❑ Weather Code ❑ Rainfall ❑ Stocking ❑ Crop Yield ❑ 120 Minute Inspections ❑ Monthly and 1" Rainfall Inspections ❑ Sludge Survey 22. Did the facility fail to install and maintain a rain gauge? ❑ Yes ❑N,o�❑ NA ❑ NE 23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes ❑ No ❑ NAEr-NE Page 2 of 3 21412015 Continued Facili Number: jDate of Inspection: 24. Did the facility fail to calibrate waste application equipment as required by the permit? ❑ Yes El No ❑ NA ❑ NE 25. Is the facility out of compliance with permit conditions related to sludge? If yes, check ❑ Yes ❑-N�6_0 NA ❑ NE the appropriate box(es) below. ❑ Failure to complete annual sludge survey ❑ Failure to develop a POA for sludge levels ❑ Non -compliant sludge levels in any lagoon List structure(s) and date of first survey indicating non-compliance: 26. Did the facility fail provide documentation of an actively certified operator in charge? ❑ Yes 0- TTo - ❑ NA ❑ NE 27. Did the facility fail to secure a phosphorus loss assessments (PLAT) certification? ❑ Yes ❑ No NA ❑ NE Other Issues 28. Did the facility fail to properly dispose of dead animals with 24 hours and/or document ❑ Yes No ❑ NA ❑ NE and report mortality rates that were higher than normal? 29. At the time of the inspection did the facility pose an odor or air quality concern? ❑ Yes E]-No ❑ NA ❑ NE If yes, contact a regional Air Quality representative immediately. 30. Did the facility fail to notify the Regional Office of emergency situations as required by the ❑ Yes No ❑ NA ❑ NE permit? (i.e., discharge, freeboard problems, over -application) 31. Do subsurface tile drains exist at the facility? If yes, check the appropriate box below. ❑ Yes ❑ No ❑ NA ❑ Application Field ❑ Lagoon/Storage Pond ❑ Other: 32. Were any additional problems noted which cause non-compliance of the permit or CAWMP? ❑ Yes No ❑ NA ❑ NE 33. Did the Reviewer/Inspector fail to discuss review/inspection with an on -site representative? ❑ Yes No NA ❑ NE 34. Does the facility require a follow-up visit by the same agency? ❑ Yes io ❑ NA NE Cgmm�nts(refer to,question #);Explain°anyYES,�an"savers and/nr".``a�y:additional �ecoinmeridafious or -:any otiter'cornnaents.°�� aa. `", Use=d`rawggs offae ty g eacplaiu situahons:(iise'additional, a es`as necessa� } ;"�' ilito b. tier. g rY)� �;: Reviewer/Inspector Name: U r'_ �p '�-- Reviewer/Inspector Signature: Page 3 of 3 Phone: 1(0 7 (6 7 3�'Y Date: 2 fiv 21412015