HomeMy WebLinkAbout19940274 Ver 1_COMPLETE FILE_19940107State of North Carolina jMK X;WA
Department of Environment,
Health and Natural Resources 4 A*9
Division of Environmental Management
A00% 00w4ftwooft
James B. Hunt, Jr., Governor
Jonathan B. Howes, Secretary C) E H N F?
A. Preston Howard, Jr., P.E., Director
May 13, 1993
Coastal Times
P.O. Box 400
Manteo, N.C. 27954
ATTN: Legal Ad Department
Dear Sir:
SUBJECT: Public Notice
. Please publish the attached Public Notice one time in the
section set aside for Legal Advertisements in your newspaper.
The publication should run on or before May 24, 1994. Please
send the invoice for publication and three copies of the
affidavit of publication to the address given below. Payment
cannot be processed without the affidavit of publication.
N.C. Division of Environmental Management
Water Quality Section
Post Office 29535
Raleigh, North Carolina 27626-0535
Attn: John Dorney
If you have any questions concerning this matter, please call
John Dorney at 919/733-1786.
Sincerely,
q
Jo n Dorney
We lands Technic 1 Review Group
94274.pub
cc: John Dorney
Washington DEM Regional Office
P.O. Box 29535, Raleigh, North Carolina 27626-0535 Telephone 919-733-7015 FAX 919-733-2496
An Equal Opportunity Affirmative Action Employer 50% recycled/ I Q% post-consumer paper
NORTH CAROLINA DIVISION OF ENVIRONMENTAL
MANAGEMENT
PUBLIC NOTICE is hereby given that US Army Corps of Engineers,
North Carolina, has applied to the North Carolina Division of
Environmental Management for a Water Quality Certification pursuant
to Section 401 of the Federal Clean Water Act and Environmental
Management Commission rules in 15A NCAC 2H .0500 and 15A NCAC 2B
.0109. The activity for which the certification is sought is
control shoreline erosion at North Carolina Aquarium, in Manteo in
Dare County.
The public is invited to comment on the above mentioned
application to the Division of Environmental Management.
Comments shall be in writing and shall be received by the
Division no later than June 10, 1994. Comments should be sent
to N.C. Division of Environmental Management, Water Quality
Planning, Post Office Box 29535, Raleigh, North Carolina
27626-0535, Attention: John Dorney. A copy.of the application
is on file at the Division office at 1424 Carolina Avenue,
Washington, North Carolina 27889 (Washington Regional Office (919)
946-6481; Fax # 919-975-3716) during normal business hours and may
be inspected by the public.
. *"r,
r
eston Howa Jr.
Director
N.C. Division of
Environmental Management
DATE: May 13, 1994
State of North Carolina
Department of Environment,
Health and Natural Resources
Division of Coastal Management
James B. Hunt, Jr., Governor
Jonathan B. Howes, Secretary
Ms. Deborah Sawyer
NC DEH&NR
Div. Environmental Management
P.O. Box 1507
Washington, NC 27889
CHEHNR
REFERENCE: DCM94-08 County: Dare
Applicant/Sponsor: U.S. Army Corps of Engineers
DPR/EA Emergency Shoreline Erosion Protection, NC Aquarium, Manteo
Dear Ms. Sawyer:
The attached Consistency Determination, dated 02/01/94
describing a proposed Federal Activity is being circulated to
State agencies for comments concerning the proposal's consistency
with the North Carolina Coastal Management Program.
Please indicate your viewpoint on the proposal and return this
form to me before 04/01/94
Ie ly ,
n B. enton
Consistency Coordinator
REPLY This office objects to the project as proposed.
IComments o this_proji are ttac.
t/ This office p ooposal.
No comment.
Signed
Date l?
Agency - lc)Q _ !tea
P.O. Box 27687, Raleigh, North Carolina 27611-7687 Telephone 919-733-2293 FAX 919-733-1495
An Equal opportunity Affirmative Action Employer 50% recycled/ 10% post-consumer paper
State ofi North Carolina
Department of Environment,
ATWMA
Health and Natural Resources / •
Division of Coastal Management
James B. Hunt, Governor E:) F= H N F1
Jonathan B. Howes, Secretory
Roger N. Schecter, Director
RECE. IV ED
WR,SNINGTC)N OFFICE
MAR 0 7 1994
March 4, 1994
is
MEMORANDUM
TO: Mr. A. Preston Howard, Director
Division of Environmental Management
FROM: John R. Parker, Jr.
Major Permits Processing Coordinator
SUBJECT: CAMA/DREDGE & FILL Permit Application Review
Applicant: NC Wildlife Resources Commission; CAMA Permit #6-92
Project Location: West end and south side of Washington Baum Bridge, Roanoke Sound,
Manteo, Dare County
Proposed Project: To modify CAMA Permit #6-92 to extend an existing dock by 30 feet
and add at a right angle a 113 foot fishing pier with widths of 8
feet and 12 feet and a 12 ft. x 57 ft. "T" end. Also, additional
single car parking will be provided.
Please indicate below your agency's position or viewpoint on the proposed project and
return this form by March 25, 1994. If you have any questions regarding the proposed
project, please contact Pete Colwell at (919) 264-3901. When appropriate,.in-depth
comments with supportijig data is requested.
REPLY - This agency has no objection to the project as proposed..
This agency has no comment on the proposed project.
This agency approves of the project only if the recommended changes
are incorporated. See attached.
This agency objects to the project for reasons described in the
attached comments.
Signe t) , Date
1367 U.S. 17 South, Elizabeth City, North Carolina 27909 Telephone 919-264-3901 FAX 919-246-3723
An Equal Opportunity Affirmative Action Employer 50%recycled/10% post-consumer paper
?r
To: Jo Do"ey
P1a nink Branch
DIVISION OF ENVIRONMENTAL MANAGEMENT
CAMA/COE PERMIT APPLICATION REVIEW
r MAY 9199
e
WaRO PROJECT If WQ SUPERVISOR: THOJ[P&
REVIEWER: SAWYER DATE: 6-7311 t,L
WLEIT AND INFORMATION FOR CENTRAL OFFICE TRACKING
PERMIT YR: 92 PERMIT NO.: COUNTY: CLO
PROJECT NAME: 14 e- W FZC
PROJECT TYPE: u PERMIT TYPE: (4;PCOE
COE #: DOT #:
?
RCD FROM CDA: ?iip DATE FROM CDA: 3 /7
REG OFFICE: WaRO RIVER S BASIN #: N
STREAM OR ADJACENT WATER BODY:Ip s
CLASS: S& STREAM INDEX #: 3 (J -?
OPEN OR CLOSED:
WL IMPACT: /) WL TYPE:
WL REQUESTED: WL ACR EST:
HYDRO CNECT?: WL SCORE:
MITIGATION: MITIGATION TYPE:
MITIGATION SIZE: G SHEET ATTACHED?
RECOMMENDATION:. ISSUE ISSUE/COND DENY HOLD
STORMWATER PLAN REQ'D: IF YES, DATE APPROVED: 'Ceu?a?
PROJECT DESCRIPTIQN:
?p
WATER QUALITY CERT. 401
CERT. REQ'D:
IF YES, TYPE:
SEWAGE DISPOSAL
TYPE OF DISPOSAL PROPOSED:
(EXISTING, PROPOSED, SEPTIC TANK ETC.)
TO BE PERMITTED BY:
(DEM, DHS, COUNTY)
IF BY DEM, IS SITE AVAILABLE AND PERMIT ISSUANCE PROBABLE:
WATER/WETLAND FILL
AREA OF FILL: WATER: -? ^ WETLAND: --U-
IS FILL ELIMINATING A SIGNIFICANT USE?
DREDGING
l/
AREA TO BE DREDGED: L! ? o-lp
IS DREDGING ACTIVITY EXPECTED TO CAUSE-A SIGNIFICANT LOSS OF
RESOURCE?
IS SPOIL DISPOSAL ADEQUATELY ADDRESSED?
MARINA Y14
ARE THE FOLLOWING ADEQUATELY ADDRESSED? ,?'J?
SEWAGE DISPOSAL: MARINA SERVICES:
OXYGEN IN BASIN: CLOSURE OF SHELLFISHING WATERS:
CC: WARD; Central Files; DCM Field Offices; COE Washington office
DIVISION OF ENVIRpNM TA?, MANAGEMENT
MEMORANDUM
j TO: Bill Moore, Environmental Engineer
Water Quality Section, WaRO
FROM: Deborah Sawyer, Environmental Technician
Water Quality Section, WaRO
SUBJECT: Dredge and Fill Reviews on Hold for Stormwater Review
Project: PV
Project No.:
(!E?- fft
DFatte/ Receive
F. Date Comment:
Description of Project:
Comments:
1.
2.
3.
4.
5.
DIVISION OF COASTAL MANAGEMENT
FIELD INVESTIGATION REPORT
APPLICANT'S NAME: N.C. Wildlife Resources Commission; CAMA Permit #6-92
LOCATION OF PROJECT SITE: West end and south side of Washington Baum Bridge, Roanoke
Sound, Manteo, Dare County.
Photo Index - 1989: 51-8; K-15, 16 1984: 140-503; G-15,16
State Plane Coordinates - X: 2995800 Y: 797200
INVESTIGATION TYPE: CAMA
INVESTIGATIVE PROCEDURE: Dates of Site Visit - 2/94 02/28/94
Was Applicant Present - Yes No
PROCESSING PROCEDURE: Application Received - February 28, 1994
Office - Elizabeth City
6. SITE DESCRIPTION:
(A) Local Land Use Plan - Dare County
Land Classification From LUP - Conservation
(B) AEC(s) Involved: PT, EW
(C) Water Dependent: Yes
(D) Intended Use: Public
(E) Wastewater Treatment: Existing - None
Planned -None
(F) Type of Structures: Existing - Three ramp boat launching facility with associated finger piers
and parking.
Planned - Fishing Pier
(G) Estimated Annual Rate of Erosion: N/A
Source - Applicant
7. HABITAT DESCRIPTION:
[AREA]
VILLbV U I HM
(A) Vegetated Wetlands
(B) Non-Vegetated Wetlands
(C) Other
Public Trust Waters
Shaded
2,034 square feet
(D) Total Area Disturbed: 2,034 square feet (.05 acre)
(E) Primary Nursery Area: No
(F) Water Classification: SA Open: No
8. PROJECT SUMMARY: Applicant proposes to modify CAMA Permit #6-92 to extend an existing
dock by 30 feet and add at a right angle a 113 foot fishing pier with widths of 8 feet and 12 feet and
a 12 ft. x 57 ft. "T" end. Also, additional single car parking will be provided.
NC WRC Modification of CAMA Permit #6-92
Bio Report
Page Two
Site Description
The N.C. Wildlife Resources Commission has proposed to modify its existing CAMA
Permit #6-92 to add a public fishing pier at its Washington Baum Bridge boating access area off
US 64/264, in Dare County. Under CAMA Permit #6-92 the WRC has constructed a three
ramp launching facility by digging out the existing upland point and adding finger piers and
decks along the sides. An asphalt parking area was constructed to accommodate 63 vehicles
with trailers.
Water depths in Roanoke Sound around the project area are 6 to 8 feet deep. The
federally maintained Manteo to Wanchese channel passes approximately 400 feet offshore from
the boat ramp facility. This channel is heavily used during the summer fishing season with boat
traffic out of Manteo and out of neighboring Pirates Cove Marina just to the north. The waters
in the project area are classified as SA closed.
The applicant proposes to construct a 125 foot long fishing pier parallel to shore,
extending under the bridge. An 8 ft. x 30 ft. extension will be added onto the existing dock on
the north side of the boat ramps. The proposed fishing pier will then extend north under the
bridge from the dock addition. This places the pier equidistant between two bridge bents. The
pier will consist of an 8 ft. x 63 ft. section, a 12 ft. x 50.5 ft. section, and a 12 ft. x 57 ft. "T"
end on the north side of the bridge. The pier will slope up from 4 feet above NWL to 7 feet
above NWL on the 12 foot wide section. The pier will provide pedestrian and handicap access
for recreational fishing. A guardrail will be constructed around the perimeter of the pier and
lighting will be installed. The pier is not to be used for dockage by boaters. The height of the
pier and the guardrail should discourage most boaters from using it. The applicant also proposes
to convert the nearest trailer parking area under the bridge into single vehicle parking for the
pier users. The ten new spaces will add another 1,980 square feet of asphalt to the parking area.
This additional parking will be located approximately 105 feet from the bulkhead and out of the
Estuarine Shoreline AEC.
Anticipated Impacts
The proposed pier will shade and occupy approximately 2,034 square feet of Estuarine
and Public Trust Waters. The location of the pier under the bridge should not significantly
interfere with navigation or use of Public Trust Waters behind the pier. The pier will provide
an opportunity for the public, including the handicapped, to participate in recreational fishing
without using a boat.
CAMA Review
The project is located in a Conservation Area identified in the Dare county LUP. A full
consistency review by Steve Gabriel will follow.
Submitted by: Peter B. Colwell
Date: March 3, 1994
Please type or print. Carefully describe all anticipated a
development activities, including construction, excava4vm 2
tion, filling, paving, land clearing, and stormwater con- r'_,a you plan to build a marina, also complete and
trol. If the requested information is not relevant to your s,,.owtl attach Form DCM-MP-2.
project, write N/A (not applicable). Items 1-4 and 8-9
must be completed for all projects. b.
1 APPLICANT
a. Name NC Wildlife Res. Comm
Div. of Boating & Fisheries
Address F,12 N_ Salisbarcy St. , Areh4le
City Raleigh State NC
Zip_27604- - Day phone
1188
Landowner or
919/733-3633
Authorized agent
b. Project name (if any)WRC-Roanoke Island
Boat Launch Facility
c. If the applicant is not the landowner, also give the
owner's name and address.
C.
Is the proposed activity maintenance of an
existing project, new work, or both?
Modification of existing project.
Re: State Permit 6-92
Will the project be for community, private, or
commercial use?
Public use
Btdy.
d. Describe the planned use of the project.
Public recreational access
4 LAND AND WATER
CHARACTERISTICS
a. Size of entire tract 4 ac
b. Size of individual lot(s) N/A
c. Elevation of tract above mean sea level or
National Geodetic Vertical Datum
2 LOCATION OF PROPOSED - .± 5'
PROJECT d. Soil type(s) and texture(s) of tract
Fill
a. Street address or secondary road number
U. S. 64 - 264 e. Vegetation on tract PC.,,
b. City, town, community, or landmark
Rnanr kQ Island f.
c. County
Dare
d. Is proposed work within city limits or planning
jurisdiction? Yes
e. Dime of ?odySpf watder nearest pro ject
oano e oun
3 DESCRIPTION AND PLANNED USE
OF PROPOSED PROJECT
a.
9.
Man-made features now on tract 3 boat ramps,
4 docks & parking
What is the CAMA Land Use Plan Classification of
the site? (Consult the local land use plan.)
X Conservation Transitional
Developed Community
Rural Other
h. How is the tract zoned by local government?
S-1
i. How are adjacent waters classified?
SA
Describe all development activities you propose (for j, Has a professional archaeological survey been
example, building a home, motel, marina, bulkhead, carried out for the tract? No If so, by whom?
or pier). Dock extension, pier, additional
parking.
3/91
5 UPLAND DEVELOPMENT
Complete this section if the project includes any land
development.
a. Type and number of t uildings, fac s, or
st ni ttlres prop?sed ppr K. 91*18 sq yds
ad itibn?l pavemen
b. Number of lots or parcels N/A
c. Density (Give the number of residential units and the
units per acre.) m/ A
d. Size of area to be graded or disturbed
Approx. 220 sq yds
e. If the proposed project will disturb more than one
acre of land, the Division of Land Resources must
receive an erosion and sedimentation control plan'at
least 30 days before land disturbing activity begins.
If applicable, has a sedimentation and erosion
control plan beesubmitted to the Division of Land
Resources? 142A
f. Give the percentage of the tract within 75 feet of
mean high water to be covered by impermeable
surfaces, such as pavement, buildings, rooftops.
Negligible
g. List the materials, such as marl, paver stone, asphalt,
or concrete, to be used for paved surfaces.
Asphalt
h. If applicable, has a stotmwater management plan
been submitted to the Division of Environmental
Management? N/A
i. Describe proposed sewage disposal and/or waste
water treatment facilities.
- N.1 A
j. Have these facilities received state or local approval?
N/A
k. Describe existing treatment facilities.
1. Describe location and type of discharges to waters of
the state (for example, surface runoff, sanitary
wastewater, industrial/commercial effluent, "wash
down"). N/A
m. Water supply source N/A
n. If the project is oceanfront development, describe
the steps that will be taken to maintain established
public beach accesswayy Rrovide new access.
o. If the project is on the oceanfront, what will be the
elevation above mean sea level of the first habitable
floor?_ --
6 EXCAVATION AND FILL
INFORMATION
a. Describe below the purpose of proposed excavation
or fill activities (excluding bulkheads, which are
covered in Section 7).
Length Width Depth
Access channel
(NILW) or (NWL)
Boat basin
Other (break-
water, pier,
boat ramp,
rock jetty)
Fill placed in
wetland or below
MHW
Upland fill
areas
b. Amount of material to be excavated from below
_
water level in cubic yards N/A
c. Typeofmaterial N/A
d. Does the area to be excavated include marshland,
swamps, or other wetlands? N /A
e. High ground excavation, in cubic yards
t)
la
2 3/91
f. Dimensions of spoil disposal area
N/A
g. Location of spoil disposal area
N/A
h. Do you claim title to the disposal area?
If not, attach a letter granting permission from the
owner.
Will a disposal area be available for future
maintenance? N/A
If so, where?
j. Does the disposal area include any marshland,
swamps, or water areas?
N/A
k. Will the fill material be placed below mean high
water? NIA
1. Amount of fill in cubic yards N/A
m. Type of fill material N/A
n. Source of fill material N/A
o. Will fill material be placed on marsh or other
wetlands? _ NIA
p. Dimensions of the wetland to be filled
N/A
q. How will excavated or fill material be kept on site
and erosion controlled? N/A
r. What type of construction equipment will be used
(for example, dragline, backhoe, or hydraulic
dredge)? Paving equipment, pile
driver
s. Will wetlands be crossed in transporting equipment
to project site? _Nr, If yes, explain steps that will
be taken to lessen environmental impacts.
7 SHORELINE STABILIZATION
a. Length of bulkhead or riprap N/A
b. Average distance waterward of mean high water or
normal water level N/A
c. Shore?nf Aerosion during preceding 12 months, in
feet
d. Type of bulkhead material N/A
e. Amount of fill, in cubs yrds, to be placed below
mean high water 1
f. Type of fill material _N/A
8 ADDITIONAL INFORMATION
In addition to the completed application form, the follow-
ing items must be submitted:
A copy of the deed (with state application only) or other
instrument under which the applicant claims title to the
affected property. If the applicant is not claiming to be
the owner of said property, then forward a copy of the
deed or other instrument under which the owner claims
title, plus written permission from the owner to carry out
the project.
An accurate work plat (including plan view and cross
sectional drawings) drawn to scale in black ink on an 8
1/2 x 11 white paper. (Refer to Coastal Resources
Commission Rule 7J.0203 for a detailed description.)
Please note that original drawings are preferred and
only high quality copies will be accepted. Blue-line
prints or other larger plats are acceptable only if 18 high
quality copies are provided by applicant. (Contact the
U.S. Army Corps of Engineers regarding that agency's
use of larger drawings.) A site or location map is a part
of plat requirements and it must be sufficiently detailed
to guide agency personnel unfamiliar with the area to the
site. Include county road (SR) numbers, landmarks, and
the like.
A stormwater management plan, if applicable, that
may have been developed in consultation with the
Division of Environmental Management.
A list of the names and complete addresses of the
adjacent waterfront (riparian) landowners. These
individuals have 30 days in which to submit comments
on the proposed project to the Division of Coastal
Management and should be advisFd•by the applicant of
that opportunity.
40
3/91
Name Mr. Kermit Skinner
Address ' Town of Manteo
P. o. Box 246
Manteo, NC 27954
Name
Address
Name
Address
A list of previous state or federal permits issued for
work on the project tract. Include permit numbers,
permittee, and issuing dates.
State Permit #6-92
A check for $250 made payable to the Department of
Environment , Health, and Natural Resources to cover
the costs of processing the application.
A signed AEC hazard notice for projects in oceanfront
and inlet areas.
A statement on the use of public funds. If the project
involves the expenditure of public funds, attach a state-
ment documenting compliance with the North Carolina
Environmental Policy Act (N.C.G.S. 113A-1 to 10).
9 CERTIFICATION AND PERMISSION
TO ENTER ON LAND
Any permit issued in response to this application will
allow only the development described in the application.
The project will be subject to conditions and restrictions
contained in the permit.
I certify that to the best of my knowledge, the proposed
activity complies with the State of North Carolina's ap-
proved Coastal Management Program and will be con-
ducted in a manner consistent with such program.
I further certify that I am authorized to grant, and do in
fact, grant permission to representatives of state and
federal review agencies to enter on the aforementioned
lands in connection with evaluating information related
to this permit application and follow-up monitoring of
project.
This is the 25 day of February-__, 19.9 4
X
ent
Landowner or Authorize fli,
4 3/91
jijy
? ? I I
-m of 1
f O
i
o
0 1 I 1
I
N I I \\ \\ I 1
? C"? < 3 = 1 \\\ I 1
O I \ \ I ail C
X300 _j j \\? i ?I Fl.e'?
°c ;'
O3?? 1 i o oI ;I
? 1 I 11
a ° C ?' L. ---- - I-- JI
- I I
C7 I
cn
R C1? ?° Do I I I
I D S Ao I I I
I I
cn A D? ?o I I f
O r vv 1 ?
'? n ° 0 1 0 p l
O °A --------------
t17 C D > -?•-+- I
c Z
rrnn° MW I
O (n n o
??, m0 n n a
z ^' v -u I N
?= I DI I N >o
p o I I
Z.P. I z Z f vvo
X y I - I o orn
m;? I I D nm
I A
S oo I z0 I K o vA
f I f0 I m mD
M m oo Cg---- W N -.? m
0
T W I C I n
C? o I C I °
?7 f
Fn CD
D i 0 C7
x I C) I 0
? ? I rn I
A - -?-
r--
t o p l t
(n CD 1
z 1 I I1
U)-, m 1 j f 1 D
Ci
1 rv 1 Q
1 I I ?--r-,
° 1 i I G,1
1 I I S? 1
I
41. IM
o ? ? Z
d
W
g ? I? N
N P? PH D?A
C) po Cz p oz R
°0
v?
P9
o 8
zn
on <
n ?
D
cJ z
O p \t ?
o
?o
Q
09
C Pq8
D D
? p
cn C4
I
4
m
N
D
r
s
v
.p N
0
N N
N
O_
P
U
W
W
o
0 S? ? O
Fi
n
A
D
y
x z O
-{
t
D
ui
:
.?
3
D z
co P
Cy!
A o
d rtl
Z
D D
O
n^
?
tmj ' ffi
?:d D
50 0
t? d D
? O D o0 00
-,
tx7 C ?/ ? s r
-i ?
1
?
cn ? '
O
a
D
C
N LX
-(
c •-•
co
4
(7
fl,
N U
r
N
fTl
D
ED
f'q
I
is
o I
I : ? ?I
N ?I
Z
c
I
?
I
N ` r r
C'DD
E
I LJ
I
I O O
I
N
Z .???D?
R
it
CDfqg --'z
I
g I
I
:\:
n
??DOOr? ? I ?? I I \\\ I
N2
I o
I
l
o
CA o o
L -- - --J L -- - ---?
i
onnn
yns,
x zo
03
3 z
? 3 D
d?-70 R
O C--) c?
cn
n
? D D
O ?
O
t? C
c z
O
U2
cn
ol
State f tVorth Carolina
Depar, &nt of Environment,
Health nd Natural Resources
Division. Environmental Management
James B. Fi t, Jr., Governor
Jonathan B. Howes, Secretary
A. Preston Howard, Jr., P.E., Director
April 18, 1994
MEMO
To: John Parker
From: John Dorne-yRe: Modification of CAMA teermit
Wildlife Resources Commission-
Roanoke Island Boat Ramp
Dare County
DEM #94274
.DEM has
Permit #6-92
pier and add
questions.
cc washing
Central
00%4 00ftft
E:) FE F=1
no objections to the proposed.modification to CAMA
to allow to extend an existing dock, and a fishing
car parking. Please advise if you have any
:on DEM Regional Office
Files
P.O. Box 29535, Raleigh, North Carolina 27626-0535 Telephone 919-733-7015 FAX 919-733-2496
An Equal Opportunity Affirmative Action Employer 5096 recycled/ 10% post-consumer paper
DIVISION OF COASTAL MANAGEMENT
FIELD INVESTIGATION REPORT
1. APPLICANT'S NAME: N.C. Wildlife Resources Commission; CAMA Permit #l6-92
2. LOCATION OF PROJECT SITE: West end and south side of Washington Baum Bridge, Roanoke
Sound, Manteo, Dare County.
Photo Index - 1989: 51-8; K-15, 16 1984: 140-503; G-15,16
3 State Plane Coordinates - X: 2995800 Y: 797200
CAMA
INVESTIGATION TYPE
i
MAR 1
. : 71994
4. INVESTIGATIVE PROCEDURE: Dates of Site Visit - 2/94 02/28/94 j WETLADS i:'
- Was Applicant Present - Yes No WATER l!M
5. PROCESSING PROCEDURE: Application Received - February 28, 1994
Office - Elizabeth City
6. SITE DESCRIPTION:
(A) Local Land Use Plan - Dare County
Land Classification From LUP - Conservation
(B) AEC(s) Involved: PT, EW
(C) Water Dependent: Yes
(D) Intended Use: Public
(E) Wastewater Treatment: Existing - None
Planned -None
(F) Type of Structures: Existing - Three ramp boat launching facility with associated finger piers
and parking.
Planned - Fishing Pier
(G) Estimated Annual Rate of Erosion: N/A
Source - Applicant
7. HABITAT DESCRIPTION: [AREA]
DREDGED FILLED
OTHER
(A) Vegetated Wetlands
(B) Non-Vegetated Wetlands
(C) Other
Public Trust Waters Shaded
2,034 square feet
(D) Total Area Disturbed: 2,034 square feet (.05 acre)
(E) Primary Nursery Area: No
(F) Water Classification: SA Open: No
8. PROJECT SUMMARY: Applicant proposes to modify CAMA Permit ##6-92-to extend an existing
dock by 30 feet and add at a right angle a 113 foot fish'ttg pier with widths of 8 feet and 12 feet and
a 12 ft. x 57 ft. "T" end. Also, additional single car parking will be provided.
NC WRC Modification of CAMA Permit #6-92
Bio Report
Page Two
Site Descriation
The N.C. Wildlife Resources Commission has proposed to modify its existing CAMA
Permit #6-92 to add a public fishing pier at its Washington Baum Bridge boating access area off
US 64/264, in Dare County. Under CAMA Permit #6-92 the WRC has constructed a three
ramp launching facility by digging out the existing upland point and adding finger piers and
decks along the sides. An asphalt parking area was constructed to accommodate 63 vehicles
with trailers.
Water depths in Roanoke Sound around the project area are 6 to 8 feet deep. The
federally maintained Manteo to Wanchese channel passes approximately 400 feet offshore from
the boat ramp facility., This channel is heavily used during the summer fishing season with boat
traffic out of Manteo and out of neighboring Pirates Cove Marina just to the north. The waters
in the project area are classified as SA closed.
The applicant proposes to construct a 125 foot long fishing pier parallel to shore,
extending under the bridge. An 8 ft. x 30 ft. extension will be added onto the existing dock on
the north side of the boat ramps. The proposed fishing pier will then extend north under the
bridge from the dock addition. This places the pier equidistant between two bridge bents. The
pier will consist of an 8 ft. x 63 ft. section, a 12 ft. x 50.5 ft. section, and a 12 ft. x 57 ft. "T
end on the north side of the bridge. The pier will slope up from 4 feet above NWL to 7 feet
above NWL on the 12 foot wide section. The pier will provide pedestrian and handicap access
for recreational fishing. A guardrail will be constructed around the perimeter of the pier and
lighting will be installed. The pier is not to be used for dockage by boaters. The height of the
pier and the guardrail should discourage most boaters from using it. The applicant also proposes
to convert the nearest trailer parking area under the bridge into single vehicle parking for the
pier users. The ten new spaces will add another 1,980 square feet of asphalt to the parking area.
This additional parking will be located approximately 105 feet from the bulkhead and out of the
Estuarine Shoreline AEC.
Anticipated Lnpacts
The proposed pier will shade and occupy approximately 2,034 square feet of Estuarine
and Public Trust Waters. The location of the pier under the bridge should not significantly
interfere with navigation or use of Public Trust Waters behind the pier. The pier will provide
an opportunity for the public, including the handicapped, to participate in recreational fishing
without using a boat.
CAMA Review
The project is located in a Conservation Area identified in the Dare county LUP. A full
consistency review by Steve Gabriel will follow.
Submitted by: Peter B. Colwell
Date: March 3, 1994
Please type or print. Carefully describe all anticipated
development activities, including construction, excava-?TM 2 '
tion, filling, paving, land clearing, and stonnwater con- r ,,;A you plan to build a marina, also complete and
trol. If the requested information is not relevant to your ?,,, a ach Form DCM-MP-2.
project, write N/A (not applicable). Items 1-4 and 8-9
must be completed for all projects. b.
1 APPLICANT
C.
a. Name NC Wildlife Res. Comm.
Div. of Boating & Fisheries
Address 51?-N_ S;4_1isb;rTSSt-. A ---IA - le
City Raleigh State NC
Zip? 7118 8 Day phone
Landowner or
919/733-3633
Authorized agent
b. Project name (if any)WRC-Roanoke Island
Boat Launch Facility
c. If the applicant is not the landowner, also give the
owner's name and address.
2 LOCATION OF PROPOSED
PROJECT
a. Street address or secondary road number
U. S. 64 - 264
b. City, town, community, or landmark
c. County Dare
d. Is proposed work within city limits or planning
jurisdiction? Yes
e. Name of ?odygf watder nearest project
oano e oun
3 DESCRIPTION AND PLANNED USE
OF PROPOSED PROJECT
a.
Is the proposed activity maintenance of an
existing project, new work, or both?
Modification of existing project.
Re: State Permit 6-92
Will the project be for community, private, or
commercial use?
Public use
Bldy.
d. Describe the planned use of the project.
Public recreational access
4 LAND AND WATER
CHARACTERISTICS
a. Size of entire tract
4 ac
b. Size of individual lot(s) N/A
c. Elevation of tract above mean sea level or
National Geodetic Vertical Datum
.± 5'
d. Soil type(s) and texture(s) of tract
Fill
e. Vegetation on tract
f. Man-made features now on tract 3 boat ramps,
4 docks & parking
g. What is the LAMA Land Use Plan Classification of
the site? (Consult the local land use plan.)
X Conservation Transitional
Developed Community
Rural Other
h. How is the tract zoned by local government?
S-1
i. How are adjacent waters classified?
SA
Describe all development activities you propose (for j. Has a professional archaeological survey been
example, building a home, motel, marina, bulkhead, carried out for the tract? No If so, by whom?
or pier). Dock extension, pier, additional
parking. -
3/91
5 UPLAND DEVELOPMENT
Complete this section if the project Includes any land
development.
a. Type and number of buildings, facHiSs, or d s
stt t lures ro eed ppr x- sq y
acciti?na pavemen
b. Number of lots or parcels N/A
_?,.....?, err,
m. Water supply source N/A
n. If the project is oceanfront development, describe
the steps that will be taken to maintain established
public beach accesswayyffovide new access.
c. Density (Give the number of residential units and the
units per acre.)-Sj fA-
d. Size of area to be graded or disturbed
_ Lp2rox. 220 sq yds
e. If the proposed project will disturb more than one
acre of land, the Division of Land Resources must
receive an erosion and sedimentation control plan at
least 30 days before land disturbing activity begins.
If applicable, has a sedimentation and erosion
control plan been submitted to the Division of Land
Resources? N/A
f. Give the percentage of the tract within 75 feet of
mean high water to be covered by impermeable.
surfaces, such as pavement, buildings, rooftops.
-Negligible
g. List the materials, such as marl, paver stone, asphalt,
or concrete, to be used for paved surfaces.
Asplialt
o. If the project is on the oceanfront, v.-flat will be the
elevation above mean sea level of the first habitable
floor? N-/.n --.-
6 EXCAVATION AND FILL
INFORMATION
a. Describe below the purpose of proposed excavation
or fill activities (excluding bulkheads, which are
covered in Section 7).
Access channel
(1`4.LW) or (NWL)
Boat basin
h. If applicable, has a stormwater management plan Other (break-
been submitted to the Division of Environmental water, pier,
Management?- N/A boat ramp,
1. Describe proposed sewage disposal and/or waste rock jetty)
water treatment facilities. Fill placed in
---N / A wetland or below
MH W
j. Ilave these facilities received state or local approval? Upland fill
NLA areas
k. Describe existing treatment facilities.
1. Describe location and type of discharges to waters of
the state (for example, surface runoff, sanitary
wastewater, industrial/commercial effluent, "wash
down").___
_-
. N L1?
Length Width Depth
In L)
b. Amount of material to be excavated from belch.,
water level in cubic yards N/A c. Type of material N/A
d. Does the area to be excavated include marshland,
swamps, or other wetlands? N/A
e. Iligh ground excavation, in cubic yards
2 3/91
f. Dimensions of spoil disposal area
c. Shore np erosion during preceding 12 months, in
fPP} / A
g. Location of spoil disposal area d. Type of bulkhead material N/A
N/A
e. Amount of fill, in cub 'We y?rds, to be placed below
h. Do you claim title to the disposal area? mean high water 1
If not, attach a letter granting permission from the
owner. f. Type of fill material N/A
i. Will a disposal area be available for future
maintenance? N/A
If so, where? 8 ADDITIONAL INFORMATION
j. Does the disposal area include any marshland,
swamps, or water areas?
N/A
In addition to the completed application form, the follow-
ing items must be submitted:
k. Will the fill material be placed below mean high
water? N/A
Amount of fill in cubic yards N/A
m. Type of fill material N/A
n. Source of fill material N/A
o. Will fill material be placed on marsh or other
wetlands? N/A
p. Dimensions of the wetland to be filled
N/A
q. flow will excavated or fill material be kept on site
and erosion controlled? N/A
r. What type of construction equipment will be used
(for example, dragline, backhoe, or hydraulic
dredge)? Paving equipment, pile
driver
s. Will wetlands be crossed in transporting equipment
to project site? Nn If yes, explain steps that will
be taken to lessen environmental impacts.
7 SHORELINE STABILIZATION
a. Length of bulkhead or riprap N/A
b. Average distance waterward of mean high water or
norm al water level N/A
A copy of the deed (with state application only) or other
instrument under which the applicant claims title to the
affected property. If the applicant is not claiming to be
the owner of said property, then forward a copy of the
deed or other instrument under which the owner claims
title, plus written permission from the owner to carry out
the project.
An accurate work plat (including plan view and cross
sectional drawings) drawn to scale in black ink on an 8
1/2 x 11 white paper. (Refer to Coastal Resources
Commission Rule 7J.0203 for a detailed description.)
Please note that original drawings are preferred and
only high quality copies will be accepted. Blue-line
prints or other larger plats are acceptable only if 18 high
quality copies are provided by applicant. (Contact the
U.S. Army Corps of Engineers regarding that agency's
use of larger drawings.) A site or location map is a part
of plat requirements and it must be sufficiently detailed
to guide agency personnel unfamiliar with the area to the
site. Include county road (SR) numbers, landmarks, and
the like.
A stormwater management plan, if applicable, that
may have been developed in consultation with the
Division of Environmental Management.
A list of the names and complete addresses of the
adjacent waterfront (riparian) landowners. These
individuals have 30 days in which to submit comments
on the proposed project to the Division of Coastal
Management and should be advisp.d-by the applicant of
that opportunity.
3/91
Name' Mr. Kermit Skinner
Address Town of Manteo
P. O. Box 246 _
Manteo, NC 27959
Name __--
Address
Name
Address
A list of previous state or federal permits issued for
work on the project tract. Include permit numbers,
pennittee, and issuing dates.
State Permit $6-92
A check for $250 made payable to the. Department of
Environment , Health, and Natural Resources to cover
the costs of processing the application.
A signed AFC hazard notice for projects in oceanfront
and inlet areas.
A statement on the use of public funds. If die project
involves the expenditure of public finds, attach a state-
ment documenting compliance with the North Carolina
Environmental Policy Act (N.C.G.S. 113A-1 to 10).
9 CERTIFICATION AND PERMISSION
TO ENTER ON LAND
Any permit issued in response to this application will
allow only the development described in the application.
The pmject will be subject to conditions acid restrictions
contained in the permit.
I certify that to the best of my knov,ledge, the proposed
activity complies with the State of North Carolina's ap-
proved Coastal Management Program and will be con-
ducted in a manner consistent with such program.
I further certify that I am authorized to grant, and do in
fact, grant permission to representatives of stale and
federal review agencies to enter on the aforementioned
lands in connection -with evaluating infomration related
to this permit application and follow up monitoring of
project.
I'his is the 25 day of _ Februar19 99.
Landowner or Authorized a ent
!t :
3101
I
- -- - 1
° 1 1 0- -O I i
o a ? a r- -?
-? 1 I 1
N I I \ \ \\ ? f
Z n <
f I \\\ 11 ?j•? ?::31r1
O D D D Cl
a D? zF{ -? I 1 \\\ ?I
x z 0 ° I \\ I 1
Z I \ \ I Ski i ? E, .? ,
?' Z7 O °c_ I \\\ \ \ I 4-11 ?..
7 D 1 1 j 11
O ---A
I
3 D O O I It
? 3 D ?! I 1
? O 03 O
I
do Cf)
R CJ) I I
z ?J I 1
I Aa j I I
I
50 n I I 1
t? D D? f
O) A
i
O 'U -0-0
'? C7 ° o I O O I
C?7 CO a D? ______________ - s wl w w-s-•-w- -•-•- I
z `''° I I I
C?
O `'0 z to
I
>0
rri
zN v v -0
I No
I
O o= j DI I woo
7 o I 2, z
m I o oC
m? I O O y ym
o° I C) 1 vow
°° I Io I z rrr -Di
m 5 o I ?- -- W N--?-I o
° I D -I
.. z oo I C ?7 I D
C3 Fn ?Im I a)
0 j
m
-?----- - - - - -^------?
-° 1 I O p^1
° 1 I I'
z 1 I
Cf)
n -0-0-
> 1 •- I I D
x
,? ? 1 I 1 cn i O
NI
g ? I DI
j i w j FT 1
1 ? I QI I
p mr = 0 1 1
1 I- C
I
i
r-?
m
N
a ? P
C)
ct Z P^
CL
91 Dom-
R
O ? ? P98 W -
9
C?
O D D 3
I--- o
f3 c? z
? CD ?
O -{ D Z
g
z3
a O D
C ? ? ^ 4
?
n9
R z
d D
CJ) 8
D
-70 goo
^
O rTl
C-) Q i!1
:lj
o ? ? I ?I
o
O I S?
- - ----------
m
o N
? s
r y
1 o
N N
O
0 1? «I
p
J
cn V' fI
-q
D
L
I
L..
-..
I
l-
I of
0
U A
8 ? ? w
v
A o
C)
n
D
O D D D
3 D =
0
3 D? ° 009 0 f'
03 C-)
n
Z
r--, 0 C i) nn
C/) n
Rl 1
O
D 03
oho
41
txj s 2
MY
- ?
0 N
O ?® D .
o.
Fn n
z
C~/) U)
O
,.
m 57
C) [ h
D?
?9
N
> .
16 . (~n
v Co cu CO
_D
41
9
U) v
n
I
L
S
N
c?
! II
'U
m
Ilk
O D D D
y D ? r?r ?
? c
p O
O
O
3 OD z
D
d D ?p ?
? o t5
CJ)
D
? D
o? D
? t?T
i Qp
C-) O
t?
?
Z
O
? o
? QO
7
O
I
I
I
I
I
I
I
I
I
I
I
L.
O O O
I
-o i
• o I
?I
N Ol ?I
"I
o ?I
_ I
O O O I
i
I
N r off. - o -1 f 0 r- o -1
?D11DD?a I I I i
:z
c:?g ?= I op
cn CA -4 --1
DrnDONLD
O I ?? I I \\\
N gs??Q Iz
0 -U \
D
6c" 0
L-- --J L-- -LJ-J
jo