Loading...
HomeMy WebLinkAboutSW3151103_Compliance Eval_20190724ROY COOPER Governor MICHAEL S. REGAN Secretary S. DANIEL SMITH NORTH CAROLINA Director Environmental Quality July 24, 2019 Mr. Donald E. Duncan, Jr., City Manager City of Conover 101 1St Street East Conover, North Carolina 28613 Subject: Compliance Evaluation Inspection NC Data Campus Phase B, Catawba County State Stormwater Permit SW3151103 Catawba County, North Carolina Dear Mr. Duncan: Enclosed please find a copy of the Compliance Evaluation Inspection Report for the inspection conducted at the NC Data Campus Phase B, Catawba County on July 17, 2019. The report should be self-explanatory; however, should you have any questions concerning this report, please do not hesitate to contact me or Christopher Graybeal at (704) 235-2147 or by email at christopher. graybeal@ncdenr.gov. Sincerely, es Moore Assistant Regional Engineer Land Quality Section Enclosure cc: Stormwater Permitting Program u ....eD North Carolina Department of Environmental Quality I Division of Energy, Mineral and Land Resources Mooresville Regional Office 1 610 East Center Avenue, Suite 301 1 Mooresville, North Carolina 28115 Compliance Inspection Report Permit: SW3151103 Effective:11/24/15 Project: NC Data Campus Phase B Owner: City of Conover County: Catawba Region: Mooresville Expiration: 11/23/23 Adress: 366D Lai Ber Dr City/State/Zip: Conover NC 28613 Contact Person: Donald E Duncan Title: Phone: 828-464-1191 Directions to Project: Main entrance to project is located off Thornburg Drive Extension, approximately 2800 ft NW of the intersection of Thornburg Rd and NC Route 16, in between the Tri-City Baptist Church and the Walmart Supercenter. Type of Project: State Stormwater - General Permit Drain Areas: On -Site Representative(s): Related Permits: Inspection Date: 07/17/2019 Entry Time: 10:25AM Primary Inspector: Christopher Graybeal Secondary Inspector(s): Reason for Inspection: Routine Permit Inspection Type: State Stormwater Facility Status: ® Compliant ❑ Not Compliant Question Areas: ® Mote �tormvvatcr (See attachment summary) Exit Time: 12:05PM Phone: 704-663-1699 Inspection Type: Compliance Evaluation page: 1 Permit: SW3151103 Owner - Project: City of Conover Inspection Date: 07/17/2019 Inspection Type Compliance Evaluation Reason for Visit: Routine Inspection Summary: The site appears to be compliant according to the approved stormwater permit. Continue to maintain BMPs according to the site maintenance agreement. File Review Yes No NA NE Is the permit active? ® ❑ ❑ ❑ Signed copy of the Engineer's certification is in the file? ® ❑ ❑ ❑ Signed copy of the Operation & Maintenance Agreement is in the file? ® ❑ ❑ ❑ Copy of the recorded deed restrictions is in the file? ® ❑ ❑ ❑ Comment: Required documents are in the file. Built Upon Area Yes No NA NE Is the site BUA constructed as per the permit and approval plans? ® ❑ ❑ ❑ Is the drainage area as per the permit and approved plans? ® ❑ ❑ ❑ Is ttie BUA (as permitted) graded such that the runoff drains to the system? ® ❑ ❑ ❑ Comment: BUA appears to be constructed according to the approved plan. Operation and Maintenance Yes No NA NE Are the SW measures being maintained and operated as per the permit requirements? ® ❑ ❑ ❑ Are the SW BMP inspection and maintenance records complete and available for review or provided to ❑ ❑ ® ❑ DWQ upon request? Comment: BPM's appear to be functional. SW Measures Yes No NA NE Are [lie SW measures constructed as per the approved plans? 0 ❑ ❑ ❑ Are the inlets located per the approved plans? 0 ❑ ❑ ❑ Are the outlet structures located per the approved plans? 0 ❑ ❑ ❑ Comment: Measures appear to be constructed according to approved plans. page: 2