Loading...
HomeMy WebLinkAboutNCG140253_Inspection_20100106Compliance Inspection Report Permit: NCG140253 SOC: County: New Hanover Region: Wilmington Contact Person: John Allen Directions to Facility: System Classifications: Primary ORC: Secondary ORC(s): On -Site Representative(s): Related Permits: Effective: 08/01/09 Expiration: 06/30/11 owner: Southern Equipment Company Inc Effective: Expiration: Facility: Ready Mix Concrete Company -Wilmington Plant #E 5125 US Hwy 421 N Inspection Date: 01/06/2010 Primary Inspector: Linda Willis Secondary Inspector(s): Title: Entry Time: 01:OOPM Certification: Wilmington NC 28401 Phone: 910-686-4890 Phone: Exit Time: 01:30PM Phone: 910-796-7396 Reason for Inspection: Routine Inspection Type: Compliance Evaluation Permit Inspection Type: Ready Mix Concrete Stormwater/Wastewater Discharge COC Facility Status: Compliant ❑ Not Compliant Question Areas: Storm Water (See attachment summary) Page 1 of 3 Permit: NCG140253 Owner - Facility: Southern Equipment Company Inc Inspection Date: 01/06/2010 Inspection Type : Compliance Evaluation Reason for Visit: Routine Inspection Summary: Page 2 of 3 Permit: NCG140253 Owner - Facility: Southern Equipment Company Inc Inspection Date: 01/06/2010 Inspection Type : Compliance Evaluation Reason for Visit: Routine Stormwater Pollution Prevention Plan Yes No NA NE Does the site have a Stormwater Pollution Prevention Plan? ❑ ❑ ❑ # Does the Plan include a General Location (USGS) map? ❑ ❑ ❑ # Does the Plan include a "Narrative Description of Practices"? ❑ ❑ ❑ # Does the Plan include a detailed site map including outfall locations and drainage areas? ❑ ❑ ❑ # Does the Plan include a list of significant spills occurring during the past 3 years? ❑ ❑ ❑ # Has the facility evaluated feasible alternatives to current practices? ❑ ❑ ❑ # Does the facility provide all necessary secondary containment? ❑ ❑ ❑ # Does the Plan include a BMP summary? ❑ ❑ ❑ # Does the Plan include a Spill Prevention and Response Plan (SPRP)? ❑ ❑ ❑ # Does the Plan include a Preventative Maintenance and Good Housekeeping Plan? ❑ ❑ ❑ # Does the facility provide and document Employee Training? ❑ ❑ ❑ # Does the Plan include a list of Responsible Party(s)? ❑ ❑ ❑ # Is the Plan reviewed and updated annually? ❑ ❑ ❑ # Does the Plan include a Stormwater Facility Inspection Program? ❑ ❑ ❑ Has the Stormwater Pollution Prevention Plan been implemented? ❑ ❑ ❑ Comment: Qualitative Monitoring Yes No NA NE Has the facility conducted its Qualitative Monitoring semi-annually? 0 ❑ ❑ ❑ Comment: Please ensure semi annually qualitative monitoring is being conducted. Analytical Monitoring Yes No NA NE Has the facility conducted its Analytical monitoring? 0 ❑ ❑ ❑ # Has the facility conducted its Analytical monitoring from Vehicle Maintenance areas? 0 ❑ ❑ ❑ Comment: Permit and Outfalls Yes No NA NE # Is a copy of the Permit and the Certificate of Coverage available at the site? ❑ ❑ ❑ # Were all outfalls observed during the inspection? ❑ ❑ ❑ # If the facility has representative outfall status, is it properly documented by the Division? ❑ ❑ ❑ # Has the facility evaluated all illicit (non stormwater) discharges? 0 ❑ ❑ ❑ Comment: The infiltration settling basin at the back of the property would be a good place to redirect as much stormwater as possible since it has such good capacity for infiltration rather than discharge. Page 3 of 3