Loading...
HomeMy WebLinkAbout20090786 Ver 1_DCM Permit_20090903z Permit Class Permit --Number ; NEW 123-09 STATE OF NORTH CAROLINA Department of Environment and Natural Resources ( y/) j and 2@L???1"/ L Coastal Resources Commission U f SEP - 3 2009 f DENR - WATER QUALITY for WETLANDS AND STORMW.ATER BRANCH X Major Development in an Area of Environmental Concern , pursuant to NCGS I I3A-118 h X Excavation and/or filling pursuant to NCGS 113-229 Issued to Town of Topsail Beach, 820 South Anderson Blvd., Topsail Beach, NC 28445 Authorizing development in Onslow County at Topsail Sound, 912 South Anderson Blvd., Topsail Beach as requested in the permittee's application dated 6/3/09. (MP-1) and 6/19/09 (MP-2) including the attached workplan drawings (3), Sheet 1 & 2 of 2 dated 6/19/09 and area map dated received 6/19/09 This permit, issued on Angus 25, 2009 , is subject to compliance with the application (where consistent with the permit), all applicable regulations, special conditions and notes set forth below. Any violation of these terms may be subject to fines, imprisonment or civil action; or may cause the permit to be null and void. Boat Ramp 1) Unless specifically altered herein, this permit authorizes the boat ramp and uses located in or.over the water that are expressly and specifically set forth in the permit application. No other structure, whether floating or stationary, shall become a permanent part of this boat ramp facility without permit modification. No non-water dependent uses of structures shall be conducted on, in or over public trust waters without permit modification. 2) The boat ramp shall either be poured at an upland location and pushed into place once hardened, or poured entirely within a watertight containment structure. Live concrete shall not be allowed to contact waters of the State or waters that will enter waters of the State. (See Attached Sheet for Additional Conditions) This permit action may be appealed by the permittee or other qualified persons within twenty (20) days of the issuing date. An appeal requires resolution prior to work initiation or continuance as the case may be. This permit must be accessible on-site to Department personnel when the project is inspected for compliance. Any maintenance work or project modification not covered hereunder requires further Division approval. All work must cease when the permit expires on December 31, 2012 In issuing this permit, the State of North Carolina agrees that your project is consistent with the North Carolina Coastal Management Program. Signed by the authority of the Secretary of DENR and the Chairman of the Coastal Resources Commission. Jam . . Gregson, Director Division of Coastal Management This permit and its conditions are hereby accepted. Signature of Permittee .cr,.. , _1,rr;.;e.,:t-s.:.;o•, w??ww?fi.,A,rw:?c•na•.a-'-:-ro-h , < ..;.:w??. , ,w<.. ..,., , -? ,w,?..?-<-r,.,.n?.w>,-,..o--w.wd??w..:,,nc?rwvw..?v.? r, ..T?.--c .? P.w > .,. P .v. es,o..?..?:aa.fp: c--P ,?r:.?:w,'n .. .. . • Town of Topsail Beach Permit #123-09 `f Page 2 of 3 ADDITIONAL CONDITIONS 3) Ground disturbing activities above and below the normal high water line shall be limited to that absolutely necessary to remove and replace the existing boat ramp in the same location. 4) No attempt shall be made by the permittee to prevent the full and free use by the public of all navigable waters at or adjacent to the authorized work. 5) The permittee shall maintain the authorized work in good condition and in conformance with the terms and conditions of this permit. The permittee is not relieved of this requirement if he abandons the permitted activity without having it transferred to a third party. 6) No sewage, whether treated or untreated, shall be discharged at any time from any boats using the boat ramp. Any sewage discharge at the boat ramp shall be considered a violation of this permit for which the permittee is responsible. This prohibition shall be applied and enforced throughout the entire existence of the permitted boat ramp. 7) This permit does not authorize the interference with any existing or proposed Federal project, and the permittee shall not be entitled to compensation for damage to the authorized structure or work, or injury which may be caused from existing or future operations undertaken by the United States in the public interest. Sedimentation and Erosion Control 8) In order to protect water quality, runoff from construction shall not visibly increase the amount of suspended sediments in adjacent waters. 9) Appropriate sedimentation and erosion control devices, measures or structures shall be implemented to ensure that eroded materials do not enter adjacent wetlands, watercourses and property (e.g. silt fence, diversion swales or berms, etc.). General 10) The permittee understands and agrees that, if future operations by the United States requires the removal, relocation, or other alteration of the structure or work authorized by this permit, or if in the opinion of the Secretary of the Army or his authorized representative, said structure or work shall cause unreasonable obstruction to free navigation of the navigable waters, the permittee will be required, upon due notice from the Corps of Engineers, to remove, relocate or alter the structural work or obstructions caused thereby, without expense to the United States or the state of North Carolina. No claim shall be made against the United States or the state of North Carolina on account of any such removal or alteration. 11) Debris resulting from the removal of the existing boat ramp shall be deposited in an approved uplands disposal site. Towd of Topsail Beach Permit #123-09 ADDITIONAL CONDITIONS Page 3 of 3 12) This permit shall not be assigned, transferred, sold, or otherwise disposed of to a third party without the written approval of the Division of Coastal Management. .y rf 13) No vegetated wetlands shall be excavated or filled, even temporarily. :r NOTE: This permit does not eliminate the need to obtain any additional state, federal or local permits, approvals or authorizations that may be required. s NOTE: The permittee and/or his contractor is urged to meet with a representative of the Division prior to project initiation. NOTE: The N.C. Division of Water Quality has authorized the proposed project under DWQ Project No. 09-0786. NOTE: The U.S. Army Corps of Engineers authorized the proposed project under COE Action Id. No. SAW-2009-01545 which was issued on 8/17/09. lT' p I - LVD z -! D- CHANNEL BLVD BRIDGERS AY? a CHANNEL 8.. w O -. m f •A _. CAROLINA BLVD . D - n p; An :. -- n m-CaaOUNA BLVD--= •. ? ? ~ f71f7711 ? D .. D S ANDERSON BLVD --7777 11 S I D iD Z c I _ OCEAN BLVD .. I S rs i Iii (.?ii j r1 i :t li rt} F ._ r c 0 ii ?i O 5 n a tJ :51 -tom i N C t 4 I` PAZ IaAl ------__-_„? wE J z? 3 • ? ?. ?? ?iFL'r /•f ?.? F r??? K.'f"r{ f?.?. r ?9 t° i _........-->-? ;•, of - f €+LI J ?G a ?!J /,va •v 1, f.. ?F U i ca 4 ' 4-' NUJ -?1\4 L LA) ML W, ? fli ?.w I ?!,r o ? x I x u? I I O I N O ?• ?P you r`? rti? 4?a? C L? 1 - - - _I 'I ?rti ? -4T c.r Q1 p? \\\ y, 'IL 0 o z , ? tv a G ?- rr?! ? ? S 100.06' S 49 "31 27" W r•p owr. o f To?sras l?s}?cam ?eaw"N G- ntuM?s6rz- oFZ rr r ?Cr??t I ? aCa Oj 249. S 49 '27- sG ?S G,p?gC? so sQ OS?, MO??.. / ?w