Certificate of Completion
Upon completion of all work approved within the 401 Water Quality Certification or applicable Buffer Rules,
and any subsequent modifications, the applicant is required to return this certificate to the 401 /Wetlands Unit,
North Carolina Division of Water Quality, 1621 Mail Service Center, .Raleigh, NC, 27699-1621. This form
inay be returned to DWQ by the applicant, the applicant's authorized agent, or the project engineer. It is not
necessary to send certificates from. all of these.
Applicant's Certification
1, , hereby state that, to the best of my abilities, due care and
diligence was used in the observation of the construction such that the construction was observed to be built
within substantial compliance and intent of the 401 Water Quality Certification and Buffer Mules, the approved
plans and specifications, and other supporting materials.
Signature: Date:
Agent's Certification
I, 0/?(dtloc'[ j , hereby state that, to the best of my abilities, due care and
diligeft was used in the observation of the construction such that the construction was observed to be built
within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved
plans and specifications, and otNr supporting materials.
S
Date: ? - ? S D
is ngin eer's -Certification
_ Partial Final
11 ? ---I as a duly registered Professional Engineer in the State of
North Carolina, having been authorized to observe (periodically, weekly, full time) the construction of the
project,for the Permittee hereby state that, to the best of my abilities, due care and diligence was used in the
observation of the construction such that the construction was observed to be built within substantial
compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and
specifications, and other supporting materials.
Signature
Registration No.
Date
DULIN-FLORA PROJECT
AUGUST 2009
Figure 1: Before, 7-28-09, Note thalwag against river right.
Figure 2: After, 8-26-09, Two rock vanes have been constructed. Thalwag toward
middle of river.