HomeMy WebLinkAbout19940387 Ver 1_COMPLETE FILE_19940503State of North Carolina
Department of Environment,
Health and Natural Resources
Division of Coastal Management
James B. Hunt, Jr„ Governor
Jonathan B, Howes, Secretary
Roger N, Schecter, Director
April 21, 1994
MEMORANDUM:
TO:
FROM:
SUBJECT:
Mr. A. Preston Howard, P.E., Director
Division of Environmental Management
John R. Parker, Jr.
Major Permits Processing Coordinator
CAMA/DREDGE & FILL Permit Application Review
APR 2 7 1994
D.EM.
Applicant: Harbour Recreation Club
Project Location: the Birdland Marina, on Caracara Drive and the Inner Harbour, at Fairfield Harbour,
off NCSR 1600, in Craven County
Proposed Project: to expand the Birdland Marina facility from 10 existing slips to 24 (total)
Please indicate below your agency's position or viewpoint on the proposed project and return this form by May
12, 1994. If you have any questions regarding the proposed project, please contact Charles Jones at (919) 726-
7021, Ext. 263. When appropriate, in-depth comments with supporting data is requested.
REPLY:
This agency has no objection to the project as proposed.
This agency has no comment on the proposed project.
This agency approves of the project only if the recommended changes are
incorporated. See attached.
This agency objects to the project for reasons described in the attached comments.
SIGNED
DATE
MOM
ID EHNR
APR 2 S 1994
RECEIVED
WASHINGTON OFFICE
P.O. Box 769, 3441 Arendell St„ Morehead City, North Carolina 28557 Courier #11-12-09
Telephone 919-726-7021 FAX 919-247-3330
An Equal Opportunity Affirmative Action Employer 50% recycled/ 10% post-consumer paper
To: John D rney '
Planni Branch
• DIVISION OF ENVIRONMENTAL MANAGEMENT
LAMA/COB PERMIT APPLICATION REVIEW
WaRO PROJECT # 441-011 -e WQ SUPERVISOR: TH?
REVIEWER: SAWYER DATE: S/3?
WB'ILAND INFORMATION FOR CENTRAL OFFICE TRACKING
PERMIT YR.- 92 PiIT N0. • eQ?? COUNTY:
PROJECT NAME: \Il
PROJECT TYPE: ' PERMIT TYPE: C?6E
COE 1: DOT 0:
2 7 /5' S?
RCD FROM CAA: DCH DATE FROM CDA:
?d
REG OFFICE: WaRO RIVER AND SUB BASIN 0: /Y C -q
STREAM OR ADJACENT WATER BODY: /1&Z6(uA-4 LA-
CLASS : -?s e- its Lem - Su) STREAM INDEX #:c-,7 740S
1-1
OPEN OR LOS
WL DeACT: A,)
WL REQUESTED:
HYDRO CNECT?:
MITIGATION:
MITIGATION SIZE:
RECOMMENDATION.-
WL TYPE:
WL ACR EST:
WL SCARE:
MITIGATION TYPE:
ING SHEET ATTACHED?
SSUE ISSUE/COND DENY HOLD
STORMWATER PLAN REQ'D: F YES AT APPROVED:
PROJECT DESCRIPTION:
WATER QUALITY CERT. (401)
CERT. REQ'D:
IF YES, TYPE: ?s r-
SEWAGE DISPOSAL
TYPE OF DISPOS OPQQSED: nIIPI??
STING), PROPOSED, SEPTIC TANK ETC.)
TO BE PERMITTED
D
(am; DHS, COUNTY)
IF BY DEM, IS SITE AVAILABLE AND PERMIT ISSUANCE PROBABLE:
MATER/WETLAND FILL
AREA OF FILL: WATER : - U WETLAND : -? ?-'
IS FILL ELIMINATING A SIGNIFICANT USE?
DREDGING -/
AREA TO BE DREDGED : At t?'` p
IS DREDGING ACTIVITY EXPECTED TO CAUSE A SIGNIFICANT LOSS OF
RESOURCE?
IS SPOIL DISPOSAL ADEQUATELY ADDRESSED?
MARINA
ARE THE FOLLOWING ADEQUATELY ADDRESSED? '
SEWAGE DISPOSAL: MARINA SERVICES:
OXYGEN IN BASIN: CLOSURE OF SHELLFISHING WATERS:
CC: WaRO; Central Files; DCM Field Offices; C OE Washington Office
DIVISION OF ENVIRONMENTAL AGEMENT
MEMORANDUM
TO: Bill Moore, Environmental Engineer
Water Quality Section, WaRO
FROM: Deborah Sawyer, Environmental Technician
Water Quality Section, WaRO
SUBJECT: Dredge and Fill Reviews on Hold for Stormwater Review
Project:
Project No.: C-),(/
Received: 2
F Date Comment:
Description of Project:
Comments:
DIVISION OF COASTAL MANAGEMENT
FIELD INVESTIGATION REPORT
1. APPLICANT'S NAME: Harbour Recreation Club
2. LOCATION OF PROJECT SITE: the Birdland Marina, on Caracara Drive and the Inner Harbour at
Fairfield Harbour, off NCSR 1600, in Craven County
Photo Index - 1989: 1984: 51-1519,V-9
State Plane Coordinates - X:2608100 Y:486300
3. INVESTIGATION TYPE: CAMA
4. INVESTIGATIVE PROCEDURE: Dates of Site Visit - 2-23-94
Was Applicant Present - Yes
5. PROCESSING PROCEDURE: Application Received - 3-23-94 & 4-19-94
Office - Morehead City
6. SITE DESCRIPTION:
(A) Local Land Use Plan - Craven,
Land Classification From LUP - Developed and Conservation
(B) AEC(s) Involved: Public Trust Area
(C) Water Dependent: Yes
(D) Intended Use: Community
(E) Wastewater Treatment: Existing - none
Planned - none
(F) Type of Structures: Existing - Parking lot and pier
Planned - Pier expansion
(G) Estimated Annual Rate of Erosion: NA
Source - Bulkheaded
7
HABITAT DESCRIPTION: ., [AREA]
DREDGED FIL
(A) Vegetated Wetlands
(B) Non-Vegetated Wetlands
Open Water Area
(C) Other
(D) Total Area Disturbed:
(E) Primary Nursery Area: No
(F) Water Classification: 'SC' Open: No
2,880 sq. ft.
(Footprint)
8. PROJECT SUMMARY: The applicant is proposing to expand the Birdland Marina facility from 20
existing slips to 24 (total).
FIELD INVESTIGATION REPORT:
Harbour Recreation Club
PAGE #2
9. NARRATIVE DESCRIPTION: The applicant is a Home Owners Association which
owns an approx. 1.6 acre tract of land adjacent to Caracara Drive and the "Inner
Harbour" in the community of Fairfield Harbour. Fairfield Harbour is located near the
end of NCSR 1600 and is a residential community with numerous man made boating
access canals and basins. These canals and basins are connected to the waters of
Northwest Creek which is a tributary of the Neuse River. Located adjacent to this
property is an approx 170' long x 8' wide pier which provides docking facilities for 20
boats ranging in size from 20 to 40' in length. The pier appears to be located within
the confines of a man-made boat basin area and does not extend into the main water
body. Water depths adjacent to the pier range form -2 to -9' Normal Water Level
(NWL) deep. The upland property is bulkheaded and a gravel parking area is provided
adjacent to the road, approx .70' away from the water. The remaining property is
maintained as a grassed yard area with elevations of approx. 15' above mean sea level
(MSL) in the parking area which slopes down to approx. 5' above MSL at the
bulkhead. The waters adjacent to the pier have been classified as "SC Nutrient
Sensitive Waters" and are closed to the harvesting of shellfish. Bathroom or pump-out
facilities are not provided at this site.
The applicant is requesting a permit to extend the pier facility into the channel for a
distance of approx. 40'. Plans included with the application shows the extension of
two 20' long x 3' wide finger piers with 5 mooring pilings being located approx. 40'
waterward from the existing "T" Head. The pier extension would be located within
the "main channel" but would not extend over one-third its width.
10. ANTICIPATED IMPACTS: The project as proposed will result in the expansion of a
marina facility from 20 to 24 boats. Approx. 2,880 sq. ft. of additional public trust
waters would be occupied by the "footprint" of this addition. It would appear that
navigation would not be adversely impacted either by the pier extension or by the
increase of boats using the water body. The applicant is not proposing any pump-out
or bathroom facilities and have indicated that a pump-out is available at Northwest
Creek Marina which is located approx. 1/2 mile away from this site.
PREPARED BY: CHARLES S. JONES
DATE: April 21, 1994
Please type or print. Carefully describe all anticipated
development activities, including construction, excava-
tion, filling, paving, land clearing, and stormwater con-
trol. If the requested information is not relevant to your
project, write N/A (not applicable). Items 1-4 and 8-9
must be completed for all projects.
1 APPLICANT
a. Name &1 ? geupz_ Rs'c+ 7ivn? f.C?3
b.
Address ? e o
City PAW State
Zip4?SzU Day phone
If you plan to build a marina, also complete and
attach Form DCM-MP-2.
b. Is the proposed activity maintenance of an
existing project, new work, or both?.
/?bp / /7 v N rw /LXI s; tr ty D Uc- ?
c. Will the project be for community, private, or
commercial use?
d. Describe the planned use of the project.
?.? (vlsz 7? lj?('N.c r
?/ ?. It1??iJt P? ?-sz S
j,,? Landowner or -Authorized agent
Project name (if any) 73 t inn ttvn of I4-s1A/ &
.P?[A.?,c) SI o .u
c. If the applicant is not the landowner, also give the
owner's name and address. ,1?9A?'K h4kpEmR?t/
o r re-5 Al adeAM e_ -?G
CbAf i, z, t-",QR 1 A16c 60AJ / r-a , 1 !5
1997 S,1c,< k,4eli,r I-Awe:
-Alva 13erlu,, AJ G t.2 85 & 2-
2 LOCATION OF PROPOSED
PROJECT
a. Street address or secondary road number
C &Kb11v i91- bR i y d:
b. City, town, community, or landmark
c. County C' dvr-nJ
d. Is proposed work within city limits or planning
iyir(9i?rccr?
jurisdiction?
e. Name of body of water nearest project
?l/,?it-72. /71i9R fi a U R /?7- ?1f 1R ?/? xd
3 DESCRIPTION AND PLANNED USE
OF PROPOSED PROJECT
a. Size of entire tract "V A,4
b. Size of individual lot(s) Al
c. Elevation of tract above mean sea level or
National Geodetic Vertical Datum .
u•-* H-t- t-_Z> AT 2264K y S 11 -t 4?oD F` `r
d. Soil type(s) and texture(s) of tract
.r ->
.S; Q/,,o y 'e.
4 LAND AND WATER
CHARACTERISTICS
e. Vegetation on tract
?'f
f. Man-made features now on tract
g. What is the CAMA Land Use Plan Classification of
the site? (Consult the local land use plan.)
Conservation Transitional
Developed _t,- Community
Rural Other
h. How is the tract zoned by local government?
42t-s, /) e7 ft #-/-
i. How arc adjacent waters classified?
a. Describe all development activities you propose (for j
example, buildin a home, motel, marina, bulkhead,
or pier). -
Has Has a professional archaeological survey been
carried out for the tract? WJ If so, by whom?
19!1
12/89
V
5 UPLAND DEVELOPMENT
gomplete this section if the project includes any land
a. Type and number of buildings, facilities, or m. Water su
b. Num*r of lots or parcels
c. Densit?\(Give the number of residential units and the
units
d. Size of
e. If the propo,;
acre of land,
receive an er
least 30 day.
If applicable
control plan
Resources?
disturbed
will disturb more than one
on of Land Resources must
sedimentation control plan at
id dis rbing activiy begins.
imen 'on and erosion
nitt e4rtd the Division of Land
4 .
n. If the project
the steps that
public beach),
o. If the project is on the oceanfront, at will be the
elevation above mean sea level of the t habitable
floor?
6 EXCAVATION AND FILL
INFORMATION
f. Give the percentage of tra t within 75 feet of a. Describe below the purpose of proposed excavation
mean high water to be e by impermeable or fill activities (excluding bulkheads, which are
surfaces, such as pave n uildings, rooftops. covered in Section 7).
g. List the materials, such as m 1, paver stone, asphalt, Access channel
or concrete, to be used for pav d surfaces. (MLW) or (NWL)
h. If applicable, has a stormwater m
been submitted to the Division of
Management?
plan
i. Describe proposed sewage disposal ar?i/or waste
water treatment facilities. \
j. Have these facilities received state or local proval?
k. Describe existing treatment facilities.
1. Describe location and type of discharges to waters f
the state (for example, surface ninoff, sanitary
wastewater, industrial/commercial effluent, "wash
down").
Boat basin
Other (break-
water, pier,
boat ramp,
rock jetty)
Fill placed in
wetland or below
MHW
Upland fill
areas
opment, describe
intain established
ide new access.
Length Width Depth
b. Amount of material to be excavated from below
water level in cubic yards
c. Type of material n? Jiy
d. Does the area to be excavated include marshland,
swamps, or other wetlands? 41z",-
c. High ground excavation, in cubic ya s
2 12/89
f. Dirltensions of spoil disposal area
h. Do you
If not,
owner.
of spoil disposal area
title to the disposal area?
a letter granting permission from the
i. Will a dispo,?
maintenance
If so, where?
area be available for future
Does the disposN area include any marshland,
swamps, or wate areas?
k. Will the fill
water?
1. Amount of filfin k4b yards
m. Type of fill material
n. Source of fill material
o. Will fill material be pla on marsh or other
wetlands?
p. Dimensions of the wetland o be filled
q. How will excavated or fill m cri a] be kept on site
and erosion controlled?
r. What type of construction equipme t will be used
(for example, dragline, backhoe, or ydraulic
dredge)?
s. Will wetlands be crossed in transporti equipment
to project site? If yes, explain ste s that will
be taken to lessen environmental impac s.
7 SHORELINE STABILIZATION
a. Length of bulkhead or riprap V j
b. Average distance waterward of mea high water or
norm a] water level
placed below mean high
c. Shoreline erosion during preceding 12 months, in
feet
d. Type of bulkhead materials/
C. Amount of fill, in cubic yards, to be placed below
mean high water -
f. Typc of fill material
8 ADDITIONAL INFORMATION
In addition to the completed application form, the follow-
ing items must be submitted:
A copy of the deed (with state application only) or other
instrument under which the applicant claims title to the
affected property. If the applicant is not claiming to be
the owner of said property, then forward a copy of the
decd or other instrument under which the owner claims
title, plus written permission from the owner to carry out
the project.
An accurate work plat (including plan view and cross
sectional drawings) drawn to scale in black ink on an 8
1/2 x l 1 white paper. (Refer to Coastal Resources
Commission Rule 7J.0203 for a detailed description.)
Please note that original drawings are preferred and
only high quality copies will be accepted. Blue-line
prints or other larger plats arc acceptable only if 18 high
quality copies are provided by applicant. (Contact the
U.S. Army Corps of Engineers regarding that agency's
use of larger drawings.) A site or location map is a part
of plat requirements and it must be sufficiently detailed
to guide agency personnel unfamiliar with the area to the
site. Include county road (SR) numbers, landmarks, and
the like.
A stormwater management plan, if applicable, that
may have been developed in consultation with the
Division of Environmental Management.
A list of the names and complete addresses of the
adjacent waterfront (riparian) landowners. These
individuals have 30 days in which to submit comments
on the proposed project to the Division of Coastal
Management and should be advised by the applicant of
that opportunity. I?7, rT--" r
4 t? cJT.rUt?. `J
12/89 ..........................
Name
Address
Name /??, 5 ???/c v s /?iu? s /?
Address (Ooo L
lS/Pw ;&e ro.) ag, 4- o
Name J-01114 K49tAJ0A--'
?a-?('?acA?'? ??'•
Address 96?
n/fw BED: ?85N0
A list of previous state or federal permits issued for
work on the project tract. Include permit numbers,
permittee, and issuing dates.
35v `-`
A check for Wihade payable to the Department of
Environment , Health & Natural Resources to cover the
costs of processing the application.
A signed AEC hazard notice for projects in oceanfront
and inlet areas.
A statement on the use of public funds. If the projecl
involves the expenditure of public funds, attach a state-
ment documenting compliance with the North Carolina
Environmental Policy Act (N.C.G.S. 113A-1 to 10).
$ .
9 CERTIFICATION AND PERMISSION
TO ENTER ON LAND
Any permit issued in response to this application will
allow only the development described in the application.
The project will be subject to conditions and restrictions
contained in the permit.
I certify that to the best of my knowledge, the proposed
activity complies with the State of North Carolina's ap-
proved Coastal Management Program and will be con-
ducted in a manner consistent with such program.
I further certify that I am authorized to grant, and do in
fact, grant permission to representatives of state and
federal review agencies to enter on the aforementioned
lands in connection with evaluating information related
to this permit application and follow-up monitoring of
project. Q
This is the day of 19!
X -14-fa W4-
4h-,-A-,L-Landowner or Authorized agent
&A4 Q l114A4,.c
12/89
Form DCM-MP-2
MARINA
DEVELOPMENT
Attach this form to Joint Application for CAMA Major
Permit. Be sure to complete all other sections of the
Joint Application which relate to this proposed project,
including upland areas, even if duplicative. All shore-
based facilities must be included in application and work
plats.
1 MARINA CHARACTERISTICS
a. Check below the type of marina proposed.
Commercial Public V"Residential
b. Will the marina be open to the general public?
Nd
c. If there is residential development associated with
the marina, how many units or lots are planned?
d.
Check all of the types of service to be provided.
Full service, including travel lift and/or rail
Dockage, fuel, and marine supplies
//Dockage ("wet slips") only
Number of slips 02-0, )cis f-, iU6 if-APiiJI-
Dry storage
Number of boats
Boat ramp(s)
Other (describe)
Check below the proposed type of siting.
Land cut and access channel
Open water with dredging for basin
and/or channel
Open water, no dredging required
Other (describe)
b. Describe treatment and location for all sanitary
wastewater. rJ?
c. Describe solid waste, fish offal, and trash disposal.
y/,9
M C) n(=?-?
E E E 11 1994 '
f. Describe the typical boats to be served (for example,
open runabout, charter boats, sail boats, mixed
types). Tic 57
g. Typical boat length .4 -?Z
h. Maximum boat length 2J
i. Are any floating buildings planned? /V 6J
If so, describe.
2 MARINA OPERATIONS
Check each of the following sanitary facilities which
will be included in the proposed project.
Office toilets
Toilets for patrons
Number
Location
Showers ?L,re, ?, ?, r str3f?c
'f Boat holding tank pumpout
Type and location K ^q
/ /Lf 14 r
. . .?M.w ...._........i.1
4/89 5
d. How will overboard discharge of sewage from boats i. Give the location of fuel handling facilities and
be controlled? describe the safety measures planned to protect area
?,fnsr??o f =??c y waterquality.
e.
9.
h.
Give the location and number of "No Sewage
Discharge" signs proposed.
Describe the special design, if applicable, for
containing industrial type pollutants, such as paint,
sandblasting waste, and petro leum products.
Where will residue be disposed of?
Give the number of channel markers and "No Wake"
signs proposed. _:4,?
Note: Regulatory signs such as these require additional
approval by the N.C. Wildlife Resources Commission.
j. Describe design measures that promote boat basin
flushing or circulation and reduce water quality
impacts.
k. What will be the marina policy on overnight and
live-board dockage?
1. Is the proposed marina located near any shellfish
leases? yo If so, give the name and address of
theleaseholder.
m. If this project is an expansion of an existing marina,
what types of services are currently, provided?
ly-? r-A'.Crz r t- Ty -
n. How many slips are now available? -2
4/89
i
z? ? Q
?aD ?o No???S Sto??
n
a
- d
Q r
u
a
z Y
Q o
z
o J o
w
? U
Q
U
Q i?
w
Z o
o -
oC
W Cf)
Q w
w
W OC
O w
z
o z. N
CL
_._.? 0
z
0 a
Cc: o
z
m n
D
O
C
0
D
Q
V --ti._ _ to PP -
-y PiC l
_ c-
Xf? C,
__ .
T =fly N S I P NO 2 -
-.+k?--fir _ - '- ?• ? ? `
- /4 x -?.
41
10
_r-__rli,r '4' -ter' ? •?i_ vv? +F l6_?, 10
-r- XQ
dan
_ 'Ct>
Cl a,:
ivl Y ?_ 4 ,.. P
_ -? + - ?f_ - _ Ill J l •?: n ?-_- _- - .//' l
?` _ _ --- - - % --_s -
r
T? KE ,Q T TORN 7-6 -TP 916 k14 - 1rc/PK Nr Th/vy
----------------- -
6rYic- -le- 2 ? a
v Aj
SCALE 1 -100 I+T?L.
?+rG IG. ZZ` 4- 1
1
,
NORTH mom
ORS
c \ 1 %'
r<16• 9
??s ? Boa
4
e
N 10' • 1 0 7 r r
1
? '9 lel .ISM !:. ' • vl '` ? ?"li+ '1n'
Z) 3OP-01 -(ON
1.0
n u t• 1
r! TREE LINE
h ZI ,r" '
W U Ir ,h ?•
20,2' 3 Lr p?>v/ ' •'
2 iC,%
BIRD LAND
MARINA ?P
°`
PARKING
/per' % .•.. ?-01.
? N/ _ / ?? 1 ^ {Irrl'?
?P
, g G?q • - ? moo, 1 r ' .,1. ? '
q.
i o tvl
1 i / 6y? - tr „ I ? ^ S
e / fir, °r• I ?t . cb i
B
? i r o wry / / '
i ^ i <
%
0.6
DIVISION OF COASTAL MANAGEMENT,
FIELD INVESTIGATION REPORT AI?K 2 9 1994
1. APPLICANTS NAME: Harbour Recreation Club
2. LOCATION OF PROJECT SITE: the Birdland Marina, on Caracara Drive and the Inner Harbour at
Fairfield Harbour, off NCSR 1600, in Craven County
Photo Index - 1989: 1984: 51-1519,V-9
State Plane Coordinates - X:2608100 Y:486300
3. INVESTIGATION TYPE: CAMA
4. INVESTIGATIVE PROCEDURE: Dates of Site Visit - 2-23-94
Was Applicant Present - Yes
5. PROCESSING PROCEDURE: Application Received - 3-23-94 & 4-19-94
Office - Morehead City
6. SITE DESCRIPTION:
(A) Local Land Use Plan - Craven
Land Classification From LUP - Developed and Conservation
(B) AEC(s) Involved: Public Trust Area
(C) Water Dependent: Yes
(D) Intended Use: Community
(E) Wastewater Treatment: Existing - none
Planned - none
(F) Type of Structures: Existing - Parking lot and pier
Planned - Pier expansion
(G) Estimated Annual Rate of Erosion: NA
Source - Bulkheaded
7. HABITAT DESCRIPTION: [AREA]
DREDGED FILLED OTHER
(A) Vegetated Wetlands
(B) Non-Vegetated Wetlands
Open Water Area
(C) Other
2,880 sq.ft.
(Footprint)
(D) Total Area Disturbed:
(E) Primary Nursery Area: No
(F) Water Classification: 'SC' Open: No
8. PROJECT SUMMARY: The applicant is proposing to expand the Birdland Marina facility from 20
existing slips to 24 (total).
FIELD INVESTIGATION REPORT:
Harbour Recreation Club
PAGE #2
9. NARRATIVE DESCRIPTION: The applicant is a Home Owners Association which
owns an approx. 1.6 acre tract of land adjacent to Caracara Drive and the "Inner
Harbour" in the community of Fairfield Harbour. Fairfield Harbour is located near the
end of NCSR 1600 and is a residential community with numerous man made boating
access canals and basins. These canals and basins are connected to the waters of
Northwest Creek which is a tributary of the Neuse River. Located adjacent to this
property is an approx 170' long x 8' wide pier which provides docking facilities for 20
boats ranging in size from 20 to 40' in length. The pier appears to be located within
the confines of a man-made boat basin area and does not extend into the main water
body. Water depths adjacent to the pier range form -2 to -9' Normal Water Level
(NWL) deep. The upland property is bulkheaded and a gravel parking area is provided
adjacent to the road, approx 70' away from the water. The remaining property is
maintained as a grassed yard area with elevations of approx. 15' above mean sea level
(MSL) in the parking area which slopes down to approx. 5' above MSL at the
bulkhead. The waters adjacent to the pier have been classified as "SC Nutrient
Sensitive Waters" and are closed to the harvesting of shellfish. Bathroom or pump-out
facilities are not provided at this site.
The applicant is requesting a permit to extend the pier facility into the channel for a
distance of approx. 40'. Plans included with the application shows the extension of
two 20' long x 3' wide finger piers with 5 mooring pilings being located approx. 40'
waterward from the existing "T" Head. The pier extension would be located within
the "main channel" but would not extend over one-third its width.
10. ANTICIPATED LMPACTS: The project as proposed will result in the expansion of a
marina facility from 20 to 24 boats. Approx. 2,880 sq. ft. of additional public trust
waters would be occupied by the "footprint" of this addition. It would appear that
navigation would not be adversely impacted either by the pier extension or by the
increase of boats using the water body. The applicant is not proposing any pump-out
or bathroom facilities and have indicated that a pump-out is available at Northwest
Creek Marina which is located approx. 1/2 mile away from this site.
PREPARED BY: CHARLES S. JONES
DATE: April 21, 1994
5 UPLAND DEVELOPMENT
Yomplete this section if the project includes any land
velopment.
a. \Densit mber of buildings, facilities, or
posed
b. ots or parcels
e
c. e the number of residential units and th
d. Size of are a o rade or disturbed
e. If the pro pose -e
acre of land, iv'si
receive an e s o d
least 30 days fo 1
If applicable as s d
control plan en su
Resources?
f. Give the percentage of
mean high water to be i
surfaces, such as paven
will disturb more than one
on of Land Resources must
sedimentation control plan at
and dis rbing activity begins.
imen on and erosion
itte t the Division of Land
within 75 feet of
by impermeable
ldings, rooftops.
g. List the materials, such as ma 1, paver stone, asphalt,
or concrete, to be used for pav d surfaces.
h. If applicable, has a stormwater mkt
been submitted to the Division of E)
Management?
i. Describe proposed sewage disposal
water treatment facilities.
r waste
j. Have these facilities received state or local ?proval?
k. Describe existing treatment facilities.
1. Describe location and type of discharges to waters
the state (for example, surface runoff, sanitary
wastewater, industrial/commercial effluent, "wash
down").
ement plan
ronmental
m. Water supply
n. If the project
the steps that
public beach
)pment, describe
ntain established
de new access.
o. If the project is on the oceanfront, at will be the
elevation above mean sea level of the t habitable
floor?
6 EXCAVATION AND FILL `
INFORMATION
a. Describe below the purpose of proposed excavation
or fill activities (excluding bulkheads, which are
covered in Section 7).
Length Width Depth
Access channel
(MLW) or (NWL)
Boat basin
Other (break-
water, pier,
boat ramp,
rock jetty)
Fill placed in
wetland or below
MHW
Upland fill
areas
b. Amount of material to be excavated from below
water level in cubic yards nt /l?L
c. Type of material /"
d. Does the area to be excavated include marshland,
swamps, or other wetlands?? ///?t
\ e. High ground excavation, in cubic ya
2 12/89
f. Dirt`lensions of spoil disposal area
g. Locatign of spoil disposal area
h. Do you c aim title to the disposal area?
If not, attach a letter granting permission from the
owner.
i. Will a disposal area be available for future
If so, where?
j. Does the disposarea include any marshland,
swamps, or wate areas?
t
k. Will the fill mar-4i N
water?
1. Amount of fil in b
m. Type of fill material _
n. Source of fill material
o. Will fill material be p:
wetlands?
placed below mean high
yards
on marsh or other
p. Dimensions of the wetland o be filled
q. How will excavated or fill ma erial be kept on site
and erosion controlled?
r. What type of construction equipme t will be used
(for example, dragline, backhoe, or ydraulic
dredge)?
nt
s. Will wetlands be crossed in Aimpac'.
to project site? If yes, be taken to lessen environm7 SHORELINE STABILIZATION
a. Length of bulkhead or riprap
b. Average distance waterward of mean. high water or
normal water level
12/89
c. Shoreline erosion during preceding 12 months, in
feet ___41?-,
d. Type of bulkhead material -
e. Amount of fill, in cubic yards, to be placed below
mean high water rv
f. Type of fill material
8 ADDITIONAL INFORMATION
In addition to the completed application form, the follow-
ing items must be submitted:
A copy of the deed (with state application only) or other
instrument under which the applicant claims title to the
affected property. If the applicant is not claiming to be
the owner of said property, then forward a copy of the
decd or other instrument under which the owner claims
title, plus written permission from the owner to carry out
the project.
An accurate work plat (including plan view and cross
sectional drawings) drawn to scale in black ink on an 8
1/2 x 11 white paper. (Refer to Coastal Resources
Commission Rule 7J.0203 for a detailed description.)
Please note that original drawings are preferred and
only high quality copies will be accepted. Blue-line
prints or other larger plats arc acceptable only if 18 high
quality copies are provided by applicant. (Contact the
U.S. Army Corps of Engineers regarding that agency's
use of larger drawings.) A site or location map is a part
of plat requirements and it must be sufficiently detailed
to guide agency personnel unfamiliar with the area to the
site. Include county road (SR) numbers, landmarks, and
the like.
A stormwater management plan, if applicable, that
may have been developed in consultation with the
Division of Environmental Management.
A list of the names and complete addresses of the
adjacent waterfront (riparian) landowners. These
individuals have 30 days in which to submit comments
on the proposed project to the Division of Coastal
Management and should be advised by the applicant of
that opportunity.
I, E I
Name
Address
Name
Address 4,06q- ( 9990, 4V_ nr .
Ale,, Ze ro.) ag54, t
Name ?o /214 Address
lVeto Re:-Ai 79566
A list of previous state or federal permits issued for
work on the project tract. Include permit numbers,
permittee, and issuing dates.
A check for $Winade payable to the Department of
Environment, Health & Natural Resources to cover the
costs of processing the application.
A signed AEC hazard notice for projects in oceanfront
and inlet areas.
A statement on the use of public funds. If the project
involves the expenditure of public funds, attach a state-
ment documenting compliance with the North Carolina
Environmental Policy Act (N.C.G.S. 113A-I to 10).
TO ENTER ON LAND
9 CERTIFICATION AND PERMISSION
Any permit issued in response to this application will
allow only the development described in the application.
The project will be subject to conditions and restrictions
contained in the permit.
I certify that to the best of my knowledge, the proposed
activity complies with the State of North Carolina's ap-
proved Coastal Management Program and will be con-
ducted in a manner consistent with such program.
I further certify that I am authorized to grant, and do in
fact, grant permission to representatives of state and
federal review agencies to enter on the aforementioned
lands in connection with evaluating information related
to this permit application and follow-up monitoring of
project.
This is the `7 iI day of 19AJ/Jii?+.+-?, '19 X ?4- -th4,P A-,L-
Landowner or Authorized agent n
4 12/89
Form DCM-MP-2
MAFJNA
DEVELOPMENT
Attach this form to Joint Application for CAMA Major
Permit. Be sure to complete all other sections of the
Joint Application which relate to this proposed project,
including upland areas, even if duplicative. All shore-
based facilities must be included in application and work
plats.
1 MARINA CHARACTERISTICS
a. Check below the type of marina proposed.
Commercial Public Residential
f. Describe the typical boats to be served (for example,
open runabout, charter boats, sail boats, mixed
types). M/ x" -D T ? S
Typical boat length
Maximum boat length
g
h
i.
Are any floating buildings planned?
If so, describe.
b. Will the marina be open to the general public?
4'4?
c. If there is residential development associated with
the marina, how many units or lots are planned?
d. Check all of the types of service to be provided.
Full service, including travel lift and/or rail
Dockage, fuel, and marine supplies
/Dockage ("wet slips") only
Number of slips' t xis >y iv6
Dry storage
Number of boats
Boat ramp(s)
Other (describe)
C. Check below the proposed type of siting.
Land cut and access channel
Open water with dredging for basin
and/or channel
Open water, no dredging required
Other (describe)
2 MARINA OPERATIONS
a. Check each of the following sanitary facilities which
will be included in the proposed project.
Office toilets
Toilets for patrons
Number
Location
Showers ) t'of?
Boat holding tank pumpoutc,4,?-?
Type and location iv, - r /-,
14
b. Describe treatment type and location for all sanitary
wastewater.
C. Describe solid waste, fish offal, and trash disposal.
FEB 11 1994
4/89
................. -. A*&
5
e.
g
h.
How will overboard discharge of sewage from boats
be controlled?
Give the location and number of "No Sewage
Discharge" signs proposed.
Describe the special design, if applicable, for
containing industrial type pollutants, such as paint,
sandblasting waste, and petroleum products.
ti/rte
Where will residue be disposed of?/rte
Give the number of channel markers and "No Wake"
signs proposed. .-;zl--- :
i. Give the location of fuel handling facilities and
describe the safety measures planned to protect area
waterquality. A"/?
j. Describe design measures that promote boat basin
flushing or circulation and reduce water quality
???/ice
impacts.
k. What will be the marina policy on overnight and
live-board dockage?
1. Is the proposed marina located near any shellfish
leases? /vu If so, give the name and address of
theleaseholder.
m. If this project is an expansion of an existing marina,
what types of services are currently, provided?
n. How many slips are now available?
Note: Regulatory signs such as these require additional
approval by the N.C. Wildlife Resources Commission.
4/89
C
1
Y, J
tl' Ik1 W
(v 17 G(I W
TT
•
n
•
z
_O
Q
U
_E
C>
O
0
w
U)
O
CL
O
Ir
n
z
Q
z
Q
0
z
J
O
Cc
m
1
?t1
C
W
14
Q
W
U
0
U
Q
LL
LL
LL
O
U)
w
n
cc:
0
_z
LL
N
0
z
cf)
0
z
CL
O
c
0
Q
?J
-3,
X7
_per J.. l _ y"•._ - ?"ice - j
T =?4- ?' N S H I P NO 2 y_ _. . bl,
1* x
Xt2
_ .? .c• - -
A t `?
i
? 'gyp 3rd-
N `/)
/3/ Y\_ ...?
J
µ -1
/ 1 T
J - j
10
duet
O
?-
g
110
J
14
?P, ?nE
rI y 71 1.
l
Tip KE 04. .,...
r.?.,
7-17
SCALE 1 "100 FT.
DATC : 3 - z
NORTH
`I
'o.
U 1?
fh.z°' 7S
rrp
i
gd} <1_Wk
'?•Bt
res tf ,[t•ft ? ?
'0p'a
` 11B ,At
3 3
i
}
.T
Q?- 4,
III ?JI
CEO \\ .. .. .:{•iri
•I'a
1 .3
z5W j
Tz-
DI 8
f 1 1
? J --? l s Jl 1a
ez•°ol 1 Il ', ' .1 + s?T 'Vi`i,
lUt-tl -fUN ' ??rT f 1?'?
?• f 1
? I 11f 11 i 11:??j?
? I o 1 `'1111' `r {.I.?
.fie '3?• ? I - II ? ?I I?Y?;r li?)}
.3Gt--11-2UN I ?} 'M ?'p011
} I If ? `fAi??"??
` r' I r ? ? I 11 f Ll?`!1(1
1 ??1f
? N I oU V? 1p}1?-Srl
•1 I ?. y?l+li
? TFlEE LINE '
• W Q
ZI 1
3 ? 1
BIRD LAND
• '?// 11 r 1'1'..
MARINA
a /J/ Ey' ?1
y f
PARKING Of
co I
j y y1' a '?^? :,• t r,. ,:
?. 5 5 .
co 41
y
't + . m / •
i
rll,
P\1? u o• } / hr
c ac no
i
/
?p
r? o
O ,JI
?Q
State of ?North Carolina
D \partment of Environment, Health, and Natural Resources
Wilmiugnon Regional Office
James B Hunt. Governor
tarv
Jonathan B. Howes, Sccre-
FAX COVEN SHEET
Bob Jalniesol
Regional ;Anna-ce
DATE: NO. OF PAGES
F/ C) f -'q -
-t--F- ----6-9,AZ
C0
C 0: FAX #, -?I _5 ?5 3 n -
REMARKS:
FAX #: 1 5,5-0
TUTI-L P.01
127 Cardrnr, firivc Extcn<%on, Wilnwogion. N.C. 29405-354_ • Tclepbont (9i0) 395.3900 • FnP (910) 350.2N04
An Equal Opponmwy °.f`iirmcli?c \?aoc Eo:ploy2r