HomeMy WebLinkAbout2019-07-30 Asheville IAP Effectiveness Mont. ReportDUKE
ENERGY®
July 30, 2019
SUBMITTED VIA ELECTRONIC FTP ONLY
North Carolina Department of Environmental Quality
Division of Water Resources
Attn: Mr. Ted Campbell
Asheville Regional Office
2090 U.S. 70 Highway
Swannanoa, NC 28778
526 South Church Street
Charlotte, NC 28202
Mailing Address:
PO Box 1006
Mail Code EC13K
Charlotte, NC 28201-1006
980 373 6636
Subject: Asheville Interim Action Plan Annual — 2019 Effectiveness Monitoring Report
Dear Mr. Campbell:
Duke Energy Progress, LLC. (Duke Energy) submits herein the 2019 Effectiveness Monitoring
Report which covers the period March 2018 through June 2019 for the one extraction well at the
Asheville Steam Electric Plant. Section 8.6 of the Basis of Design (BOD) Report includes a
requirement to submit an annual report to assess the effectiveness of the extraction system.
The enclosed is meant to fulfill that requirement.
Per the Department of Environmental Quality (DEQ) letter dated April 4, 2019, the due date for
this report was deferred from April 30, 2019 to July 31, 2019. If you have any questions or need
any clarification regarding the information provided, feel free to contact me at
Bryson.Sheetz@duke-energy.com or at 980-373-6636 at your convenience.
Respectfully submitted,
L. Bryson S. Allison
Bryson S. Allison
Environmental Services
Digitally signed by L. Bryson S.
Allison
Date: 2019.07.30 17:23:11-04'00'
cc: Mr. Eric Smith - DEQ Central Office
Mr. Steve Lanter
— DEQ Central Office
Mr. Ed Sullivan -
Duke Energy
Mr. Scott Davies
— Duke Energy
Mr. Grant Barrier
— Duke Energy
Mr. Todd Plating
— Duke Energy
Enc: Asheville Interim Action Plan - 2019 Effectiveness Monitoring Report