HomeMy WebLinkAboutCAMA Annual Report CL_20190730DUKE
ENERGY,
July 30, 2019
SUBMITTED VIA ELECTRONIC FTP ONLY
North Carolina Department of Environmental Quality
Division of Water Resources
Attn: Mr. Ted Campbell
Asheville Regional Office
2090 U.S. 70 Highway
Swannanoa, NC 28778
Subject: Asheville Steam Electric Plant 2018 CAMA Annual Report
Dear Mr. Campbell:
526 South Church Street
Charlotte, NC 28202
Mailing address:
PO Box 1006
Mail Code EC13K
Charlotte, NC28201.1006
980 373 6636
Duke Energy submits enclosed the 2018 CAMA Annual Report prepared by SynTerra
Corporation for the Asheville Steam Electric Plant. This Annual Report documents the
information required by the North Carolina Department of Environmental Quality per the letter
dated May 1, 2017.
Per NCDEQ letter dated April 4, 2019, the due date for this report was deferred from April 30,
2019 to July 31, 2019. If you have any questions or need any clarification regarding the
information provided, feel free to contact me at Bryson.Sheetz@duke-energy.com or at 980-
373-6636 at your convenience.
Respectfully submitted,
Bryson S. Allison
Environmental Services
cc: Mr. Eric Smith - DEQ Central Office
Mr. Steve Lanter — DEQ Central Office
Mr. Ed Sullivan - Duke Energy
Mr. Scott Davies — Duke Energy
Mr. Grant Barrier — Duke Energy
Mr. Todd Plating — Duke Energy
Enc: 2018 CAMA Annual interim Monitoring Report for Asheville Steam Electric Plant, July
2019