Loading...
HomeMy WebLinkAboutNCG080261_Revised COC Ltr_20190730ROY COOPER Governor MICHAEL S. REGAN Secretary S. DANIEL SMITH Director Celadon Trucking William Champine P.O. Box 1806 Hope Mills, NC 28348 NORTH CAROLINA Environmental Qualit), July 30, 2019 Subject: Certificate of Coverage (COC) NCG080261 Taylor Express Incorporated Cumberland County Please see the attached new Certificate of Coverage No. NCG080261 for coverage under Stormwater General Permit NCG080000 for this facility. This permit is reissued pursuant to the requirements of North Carolina General Statute 143-215.1 and the Memorandum of Agreement between the state of North Carolina and the U.S. Environmental Protection Agency, dated October 15, 2007 (or as subsequently amended.) You must print a copy of the new NCG080000 General Permit from our Stormwater General Permits web page: https:Hdeq.nc .uov/about/divisions/energy-minera 1- land- resources/npdes-stormwater-gps. In addition to the full permit, the print package on the website includes revised Discharge Monitoring Report (DMR) forms and Qualitative Monitoring Report Forms. The General Permit authorizes discharges of stormwater, and it specifies your obligations with respect to discharge controls, management, monitoring, and record keeping. Please review the new permit to familiarize yourself with all changes in the reissued permit. Your facility has six (6) months from receipt of the permit to update your Stormwater Pollution Prevention Plan (SPPP) to reflect any new permit requirements. When does electronic DMR (eDMR) reporting start, and does it affect this permit? If activities at this facility ever require analytical monitoring, eDMR will affect you. We are setting up our database with the outfalls that permittees submitted on-line and permit parameters. Permittees will receive notification when our eDMR system is ready for permit -holders to register and begin reporting monitoring data electronically. If you have any questions about the status, please contact Bethany Georgoulias at (919) 707- 3641. Sincerely, porS. Daniel Smith Director cc: Fayetteville Regional Office — M. Lawyer Stormwater Permitting Program � North Carolina Department of Environmental Quality DK ision of Energy, Mineral and Land Resources 1! aEQ 512 North Salisbury Street i 1612 Mail Service Center I Raleigh, North Carolina 27699-1612 pry 919.707.9200 STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENTAL QUALITY DIVISION OF ENERGY, MINERAL, AND LAND RESOURCES GENERAL PERMIT NO. NCGO80000 CERTIFICATE OF COVERAGE No. NCGO80261 STORMWATER DISCHARGES NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM In compliance with the provision of North Carolina General Statute 143-215.1, other lawful standards and regulations promulgated and adopted by the North Carolina Environmental Management Commission, and the Federal Water Pollution Control Act, as amended, Celadon Trucking is hereby authorized to discharge stormwater from a facility located at Taylor Express Incorporated 5417 US 301 South Hope Mills Cumberland County to receiving waters designated as Rockfish Creek, class C waters in the Cape Fear River Basin, in accordance with the effluent limitations, monitoring requirements, and other conditions set forth in Parts 1, 11, Ill, and IV of General Permit No. NCGO80000 as attached. This certificate of coverage shall become effective July 30, 2019. This Certificate of Coverage shall remain in effect for the duration of the General Permit. Signed this 301h day of July 2019. for S. Daniel Smith Director, Division of Energy, Mineral and Land Resources By the Authority of the Environmental Management Commission