HomeMy WebLinkAboutNCG080261_Revised COC Ltr_20190730ROY COOPER
Governor
MICHAEL S. REGAN
Secretary
S. DANIEL SMITH
Director
Celadon Trucking
William Champine
P.O. Box 1806
Hope Mills, NC 28348
NORTH CAROLINA
Environmental Qualit),
July 30, 2019
Subject: Certificate of Coverage (COC)
NCG080261
Taylor Express Incorporated
Cumberland County
Please see the attached new Certificate of Coverage No. NCG080261 for coverage under
Stormwater General Permit NCG080000 for this facility. This permit is reissued pursuant
to the requirements of North Carolina General Statute 143-215.1 and the Memorandum of
Agreement between the state of North Carolina and the U.S. Environmental Protection
Agency, dated October 15, 2007 (or as subsequently amended.)
You must print a copy of the new NCG080000 General Permit from our Stormwater
General Permits web page: https:Hdeq.nc .uov/about/divisions/energy-minera 1- land-
resources/npdes-stormwater-gps. In addition to the full permit, the print package on the
website includes revised Discharge Monitoring Report (DMR) forms and Qualitative
Monitoring Report Forms.
The General Permit authorizes discharges of stormwater, and it specifies your obligations with
respect to discharge controls, management, monitoring, and record keeping. Please review the
new permit to familiarize yourself with all changes in the reissued permit. Your facility has six
(6) months from receipt of the permit to update your Stormwater Pollution Prevention Plan
(SPPP) to reflect any new permit requirements.
When does electronic DMR (eDMR) reporting start, and does it affect this permit?
If activities at this facility ever require analytical monitoring, eDMR will affect you. We
are setting up our database with the outfalls that permittees submitted on-line and permit
parameters. Permittees will receive notification when our eDMR system is ready for
permit -holders to register and begin reporting monitoring data electronically. If you
have any questions about the status, please contact Bethany Georgoulias at (919) 707-
3641.
Sincerely,
porS. Daniel Smith
Director
cc: Fayetteville Regional Office — M. Lawyer
Stormwater Permitting Program
� North Carolina Department of Environmental Quality DK ision of Energy, Mineral and Land Resources
1! aEQ 512 North Salisbury Street i 1612 Mail Service Center I Raleigh, North Carolina 27699-1612
pry
919.707.9200
STATE OF NORTH CAROLINA
DEPARTMENT OF ENVIRONMENTAL QUALITY
DIVISION OF ENERGY, MINERAL, AND LAND RESOURCES
GENERAL PERMIT NO. NCGO80000
CERTIFICATE OF COVERAGE No. NCGO80261
STORMWATER DISCHARGES
NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM
In compliance with the provision of North Carolina General Statute 143-215.1, other lawful
standards and regulations promulgated and adopted by the North Carolina Environmental
Management Commission, and the Federal Water Pollution Control Act, as amended,
Celadon Trucking
is hereby authorized to discharge stormwater from a facility located at
Taylor Express Incorporated
5417 US 301 South
Hope Mills
Cumberland County
to receiving waters designated as Rockfish Creek, class C waters in the Cape Fear River
Basin, in accordance with the effluent limitations, monitoring requirements, and other
conditions set forth in Parts 1, 11, Ill, and IV of General Permit No. NCGO80000 as attached.
This certificate of coverage shall become effective July 30, 2019.
This Certificate of Coverage shall remain in effect for the duration of the General Permit.
Signed this 301h day of July 2019.
for S. Daniel Smith
Director, Division of Energy, Mineral and Land Resources
By the Authority of the Environmental Management Commission